HomeMy WebLinkAboutREDTAIL PONDS - PDP - PDP130030 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSHD PARK BENCH
ONE
NOTES
Lail Designs
1325 N 59th Ave W
Duluth, Minnesota 55807
877-740-3387
www.lolldnigns.com
ANCHOR BOLT IN PLACE
MFG OF HD RECYCLED HOPE
STAINLESS STEEL FASTENERS
loll SITE FURNISHINGS 0r`6" 2'
1 SCALE: 1--V-O" LS54.dwg
7N _%
NOTES:
MFG by;
LANDSCAPE FORMS, INC.
800.521.2545 269.381.3455 FAX
431 LAWNDALE AVENUE, KALAMAZOO, MI 49048
TABLES &CHAIRS
3 SCALE: HITS LS54.dwg
NOTES
1. MODEL: RB 11 1 G
3. MFG BY:
FINISH: CALM STEEL
BRANDIR INTERNATIONAL, INC.
INCROUND ANCHOR MOUNT
521 Fifth Avenue, 171h Floor
2. OR APPROVED EQUAL
New York, NY 10175-1799 USA
800-849-3488
,mBIKE RACK 0'- ems••
LS54.dwg
"k
VICTOR STANLEY
P.O. Drower 330
Dunkirk, Moryland 20754
xww.viclorstanlry.com
STEEL CONST W/ POWDER COAT FIN
COLOR: RAL8022 - BLACK BROWN
ANCHOR BOLT IN PLACE
Pe=`-L<' ALL STAINLESS STEEL FASTENERS
2 LITTER CONTAINER
SCALE: 1 1'-0" LS54.dwq
LAVA ROCK
DRYLAID FIRE BRICK LINING
—NATURAL CAS BURNER - 90.000 BT
—3" T GRANITE COPING - THERMAL
FIN
_CMU 6x8x16
—SST LOCKABLE ACCESS PANEL
PRV, SOLENOID AND SHUT-OFF
—BUFF SANDSTONE VENEER
g�
1' PVC WEEP
CMU 8x12x16
--GAS SUPPLY LINE
—RB PER STRL
SECTION
AFIRE PIT 0-6" 12••
SCALE: 1"=1'-0" LS54.dwg
FCH�A
FORT COLLINS
"DIMING AUTHORITY
REDTAIL PONDS PSH
FORI COU]N>
I IOUSINC ALI II kiR 11)
1715 WEST MOUNTAIN AVENUE
FORT COLLINS, CO. NL521
PHONE: 9/0i16-2910
FAX: 970-221-0921
ARCHITECT:
STUDIOCO\719.I II\ \
3000 ZUNI STREET
DENVER, CO 30211
PNORE: 364774155
FAR 3114"4421
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COLLINS, CO. W522
PHUNE:Sr041117J 12
I\ \
25 OLD TOWN SQUARE SUITE 200
FORT COLLINS, CO.80524
PHONE: 97012T}8aN9
FAX: 970-2254923
STRUCTURAL:
hi:\ \
421 EAST 4TH STREET
LOVELAND, CO.90507
PHONE: 970-087.2420
FAX: 970467449I
MECKAISCAL/PLUMBWG
MOLINT.AIN AIRE
2165 S. IULL II STREET
DOM COLORADO UM
PI101@ i0eie2.71SS
FAS:20S41Q41N1
ELECIRICAL:
WAYNE'S ELECTRIC
21WI WELD000MYMO V
FORFLJrMCO O
P"011 712•IIIll
FA12 51341//6 T
PROJECT NUMBER: 130201.01
DATE: 10/27/13
DRAWN BY: AG
CHECKED BY: BS
APPROVED BY:
SHEET TIP F'
PRODUCT SHEETS
& SITE DETAILS
SHEET NUMBER:
LS54
DIAMOND PRO STRAIGHT FACE BLOCK
COLOR: BUFF
MFG BY ANCHOR BLOCK
DIAMOND STRAIGHT FACE BLOCK
CONIC PAN 9401 E.erso961h Avenue
BPRO
UFF
CAP UNIT Hendn, Colorado 80640
MFG BY ANCHOR BLOCK
a1
9401 E. 961h Avenue
MIN
Henderson, Colorado 80640
MIMONDPR00CEOSYNTHETX;
�pCK
REINf-TYP
CAP BLOCK
SLOPE VARIES
112" FREE -DRAINING AGGREGATEpIAMONDPRO
BLOCK
12 INCHES FREE-
FI OSYNTFE71C REINF-TYP
AGGREGATE
G
GRADEDRAINING
GRADE
4. 00. DRAIN TILE (EL.
