HomeMy WebLinkAboutCITY OF FORT COLLINS UTILITIES CUSTOMER SERVICES BUILDING - PDP - PDP140005 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYt U
Bicycle LOS Worksheet
Level of Service — Connectivity
Minimum Actual --- Proposed
Base Connectivity:
�,
B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320'
j( Destination
{ Area
Classification
Commercial uses in
downtown
Commercial
2
3
4
Cherry
Maple
1
Laporte
aD
c a>
0
7
U @
a)
U @
a)
N
N
v1
(j
O
�
3
U
0
Mountain
2
0
0
m
m
k
Olive
SCALE: 1 "=500'
BICYCLE INFLUENCE AREA
-./i L-DELICH Fort Collins Utilities Block 32 TIS, July 2014
-7 1 r-ASSOCIATES
d
Pedestrian LOS Worksheet
Project Location Classification: Activity Center
Description of Destination Level of Service (minimum based on project tocation classification)
Applicable Destination Area Visual
seec
Area Within 1320' Classification : Directress Continuity Crossings Interest& Security
A,nenties
1
Civic Center
Institutional
Minimum
B
B
C
B
Actual
A
B
A
A
A
Proposed
A
B
A
A
A
2
Commercial uses in
downtown
Commercial
Minimum
B
B
C
B
B
Actual
A
A
B
A
A
Proposed
A
A
B
A
A
3
Neighborhood to the
NW of the site
Residential
Minimum
B
B
C
B
B
Actual
A
B
B
B
A
Proposed
A
B
B
B
A
4
Neighborhood to the
SW of the site
Residential
Minimum
B
B
C
B
B
Actual
A
B
B
B
A
Proposed
A
B
B
B
A
5
Minimum
Actual
Proposed
6
Minimum
Actual
Proposed
7
Minimum
Actual
Proposed
8
Minimum
Actual
Proposed
9
Minimum
Actual
Proposed
10
Minimum
Actual
Proposed
I u 1
,
Cherry
3
Maple
Laporte 2
�m
o U
L v D N
U U
U) 3
0
2
4 Mountain
0
0
m
k
Olive
SCALE: 1 "=500'
PEDESTRIAN INFLUENCE AREA
—•/I L-DELICH Fort Collins Utilities Block 32 TIS, July 2014
f (-ASSOCIATES
APPENDIX G
R 0 e
DURATION OF STAY REPORT Page 2 of 3
From: 08/07/2013 00:00
To: 08/0712013 23:59
Printed on 08/08/2013 16:05
CONTRACT ACTIVITY
Time Categories
% of Total
From
To
Transactions
Transactions
0 hr -
0 hr .30 mn
44
5.18`k
0 hr 30 mn -
I hr
11
129%
1 hr -
I hr 30 mn
18
2.12 %
1 hr 30 mn .
2 hr
31
3.88%a
2 hr -
2 hr 30 mn
27
3.18%
2 hr 30 mn -
3 hr
37
4.35%
3 hr -
4 hr
51
6.00%
4 hr -
5 hr
88
10.35%
5 hr -
6 hr
63
7AM
6 hr -
7 hr
56
6.59%
7 hr -
8 hr
57
6.71 %r,
8 hr -
9 hr
110
12.94%
9 hr -
10 hr
162
19.06%
10 hr -
I I hr
40
4.71 `>'h
11 hr -
12 hr
13
1.53%
12 hr -
13 hr
6
0.11 `,"c
13 hr -
14 hr
3
0.35%
14 hr -
15 hr
4
0.47%
15 hr -
16 hr
3
0.35%
16 hr -
24 hr
14
1.65%
24 hr -
36 hr
3
0.35%
36 hr -
48 hr
2
0.24%i,
48 hr -
60 hr
0
0.00%
60 hr -
72 hr
I
0.12%
72 hr -
99999 hr
4
0.47%
Totals 850 t00-00%
t V I
DURATION OF STAY REPORT Page 1 of 3
Fee Computers, Auto Fay Stations
From: 08/07/2013 00:00
To: 08/0712013 23:59
Printed on 08108/201316:05
TRANSIENT ACTIVITY
Time Categories
% of Total
Total Net
% of Total
Average Net
From
To
Transactions
Transactions
Amount
Amount
Ticket Value
0 hr -
0 hr 30 mn
96
10.71 %
$0.00
0.00%
$0.00
0 hr 30 mn -
I hr
116 - 1
12.9.5%
$0.00
0.00"%
$0.00
I hr -
I hr 30 mn
172
19-20%
$160.00
10.60%n
$0.93
1 hr 30 ma -
2 hr
138
15.40%
$132.00
8.74%
$0.96
2 hr -
2 hr 30 mn
117 .
13.06%
$214,00
14.17%
$1.83
2 hr 30 mn -
3 hr
86
9.60%-
$159.05
10.53%
$1.85
3 hr -
4 hr
69
7.70%
$196.00
12.98%
$2.84
4hr -
S hr
27
3.01%
$108.00
7.15%
$4.00
5 hr -
6 hr
21
234%
$104.00
6.89%
$4.95
6 hr -
7 hr
11
1.23%
$65.00
4.30%
$5.91
7 hr -
8 hr
15
1.67%
$104.00
6.89%
$6.93
8 hr -
9 hr
12
1.34%
$96.00
6.36%
$8.00
9 fir -
10 hr
4
0.45%
$36.00
2.38%
$9.00
10 hr -
I I hr
6
0.6795
$60.00
3.97%
$10.00
11 hr -
12 hr
2
012%
$22.00
1.46%
$11.00
12 hr -
13 hr
1
0.11%
$12.00
0.79%
$12.00
13 hr -
14 hr
2
0.22%
$20-00
1.72%
$13.00
14 hr -
15 hr
0
0.00%
$0.00
0.00%
$0.00
15 hr -
16 hr
0
0.00%
$0.00
0.00%
$0.00
€6hr -
24hr
1
0.11%
$16.00
1.06%
$16.00
24 hr -
36 hr
0
0.00%
$0.00
0A0%
$0.00
36 hr -
48 hr
0
0.00%
$0.00
0.00%
$0.00
48 hr -
60 hr
0
0.00%
$0.00
0.00%
$0.00
60 hr -
72 hr
0
0.00%
$0.00
0.00%
$0.00
7= hr -
99.999 hr
0
0.00%
50.00
0.00%
$0.00
Totals 8% 100.00% $1,510.05 100.00% $1.69
Note: I transaction for a total of $4.00 had a missing entry time and was not included.
< The total amount includes as average amount of $0.05.
COUNT ACTIVITY - DIFFERENTIALS OCCUPIED SPACES (CIVIC CENTER GAR4,GI4,e 1 of]
08/07/2013 00:00 - 08/07/2013 23:59
Printed on 08/08/2013 16:00
Date and Time
Contract
Facility
Transient
08/07/2013 00:00:00
32
61
13
08/07r013 01:00:01
26
54
12
08/07/2013 02:00:01
25
51
10
08/07/2013 03:00.00
15
51
1 fi
08/07/2013 04:00:01
30
35
5
08/07/2013 05:00:00
33
38
5
08/07/2013 06:00:01
40
47
7
08/07/2013 07:000)
67
77
10
08/07/2013 08:000)
234
271
37
08/07/2013 09:00:01
359
441
83
08/07/2013 10:00:01
429
523
96
08/07/2013 11:00:00
461
571
106
08/07/2013 12:00:00
477
614
138
08107rzo 13 13:00:00
461
600
140
08/07/2013 14:00:00
464
587
122
08/07/2013 15:00:00
444
538
94
08/07/2013 16:00:00
410
487
74
08/07/2013 17:00:01
307
385
75
08/07/2013 18:00:01
132
238
10+
08/07/201.1 19:00:00
78
137
142
08/07/2013 20:00:00
64
206
121
08/07/2013 21:00:01
51
126
54
08/07/2013 22:00:00
37
80
21
08/07/2013 23:00:01
33
62
7
Number of Records: 24
APPENDIX F
` u �
Lanes and Geometrics Short Total PM
9: Garage Access & Laporte Avenue
--go-
-N*
C;
Ir
*N
1*
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
tT+
A
M
V
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Ufil. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Frt
0.989
0.870
Fit Protected
0.950
0.998
Satd. Flow (prot)
3500
0
0
1770
1863
1617
0
Fit Permitted
0.950
0.998
Said. Flow (perm)
3500
0
0
1770
1863
1617
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
� U �
HCM 2010 TWSC Short Total PM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 3.1
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, vehm
347
26
24
32
281
7
171
Conflicting Peds, #/hr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
-
None
Storage Length
100
-
0
Veh in Median Storage, #
0
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
408
31
28
38
331
8
201
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
640
439
0
830
219
Stage 1
-
-
-
-
-
424
-
Stage 2
-
-
-
406
-
Critical Hdwy
6.94
4.14
-
6.63
6.93
Critical Hdwy Stg 1
-
-
-
5.83
-
Critical Hdwy Stg 2
-
-
-
-
-
5.43
-
Follow-up Hdwy
-
-
3.12
2.22
-
3.519
3.319
Pot Cap-1 Maneuver
-
-
438
1117
-
324
786
Stage 1
-
-
-
-
-
629
-
Stage 2
-
-
-
-
-
672
-
Platoon blocked, %
-
Mov Cap-1 Maneuver
-
568
568
-
324
786
Mov Cap-2 Maneuver
-
-
-
-
324
-
Stage 1
-
-
629
Stage 2
-
-
672
Approach
EB
WB
NB
HCM Control Delay, s
0
2
11.7
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
744
-
-
568
-
HCM Lane V/C Ratio
0.281
-
-
0.116
-
HCM Control Delay (s)
11.7
-
-
12.2
-
HCM Lane LOS
B
-
-
B
-
HCM 95th %file Q(veh)
1.2
-
-
0.4
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
I A
Lanes and Geometrics Short Total AM
9: Garage Access & Laporte Avenue
--p.
