HomeMy WebLinkAboutREDTAIL PONDS - PDP - PDP130030 - REPORTS - CITY STAFF• One of the key aspects of the project had been the position and angle of the building
provide separation from the adjacent office building to the south.
23
I
.��[ t u r• I111 rr-rir wr rn �•
—.
IIIIIII�.�_
snv
��� rs semetm u: wrrsssrm -
uu
Ir Il NY �•
Illegal d
'Ll
Here you can see how the detail, massing, color and materials have been use to break up
and cpae down the building on all 4 sides.
22
• Here I want to pint out he progression of color and materials
• We recommended that the colors be a bit more muted, and that brick be added to the
east to balance out the building and add to the feel of quality expected in the TOD
zone.
21
• Here we can see the progression of the form and detail through the process, through
use of
• Recess an projected wall modules, contrasting materials and parapet accents;
• To the south you can see the one story elements where the building gets closer to the
PL.
• I also want to point out the roof parapets, we recommended that the repeating patterns
of steel accents and parapets be broken up a bit, so that the pattern was less uniform.
20
FLY)�77.irrt�r,,uri*\ W
JJ 11
J AJ.1\Y JIL
0
c ryof
Fnrt C'nllin
• A lot of focus on the architecture during D.R.
• White shell building is what was presented at the City neighborhood meeting, and we
can see the progression o breaking down of building faces into modules and breaking
up the roofline with sloped areas and parapet accents.
• Materials are mixed with lap siding, corrugated metal, scored cement panels, and
brick metal accents.
19
• Here I want to point out the progression of the parking design through development
review.
• As part of the modification rested to the TOD standards, the design focussed on
enhancing the parking lot to make it "more urban, more street character with angled
parking, trees in grates, one way narrow drive isles, less drive isle, more landscaped
median, plaza space along the entrance to tie the parking area to the building.
• The standards require that the entrance face the streets and not parking lots, and that
no parking be allowed btw. the front or side of a building.
IN
• This is the plan that was approved in 2006 and has expired.
• Mix of Multi -family and two- family, 51 units total, ten buildings
17
Here are the three buildings located south of Coronado Court
16
Here you can see the closest building to the south.
lr�
Spatial Transition
14
ort�s
rysirzn ew*ialce:ewenx�-em.ur->mrri
xouBelGMmgln
REDTAIL PONDS
swnwenE noesen
SOLAR STUDY
This angle and position also helps with shadowing
13
-11
This angle and position also helps with shadowing
I
MdXPLY15dBI15.I(IM-4®fM Vtl�9.r@VYlM4MgR1M wx_LM. KPry
�TCrY lil on G
'�iS r�m .au 2L6-r]La 9Nn•W
�MYOY�irM.Ya.auwmaiapnW �11�_Y
�OA'�V IauY}ats�y�aMYY � JLCr1
This angle and position also helps with shadowing
Before I get into the highlights of the development review, I want to zoom in a little
closer and point out:
• Right of way that's proposed to be vacated
• Drainage feature to the west
• Existing mature trees along the south portion of Woodleys
_ II3
l
;8J1llGE ACCE6•DR&;
SOUTH COLLEGE _ _. 0
AVENUE ACCESS — ® � wnWl MMO
CONTROL PLAN 01-'£°1O �e
UPDATE - IIIIIIIII « nWWsi
F019:L CPEII %IWY iOFNPVI .
Before I get into the highlights of the development review, I want to zoom in a little
closer and point out:
• Right of way that's proposed to be vacated
• Drainage feature to the west
• Existing mature trees along the south portion of Woodleys
Project Review
Building Orientation &
Site Placement (privacy,
shading, land use
transition)
Parking area design
• Buffering & transition
• Building massing &
detail
Connectivity
Landscaping
Overall Code
compliance
G"t Collns
Public Input:
• Operational — ex: security,
safety, property value,
proximity
• Location / Intensity of Use
Building Height / # Stories
• Building color I appearance
7
• Privacy, amenity locations
• Compatibility — scale, form
mass, height
Fencing
Land height / blocked views
• Trail Lighting Cfty f lllns
Key features I'd like to point out here:
• General Commercial and TOD overlay, surrounded by Urban Estate, Low Density
Residential and POI
• BNSF railroad to the west
• Woodley's to the north and the MAX South transit center
• Redtail Grove Natural Area to the south
• Fossil Blvd. expected to be siganalized in December 2013, early 2014
• Mason trail
• Neighborhoods: W: Applewood, SE: Fossil Creek Meadows, NE: Fairway Estates,
NW: Clarendon Hills
6
Staff Finding, Modifications and
Determination of Infeasibility --
(i) either compliance with Section
3.8.30(D)(1) Block Structure is deemed
infeasible or that the Modification of
Standard to Section 3.8.30(D)(1) Block
Structure is approved and;
• (ii) provided that the Modifications to Section
3.10.3(A) Building Orientation and Section
3.10.4(C) Off -Street Parking are approved.
Forte 't��W=s
5
Summary of Staff Finding --
Project complies applicable standards
and procedures:
• Article 2, Development Review Procedures;
• Division 4.21, General Commercial District (C-G);
And Article 3 — General Development Standards
provided that;
ort
4 Cgllns
Staff Recommendation:
Approval
-Lnl`'s
Key features I'd like to point out here:
• General Commercial and TOD overlay, surrounded by Urban Estate, Low Density
Residential and POI
• BNSF railroad to the west
• Woodley's to the north and the MAX South transit center
• Redtail Grove Natural Area to the south
• Fossil Blvd. expected to be siganalized in December 2013, early 2014
• Mason trail
• Neighborhoods: W: Applewood, SE: Fossil Creek Meadows, NE: Fairway Estates,
NW: Clarendon Hills
Redtail Ponds Permanent
Supportive Housing
Project Development Plan #130024
,-F,�rt`ins