VARIES)
4.0 DRAIN TILE (DAYLIGHT THRU
i17 T T
WALL FACE EVERY 50 FT.)
6
6
6• MINIMUM COMPACTED REPRESERTATN
2'-D• 6• MIN COMPACTED GRANULAR -BASE
2•_0• GRANULAR -BASE
LEVELING PAD
LEVELING PAD
RASE BLOCK WALL ,
MSE
BLOCK GRAVITY WALL
o
1
Scale i/2'•=1'-O" LS53.dwg
Scale:
1/2"=1'-0" 553dwg
STL ANGLE-1.5x2.54 —
CONT
FLATTENED EXPANDED
METAL, PLAIN STEEL HOT
ROLLED, 1/2 113 CA
FLATTENED, 52Z OPEN
AREA
N
b
HISS POST - 2x2sY4 O
B'-O'• LUX
STL FLAT BAR-1.5,Y -
CONT
STL ANGLE-IxIA -
CONT, NOTCH AT POST
10" DU CONIC POST FTC
ALL FENCE METAL SHALL BE HD
GALV WITH BLACK POWDER COAT
SECTION FIN, 4 MIL MIN
EXPANDED METAL IMAGES
METAL FENCE u 1.i'
4 Scale: 1/2"=l'-O" LS53.dwg
FCHA
FORT COLLINS
HOUSING AUTHORITY
REDTAIL PONDS PSH
FORT COLLINS
I IOLLSINCIAU IHORM
FORT COLLINS, CO. 80521
PHONE: 9704163910
FAX: 970-2214821
ARCI IECT:
STUDIO COMI'LI.I I\ ,\
30N23NI STREET
IIE RIM CO, U211
PHONE: 3034fl 9155
FAX 3034TY4426
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COLLINS, CO.90572
PHONE 9704117-3612
CIVIL:
1\ \
25 OLD TOWN SQUARE SUITE 2D0
FORT COLLINS, CO.90524
PHONE 9/0.225.9099
FAX: 970-225-6923
STRUCTURAL=
KMA
421 EAST 4TH STREET
LOVELAND, CO.90537
PHONE: 910E67-2426
FAX 97=7-2493
MECHAWCAL/PLUMBINQ
MOLIKGUN ,\IIU
211115 S. KALAMATH STREET
DENVE , COLORADO KIM
PHDNE:303462-M
FAX: 303.962,Ml
ELECTRICAL_:
NI ELEC 11, h
2101 WELD COUNTY ROAD 21
FORT LUPTON, CO 90521
PHONE: 3034i59-7461
FAX 3034"T1
REVISION.
PROJECT NUMBER
130201.01
DATE:
10/27/13
DRAWN BY
AG
CHECKED BY:
BS
APPROVED BY:
SHEET TIRE:
SITE DETAILS AND
PRODUCT SHEETS
SHEET NUMBER:
LS53
SECTION A -A
PLAN
COURT
Scale:
E BEYOND WALL (DASHED)
PT WOOD RETAINING WALL
PVMTe
BUFF BREEZE - 4" D
AGG BASE W/ 4" PERF
PIPE SUBDRAIN
TURF
73'-0*
WALL DOWN PA PA
PT WOOD RETAINING WALL e
5
PVMT 3®
0 1' 24'
LS52.dwq
FCHA
FORT COLLINS
HOU SING AUTHOSIT•
REDTAIL PONDS PSH
FORT COLLINS
HOLLSING AUTHORITY
U1SINEST MOUNTAIN AVENUE
FORT COLLINS, 00. E0521
PM FAX:
AX: STO-2214821
fAK:9T0�221-0EI7
ARCHITECT:
STUDIO CO,M111.1-:I I\':\
ON ZUNI STREET
DOMRR CO EOII I
PHONE: 3034774155
FAX 203177442E
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COWNS, CO. S0522
PHONE: 910-0174612
1\ \
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.50524
PHONE: 91DZM.9099
FAX 970-225-6923
STRUCTURAL-
M CA
421 EAST 4TH STREET
LOVELAND, CO.$0537
PHONE: 970487-2425
FAX 9704614493
MECHANICAL/PLUMBING:
MOLINI:\IN AIRI.