7
xep
~
4\
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
Tj►
♦
V
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Frt
0.962
0.865
Fit Protected
0.950
Satd. Flow (prot)
3405
0
0
1770
1863
1611
0
Fit Permitted
0.950
Satd. Flow (perm)
3405
0
0
1770
1863
1611
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st am. syn
J U ,
HCM 2010 TWSC Short Total AM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 2.1
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, veh/h
292
98
7
157
219
0
13
Conflicting Peds, Whr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
344
115
8
185
258
0
15
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
474
459
0
1028
229
Stage 1
-
-
-
-
-
401
Stage 2
-
-
-
-
-
627
-
Critical Hdwy
-
-
6.94
4.14
-
6.63
6.93
Critical Hdwy Stg 1
-
-
-
-
5.83
-
Critical Hdwy Stg 2
-
-
-
-
-
5.43
-
Follow-up Hdwy
-
-
3.12
2.22
-
3.519
3.319
Pot Cap-1 Maneuver
-
564
1098
-
244
774
Stage 1
-
-
-
-
646
-
Stage 2
-
-
-
531
-
Platoon blocked, %
Mov Cap-1 Maneuver
1054
1054
-
244
774
Mov Cap-2 Maneuver
-
-
-
244
-
Stage 1
-
646
Stage 2
-
531
Approach
EB
WB
NB
HCM Control Delay, s
0
3.9
9.7
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
774
-
-
1054
-
HCM Lane V/C Ratio
0.02
-
-
0.183
-
HCM Control Delay (s)
9.7
-
-
9.2
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
0.1
-
-
0.7
-
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st am.syn
Timing Report, Sorted By Phase Short Total PM
6: Mason Street & Laporte Avenue
--► * t
Phase Number 2 4 6 8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
27
33
27
33
Maximum Split (%)
45.0%
55.0%
45.0%
55.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
27
0
27
End Time (s)
27
0
27
0
Yield/Force Off (s)
21
54
21
54
Yield/Force Off 170(s)
10
43
10
43
Local Start Time (s)
0
27
0
27
Local Yield (s)
21
54
21
54
Local Yield 170(s)
10
43
10
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
HCM 2010 Signalized Intersection Summary Short Total PM
6: Mason Street & Laporte Avenue
�� 4--4N T t ti 1
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
tT#
}
r
4�
*T*
Volume (veh/h)
20
303
24
50
221
17
137
176
53
17
71
13
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.95
0.85
0.94
1.00
0.97
0.97
1.00
0.97
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow,vehmM
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
24
356
17
59
260
0
161
207
50
20
84
6
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
398
1250
59
433
683
581
328
403
88
168
660
44
Arrive On Green
0.73
0.73
0.70
0.37
0.37
0.00
0.45
0.47
0.45
0.45
0.47
0.45
Sat Flow, veh/h
1054
3409
162
945
1863
1583
524
863
188
208
1415
94
Grp Volume(v), veh/h
24
184
189
59
260
0
418
0
0
110
0
0
Grp Sat Flow(s),veh/hlln
1054
1770
1802
945
1863
1583
1575
0
0
1716
0
0
Q Serve(g_s), s
0.7
2.1
2.2
2.7
6.2
0.0
8.2
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
6.8
2.1
2.2
4.8
6.2
0.0
11.4
0.0
0.0
2.1
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.39
0.12
0,18
0.05
Lane Grp Cap(c), veh/h
398
649
661
433
683
581
792
0
0
843
0
0
V/C Ratio(X)
0.06
0.28
0.29
0.14
0.38
0.00
0.53
0.00
0.00
0.13
0.00
0.00
Avail Cap(c_a), veh/h
398
649
661
433
683
581
792
0
0
843
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
0.99
0.99
0.99
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
7.5
5.3
5.4
14.3
14.0
0.0
11.6
0.0
0.0
9.1
0.0
0.0
Incr Delay (d2), s/veh
0.3
1.1
1.1
0.7
1.6
0.0
2.5
0.0
0.0
0.3
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),vehlln
0.2
1.1
1.2
0.8
3.5
0.0
5.7
0.0
0.0
1.2
0.0
0.0
LnGrp Delay(d),s/veh
7.8
6.4
6.5
15.0
15.6
0.0
14.1
0.0
0.0
9.5
0.0
0.0
LnGrp LOS
A
A
A
B
B
B
A
Approach Vol, veh/h
397
319
418
110
Approach Delay, s/veh
6.5
15.5
14.1
9.5
Approach LOS
A
B
B
A
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
27.0
33.0
27.0
33.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
21.0
27.0
21.0
27.0
Max Q Clear Time (g_c+11), s
8.8
4.1
8.2
13.4
Green Ext Time (p-c), s
3.4
3.5
3.5
2.9
Intersection Summary
HCM 2010 Ctd Delay 11.6
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
1. ,
Timing Report, Sorted By Phase Short Total AM
6: Mason Street & Laporte Avenue
Phase Number
—► ~ t
4 6
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
F
Fort Collins Utilities Block 32 6/30/2014 Synchro S Light Report
Delich Associates st am.syn
HCM 2010 Signalized Intersection Summary Short Total AM
6: Mason Street & Laporte Avenue
� 7 � � A, - I y
ql
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
I
tT
T
r
+
4+
Volume (veh/h)
28
355
25
21
182
16
25
38
26
9
57
17
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.94
0.87
0.95
1.00
0.97
0,96
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow,vehrnnn
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
33
418
20
25
214
0
29
45
7
11
67
5
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
555
1593
76
528
869
739
254
371
51
112
572
39
Arrive On Green
0.93
0.93
0.90
0.47
0.47
0.00
0.35
0.37
0.35
0.35
0.37
0.35
Sat Flow, veh/h
1095
3413
163
896
1863
1583
470
1011
140
119
1561
108
Grp Volume(v), veh/h
33
216
222
25
214
0
81
0
0
83
0
0
Grp Sat Flow(s),veh/hAn
1095
1770
1806
896
1863
1583
1621
0
0
1788
0
0
Q Serve(g_s), s
0.4
0.6
0.7
0.9
4.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
4.5
0.6
0.7
1.6
4.2
0.0
1.8
0.0
0.0
1.8
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.36
0.09
0.13
0.06
Lane Grp Cap(c), veh/h
555
826
843
528
869
739
649
0
0
694
0
0
V/C Ratio(X)
0.06
0.26
0.26
0.05
0.25
0.00
0.12
0.00
0.00
0.12
0.00
0.00
Avail Cap(c_a), veh/h
555
826
843
528
869
739
649
0
0
694
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
0.96
0.96
0.96
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
1.7
1.1
1.1
9.2
9.6
0.0
12.7
0.0
0.0
12.7
0.0
0.0
Incr Delay (d2), s/veh
0.2
0.7
0.7
0.2
0.7
0.0
0.4
0.0
0.0
0.4
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.1
0.4
0.4
0.3
2.3
0.0
1.0
0.0
0.0
1.0
0.0
0.0
LnGrp Delay(d),slveh
1.9
1.8
1.9
9.3
10.3
0.0
13.1
0.0
0.0
13.0
0.0
0.0
LnGrp LOS
A
A
A
A
8
B
B
Approach Vol, veh/h
471
239
81
83
Approach Delay, s/veh
1.8
10.2
13.1
13.0
Approach LOS
A
B
B.
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max Q Clear Time (g_c+l1), s
6.5
3.8
6.2
3.8
Green Ext Time (p-c), s
4.2
0.8
4.2
0.8
Intersection Summary
HCM 2010 Ctrl Delay 6.2
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st am.syn
Timing Report, Sorted By Phase Short Total PM
3: Laporte Avenue & Howes Street
Phase Number 2 4 6 8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 3: LaDorte Avenue & Howes Street
s I sm/.%
F
05 'R': 1 eE
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
HCM 2010 Signalized Intersection Summary Short Total PM
3: Laporte Avenue & Howes Street
-♦ `► � z� T to ti 1 d
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
I
4T+
Vi
T+
Vi
T#
I
T*
Volume (veh/h)
31
241
39
51
321
16
56
117
30
17
106
65
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A-pbT)
0.99
0.95
0.99
0.95
0.99
0.97
0.99
0.96
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/h/In
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
36
280
21
59
373
16
65
136
18
20
123
33
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
552
1552
115
562
825
35
490
589
78
495
514
138
Arrive On Green
0.47
0.47
0.45
0.93
0.93
0.90
0.37
0.37
0.35
0.37
0.37
0.35
Sat Flow, veh/h
978
3326
247
1060
1769
76
1211
1606
213
1219
1401
376
Grp Volume(v), veh/h
36
148
153
59
0
389
65
0
154
20
0
156
Grp Sat Flow(s),veh/h/In
978
1770
1804
1060
0
1845
1211
0
1819
1219
0
1777
Q Serve(g_s), s
1.3
2.9
3.0
0.6
0.0
1.5
2.4
0.0
3.5
0.7
0.0
3.7
Cycle Q Clear(g_c), s
2.8
2.9
3.0
3.6
0.0
1.5
6.0
0.0
3.5
4.2
0.0
3.7
Prop In Lane
1.00
0.14
1.00
0.04
1.00
0.12
1.00
0.21
Lane Grp Cap(c), veh/h
552
826
842
562
0
861
490
0
667
495
0
652
V/C Ratio(X)
0.07
0.18
0.18
0.10
0.00
0.45
0.13
0.00
0.23
0.04
0.00
0.24
Avail Cap(c a), veh/h
552
826
842
562
0
861
490
0
667
495
0
652
HCM Platoon Ratio
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
1.00
1.00
1.00
0.93
0.00
0.93
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
9.7
9.3
9.4
1.5
0.0
1.1
15.3
0.0
13.2
14.6
0.0
13.3
Incr Delay (d2), s/veh
0.2
0.5
0.5
0.3
0.0
1.6
0.6
0.0
0.8
0.2
0.0
0.9
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/ln
0.4
1.5
1.6
0.2
0.0
0.8
0.9
0.0
1.9
0.3
0.0
1.9
LnGrp Delay(d),s/veh
9.9
9.8
9.8
1.8
0.0
2.7
15.9
0.0
14.0
14.8
0.0
14.1
LnGrp LOS
A
A
A
A
A
B
B
B
B
Approach Vol, veh/h
337
448
219
176
Approach Delay, s/veh
9.8
2.6
14.5
14.2
Approach LOS
A
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max Q Clear Time (g_c+l1), s
5.0
6.2
5.6
8.0
Green Ext Time (p-c), s
4.8
1.8
4.8
1.7
Intersection Summary
HCM 2010 Ctrl Delay 8.6
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st pm.syn
Timing Report, Sorted By Phase Short Total AM
3: Laporte Avenue & Howes Street
--.
1
*7
t
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
31
29
31
29
Maximum Split (%)
51.7%
48.3%
51.7%
48.3%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
31
0
31
End Time (s)
31
0
31
0
Yield/Force Off (s)
25
54
25
54
Yield/Force Off 170(s)
14
43
14
43
Local Start Time (s)
0
31
0
31
Local Yield (s)
25
54
25
54
Local Yield 170(s)
14
43
14
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st am.syn
HCM 2010 Signalized Intersection Summary Short Total AM
3: Laporte Avenue & Howes Street
Movement
EBL
EST
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
I
T1+
T
T
1*
Volume (veh/h)
63
371
68
66
126
21
27
49
36
15
167
37
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A-pbT)
0.98
0.95
0.99
0.95
0.98
0.98
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, vehmnn
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
72
426
49
76
145
13
31
56
12
17
192
28
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
621
1379
158
432
726
65
479
592
127
611
630
92
Arrive On Green
0.43
0.43
0.42
0.87
0.87
0,83
0.40
0.40
0.38
0.40
0.40
0.38
Sat Flow, veh/h
1196
3182
363
906
1676
150
1135
1481
317
1304
1575
230
Grp Volume(v), veh/h
72
236
239
76
0
158
31
0
68
17
0
220
Grp Sat Flow(s),veh/h/In
1196
1770
1776
906
0
1827
1135
0
1798
1304
0
1805
Q Serve(g_s), s
2.2
5.2
5.3
1.9
0.0
0.9
1.2
0.0
1.4
0.5
0.0
5.0
Cycle Q Clear(g_c), s
3.1
5.2
5.3
7.2
0.0
0.9
6.2
0.0
1.4
1.9
0.0
5.0
Prop In Lane
1.00
0.20
1.00
0.08
1.00
0.18
1.00
0,13
Lane Grp Cap(c), veh/h
621
767
769
432
0
792
479
0
719
611
0
722
V/C Ratio(X)
0.12
0.31
0.31
0.18
0.00
0.20
0.06
0.00
0.09
0.03
0.00
0.30
Avail Cap(c_a), veh/h
621
767
769
432
0
792
479
0
719
611
0
722
HCM Platoon Ratio
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
1.00
1.00
1.00
0.98
0.00
0.98
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
10.8
11.1
11.2
3.7
0.0
2.4
14.4
0.0
11.3
11.8
0.0
12.3
Incr Delay (d2), s/veh
0.4
1.0
1.1
0.9
0.0
0.6
0.3
0.0
0.3
0.1
0.0
1.1
Initial 0 Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.8
2.8
2.8
0.6
0.0
0.5
0.4
0.0
0.8
0.2
0.0
2.7
LnGrp Delay(d),s/veh
11.2
12.2
12.3
4.6
0.0
2.9
14.7
0.0
11.5
11.9
0.0
13.4
LnGrp LOS
B
B
B
A
A
B
B
B
B
Approach Vol, veh/h
547
234
99
237
Approach Delay, s/veh
12.1
3.5
12.5
13.3
Approach LOS
B
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
31.0
29.0
31.0
29.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
25.0
23.0
25.0
23.0
Max Q Clear Time (g_c+l l ), s
7.3
7.0
