Loading...
HomeMy WebLinkAboutRIGDEN FARM FILING SEVENTEEN - PDP - PDP130015 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONShow Receipt Detail Page 1 of 1 RECEIPT CITY OF FORT COLLINS COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 281 N. COLLEGE AVE 970.221.6760 PO BOX 580 970.224.6134 - fax Application: PDP130015 Application Type: Planning/Project Development Plan/NA/NA Address: FORT COLLINS, CO Receipt No. 191136 Payment Method Ref Number Amount Paid Payment Date Cashier ID Received Comments Check 00677519 $11,588.25 04/26/2013 ALOMMEL Owner Info.: Meritage Homes Inc. 6892 South Yosemite Court Ste 1-201 Centennial, CO 80112 Project This is a request to replat portions of Rigden Farm Filing Six. Description: Project Development Fee of 5879.00, Sign posting fee of 50.00, APO label fee of 246.75, Poudre Fire Authority Fee of 250.00, and Transportation Development Fee of 5162.50 paid by Meritage Homes Corp. CH#00677519 https:llalm-v360.fcgov.com/portietslfeelreceiptV iew.do?mode=view&autoPri nt=false&rec... 4/26/2013 City of Transportation Develop�kl Rev ew Fee Da Received/ Paid 3 Fort Collins Total Amid` Project Name: RIGDEN FARM FILING SEVENTEEN Project Location: Located north and south of the intersection of William Date: 4-24-2013 Neale Parkway and Zeigler Road and north and south Type of Submittal of the intersection of Percheron Dr. and Ziegler Road Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due ❑ Overall Development Plan (ODP) $500 each ❑ Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each C Additional round of review $ 500 each F. Annexation 12 Minor Amendment D Major Amendment G Re -zone Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing use, as determined by the current Institute of Transportation Engineers Trip Generation. If the new use does not generate more traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). $20 X _ acres = + $250 = These fees do not include the cost of filing fees for the recording of $250 each the Development Agreement. When a Development Agreement or Amendment Agreement is entered into the Developer shall be $2,500 each responsible for the cost of recording the document. Said filing fees shall be calculated and provided when the signed document is $200 each returned to the City for signatures and filing. Modification to Land Use Code $200 each C Wireless Telecommunication Equipment (WTE) $65 each Road Projects acres (of roadway) X $250 = Vacation of Easement(s) *** # of vacations _ X $400 = C Vacation of Right(s)-of-Way *** # of vacations _ X $800 = Dedication of Easement(s) and/or Right(s)-of-Way *** # of dedications _ X $250 = Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit 5 # of units X S 160 = 800 Multifamily or other residential units $115 per unit # of units X $115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot sq ft X $0.25 = Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre 9.45 acres X $ 250 = 2,362.50 Project fee $2,000 each S7�i10 Total of above amounts 5,162.50 If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + /2 (the amount over 30,000 _ The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP�� cc: Christie White, Engineering Development Review Engineering *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. General Information: Owners Name(s): Meritage Homes, Inc. Street address: 6892 S. Yosemite Court Suite 1-201 City/State/Zip: Centennial, CO 80112 Telephone: 303-406-4323 Fax: Applicants/ Consultants Firm Name: _ JR Engineering / Landmark Planning Contact: Michael Brake Street address: 2900 S. College Suite 3D City/State/ Zip: Fort Collins, CO 80525 Telephone:970.217.4911 Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit fy officials to enter upon the property for purloses of ins�tion. Name 7