2165 S. KALAMATH MEET
DENVER COLORADO E0223
PHONE: 3034624M
FAX: 303462a991
ELECTRICAL;
WAYNES ELECTRIC
aBSimcoumNOAB22
FORTLUPTOKCONM
ffIM: 3134WAI
FAX' 3011464411T
PROJECT NUMBER 130201.01
DATE: 10/27/13
DRAWN BY: AG
CHECKED BY: BS
APPROVED BY:
SHEET Tm F
SITE DETAILS
SHEET NUMBER:
LS52
0
NOTES _
1. ALL SITE CONCRETE SHALL BE 4,000 PSI 0 28-DAYS.
2. WATER/CEMENT RATIO SHALL BE 0.45 MAX
3. TYPICAL PEDESTRIAN PAVEMENT THICKNESS SHALL BE 4" D.
4. ALL WALKWAYS 18'-0" SHALL BE 6" D.
1/0" R
1/8" R //--SLAL#V41 /-1/B" R
o EXP JT
\ MATERIAL
1 ••
18 1/3D'
c-
°.•. 4 T. 1/3 Do,
#I- r
CONTROL JOINT (CJ EXPANSION JOINT (EJ) CONSTRUCTION JOINT
1 CONCRETE JOINTS D~- 1 2�"
LS51.dwg
AREA
SURFACE
(2) CONT
TROWEL SCORE O 2'-0- OC MAX
AND 0 ALL CORNERS •135'
TROWEL FIN TOP
MOW STRIP _
� SCALES 1 1/2"=1'-0" LSSl.dwg
2X4 TREK EDGER e
FLAGSTONE - 1-" T MIN
POLYMERIC JOINT SAND
SAND SETTING BED - 1"D
-I
a
AGGREGATE BASE
SUBBASE
NOTE: NOT FOR HEAVY TRAFFIC
STONE PAVEMENT 0� 61 12'•
In
4G SCALE- 1 1/2"=1'-O" LS51.dwg
`,+--TOOLED NOSING 'V' NOTCH
#4 REINF CONT 0 NOSING
e1 )¢" CLR
° / I
e
� I
SCALE: 3*-1 AID" I
\\ I x 1`—t
\ i�'♦z +
If
mom. In-=
1/2" DIA X 12" DOWEL 0 18"
OC - SLEEVE ONE SIDE ONLY
1/2" DIA X 12" DOWEL O 18"
OC - SLEEVE ONE SIDE ONLY
EXPANSION JOINT - CONT
14 REINF 012" OC EA WAY
1. ALL RISER (R) HT TO BE EO
2. ALL TREADS SHALL BE 16"
3. MEDIUM BROOM FINISH ON ALL EXPOSED
HORI SURFACES PARALLE TO NOSING
/ G STAIRS 0~fi 2..
SCALE: 1 "oo1'-O" LS51.dwg
I
f^ACP PT WOOD STAKE -
II
I
2x4 TREK EDGER
IE" MINUS CRUSHER FINES
COMPACTED SUBGRADE
0 24" OC
NOTES
1. EDGE RESTRAINT WITH 2X4 TREX BOARDS STAKED AT 24-INCH O.C.
ICI: FASTENED 2x2x18" STAKES WITH TWO (2) 2)" SSTL WOOD SCREWS AT
EACH STAKE.
2. COUPLING SHALL BE 3"X12"106" MARINE GRADE PLYWOOD, FASTENED WITH
EIGHT (8) 2" SSTL WOOD SCREWS, FOUR (4) ON EACH SIDE OF SPLICE.
3. RECESS STAKES AND COUPLING PLYWOOD �" BELOW TOP OF EDGER.
4. CRUSHER FINES SHALL BE A UNIFORMLY BLENDED COMPOSITION OF 75%
AASHTO M 43, NO. 8 COURSE AGGREGATE AND 25X AASHTO M6 FINE
AGGREGATE AS DEFINED IN CDOT STANDARD SPECIFICATIONS, TABLE 703-1.
n- AGGREGATE PAVEMENT 0 6*' 12 •
SCALEI 1 1/2"=1'-0" LSSl.tlwg
TERRACE PVMT
PVMT - BEYOND
FRENCH DRAIN W/4" PVC PERF PIPE
- DAYLIGHT SOUTH OF SIDEWALK. LINE
WITH DRAIN FABRIC h FILL W/ 50%
SAND, 50% TOPSOIL BY VOL.