9.2
8.2
Green Ext Time (p-c), s
4.3
1.6
4.1
1.6
Intersection Summary
HCM 2010 Ctrl Delay 10.6
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates st am. syn
APPENDIX E
Lanes and Geometrics Short Bkgrd PM
9: Garage Access & Laporte Avenue
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
tT+
t
V
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Frt
0.994
0.871
Fit Protected
0.950
0.998
Satd. Flow (prot)
3518
0
0
1770
1863
1619
0
Flt Permitted
0.950
0.998
Satd. Flow (perm)
3518
0
0
1770
1863
1619
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
HCM 2010 TWSC Short Bkgrd PM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 2.6
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, veh/h
344
14
24
20
280
7
140
Conflicting Peds, #/hr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
405
16
28
24
329
8
165
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0 586
421 0
789
211
Stage 1
-
- -
- -
413
-
Stage 2
-
- -
-
376
-
Critical Hdwy
-
- 6.94
4.14
6.63
6.93
Critical Hdwy Stg 1
-
- -
- -
5.83
-
Critical Hdwy Stg 2
-
- -
- -
5.43
-
Follow-up Hdwy
-
- 3.12
2.22 -
3.519
3.319
Pot Cap-1 Maneuver
-
- 476
1135 -
343
795
Stage 1
-
- -
- -
637
-
Stage 2
-
- -
-
693
-
Platoon blocked, %
-
-
Mov Cap-1 Maneuver
-
- 558
558
343
795
Mov Cap-2 Maneuver
-
- -
-
343
-
Stage 1
-
637
Stage 2
-
693
Approach
EB
WB
NB
HCM Control Delay, s
0
1.6
11.3
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBT
EBR WBL
WBT
Capacity (veh/h)
748
- 558
-
HCM Lane V/C Ratio
0.231
- 0.093
-
HCM Control Delay (s)
11.3
- 12.1
-
HCM Lane LOS
B
- B
-
HCM 95th %tile 0(veh)
0.9
- 0.3
-
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
Lanes and Geometrics Short Bkgrd AM
9: Garage Access & Laporte Avenue
(;
%,r
f--
4%
1*
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
+T+
+
V
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Fit
0.970
0.865
At Protected
0.950
Satd. Flow (prot)
3433
0
0
1770
1863
1611
0
At Permitted
0.950
Satd. Flow (perm)
3433
0
0
1770
1863
1611
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb am.syn
HCM 2010 TWSC Short Bkgrd AM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 1.8
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, veh/h
292
73
7
131
216
0
8
Conflicting Peds, #/hr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
344
86
8
154
254
0
9
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
439
429
0
948
215
Stage 1
-
-
-
-
-
386
-
Stage 2
-
-
-
-
-
562
-
Critical Hdwy
-
-
6.94
4.14
-
6.63
6.93
Critical Hdwy Stg 1
-
-
-
-
-
5.83
-
Critical Hdwy Stg 2
-
-
-
-
-
5.43
-
Follow-up Hdwy
-
-
3.12
2.22
-
3.519
3.319
Pot Cap-1 Maneuver
-
-
595
1127
-
274
790
Stage 1
-
-
-
-
-
657
-
Stage 2
-
-
-
-
-
570
-
Platoon blocked, %
-
-
Mov Cap-1 Maneuver
-
-
1077
1077
274
790
Mov Cap-2 Maneuver
-
-
-
-
274
-
Stage 1
-
-
657
Stage 2
-
-
570
Approach
EB
WB
NB
HCM Control Delay, s
0
3.5
9.6
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
790
-
-
1077
-
HCM Lane V/C Ratio
0.012
-
-
0.151
-
HCM Control Delay (s)
9.6
-
-
8.9
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile Q(veh)
0
-
0.5
-
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb am.syn
Timing Report, Sorted By Phase Short Bkgrd PM
6: Mason Street & Laporte Avenue
Phase Number
2 4
47 T
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
27
33
27
33
Maximum Split (%)
45.0%
55.0%
45.0%
55.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
27
0
27
End Time (s)
27
0
27
0
Yield/Force Off (s)
21
54
21
54
Yield/Force Off 170(s)
10
43
10
43
Local Start Time (s)
0
27
0
27
Local Yield (s)
21
54
21
54
Local Yield 170(s)
10
43
10
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
C=
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
6: Mason Street & Laporte Avenue
7 s' t- 4--4\ t t' �► 1 d
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+T+
Vi
+
Ir
4*
4*
Volume (veh/h)
20
290
23
50
220
17
112
173
53
15
71
13
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.95
0.85
0.94
1.00
0.97
0.97
0.99
0.97
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, vehlh/In
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
24
341
16
59
259
0
132
204
49
18
84
6
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
399
1251
58
438
683
581
296
437
95
156
675
45
Arrive On Green
0.73
0.73
0.70
0.37
0.37
0.00
0.45
0.47
0.45
0.45
0.47
0.45
Sat Flow, veh/h
1055
3413
159
957
1863
1583
461
936
204
184
1445
96
Grp Volume(v), veh/h
24
176
181
59
259
0
385
0
0
108
0
0
Grp Sat Flow(s),veh/hAn
1055
1770
1803
957
1863
1583
1601
0
0
1725
0
0
Q Serve(g_s), s
0.7
2.0
2.0
2.6
6.1
0.0
6.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
6.8
2.0
2.0
4.7
6.1
0.0
9.8
0.0
0.0
2.0
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.34
0.13
0.17
0.06
Lane Grp Cap(c), veh/h
399
649
661
438
683
581
801
0
0
846
0
0
V/C Ra6o(X)
0.06
0.27
0.27
0.13
0.38
0.00
0.48
0.00
0.00
0.13
0.00
0.00
Avail Cap(c_a), veh/h
399
649
661
438
683
581
801
0
0
846
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1,00
1.00
Upstream Filter(I)
0.99
0.99
0.99
1.00
1.00
0,00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
7.5
5.3
5.4
14.2
14.0
0.0
11.2
0.0
0.0
9.1
0.0
0.0
Incr Delay (d2), s/veh
0.3
1.0
1.0
0.6
1.6
0.0
2.1
0.0
0.0
0.3
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile Back0fQ(50%),veh/In
0.2
1.1
1.1
0.8
3.4
0.0
5.0
0.0
0.0
1.1
0.0
0.0
LnGrp Delay(d),s/veh
7.8
6.3
6.4
14.9
15.6
0.0
13.3
0.0
0.0
9.4
0.0
0.0
LnGrp LOS
A
A
A
B
B
B
A
Approach Vol, veh/h
381
318
385
108
Approach Delay, s/veh
6.5
15.4
13.3
9.4
Approach LOS
A
B
B
A
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
27.0
33.0
27.0
33.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
21.0
27.0
21.0
27.0
Max Q Clear Time (g_c+l1), s
8.8
4.0
8.1
11.8
Green Ext Time (p-c), s
3.3
3.2
3.4
2.8
Intersection Summary
HCM 2010 CM Delay 11.3
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
r
Timing Report, Sorted By Phase Short Bkgrd AM
6: Mason Street & Laporte Avenue
-61 l t
Phase Number 2 4 6 8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
4-
Fort Collins Utilities Block 32 6/30/2014
Delich Associates
Synchro 8 Light Report
sb am.syn
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
6: Mason Street & Laporte Avenue
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+T
+
r
4+
4)-
Volume (vehlh)
28
333
25
21
179
16
22
37
26
6
56
17
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A-pbT)
0.94
0.87
0.94
1.00
0.97
0.96
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/h/1n
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
33
392
18
25
211
0
26
44
7
7
66
5
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
558
1597
73
539
869
739
241
384
54
88
598
43
Arrive On Green
0.93
0.93
0.90
0.47
0.47
0.00
0.35
0.37
0.35
0.35
0.37
0.35
Sat Flow, veh/h
1098
3421
156
917
1863
1583
438
1047
149
63
1630
116
Grp Volume(v), veh/h
33
202
208
25
211
0
77
0
0
78
0
0
Grp Sat Flow(s),veh/h/In
1098
1770
1808
917
1863
1583
1634
0
0
1809
0
0
Q Serve(g_s), s
0.4
0.6
0.6
0.9
4.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
4.5
0.6
0.6
1.5
4.1
0.0
1.7
0.0
0.0
1.7
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.34
0.09
0.09
0.06
Lane Grp Cap(c), veh/h
558
826
844
539
869
739
652
0
0
698
0
0
V/C Ratio(X)
0.06
0.24
0.25
0.05
0.24
0.00
0.12
0.00
0.00
0.11
0.00
0.00
Avail Cap(c_a), veh/h
558
826
844
539
869
739
652
0
0
698
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
0.96
0.96
0.96
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
1.7
1.1
1.1
9.1
9.6
0.0
12.7
0.0
0.0
12.6
0.0
0.0
Incr Delay (d2), s/veh
0.2
0.7
0.7
0.2
0.7
0.0
0.4
0.0
0.0
0.3
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.1
0.4
0.4
0.3
2.2
0.0
0.9
0.0
0.0
0.9
0.0
0.0
LnGrp Delay(d),s/veh
1.9
1.8
1.8
9.3
10.3
0.0
13.1
0.0
0.0
12.9
0.0
0.0
LnGrp LOS
A
A
A
A
B
B
B
Approach Vol, veh/h
443
236
77
78
Approach Delay, s/veh
1.8
10.2
13.1
12.9
Approach LOS
A
B
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max Q Clear Time (g_c+l1), s
6.5
3.7
6.1
3.7
Green Ext Time (p-c), s
4.0
0.7
4.0
0.7
Intersection Summary
HCM 2010 Chi Delay 6.2
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb am.syn
Timing Report, Sorted By Phase Short Bkgrd PM
3: Laporte Avenue & Howes Street
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 3: Laporte Avenue & Howes Street
4-
fi
o4
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
3: Laporte Avenue & Howes Street
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
tT*
11►
T
T*
Volume (vehlh)
30
233
39
46
303
13
56
117
29
12
105
63
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial 0 (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.99
0.95
0.99
0.95
0.99
0.97
0.99
0.96
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow,veh/hAn
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
35
271
19
53
352
12
65
136
17
14
122
31
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap,veh/h
565
1561
109
569
834
28
493
593
74
496
521
132
Arrive On Green
0.47
0.47
0.45
0.93
0.93
0.90
0.37
0.37
0.35
0.37
0.37
0.35
Sat Flow,veh/h
1000
3344
233
1071
1787
61
1215
1618
202
1220
1420
361
Grp Volume(v), veh/h
35
142
148
53
0
364
65
0
153
14
0
153
Grp SatFlow(s),veh/hAn
1000
1770
1807
1071
0
1848
1215
0
1821
1220
0
1780
Q Serve(g_s), s
1.2
2.8
2.9
0.5
0.0
1.3
2.4
0.0
3.5
0.5
0.0
3.6
Cycle Q Clear(g_c), s
2.5
2.8
2.9
3.4
0.0
1.3
5.9
0.0
3.5
4.0
0.0
3.6
Prop In Lane
1.00
0.13
1.00
0.03
1.00
0.11
1.00
0.20
Lane Grp Cap(c), veh/h
565
826
843
569
0
862
493
0
668
496
0
653
V/C Ratio(X)
0.06
0.17
0.18
0.09
0.00
0.42
0.13
0.00
0.23
0.03
0.00
0.23
Avail Cap(c_a), veh/h
565
826
843
569
0
862
493
0
668
496
0
653
HCM Platoon Ratio
1.00
1.00
1.00
2,00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
1.00
1.00
1.00
0.93
0.00
0.93
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
9.6
9.3
9.3
1.4
0.0
1.1
15.2
0.0
13.2
14.5
0.0
13.2
Incr Delay (d2), s/veh
0.2
0.5
0.5
0.3
0.0
1.4
0.6
0.0
0.8
0.1
0.0
0.8
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
°/wile BackOfQ(50%),veh/In
0.4
1.4
1.5
0.2
0.0
0.7
0.9
0.0
1.9
0.2
0.0
1.9
LnGrp Delay(d),slveh
9.8
9.7
9.8
1.7
0.0
2.5
15.8
0.0
14.0
14.6
0.0
14.1
LnGrp LOS
A
A
A
A
A
B
B
B
B
Approach Vol, veh/h
325
417
218
167
Approach Delay, s/veh
9.8
2.4
14.5
14.1
Approach LOS
A
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max Q Clear Time (g_c+l1), s
4.9
6.0
5.4
7.9
Green Ext Time (p-c), s
4.5
1.8
4.5
1.7
Intersection Summary
HCM 2010 Chi Delay 8.6
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb pm.syn
Timing Report, Sorted By Phase Short Bkgrd AM
3: Laporte Avenue & Howes Street
1 '~ tt
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
31
29
31
29
Maximum Split (%)
51.7%
48.3%
51.7%
48.3%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
31
0
31
End Time (s)
31
0
31
0
Yield/Force Off (s)
25
54
25
54
Yield/Force Off 170(s)
14
43
14
43
Local Start Time (s)
0
31
0
31
Local Yield (s)
25
54
25
54
Local Yield 170(s)
14
43
14
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 3: Laporte Avenue & Howes Street
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb am. syn
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
3: Laporte Avenue & Howes Street
-i 1 4 t `� T �' ls� j d
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
tT*
1
13.