RIVER COBBLE; 3"-6" DIA, 5" D
CIP CONIC WALL
CIP CONC PAVEMENT
z
a�
STAIR - BEYOND®
PUNTING BED
CONC EDGER-6"x6"e
TURF
RAMP SECTION a 1. 2
0 Scale: 1/21'-1'-OII LS51.dwg
RECESS ROD 1 1/2"
EASE ALL EXPOSED EDGES
3/4" GALV STL ROD - TWO
PER TIMBER. ROD TO BE
DRIVEN THRU 3 TIMBERS MIN
6"x8" ACO PT TIMBER
FIN GRADE
4" COMPACTED AGG
COMPACTED SUBGRADE
3/4" GALV STL ROD ANCHOR
TO BE DRIVEN THRU 2 TIMBERS
AND 3'-0" MIN INTO SUBGRADE
7 BOCCE COURT WALL DT�f1„
SCN.F 1"=1'-0" L551.dwg
FC HA
FORT COLLINS
HOUSING AU!HOIITV
REDTAIL PONDS PSN
PORT COLL.INS
HOUSING .1uTLiORFTI
17151MPST MOUNTAINAVENUE
FORTCOLLINS, CO.NS21
PJK3N8: 0718,'810
FAIL• p11O1
ARCHITECT:
51UUI�4 �?VIPLI IIA \
3000 ZUNI STREET
DENVER.Co00271
PHONE:=14774155
FAX: 3034774428
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COLLINS, CO.80522
PHONE: 970417J812
1\ \
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.11M
PHUNE:979425410N
FAIL 970.2254M
STRI3CTURALS
T:I SSA
421 EAST 4TH STREET
LOVELAND, CO. S0531
PHONE: 970467-2426
FAX: 970-667,2493
MECHANCAL/PLUMBING,
VOUNI \IN ,\II"I_
2155 S. KALAMATH STREET
DENVER COLORADO 80223
PNONE: 363 41990
FAX: 303-862J891
ELECTRICAL*
WA) NF5 R.FCTP IC
2101 WELD COUNTY ROAR 27
FORT LUPTON, CO 80821
PHONE: 303459-7431
FAX 303454-0811
REVISION:
PROJECT NUMBER
DATE:
DRAWN BY
CHECKED BY:
APPROVED BY
130201.01
10/27/13
AG
BS
SHEET TIT F
STTF DETAILS
SHEET NUMBER:
LS51
BUILDING OVERHANG EXISTING GRADE
BOCCE COURT
PAVEMENT
SCHEDULE
AGGREGATE PATHIG
El
CONCRETE PAVEMENT - Standard grey concrete with medium brooms
finish perpendicular to path of travel. Four inch depth with
PLAN SHADE SHELTER
5010LLRTAMP
Sfibermesh
unless subject to vehicular loads.
PROPOSED5005 GRADE 4
PERIMETER FENC�
19
DECORATIVE CONCRETE PAVEMENT - Integral color concretewit5t
medium broom knish perpendicular to path of travel. Fournch
e
1 _ _ _ _ _
MSE BLOCK WAL 9
depth with libermesh unless subject to vehicular loads5000
- _y"
4995
`
®
FLAGSTONE PAVING - Sand set 1 3/4 inch thick sandstone povers
on 5/8-inch minus lase. Joint sand sholl include a polymeric
e
binder. Edge restraint with 2x4 TREX boards staked at 24-inch
4990
_ _ -
_
O.C.
'-0'G'-O' 2X. 19" 22'-8" 12'-7"
�
AGGREGATE PATH - Compacted 5/8-inch minus angular rock,
depth. Edge
e
3-inch restraint with 2x4 TREX boards slaked at
24-inch O.C.
5
„1 SITE SECTION B - B
IY1
1 sme t"•t0-0"
4912dx 0 5' 10' 20'
INVERT-4988.2 I 11I
4999.9 a99e. 111��
—
ssil Creek Office Pork —i--
U.D. Homeowners EXISTING I
BUILDING
,�AN LANDSCAPE WE PLAN - EAST \
A sore. 1-Q 77e«c
enioNmeepi
0 10' 20' 40 A
..
FCHA
FORT COLLINS
HOUSiNO AUTHOTITY
REDTAIL PONDS PSN
FORT COII.INS
HOUSING :\UI 1 IJRH)
1715 WEST MOUNTAIN AVENUE
FORT COLUNS, CO.80521
PHONE: 970416.2910
FAX: 970.231-Mi
ARCHITECT -
STUDIO COW)] I I I\ \
3000 ZUNI STREET
DENVER, CO$0211
PHONE: 30N7741R
FAX: 3034T7-9429
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COLLINS, CO.905N
PHONE: 970417-M12
CINL-
I\ \
25 OLD TOWN SQUARE SUITE 200
FORT COLLINS, CO.80524
PHONE: 970-225A099
FAX: 970-225-6923
STRUCTURAL;
hl&\
421 EAST 4TH STREET
LOVELAND, CO.60537
PHONE: 970467-2426
FAR 970467.2493
►ECHANICAL/1"W19BINM
AIJLINI \IN \IRI
2165 S. XALAMATH STREET
DENVER, COLORADO 80223
PHONE: 303-062-3990
FAX: 303-8624991
ELECTRICAL'
\\:\1N'F :S LLFCIRK,
2101 WELD COUNTY ROAD 27
FORT LUPTON, CO 801121
PHONE: 303459-7481
FAX: 303454-0877
REVISION'.
PROJECT NUMBER
DATE:
DRAWN BY.
CHECKED BY:
APPROVED BY:
130201.01
10/27/13
AG
BS
SHEET TRI F.
LANDSCAPE SITE
PLAN - EAST
SHEET NUMBER'.
LS12
4995
4990
4985
4980
4975
FACE OF BUILDING
GENERAL NOTES FOR LAYOUT AND CONSTRUCTION
I. All base information provided by Owner. Contractor shall field verify ON
information prior to initialing construction activities.
2. Contractor shall notify all necessary utility companies 48 hours minimum
prior to digging for verification of all underground utilities, irrigation and all other
obstructions and coordinate with Owners Representative prior to initialing
operations. Drawings are prepared according to the best information avoiloble at
the time of preparing these documents.
3. Contractor shall familiarize himself/herself with existing site conditions prior
to inilioling demolition operations. All existing site furnishings, paving, landscape
and other elements to remain shall be protected from any damage unless
otherwise noted. Report any discrepancies between the construction drawings and
field conditions to the Owner's Representative immediately.
4. Contractor sholl coordinate all work with related contractors and with the
general construction of the project in order not to impede the progress of the
work of others or the Contractor's own work.
5. Contractor shall provide ell necessary safely measures during demolition
operations to protect the public according to all applicable codes and recognized
local practices.
5. Contractor sholl coordinate access and staging area with the Owner's
Representative.
7. Contractor shall layout all construction lines and verify with Owner's
Representative prior to beginning of any construction operations.
BOULDER SEATING
r FIRE PIT
8. All dimensions are to edge of pavement, face of wall, face of curb, unless
noted otherwise.
9. NI dimensions derived from survey and original site construction documents.
Contractor shall verify oil dimensions necessary to assure for the accurate
completion of the project prior to initialing work. Report all discrepancies to the
Owner's Representative for reconciliation.
10. Contractor shall refer to all drawings, schedules, the project manual, and
specifications for further and complete information.
II. All concrete sholl be natural gray concrete color unless otherwise noted.
12. See Pavement Details for all concrete expansion pints and
control/contraction joint details.
13. See grading plans for pavement elevations. Match grades with existing
cormditions and (lush conditions with adjacent existing concrete pavement to
remain.
14. Limits of construction ore indicated on the drawings unless otherwise noted.
15. Contractor shall be responsible for all erosion control/protection by locally
approved means. Contractor shall adhere to ail governing codes and
requirements.
16. Contractor shall clean the work areas of the end of each working day.
Rubbish and debris shall be collected and deposited off -site daily. All materials,
products and equipment sholl be stored in on organized fashion as directed by
the Owner's Representative.