Vi
to
I
T+
Volume (veh/h)
61
353
68
66
124
17
27
48
34
13
167
37
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.98
0.95
0.99
0.95
0.98
0.98
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/hAn
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
70
406
47
76
143
10
31
55
13
15
192
28
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
624
1378
158
443
743
52
479
580
137
611
630
92
Arrive On Green
0.43
0.43
0.42
0.87
0.87
0.83
0.40
0.40
0.38
0.40
0.40
0.38
Sat Flow, veh/h
1202
3179
365
924
1714
120
1135
1450
343
1304
1575
230
Grp Volume(v), veh/h
70
225
228
76
0
153
31
0
68
15
0
220
Grp Sat Flow(s),veh/h/In
1202
1770
1775
924
0
1834
1135
0
1793
1304
0
1805
Q Serve(g_s), s
2.2
4.9
5.0
1.8
0.0
0.8
1.2
0.0
1.4
0.4
0.0
5.0
Cycle Q Clear(g_c), s
3.0
4.9
5.0
6.8
0.0
0.8
6.2
0.0
1.4
1.9
0.0
5.0
Prop In Lane
1.00
0.21
1.00
0.07
1.00
0.19
1.00
0.13
Lane Grp Cap(c), veh/h
624
767
769
443
0
795
479
0
717
611
0
722
V/C Ratio(X)
0.11
0.29
0.30
0.17
0.00
0.19
0.06
0.00
0.09
0.02
0.00
0.30
Avail Cap(c_a),veh/h
624
767
769
443
0
795
479
0
717
611
0
722
HCM Platoon Ratio
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
1.00
1.00
1.00
0.98
0.00
0.98
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
10.7
11.0
11.1
3.6
0.0
2.4
14.4
0.0
11.3
11.8
0.0
12.3
Incr Delay (d2), s/veh
0.4
1.0
1.0
0.8
0.0
0.5
0.3
0.0
0.3
0.1
0.0
1.1
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.8
2.6
2.6
0.5
0.0
0.5
0.4
0.0
0.8
0.2
0.0
2.7
LnGrp Delay(d),s/veh
11.1
12.0
12.1
4.5
0.0
2.9
14.7
0.0
11.6
11.9
0.0
13.4
LnGrp LOS
B
B
B
A
A
B
B
B
B
Approach Vol, veh/h
523
229
99
235
Approach Delay, s/veh
11.9
3.4
12.5
13.3
Approach LOS
B
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
31.0
29.0
31.0
29.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
25.0
23.0
25.0
23.0
Max Q Clear Time (g_c+l1), s
7.0
7.0
8.8
8.2
Green Ext Time (p-c), s
4.1
1.6
4.0
1.6
Intersection Summary
HCM 2010 Ctd Delay 10.5
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates sb am.syn
APPENDIX D
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Land Use (from structure plan)
Other corridors within:
Low density
Intersection type
Commercial
Mixed use
mixed use
All other
corridors
districts
residential
areas
Signalized intersections
0
E'
D
D
(overall)
Any Leg
E
E
D
E
Any Movement
E
E
D
E
Stop sign control
NIA
F"
F"
E
(arterial/collector or local --
any approach leg)
Stop sign control
N/A
C
C
C
(arterial/arterial.
arterial/collector, or
collector/local—any
a roach le )
mitigating measures required
" considered normal in an urban environment
UNSIGNALIZED INTERSECTIONS
Level -of -Service
Average Total Delay
sec/veh
A
<10
B
>10and<15
c
>15and <25
D
>25and <35
E
> 35 and < 50
F
> 50
SIGNALIZED INTERSECTIONS
Level -of -Service
Average Total Delay
sec/veh
A
< 10
B
>10and <20
c
>20and <35
D
>35and <55
E
>55and <80
F
> 80
Lanes and Geometdcs Recent PM
9: Garage Access & Laporte Avenue
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
+T+
A
♦
Y
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Frt
0.994
0.872
Fit Protected
0.950
0.998
Satd. Flow (prot)
3518
0
0
1770
1863
1621
0
Fit Permitted
0.950
0.998
Satd. Flow (perm)
3518
0
0
1770
1863
1621
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
HCM 2010 TWSC Recent PM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 2.6
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, veh/h
327
13
23
19
266
7
133
Conflicting Peds, #/hr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
-
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
385
15
27
22
313
8
156
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
556
400
0
750
200
Stage 1
-
-
392
-
Stage 2
-
-
-
358
-
Critical Hdwy
6.94
4,14
-
6.63
6.93
Critical Hdwy Stg 1
-
-
-
5.83
-
Critical Hdwy Stg 2
-
-
-
5.43
-
Follow-up Hdwy
3.12
2.22
-
3.519
3.319
Pot Cap-1 Maneuver
498
1155
-
363
808
Stage 1
-
-
-
653
-
Stage 2
-
-
-
707
-
Platoon blocked, %
Mov Cap-1 Maneuver
585
585
-
363
808
Mov Cap-2 Maneuver
-
-
-
363
-
Stage 1
-
653
Stage 2
-
707
Approach
EB
WB
NB
HCM Control Delay, s
0
1.6
11
HCM LOS
B
Minor Lane/Major Mvmt
NBLn1
EBT
EBR
WBL
WBT
Capacity (veh/h)
761
-
585
-
HCM Lane V/C Ratio
0.216
-
-
0.084
-
HCM Control Delay (s)
11
-
-
11.7
-
HCM Lane LOS
B
-
-
B
-
HCM 95th %tile Q(veh)
0.8
-
-
0.3
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
Lanes and Geometrics Recent AM
9: Garage Access & Laporte Avenue
--*
7
(FI.
4r-
~
4%
/Ap
Lane Group
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Lane Configurations
+T*
,
t
Y
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
Lane Width (ft)
12
12
12
12
12
12
12
Grade (%)
0%
0%
0%
Storage Length (ft)
0
100
0
0
Storage Lanes
0
1
1
0
Taper Length (ft)
25
25
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
1.00
1.00
Ped Bike Factor
Frt
0.970
0.865
Fit Protected
0.950
Satd. Flow (prot)
3433
0
0
1770
1863
1611
0
Fit Permitted
0.950
Satd. Flow (perm)
3433
0
0
1770
1863
1611
0
Link Speed (mph)
30
30
30
Link Distance (ft)
218
343
261
Travel Time (s)
5.0
7.8
5.9
Intersection Summary
Area Type: Other
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent am. syn
HCM 2010 TWSC Recent AM
9: Garage Access & Laporte Avenue
Intersection
Int Delay, s/veh 1.8
Movement
EBT
EBR
WBU
WBL
WBT
NBL
NBR
Vol, veh/h
279
69
7
125
205
0
8
Conflicting Peds, #/hr
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
-
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
0
0
-
Peak Hour Factor
85
85
85
85
85
85
85
Heavy Vehicles, %
2
2
2
2
2
2
2
Mvmt Flow
328
81
8
147
241
0
9
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
419
409
0
904
205
Stage 1
-
-
-
-
-
369
-
Stage 2
-
-
-
-
-
535
-
Critical Hdwy
-
-
6.94
4.14
-
6.63
6.93
Critical Hdwy Stg 1
-
-
-
-
-
5.83
Critical Hdwy Stg 2
-
-
-
-
-
5.43
-
Follow-up Hdwy
-
3.12
2.22
-
3,519
3,319
Pot Cap-1 Maneuver
-
-
614
1146
-
292
802
Stage 1
-
-
-
-
-
670
-
Stage 2
-
-
-
-
586
-
Platoon blocked, %
-
-
-
Mov Cap-1 Maneuver
-
-
1095
1095
-
292
802
Mov Cap-2 Maneuver
-
-
-
-
-
292
-
Stage 1
-
-
-
670
Stage 2
-
-
-
586
Approach
EB
WB
NB
HCM Control Delay, s
0
3.5
9.5
HCM LOS
A
Minor Lane/Major Mvmt
NBLn1
EST
EBR
WBL
WBT
Capacity (veh/h)
802
-
-
1095
-
HCM Lane V/C Ratio
0.012
-
-
0.142
-
HCM Control Delay (s)
9.5
-
-
8.8
-
HCM Lane LOS
A
-
-
A
-
HCM 95th %tile 0(veh)
0
-
-
0.5
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent am.syn
Timing Report, Sorted By Phase Recent PM
6: Mason Street & Laporte Avenue
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
27
33
27
33
Maximum Split (%)
45.0%
55.0%
45.0%
55.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
27
0
27
End Time (s)
27
0
27
0
Yield/Force Off (s)
21
54
21
54
Yield/Force Off 170(s)
10
43
10
43
Local Start Time (s)
0
27
0
27
Local Yield (s)
21
54
21
54
Local Yield 170(s)
10
43
10
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
�e2
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
HCM 2010 Signalized Intersection Summary Recent PM
6: Mason Street & Laporte Avenue
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
1
0
1
♦
r
*T*
*T*
Volume (veh/h)
19
276
22
48
209
16
107
165
50
14
68
12
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.94
0.85
0.94
1.00
0.97
0.97
0.99
0.97
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/h/In
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
22
325
15
56
246
0
126
194
46
16
80
6
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
408
1253
57
445
683
581
297
437
94
148
682
48
Arrive On Green
0.73
0.73
0.70
0.37
0.37
0.00
0.45
0.47
0.45
0.45
0.47
0.45
Sat Flow, veh/h
1065
3417
157
970
1863
1583
464
937
201
168
1461
102
Grp Volume(v), veh/h
22
167
173
56
246
0
366
0
0
102
0
0
Grp Sat Flow(s),veh/h/In
1065
1770
1804
970
1863
1583
1603
0
0
1731
0
0
Q Serve(g_s), s
0.6
1.9
1.9
2.4
5.8
0.0
5.4
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
6.4
1.9
1.9
4.4
5.8
0.0
9.2
0.0
0.0
1.9
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.34
0.13
0.16
0.06
Lane Grp Cap(c), veh/h
408
649
661
445
683
581
802
0
0
848
0
0
V/C Ratio(X)
0.05
0.26
0.26
0.13
0.36
0.00
0.46
0.00
0.00
0.12
0.00
0.00
Avail Cap(c_a), veh/h
408
649
661
445
683
581
802
0
0
848
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
0.99
0.99
0.99
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
7.3
5.3
5.4
14.1
13.9
0.0
11.0
0.0
0.0
9.1
0.0
0.0
Incr Delay (d2), s/veh
0.2
1.0
1.0'
0.6
1.5
0.0
1.9
0.0
0.0
0.3
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.2
1.0
1.0
0.7
3.2
0.0
4.8
0.0
0.0
1.0
0.0
0.0
LnGrp Delay(d),slveh
7.6
6.3
6.3
14.7
15.3
0.0
12.9
0.0
0.0
9.4
0.0
0.0
LnGrp LOS
A
A
A
B
B
B
A
Approach Vol, veh/h
362
302
366
102
Approach Delay, s/veh
6.4
15.2
12.9
9.4
Approach LOS
A
B
B
A
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
27.0
33.0
27.0
33.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
21.0
27.0
21.0
27.0
Max Q Clear Time (g_c+l1), s