6 FT HT PERIMETER
FENCE
EXISTING GRADE
57'-7)/4"
GRADE
,,GABION WALL W
8' WIDE CONIC WALK
COLLEGE
- _ AVENUE
1 SITE SECTION A -A
s<we r=1o0- LS11 a.0 0 5' 10' 20'
eL SITE SECTION C - C f1�
ss'y. r=1oa-
Lsl, a.a 0 5' 10' 20'
PAVEMENT SCHEDULE
CONCRETE PAVEMENT - Standard grey concrete with medium brooms
finish perpendicular to path of travel. Four inch depth with
fibermesh unless subject to vehicular loads.
DECORATIVE CONCRETE PAVEMENT - Integral color concrete with L
medium broom finish perpendicular to path of travel. Four inch e depth with fibermesh unless subject to vehicular bads.
®FLAGSTONE PAYING - Sand set 1 3/4 inch thick sandstone pavers e
on 5/8-inch minus base. Joint sand sholl include a polymeric S
binder. Edge restroinl with 2x4 TREX boards stoked at 24-inch
O.C.
AGGREGATE PATH - Compacted 5/8-inch minus angular rock, 3-inch depth. Edge restraint with 2x4 TREX boards staked at 3
24-inch O.C. e
1' HARDSCAPE SITE PLAN -WEST
V soak ,'-M-a" Lat 1.Av9
f
0 10' 20' 40'
FCHA
FORT COLLINS
HOUSING AUrHOufY
REDTAIL PONDS PSH
PORT COII.INS
WILISINIC.AILITI loam
1715 WEST MOUNTAIN AVENUE
FORT COLLINS, CO. U521
MIOIE: 970416-2910
FI 978-271-0021
ARp9TECF,
STIII)IO COWil I I I\ \
30H ZUNI STREET
DENVER CO B0211
PHONE: 30341141H
FAX: 301-9429
LANDSCAPE ARCHITECT;
azur ground
PO BOX 210
FORT COLLINS, CO. 811522
PHONE 9794173912
J\ \
25 OLD TOWN SQUARE SUITE 200
FORT COLLINS, CO. 90524
PHONE'97D225-M
FAX: 970-225-8923
STRUCTURAL;
LI\\
421 EAST 4TH STREET
LOVELAND, CO.901
PHONE: 97MI-2426
FAX: 970467-2493
MEWANICAL/PLIMIBNR
NOLINI.MN \IRI
295 S. KALAMATH STREET
DENWR, COLORADO 60223
PHONE: 303-067.3990
FAX: 303462.3991
ELECTRICAL:
W'-A1NES U11CIIt1,
21#1 WELDCOLA YROAD 27
FORTUWFO16CON9N
MIDIS 3134 MINI
FAX'X3H4S94SR
REVISION
PROTECT NUMBER 130201 01
DATE 10/27/13
DRAWN Bi AS
CHECKED BY. BS
APPROVED BY:
SHEET TITLE: LANDSCAPE SITE
PLAN - WEST
SHEET NUMBER:
LS11
aw
ABBREVIATIONS
TYPICAL SYMBOLS AND INDICATORS
&•B
AND
EL
ELEVATION
L
ANGLE
ELEV
ELEVATOR
MOM
NOMINAL
MATERIAL
INDICATIONS
REFERENCE INDICATIONS
®
AT
EMER
EMERGENCY
N
NORTH
Q
CENTERUNE
ENCL
ENCLOSURE
NIC
NOT IN CONTRACT
SCTI ON
[
CHANNEL
EO
EQUAL
TITS
NOT TO SCALE
EARTH
m
DIAMETER OR ROUND
EOUIP
EQUIPMENT
NO. /
NUMBER
(E)
EXISTING
EDON
EQUIVALENT
EXST
Ell
EXISTING
EXPANSION DOLT
BASE COURSE.
SECTION IDENTIFICATION
AI
i
PLATE POUND OR
EJ
EXPANSION JOINT
OBS
OC
OBSCURE
BS
ON CENTER
CUSHION FILL
SUB -SASE. GRAVEL,
/
NUMBER
EXP
EXPOSED
OPNG
OPENING
CRUSHED ROCK
SHEET WHERE SHOWN
A
EXTN
EXTENSION
ODP
OPPOSITE
ABV
ABOVE
EXT
EXTERIOR
OD
OUTSIDE D
SAND, MORTAR,
AFF
ABOVE FINISH FLOOR
EPT
EXTERNAL PIPE THREAD
OHMS
MACHINDIMENSION
OVAL HEAD MACHINE SCREW
J".
c
•, .`A`I'•
PIASTER
ACS PNL ACCESS PANEL
C
OHWS
OVAL HEAD W000 SCREW
ELEVATION
ACC
ACST
ADDM
ACCESSIBLE
ACOUSTICAL
ADDENDUM
r
FOC
FOS
FACE OF CONCRETE
FACE OF STUD(S)
GA
n
OVERALL
.a
CONCRETE. CAST IN
ADJ
ADJACENT/ADJUSTABLE
F
FEMALE
PTD, P
PAINTED
PLACE
SECTION IDENTIFICATION
AGGR
AGGREGATE
FF
FINISH FACE
PR
PAIR
A/C
AIR CONDITIONING
FIN
FINISHED)
PNL
PANEL
SHEET WHERE SHOWN
ALT
ALTERNATE
FPRF
FIREPROOF
PVMT
PAVEMENT
PRECAST CONCRETE
ALUM
ALUMINUM
FLASH
FLASHING
PC
PIECE
AB
ANCHOR BOLT
FB
FLAT BAR
PLBG
PLUMBING
MOD
ANODIZED
FMMS
FLAT HEAD MACHINE SCREW
P
PLYWOOD
DETAIL
APPD
APPROVED
FHWS
FLAT HEAD WOOD SCREW
POL OL
POLISHED
®
BRICK
APPROX
APPROXIMATE
FL
FLOOR
PVC
POLYVINYL CHLORIDE
ARCH
ARCHITECT(URAL)
FD
FLOOR DRAIN
PRCST
PRECAST
AD
ASPH
AREA DRAIN
ASPHALT
FAEM
MEMBRANE
FLUID APPLIED ELASTOMERIC
PT
PRESSURE TREATED, POINT
OF TANGENCY
CONCRETE
C1 DETAIL IDENTIFICATION
AC
ASPHALTIC CONCRETE
FLUOR
FLUORESCENT
pL
PROPERTY LINE
MASONRY UNITS
SHEET WHERE SHOWN
ASSY
ASSEMBLY
FT
FOOT FEET
A
AUTOMATICS RAVING JURISDICTION
FIC
FOOTING
Q
AUTO
O
AUTOMATIC
ION
FOUNDATION
0T
QUARRY TILE
ROCK WAIL
ACV
AUTOMATIC CONTROL VALVE
FR
FRAME
FBC
FURNISHED BY CONTRACTOR
R
FINISH KEY
FBO
FURNISHED BY OTHERS
FAD
RADIUS
BFP
BACK FLOW PREVENTEfl
FURR
FURING
RED, (ING)
RP
RECYCLED PLASTIC
STONE. MARBLE.