8.4
3.9
7.8
11.2
Green Ext Time (p-c), s
3.2
3.0
3.2
2.7
Intersection Summary
HCM 2010 Ctrl Delay 11.1
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
Timing Report, Sorted By Phase Recent AM
6: Mason Street & Laporte Avenue
Phase Number 2 4 6 8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
and Phases: 6: Mason Street & Laporte Avenue
133 s. _. I �27 e I
F
Oa
Fort Collins Utilities Block 32 6/30/2014
Delich Associates
Synchro 8 Light Report
recent am.syn
HCM 2010 Signalized Intersection Summary Recent AM
6: Mason Street & Laporte Avenue
-. --* r 4--- t 0* `- 1 -4/
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+'*
Vi
+
r
41
41-
Volume (veh/h)
27
317
24
20
170
15
21
35
25
6
53
16
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A-pbT)
0.94
0.87
0.94
1.00
0.97
0.96
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/h/In
1863
1863
1900
1863
1863
1863
1900
1863
1900
1900
1863
1900
Adj Flow Rate, veh/h
32
373
17
24
200
0
25
41
8
7
62
5
Adj No. of Lanes
1
2
0
1
1
1
0
1
0
0
1
0
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
565
1597
72
546
869
739
241
373
65
91
592
45
Arrive On Green
0.93
0.93
0.90
0.47
0.47
0.00
0.35
0.37
0.35
0.35
0.37
0.35
Sat Flow, veh/h
1107
3423
155
933
1863
1583
437
1016
176
68
1615
122
Grp Volume(v), veh/h
32
192
198
24
200
0
74
0
0
74
0
0
Grp Sat Flow(s),veh/h/In
1107
1770
1809
933
1863
1583
1630
0
0
1805
0
0
Q Serve(g_s), s
0.4
0.6
0.6
0.9
3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Cycle Q Clear(g_c), s
4.2
0.6
0.6
1.4
3.8
0.0
1.6
0.0
0.0
1.6
0.0
0.0
Prop In Lane
1.00
0.09
1.00
1.00
0.34
0.11
0.09
0.07
Lane Grp Cap(c), veh/h
565
826
844
546
869
739
651
0
0
697
0
0
V/C Ratio(X)
0.06
0.23
0.23
0.04
0.23
0.00
0.11
0.00
0.00
0.11
0.00
0.00
Avail Cap(c_a), veh/h
565
826
844
546
869
739
651
0
0
697
0
0
HCM Platoon Ratio
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
0.96
0.96
0.96
1.00
1.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
Uniform Delay (d), s/veh
1.6
1.1
1.1
9.1
9.6
0.0
12.7
0.0
0.0
12.6
0.0
0.0
Incr Delay (d2), s/veh
0.2
0.6
0.6
0.2
0.6
0.0
0.4
0.0
0.0
0.3
0.0
0.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.1
0.4
0.4
0.2
2.1
0.0
0.9
0.0
0.0
0.9
0.0
0.0
LnGrp Delay(d),s/veh
1.8
1.7
1.8
9.2
10.2
0.0
13.1
0.0
0.0
12.9
0.0
0.0
LnGrp LOS
A
A
A
A
B
B
B
Approach Vol, veh/h
422
224
74
74
Approach Delay, s/veh
1.7
10.1
13.1
12.9
Approach LOS
A
B
B
8
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max 0 Clear Time (g_c+l1), s
6.2
3.6
5.8
3.6
Green Ext Time (p-c), s
3.7
0.7
3.8
0.7
Intersection Summary
HCM 2010 Ctrl Delay 6.2
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent am.syn
Timing Report, Sorted By Phase Recent PM
3: Laporte Avenue & Howes Street
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
33
27
33
27
Maximum Split (%)
55.0%
45.0%
55.0%
45.0%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
33
0
33
End Time (s)
33
0
33
0
Yield/Force Off (s)
27
54
27
54
Yield/Force Off 170(s)
16
43
16
43
Local Start Time (s)
0
33
0
33
Local Yield (s)
27
54
27
54
Local Yield 170(s)
16
43
16
43
Intersection Summary
Cycle Length
60
Control Type
Actuated -Coordinated
Natural Cycle
45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Laporte Avenue & Howes Street
3s
5 ,
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
HCM 2010 Signalized Intersection Summary Recent PM
3: Laporte Avenue & Howes Street
Movement EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
t'l
T
T+
I
T*
Volume (veh/h)
29
222
37
44
288
12
53
111
28
11
100
60
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.99
0.95
0.99
0.95
0.99
0.97
0.99
0.96
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/h/In
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
34
258
17
51
335
11
62
129
16
13
116
28
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
574
1568
103
578
835
27
500
594
74
503
527
127
Arrive On Green
0.47
0.47
0.45
0.93
0.93
0.90
0.37
0.37
0.35
0.37
0.37
0.35
Sat Flow, veh/h
1017
3360
220
1085
1790
59
1224
1620
201
1229
1437
347
Grp Volume(v), veh/h
34
135
140
51
0
346
62
0
145
13
0
144
Grp Sat Flow(s),veh/h/In
1017
1770
1810
1085
0
1849
1224
0
1821
1229
0
1784
Q Serve(g_s), s
1.1
2.6
2.7
0.5
0.0
1.2
2.2
0.0
3.3
0.4
0.0
3.4
Cycle Q Clear(g_c), s
2.4
2.6
2.7
3.2
0.0
1.2
5.6
0.0
3.3
3.7
0.0
3.4
Prop In Lane
1.00
0.12
1.00
0.03
1.00
0.11
1.00
0.19
Lane Grp Cap(c),veh/h
574
826
845
578
0
863
500
0
668
503
0
654
V/C Rabo(X)
0.06
0.16
0.17
0.09
0.00
0,40
0.12
0.00
0.22
0.03
0.00
0.22
Avail Cap(c_a), veh/h
574
826
845
578
0
863
500
0
668
503
0
654
HCM Platoon Ratio
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter([)
1.00
1.00
1.00
0.94
0.00
0.94
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
9.5
9.2
9.3
1.4
0.0
1.1
15.0
0.0
13.1
14.4
0.0
13.2
Incr Delay (d2), s/veh
0.2
0.4
0.4
0.3
0.0
1.3
0.5
0.0
0.7
0.1
0.0
0.8
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
%ile BackOfQ(50%),veh/In
0.4
1.4
1.4
0.2
0.0
0.7
0.8
0.0
1.8
0.2
0.0
1.8
LnGrp Delay(d),s/veh
9.7
9.7
9.7
1.7
0.0
2.4
15.5
0.0
13.9
14.5
0.0
13.9
LnGrp LOS
A
A
A
A
A
B
B
B
B
Approach Vol, veh/h
309
397
207
157
Approach Delay, s/veh
9.7
2.3
14.4
14.0
Approach LOS
A
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
33.0
27.0
33.0
27.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
27.0
21.0
27.0
21.0
Max Q Clear Time (g_c+ll), s
4.7
5.7
5.2
7.6
Green Ext Time (p-c), s
4.2
1.7
4.2
1.6
Intersection Summary
HCM 2010 Ctrl Delay 8.5
HCM 2010 LOS A
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent pm.syn
Timing Report, Sorted By Phase Recent AM
3: Laporte Avenue & Howes Street
Phase Number
2
4
6
8
Movement
EBTL
SBTL
WBTL
NBTL
Lead/Lag
Lead -Lag Optimize
Recall Mode
C-Max
Max
C-Max
Max
Maximum Split (s)
31
29
31
29
Maximum Split (%)
51.7%
48.3%
51.7%
48.3%
Minimum Split (s)
22
22
22
22
Yellow Time (s)
4
4
4
4
All -Red Time (s)
2
2
2
2
Minimum Initial (s)
4
4
4
4
Vehicle Extension (s)
3
3
3
3
Minimum Gap (s)
3
3
3
3
Time Before Reduce (s)
0
0
0
0
Time To Reduce (s)
0
0
0
0
Walk Time (s)
5
5
5
5
Flash Dont Walk (s)
11
11
11
11
Dual Entry
Yes
Yes
Yes
Yes
Inhibit Max
Yes
Yes
Yes
Yes
Start Time (s)
0
31
0
31
End Time (s)
31
0
31
0
Yield/Force Off (s)
25
54
25
54
Yield/Force Off 170(s)
14
43
14
43
Local Start Time (s)
0
31
0
31
Local Yield (s)
25
54
25
54
Local Yield 170(s)
14
43
14
43
Intersection Summa
Cycle Length 60
Control Type Actuated -Coordinated
Natural Cycle 45
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Laporte Avenue & Howes Street
2 "R�
1
49
♦ ao :R',
I a8
£s
�
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent am. syn
HCM 2010 Signalized Intersection Summary Recent AM
3: Laporte Avenue & Howes Street
-10. Z fe ~ k I t
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
TT
T+
Vi
'j+►
I
1+
Volume (veh/h)
58
336
65
63
118
16
26
46
32
12
159
35
Number
5
2
12
1
6
16
3
8
18
7
4
14
Initial Q (Qb), veh
0
0
0
0
0
0
0
0
0
0
0
0
Ped-Bike Adj(A_pbT)
0.98
0.95
0.99
0.95
0.98
0.98
0.98
0.94
Parking Bus, Adj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Adj Sat Flow, veh/hlln
1863
1863
1900
1863
1863
1900
1863
1863
1900
1863
1863
1900
Adj Flow Rate, veh/h
67
386
44
72
136
9
30
53
12
14
183
25
Adj No. of Lanes
1
2
0
1
1
0
1
1
0
1
1
0
Peak Hour Factor
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
Percent Heavy Veh, %
2
2
2
2
2
2
2
2
2
2
2
2
Cap, veh/h
629
1380
156
454
746
49
489
586
133
613
636
87
Arrive On Green
0.43
0.43
0.42
0.87
0.87
0.83
0.40
0.40
0.38
0.40
0.40
0.38
Sat Flow,veh/h
1210
3186
360
943
1721
114
1146
1464
331
1307
1591
217
Grp Volume(v), veh/h
67
213
217
72
0
145
30
0
65
14
0
208
Grp Sat Flow(s),veh/h/In
1210
1770
1776
943
0
1835
1146
0
1796
1307
0
1808
Q Serve(g_s), s
2.0
4.7
4.8
1.6
0.0
0.8
1.1
0.0
1.4
0.4
0.0
4.7
Cycle Q Clear(g_c), s
2.8
4.7
4.8
6.3
0.0
0.8
5.8
0.0
1.4
1.8
0.0
4.7
Prop In Lane
1.00
0.20
1.00
0.06
1.00
0.18
1.00
0.12
Lane Grp Cap(c), veh/h
629
767
770
454
0
795
489
0
718
613
0
723
V/C Ratio(X)
0.11
0.28
0.28
0.16
0.00
0.18
0.06
0.00
0.09
0.02
0.00
0.29
Avail Cap(c_a), veh/h
629
767
770
454
0
795
489
0
718
613
0
723
HCM Platoon Ratio
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Upstream Filter(I)
1.00
1.00
1.00
0.98
0.00
0.98
1.00
0.00
1.00
1.00
0.00
1.00
Uniform Delay (d), s/veh
10.7
11.0
11.0
3.5
0.0
2.4
14.2
0.0
11.3
11.8
0.0
12.2
Incr Delay (d2), s/veh
0.3
0.9
0.9
0.7
0.0
0.5
0.2
0.0
0.2
0.1
0.0
1.0
Initial Q Delay(d3),s/veh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
°/wile BackOfQ(50%),veh/In
0.7
2.4
2.5
0.5
0.0
0.4
0.4
0.0
0.7
0.2
0.0
2.5
LnGrp Delay(d),s/veh
11.0
11.9
12.0
4.2
0.0
2.8
14.4
0.0
11.5
11.8
0.0
13.2
LnGrp LOS
B
B
B
A
A
B
B
B
B
Approach Vol, veh/h
497
217
95
222
Approach Delay, s/veh
11.8
3.3
12.4
13.2
Approach LOS
B
A
B
B
Timer
1
2
3
4
5
6
7
8
Assigned Phs
2
4
6
8
Phs Duration (G+Y+Rc), s
31.0
29.0
31.0
29.0
Change Period (Y+Rc), s
6.0
6.0
6.0
6.0
Max Green Setting (Gmax), s
25.0
23.0
25.0
23.0
Max Q Clear Time (g_c+l1), s
6.8
6.7
8.3
7.8
Green Ext Time (p-c), s
3.9
1.5
3.8
1.5
Intersection Summary
HCM 2010 CM Delay 10.4
HCM 2010 LOS B
Fort Collins Utilities Block 32 6/30/2014 Synchro 8 Light Report
Delich Associates recent am.syn
APPENDIX C
R = right turn
S = straight
L = left turn
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
L.OVELAND,CO80538
Phone: 970 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/12/2014 Observer: Sue
Day: Thursday Jurisdiction: Fort Collins
Intersection: Laporte/Garage Access
Time
Begins
Northbound:
Southbound:
Total
north/south
Eastbound:
Westbound:
Total
east1west
Total
All
L
s
R
Total
L
S
R
Total
L
S
R
Total
UT
L
S
R
Total
7:30
0
2
2
0
2
50
10
60
2
24
43
69
129
131
7:45
0
2
2
0
2
100
28
128
3
50
68
121
249
251
8:00
0
3
3
0
3
69
18
87
1
25
47
73
160
163
8:15
0
1
1
0
1
60
13
73
1
26
47
74
147
148
7:30-8:30
8
8
0
0
0
0
8
0
279
69
348
7
125
205
0
337
685
693
PHF
+anol
0.67
1 0.67
1 nla
I n/a
I nla
I nla
nla
0.7
1 0.62
1 0.68
1 0.58
1 0.63
1 0.75
1 nla
1 0.7
0.69
4:30
0
35
35
0
35
86
1
87
10
4
69
83
170
205
4:45
2
19
21
0
21
74
2
76
4
3
61
68
144
165
5:00
3
56
59
0
59
96
4
100
4
2
72
78
178
237
5:15
2
23
25
0
25
71
6
77
5
10
64
79
156
181
4:30-5:30
7
0
1 133
1 140
0
0
0
0
140
0
1 327
1 13
1 340
1 23
1 19
1 266 1
0
1 308
648
788
PHF 1
0.58
1 n/a
1 0.59
1 0.59
nla
nla
nla
nla
nla
0.85
0.54
1 0.85
1 0.58
1 0.48
1 0.92
1 nla
1 0.93
0.83
R = right turn
S = straight
I = IPff turn
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: 970 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/12/2014 Observer: Sue
Day: Thursday Jurisdiction: Fort Collins
Intersection: Laporte/Mason
Time
Begins
Northbound: Mason
Southbound: Mason
Total
north/south
Eastbound: Laporte
Westbound: Laporte
Total
east/west
Total
All
L
S
R
Total
L
S
R
Total
L
S
R
Total
L
S
R
Total
7:30
3
5
2
10
0
10
4
14
24
7
58
5
70
5
35
3
43
113
137
7:45
2
6
5
13
2
15
3
20
33
10
121
13
144
8
57
3
68
212
245
8:00
5
6
11
22
1
16
5
22
44
4
75
4
83
4
38
5
47
130
174
8:15
F11
18
1 7
36
3
12
4
19
55
6
63
2
71
3
40
4
47
118
173
7:30-8:30
21
35
25
81
6
53
16
75
156
27
317
24
368
20
170
15
205
573
729
PHF
0.48
0.49
0.57
0.56
0.5
0.83
0.8
0.85
0.68
0.65
0.46
0.64
0.63
0.75
0.75
0.75
0.74
4:30
23
43
11g54
14
3
19
96
5
74
7
86
8
53
8
69
155
251
4:45
19
35
11
16
2
22
87
6
61
5
72
16
45
2
63
135
222
5:00
44
46
14
21
4
28
132
6
83
5
94
12
58
5
75
169
301
5:15
21
41
14
17
3
25
101
2
58
5
65
12
53
1
66
131
232
4:30-5:30
107
165
50
322
14
68
12
94
416
19
276
22
317
48
209
16
273
590
1006
PHF
0.61
0.9
0.89
0.77
0.7
0.81
0.75
0.84
0.79
0.83
0.79
0.84
0.75
0.9
0.5
0.91
0.84
R = right turn
S = straight
L = left turn
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: 970 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9112/2013 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
Intersection: Laporte/Howes
Time
Begins
Northbound: Howes
Southbound: Howes
Total
north/south
Eastbound: Laporte
Westbound: Laporte
Total
east/west
Total
All
L
S
R
Total
L
S
R
Total
L
S
R
Total
L
S
R
Total
7:30
2
7
4
13
2
28
9
39
52
17
86
13
116
8
25
1
34
150
202
7:45
5
6
7
18
1
50
7
58
76
17
97
17
131
22
31
6
59
190
266
8:00
7
16
4
27
4
42
13
59
86
20
91
26
137
15
35
5
55
1aEl
8:15
12
17
17
46
5
39
6
50
96
4
62
9
75
18
27
4
49
1
7:30-8:30
26
1 46
1 32
1 104
12
1 159
1 35
1 206
1 310
1 58
1 336
1 65
1 459
1 63
118 1
16
1 197
656
1 966
PHF
1 0.54
1 0.68
1 0.47
1 0.57
0.6
1 0.8
1 0.61
1 0.87
1
0.73
1 0.87
1 0.63
1 0.84
1 0.72
0.84 1
0.67
1 0.83
0.87
4:30
11
29
15
55
0
23
12
35
90
1
56
12
69
12
62
1
75
144
234
4:45
15
22
6
43
2
29
8
39
82
8
54
11
73
9
74
4
87
160
242
5:00
12
34
5
51
7
24
22
53
104
13
59
9
81
13
86
5
104
185
289
5:15
15
26
2
43
2
24
18
44
87
7
53
5
65
10
66
2
78
143
230
4:30-5:30
53
111
28
192
11
100
60 1
171
363 29
222
37
288
44
288
12
344
632
995
PHF
0.88
0.82
0.47
0.87
0.39
0.86
0.68
1 0.81
0.56
1 0.94
1 0.77
0.89
0.85
0.84
0.6
0.83
0.86
APPENDIX B
N
Cherry
Maple
0
0
u�
in
30%
Site
� �-
40
��
Laporte
L
C
(D
U �
3 0
v`
y �
o �-
=
>_
U
o
Mountain
c
0
(o
(6
Oak
SCALE: 1 "=300'
TRIP DISTRIBUTION Figure 5
—J/ L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
Page 2
-7 1 ['ASSOCIATES
TABLE 2
Trip Generation
AWDTE
AM Peak Hour
PM Peak Hour
Code
Use
Size
Rate
Trips
Rate
In
Rate
Out
Rate
in
Rate
Out
733
Government Office
121
7.75
938
0.54
65
0.07
8
0.24
29
0.55
67
Complex
Employees
733
Government Office
39.633 KSF
27.92
1106
1.97
78
0.24
10
0.88
35
1.97
78
Complex
Average
1022
72
9
32
73
TABLE 2
Trip Generation
AWDTE
AM Peak Hour
PM Peak Hour
Code
Use
Size
Rate
Trips
Rate
In
Rate
Out
Rate
In
Rate
Out
710
General Office
121
3.32
402
0.42
51
0.06
7
0.08
10
0.38
46
Employees
710
General Office
39.633 KSF
11.03
437
1.37
54
0.19
8
0.25
10
1.24
49
Average
420
53
8
10
48
-/I L-DELICH
-71 rASSOCIATES
Fort Collins Utilities Block 32 TIS, July 2014
Page 11
1]nL,D VAIl
n IItAr.E
lil ILDIAf.
ji
- ZMWAI:E
s
BUILDING
R-
A:
R91,=vim
.uru N uLn
AJAX11
wnnm Tx..vM
l N,YIMN RR
Mjk,ill Y W1 V.
rAnrr a r?n
�' Ynnnn •Rll.nnu >� 1 .
cnlR ra.nY � 1
VJuc rt.AY"V.., MAIN 1'.AWL"
L.MFI.n1.L nsNAL1:
IWI f\W
I•IYfL 4 YI•I I•l l):
rATOlnl� w•IrR+
CI: STWMEB 5ERN7CF-%
BOILDING
i�
Ixtcpn
P
Tni 1
`-1
Mlnal
I.LNMr:
. Mv1'M1
!! 'fYYnM.VY
Z
TTFNI W'. - UTANIYI: I n !/
I•PROI YYIM,:tPI: MiG'
F.\TNl pl n'Yn 1l T1LV0
FUU
wA•w- 31M3
.T RLn
11{ nnrnv: '1
, `YI n'enn l
, Ilwmr: t
1 i
411T
3 •n' pTP9f.Y Y.iR,41.f.1. 1•AIM
N
SCALE: 1 "=60'
215 N. MV40N
BITIAINC
ncu,.L•Nr. a
MY.�:NAVILALI rR+
s
1
rl nuc J 1 �
L
W
Ww-
IT u:Yn.
.RW,
YRANNIYr6L wau+FT
t
__—•I IAnnt.AllfMC3
I\ :LLS eN n
1 F1IT@41
r-1
'-A��-•�.40
1.
FTII:RI:RW:I \NNN:II:
nrYR
NILN L\vF
�-
1:1'.WV
13ON
\
t\ YnNiTNNVL
N9"Y
M'F.N.Ye
bllT+:11RL'NT
y
4
•II
',
ail
SITE PLAN
Figure 3
—// I—DELICH Fort Collins Utilities Block 32 TIS, July 2014
—7 1 [—ASSOCIATES Page 7
Fort Collins
Utilities
Block 32
Cherry
Maple
Laporte
aU
a�
0y N
(D a) 0 U U
Mountain
C
0
(n
(Q
Oak
Olive
SCALE: 1 "=500'
SITE LOCATION Figure 1
—_ // L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
—7i [—ASSOCIATES Page 2
f V
city utility building scraping
mailbox:///C:/Users/Matt Deli ch; AppData/Roaming/Thunderbi...
Subject: city utility building scoping
From: Martina Wilkinson <mwilkinson@fcgov.corn>
Date: 5/7/20141:35 PM
To: 'Matt Delich' <matt@de(ichassoc.com>
CC: Seth Lorson <slorson@fcgov.com>
Hey Matt —
We've had some internal cwnversadons aboutthe•city complex and proposed utility building. They really aren't far enough along to do an
CDP style process. So we're moving forward with just the utility building. in terms of scoping the TIS —your trip gen will determine whether
it's an intermediate or full.
Please include the intersections
Mason / Laporte
Howes / Laporte
Parking garage entrance at Laporte
Any other access drives
Please discuss the logic behind the trip gen. If the Info In the trip gen manual is really limited and doesn't seem to fit, then I'm interested in a
solid estimate of trip gen from their own information (number of employees etci. Please also include customers if that is an element of
who's goingto be in the building, For the distribution you'll reed to work with city staff to get an estimate of the percentage of city
employees that utilize the garage....
Finally —the project will need to include a parking demand component. What's the mode split? If very limited parking is to be built, then
where will all the employees park? What percent will use the garage, and what percent will park and walk —and where will that be located?
Hope that gives you enough to go on - you can fill out a BAF using the above information and einail it to me for signature.
As for submittal timeframe — you asked for extra time, and I'm line working within a week of the rest of the submittal, but I can't really
accommodate more than that. If they were planning to submit this week, and you're mere than a week out, *hen you need to visit with the
project team to delay the submittal.
As aways — let me know if you have questians or if I missed anything.
Thanks - martina
From: Matt Delidi [mailto:matt@delichassoc.corrl
Sent: Friday, April 18, 2014 9:13 AM
To: Ward Stanford
Cc: Martina Wilkinson
Subject: Re: Martin's C
Ward,
I will wait to talk to Martina. Seems like they knew they needed a TIS back on March 19, 2014. They came to me on April 16, 2014. Go
figure!! I see this being more than a two week exercise. It is not like we have nothing on our plate and we are just waiting for this project.
Matt
On 4/18/2014 8:56 AM, Ward Stanford wrote:
Matt,
nnartina will make the call but for some input a simple look at the Trip Gen lands it in the full study range, I've attached the Trip
Ger, (Rev 6) for Gov Bldg (130), and Gov Off Complex (733) both providing over 1000 ADT or over 100 Peak trips.
My comments from the PDR include the TIS requirement and also asks for discussion of the larger Civic Center Complex
transportation plans, as they've not done any traffic study for the larger plan. We would like to know how this will tie-in to the
larger scheme. We've advocated for Howes to terminate at Laporte and at Maple, not passing thru the campus.
Attached are the PDR dot's and a the Trip Gen 6 output.
Ward Stanford
Traffic Systems Engineer
Ci tv of Fort Collins
Traffic Operations
1 of 2 5/29/2014 4:04 PM
Attachment "A"
Transportation Impact Study
Base Assumptions
Project Information
Project Name Fort Collins Utilities Block 32
Project Location 222 Laporte Avenue
TIS Assumptions
Type of Study
Full: No
Intermediate: Yes
Study Area Boundaries
North: Laporte Avenue
South: Laporte Avenue
East: Parkins Garai_>e
West: Howes Street
Study Years
Short Range: 2019
Long Range: N/A
Future Traffic Growth Rate
l %/year
1 %/year
Study intersections
1. All access drives
5.
2. Laporte/Howes
6.
3. Laporte/Mason
7.
4. Laporte/Parking Garage
8.
Time Period for Study
AM: 7:00-9:00 PM: 4:00-6:00
Sat Noon: N/A
Trip Generation Rates (see attached)
Per ITE (discuss)
'Drip Adjustment Factors
Passby: N/A
Captive Market: N/A
Trip Distribution (see attached)
North 10%
South 15%
Fast 45%
West 30%
Mode Split Assumptions
10% ped/bike (discuss)
Committed Roadway Improvements
Discuss
Other Traffic Studies
Areas Requiring Special Study
Parking demand
Date: June 25, 2014
Traffic F..naineer: Delich Associates `
Local Entity Engineer: 0 V1 �,t / �1\,%-� _ / G , 2 5 -'�-1
Larimer County Urban Area Street Standards
January 2, 2001
APPENDIX A
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Fort Collins Utilities Block 32 development
on the short range (2019) street system in the vicinity of the proposed development. As a
result of this analysis, the following is concluded:
• The development of the Fort Collins Utilities Block 32 site is feasible from a traffic
engineering standpoint. At full development, the Fort Collins Utilities Block 32
site will generate approximately 920 daily weekday trip ends, 73 morning peak
hour trip ends, and 95 afternoon peak hour trip. Many of these trip ends are
already occurring in the area.
• Current operation at the key intersections is acceptable with existing control and
geometry.
• In the short range (2019) future, given development of the Fort Collins Utilities
Block 32 site and an increase in background traffic, the key intersections operate
acceptably with existing control and geometry in the morning and afternoon peak
hours.
• No additional geometric improvements are recommended/required at the key
intersections.
• Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi -modal transportation guidelines.
1j L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
-7j--ASSOCIATES Page 21
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there is one destination area within
1320 feet of the Fort Collins Utilities Block 32 site, as shown in Appendix F. This
destination area is the commercial uses in downtown. The bicycle level of service is
acceptable. The bicycle LOS Worksheet is provided in Appendix F.
Transit Level of Service
This area is served by transit Routes 5, 8, 9, 14, 18, 81, 91, 92, and the MAX
service. The Downtown Transit Center is located on Mason Street, between Laporte
Avenue and Maple Street. There are transit stops very close to this site.
-/! L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
7 [—ASSOCIATES Page 20
TABLE 5
Parking Generation
Average Peak Period (gam-
851h Percentile Peak Period
Code
,' Use Size
12pm) Parking Demand"
(9am-12pm) Parking Demand
Rate
Vehicles
Rate
Vehicles
I
730
Government Office
121
0.83
100
1.01
122
Building
Employees
730
Government Office
39.633 KSF
4.15
164
6.13
243
Building
Average
132
183
Less 10% pedestrian/bicycle
13
18
Total
119
165
-/I L-DELICH Fort Collins Utilities Block 32 TIS, July 2014
-7rASSOCIATES Page 19
U)
3 0
w
o m
2 �
U
U
Q
N
01
(0
fd
�w - Denotes Lane
SHORT RANGE (2019) GEOMETRY
—/,/ L—DELICH
-T, r—ASSOCIATES
Laporte
Figure 9
Fort Collins Utilities Block 32 TIS, July 2014
Page 18
TABLE 4
Short Range (2019) Total Peak Hour Operation
Intersection
Movement - Level of Service
AM PM
Laporte/Howes
(signal)
EB LT
B
A
EB T/RT
B
A
EB APPROACH
B
A
WB LT
A
A
WB T/RT
A
A
WB APPROACH
A
A
NB LT
B
B
NB T/RT
B
B
NB APPROACH
B
B
SB LT
B
B
SB T/RT
B
B
SB APPROACH
B
B
OVERALL
B
A
Laporte/Mason
(signal)
EB LT
A
A
EB T/RT
A
A
EB APPROACH
A
A
WB LT
A
B
WB T
B
B
WB RT
A
A
WB APPROACH
B
B
NB LT/T/RT
B
B
SB LT/T/RT
B
A
OVERALL
A
B
Laporte/Garage Access
(stop sign)
NB LT/RT
A
B
WB LT
A
B
/; LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-71 rASSOCIATES Page 17
Using the traffic volumes shown in Figure 8, the key intersections operate in the
short range (2019) total condition as indicated in Table 4. Calculation forms for these
analyses are provided in Appendix E. The key intersections operate similar to the
background operation with existing control and geometry in the morning and afternoon
peak hours
Geometry
The short range (2019) geometry is shown in Figure 9. The geometry at the
analyzed intersections is the existing geometry.
Parking Demand
The City of Fort Collins requested a parking demand analysis for the Fort Collins
Utilities Block 32 site. A compilation of parking generation information contained in
Parking Generation, 4th Edition, ITE was used to estimate the parking demand that would
occur by the proposed/expected use at this site. Table 5 shows the peak period (9am-
12pm) parking generation for Fort Collins Utilities Block 32. According to the operator of
the Fort Collins Utilities Block 32 site, of the 121 employees, 73 already work in downtown
Fort Collins at different buildings. With the construction of the Fort Collins Utilities Block 32
building, Howes Street will be restriped to have 72 spaces, which is an increase of 47
spaces that currently exist. In addition to this, there will be 5 parallel spaces for customer
traffic on Laporte Avenue, adjacent to the building. It is likely that most customer traffic will
utilize on -street parking.
It is assumed that most of the employees at the Fort Collins Utilities Block 32 site
will utilize the Civic Center Garage for parking. According to data provided by the Civic
Center Garage (Appendix F), there are a total of 902 spaces in the parking garage. Based
upon an occupied spaces count, the Civic Center Garage had a maximum occupancy of
68% (614 spaces) during the peak period (12pm). That leaves 288 spaces unoccupied.
Based upon the parking generation in Table 5, the Civic Center Garage has adequate
parking spaces available to accommodate the Fort Collins Utilities Block 32 site parking
demand.
Pedestrian Level of Service
Appendix G shows a map of the area that is within 1320 feet of the Fort Collins
Utilities Block 32 site. The Fort Collins Utilities Block 32 site is located within an area
termed as a "activity center," which sets the level of service threshold at LOS B & C for
all measured factors. There are four destination areas within 1320 feet of the proposed
Fort Collins Utilities Block 32: 1) Civic Center; 2) commercial uses in downtown; 3) the
neighborhood to the northwest of the site; and 4) the residential neighborhood to the
southwest of the site. Sidewalks exist along all properties within the pedestrian
influence area. Appendix F contains a Pedestrian LOS Worksheet.
--I;' L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
[—ASSOCIATES Page 16
TABLE 3
Short Range (2019) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM PM
Laporte/Howes
(signal)
EB LT
B
A
EB T/RT
B
A
EB APPROACH
B
A
WB LT
A
A
WB T/RT
A
A
WB APPROACH
A
A
NB LT
B
B
NB T/RT
B
B
NB APPROACH
B
B
SB LT
B
B
SB T/RT
B
B
SB APPROACH
B
B
OVERALL
B
A
Laporte/Mason
(signal)
EB LT
A
A
EB T/RT
A
A
EB APPROACH
A
A
WB LT
A
B
WB T
B
B
WB RT
A
A
WB APPROACH
B
B
NB LT/T/RT
B
B
SB LT/T/RT
B
A
OVERALL
A
B
Laporte/Garage Access
(stop sign)
NB LT/RT
A
B
WB LT
A
B
--/l L--DELICH Fort Collins Utilities Block 32 TIS, July 2014
%, rASSOCIATES Page 15
0
n � � 21/16
126/321
J 1 l 66/51
63/31 1 f
371/241 —�
68139
t; m
NE�
C r f 219/281
16/17
LO rn157/32
—7124 182/221 �7/24
J + �21/50
28/20
355/303 y
25/24
SHORT RANGE (2019) TOTAL
PEAK HOUR TRAFFIC
_-// L-DELICH
-71 [-ASSOCIATES
1 �292/347 -
98/26
m oO
co
co
N Cl) N
M&
N
Figure 8
Fort Collins Utilities Block 32 TIS, July 2014
Page 14
N
0
N N
4/3
2/18
f 3/1
J i
0/5
i
26/12
fff
3/1
2/11�
221131
0/3— Laporte
18/8 i
o
0/1
25/12
h
N
M
N �
M
�
N
N
N
U
U
Q
N
m
(0
(0
f AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC
-/I L--DELICH
- 7 j (-ASSOCIATES
Figure 7
Fort Collins Utilities Block 32 TIS, July 2014
Page 13
A&
N
0
o
3
o
N
2
�
0
c')�°
f 216/280
17/13131/20
16/17
CO f 124/303
' m
f 179/220
7/24
66/46
21 /50
�7/24
'l
61/30 1 T
3531233 y N
68/39
N co
7
28/20 _f
333/290 i
25/23
1 �292/344 �
73/14--\
N N
N M
Al
--mm- AM/PM
SHORT RANGE (2019) BACKGROUND
PEAK HOUR TRAFFIC
Laporte
� o
o �
`m
Figure 6
. _.,/1' L-DELICH Fort Collins Utilities Block 32 TIS, July 2014
-7 [-ASSOCIATES Page 12
&
A
, v
Cherry
i
Maple
0
0
U-3
u�
30%
Site
45%
Laporte
i
L
y
t_
0)
a)0)
E
UL--
3 a
U_ (
rn
LO
0 o
>_
0
=
U
0
Mountain
c
0
U)
m
Oak
SCALE: 1 "=300'
TRIP DISTRIBUTION
_-/>LDELICH
-7 1 [-ASSOCIATES
Figure 5
Fort Collins Utilities Block 32 TIS, July 2014
Page 11
}
Trip Distribution
Directional distribution of the generated trips was determined for the Fort Collins
Utilities Block 32 site using the recent traffic counts at the key intersections and using the
location of the Fort Collins Utilities Block 32 site in Fort Collins. Figure 5 shows the vehicle
trip distribution used for the Fort Collins Utilities Block 32 site. The trip distribution
analysis was agreed to in the scoping emails.
Background Traffic Projections
Figure 6 shows the short range (2019) background peak hour traffic projections
at the key intersections. The traffic at the key intersections was increased at a rate of
one percent per year for the short range (2019) background traffic forecasts.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 5, Figure 7 shows the assignment
of the site generated peak hour vehicle traffic. The site generated vehicle traffic was
combined with the background traffic to determine the total forecasted vehicle traffic at
the key intersections. Figure 8 shows the short range (2019) total peak hour vehicle
traffic at the key intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). The
Laporte/Garage Access stop sign controlled intersection does not meet signal warrants.
Operation Analysis
Operation analyses were performed at the Laporte/Howes, Laporte/Mason, and
Laporte/Garage Access intersections. The operation analyses were conducted for the
short range analysis, reflecting a year 2019 condition.
Using the short range (2019) background peak hour traffic volumes, the key
intersections operate as indicated in Table 3. Calculation forms for these analyses are
provided in Appendix D. The key intersections operate acceptably with existing control
and geometry in the morning and afternoon peak hours.
—/- '—DELICH Fort Collins Utilities Block 32 TIS, July 2014
ASSOCIATES Page 10
STORACK
+R)RAV.E
at ILDING
t
11"4L IkI.11 M TI Ilk
r
'. g"OwI.AnL. l
(3 STOMER
RVILDIM;
Irw
rnRcls
POMMAL 11LIIII
KMz"lNtRk.
WI:■AIPAL A
I"Ilk,ft
WN
A&
N
SCALE: 1"=60'
215 N. MA.M)N
B1 ILDIN't;
C3
13
SITE PLAN Figure 4
-.-/I I DELICH Fort Collins Utilities Block 32 TIS, July 2014
-71 r-ASSOCIATES Pages
A
Ill. PROPOSED DEVELOPMENT
The Fort Collins Utilities Block 32 is a proposed government office building of
39,633 square feet. This building is estimated to have 121 employees. Figure 4 shows
a site plan of the Fort Collins Utilities Block 32. This building will not have its own
parking lot. It is expected that most of the employees in the building will utilize the Civic
Center Parking Garage, located in the southeast quadrant of the Laporte/Mason
intersection. Customers and some of the employees of the Fort Collins Utilities Block
32 will utilize on -street parking in the area. The City of Fort Collins requested a parking
demand analysis, which will be addressed later in this report. The short range analysis
(Year 2019) includes development of the Fort Collins Utilities Block 32 site and an
appropriate increase in background traffic. This building will be part of a larger Civic
Center redevelopment project. The Civic Center redevelopment project will require a
comprehensive transportation impact study. Therefore, the long range (2035) analysis
was not included in this TIS.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9th Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at this site. Table 2 shows the daily and peak
hour trip generation for Fort Collins Utilities Block 32. Government Office Building (Code
730) has very little data for this land use. Therefore, Government Office Complex (Code
733) was used as the land use for trip generation purposes. The average of the employee
and square footage variables was used. Full development of Fort Collins Utilities Block
32 resulted in 920 daily weekday trip ends, 73 morning peak hour trip ends, and 95
afternoon peak hour trip ends.
TABLE 2
Trip Generation
AWDTE
AM Peak Hour
PM Peak Hour
Code
Use
Size
Rate
Trips
Rate
—
In
Rate
Out
Rate
In
Rate
Out
733
Govemment Office
121
7.75
938
0.54
65
0.07
8
0.24
29
0.55
67
Complex
Employees
733
Government Office
39.633 KSF
27.92
1106
1.97
78
0.24
10
0.88
35
1.97
78
Complex
Average
1022
72
9
32
11
73
Less 10% pedestrian/bicycle
102
7
1
3
7
Total
920
65
8
29
66
--/f LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-/1 rASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection
Movement
Level of Service
AM PM
Laporte/Howes
(signal)
EB LT
B
A
EB T/RT
B
A
EB APPROACH
B
A
WB LT
A
A
WB T/RT
A
A
WB APPROACH
A
A
NB LT
B
B
NB T/RT
B
B
NB APPROACH
B
B
SB LT
B
B
SB T/RT
B
B
SB APPROACH
B
B
OVERALL
B
A
Laporte/Mason
(signal)
EB LT
A
A
EB T/RT
A
A
EB APPROACH
A
A
WB LT
A
B
WB T
B
B
WB RT
A
A
WB APPROACH
B
B
NB LT/T/RT
B
B
SB LT/T/RT
B
A
OVERALL
A
B
Laporte/Garage Access
(stop sign)
NB LT/RT
A
B
WB LT
A
B
--/I LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-71 rASSOCIATES Page 7
i ;
3
ca
m
2
�
0
0
L
L
f 205/266
N 16/12
15/16
f 118/288
`O CO
f 170/209
125/19
�J 63/44
�J j
20/48
Cl.7/23
58/29 f r
336/222 y
M CO
65/37 t' —, `NN
(D N � Cl)
27119
317/276 —�
24/22
f- AM/PM
RECENT PEAK HOUR TRAFFIC
_-/I L-DELICH
-71 [-ASSOCIATES
1 �279/327 i
69/13
uo o 0 to m
to N
N M
N
Laporte
C C)
0
N
N
U
U
Q
m
f6
N
Figure 3
Fort Collins Utilities Block 32 TIS, July 2014
Page 6
4
Existing Traffic
Figure 3 shows recent peak hour traffic counts at the Laporte/Howes,
Laporte/Mason, and Laporte/Garage Access intersections. Recent count data at the
Laporte/Howes intersection was obtained by the City of Fort Collins in September 2013.
Recent count data at the Laporte/Mason and Laporte/Garage Access intersections was
obtained in June 2014. Raw count data is provided in Appendix B.
Existing Operation
The Laporte/Howes, Laporte/Mason, and Laporte/Garage Access intersections
were evaluated and the peak hour operation is displayed in Table 1. Calculation forms
are provided in Appendix C. The key intersections are currently operating acceptably
with existing control and geometry in the morning and afternoon peak hours. The
intersections were evaluated using techniques provided in the 2010 Highway Capacity
Manual (2010HCM). A description of level of service for signalized and unsignalized
intersections from the 2010 Highway Capacity Manual and a table showing the Fort
Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C.
The Fort Collins Utilities Block 32 site is in an area termed "downtown district," which
puts the site in the "mixed use district' category. In areas termed "mixed use district,"
acceptable operation at signalized intersections during the peak hours is defined as
level of service E or better for the overall intersection and for any leg or movement. For
unsignalized intersections, acceptable operation during the peak hours is defined as
level of service F or better for any approach leg for an arterial/collector or arterial/local
and level of service C or better for any approach leg for an arterial/arterial,
arterial/collector, and collector/local intersection.
Pedestrian Facilities
There are pedestrian facilities along all streets in this area.
Bicycle Facilities
Bicycle lanes exist within the cross section of Laporte Avenue, Howes Street,
and Mason Street. The Fort Collins Bike Map shows Laporte Avenue, Howes Street,
and Mason Street as "streets with bike lanes."
Transit Facilities
This area is served by transit Routes 5, 8, 9, 14, 18, 81, 91, 92, and the MAX
service. The Downtown Transit Center is located on Mason Street, between Laporte
Avenue and Maple Street.
—IJ LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-7j [—ASSOCIATES Page 5
U)
3 0
N
O N
1,
U
Q
01
f6
(6
676
-ad - Denotes Lane
Laporte
EXISTING INTERSECTION GEOMETRY Figure 2
—// L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
_
j (—ASSOCIATES Page 4
0
r
Fort Collins
Utilities
Block 32
Cherry
Maple
Laporte
Cw
O 7 U m 0)
" °
3 •`v 3 . a�
L
t _ 0
Mountain
c
0
u,
m
Oak
Olive
SCALE: 1 "=500'
SITE LOCATION
—/i L—DELICH
—7/ rASSOCIATES
Figure 1
Fort Collins Utilities Block 32 TIS, July 2014
Page 3
r
II. EXISTING CONDITIONS
The location of the Fort Collins Utilities Block 32 site is shown in Figure 1. It is
important that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial or institutional (church and
government). There are institutional uses surrounding the site. There are commercial
uses east of the site. The site is within the Fort Collins Central Business District. Land
adjacent to the site is flat (<2% grade) from a traffic operations perspective.
Roads
The primary streets near the Fort Collins Utilities Block 32 site are Laporte Avenue,
Howes Street, and Mason Street. The existing geometry at the key intersections is
shown in Figure 2.
Laporte Avenue is to the south of (adjacent to) the Fort Collins Utilities Block 32
site. According to the Fort Collins Master Street plan, Laporte Avenue is classified as a
four -lane arterial between College Avenue and Wood Street. Adjacent to the site, Laporte
Avenue currently has two eastbound through lanes, a center left -turn median lane, and
one westbound through lane. At the Laporte/Howes intersection, Laporte Avenue has
eastbound and westbound left -turn lanes, two eastbound through lanes, and one
westbound through lane. At the Laporte/Mason intersection, Laporte Avenue has
eastbound and westbound left -turn lanes, two eastbound through lanes, one westbound
through lane, and a westbound right-tum lane. The Laporte/Howes and Laporte/Mason
intersections have signal control. The existing speed limit in this area of Laporte Avenue is
30 mph.
Howes Street is to the west of (adjacent to) the Fort Collins Utilities Block 32 site. It
is classified as a two-lane arterial street according to the Fort Collins Master Street plan.
Currently, Howes Street has a two-lane cross section with a center left -turn median lane.
At the Laporte/Howes intersection, Howes Street has northbound and southbound left -turn
lanes and one through lane in each direction. There is parking on both sides of Howes
Street.
Mason Street is to the east of the Fort Collins Utilities Block 32 site. It is classified
as a two-lane arterial street according to the Fort Collins Master Street plan. Currently,
Mason Street has a two-lane cross section. The Burlington Northern Railroad tracks run
down the center of Mason Street. At the Laporte/Mason intersection, Mason Street has all
movements combined into single lanes.
—/y LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-71 rASSOCIATES Page 2
I. INTRODUCTION
This intermediate transportation impact study (TIS) addresses the capacity,
geometric, and control requirements at and near the proposed Fort Collins Utilities Block
32. The proposed Fort Collins Utilities Block 32 is located at 222 Laporte Avenue in Fort
Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
planner (RNL Design) and the Fort Collins Traffic Engineering staff. This study generally
conforms to the format set forth in the Fort Collins transportation impact study guidelines
contained in the "Larimer County Urban Area Street Standards" (LCUASS). Appendix A
contains the Transportation Impact Study Base Assumptions form and related
attachments for Fort Collins Utilities Block 32. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
--/J LDELICH Fort Collins Utilities Block 32 TIS, July 2014
-7 J [—ASSOCIATES Page 1
IRF4961ail LC ;4*1
1. Site Location............................................................................................................. 3
2. Existing Intersection Geometry ................................................................................. 4
3. Recent Peak Hour Traffic.......................................................................................... 6
4. Site Plan.................................................................................................................... 9
5. Trip Distribution.......................................................................................................11
6. Short Range (2019) Background Vehicle Peak Hour Traffic...................................12
7. Site Generated Peak Hour Traffic...........................................................................13
8. Short Range (2019) Total Peak Hour Traffic...........................................................14
9. Short Range (2019) Geometry ................................................................................18
APPENDICES
A. Base Assumptions Packet
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2019) Background Peak Hour Operation
E. Short Range (2019) Total Peak Hour Operation
F. Civic Center Garage Data
G. Pedestrian/Bicycle Level of Service
--//' DELICH
-7/ [—ASSOCIATES
Fort Collins Utilities Block 32 TIS, July 2014
4 ` i
TABLE OF CONTENTS
INTRODUCTION........................................................................................................1
II. EXISTING CONDITIONS.......................................................................................... 2
LandUse.........................................................................................................................2
Roads.............................................................................................................................. 2
ExistingTraffic................................................................................................................. 5
ExistingOperation........................................................................................................... 5
Pedestrians Facilities...................................................................................................... 5
BicycleFacilities..............................................................................................................5
TransitFacilities.............................................................................................................. 5
III. PROPOSED DEVELOPMENT.................................................................................8
TripGeneration............................................................................................................... 8
TripDistribution.............................................................................................................10
Background Traffic Projections.....................................................................................10
TripAssignment............................................................................................................10
SignalWarrants.............................................................................................................10
OperationAnalysis........................................................................................................10
Geometry......................................................................................................................16
ParkingDemand...........................................................................................................16
Pedestrian Level of Service...........................................................................................16
BicycleLevel of Service................................................................................................ 20
Transit Level of Service................................................................................................. 20
IV. CONCLUSIONS/RECOMMENDATIONS.............................................................. 21
LIST OF TABLES
1. Current Peak Hour Operation....................................................................................7
2. Trip Generation.........................................................................................................8
3. Short Range (2019) Background Peak Hour Operation..........................................15
4. Short Range (2019) Total Peak Hour Operation.....................................................17
5. Parking Generation.................................................................................................19
--/J L—DELICH Fort Collins Utilities Block 32 TIS, July 2014
-7.1 [—ASSOCIATES
FORT COLLINS UTILITIES BLOCK 32
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JULY 2014
Prepared for:
RNL Design
1050 17t�' Street, Suite A200
Denver, CO 80265
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
"7, r
Project #1377