BV
BALL VALVE
FUT
FUTURE
RWD
REF
REDWOOD
REFERENCE
®
SERRATED MARBLE,
TERRAZZO
1 FINISH DESIGNATION
BSMT
BM
BASEMEN
BEAM, BENCHMARK
G
REINF
REINFORCES, REINFORCING
BTWN
BETWEEN
GI
GALVANIZED
RR
REINFORCING BAR(S)
BIT
BEVEL
GI
GALVANIZED IRON/STEEL
RED
REQUIRED
®
STEEL
BLXC
BITUMINOUS
CA
GAUGE
RESIL
RISER, NT
BLKC
BLOCKING
GC
GENERA CONTRACT(OR)
ft
RISER, RADIUS
COLUMN GRID LINES
BD
BOARD
GL
GLB
GLASS
GLASS BLOCK
RD
RM
ROOF DRAIN
ROOM
®
ALUMINUM (OMIT
INDICATION IN THIN
DOT
BC
BOTTOM
BOTTOM OF CURB
GLUTAM
GLUE LAMINATED
RO
ROUGH OPENING
MATERIAL)
1 NUMBERS: LEFT TO RIGHT
BS
BRKT
BOTTOM OF STAIR
BRACKET
GR
GND
GRADE
GROUND
c
0
BRZ
BRONZE
SC
SCALE
METAL LATH
I
BLDG
BUILDING
H
SCHED
SCHEDULE
BRLP
BURLAP
HR
HANDRAIL
SCR
SCREEN
2i
TOP TO BOTTOM
ON
ON
BUTTERFLY CHECK VALVE
HOED
HARDBOARD
SECT
SECTION
HOWE
HARDWARE
SHT
SHEET
®
WOOD. FINISH
C
HOWD
HARDWOOD
SIM
SIMILAR
CAB
CABINET
NOR
HEADER
SLDG
SLIDING
CIP
CAST N PUCE
HNAC
HEATING/VENTILATING AIR
SL
SLOPE
®
WOOD FRAMING
MEMBER
REVISION SYMBOL
CI
CAST IRON
CONDITIONING
SC
SOLID CORE
CB
CATCH BASIN
HO
HEAVY DUTY
S
SOUTH
AREA OF REVISION
CLKJ
CAULKED JOINT
HT
HEIGHT
SO
SQUARE
WOOD FRAMING
CLG
CEILING
H
HIGH
SF
SQUARE FOOT (FEET)
E—`1
INTERRUPTED
CEM
CEMENT
HP
HIGH POINT
SST, S/S
STAINLESS STEEL
MEMBER
CTR
CENTER
HORIZ
HORIZONTAL
STD
STANDARD
CL
CENTER LINE
HE
HOSE 8108
STA
STATION
2 REVISION NUMBER
CT
CERAMIC TILE
STL
STEEL
PLYWOOD
CHAR
CHAMFER
STOR
STORAGE
CHKV
CHECK VALVE
INCL
INCLUD(ED), (ING), (SIVE)
STRL
STRUCTURAL
CO
CLEAN OUT
ID
INSIDE DIAMETER/DIMENSION
SAR
SUPPLY AIR REGISTER
'—r
PARTICLE BOARD
CUR
CLEAR(ANCE)
IBC
INSTALLED BY CONTRACTOR
SURR
SURROUND
COL
COLUMN
LBO
INSTALLED BY OTHERS
SUSP
SUSPENO(ED)
DRAWING LABEL
COMB
COMBINATION
INSUL
INSULATION
SYM
SYMMETRICAL
COMP
COMPRESS(ED). (ION). (IBLE)
INT
INTERIOR/INTEGRAL
INSULATION. RICIO
KEY LETTER AND NUMBER
CONC
CONCRETE
T
PLAN NAME
CMU
CONCRETE MASONRY UNR(S)
AJ
TEL
TELEPHONE
COND
CONDITION
a
JOINT
N
TELEVISION
CONN
CONNECTION
JST
JOIST
TEMP
TEMPERED
DRAWING NAME 0 12
CONSTR CONSTRUCTION
CONT CONTINUOUS
K
TER
T!G
TERRAllO
TONGUE AND GROOVE
SCALE: 1 112"=1'-0" �SOI.dwq
CONTR
CONTRACTOR
KJ
KEYED JOINT
TO
TOP OF CURB
*---_____,SCALE FILE NAME
CJ
CONTROL JOINT
KO
KNOCKOUT
TP
TOP OF PAVEMENT
CORR
CORRICATED
TS
TOP OF STAIR
CTSK
COUNTERSUNK. (SINK)
L
TOT
TOP OF THRESHOLD
CU FT
CUBIC FOOT/FEET
LAM
LAMINATE
TW
TOP OF WALL
CU YD
CUBIC YARD(S)
LA
LANDSCAPE AREA
TB
TOWEL BAR
LT
LIGHT
T
TREAD
D
LED
LIGHT EMITTING DIODE
TYP
TYPICAL
PROJECT
NORTH
D
DEEP. DEPTH
DEMO
DEMOLISH, DEMOLITION
LLWT VR
LP
LIGHTWIGHT OUVER
LOW POINT
U
UNF
UNFINISHED
DEPi
DEP
DEPARTMENT
DEPRESSED
UON
UNLESS OTHERWISE NOTED
ri ►l
■�
INDIC'ATES [RUE NCRTH
DET
DETAIL
M�
V
DIM
DIM
DIAMETER
DIMENSION
MH
MANHOLE
VERT
VERTICAL
DR
DOOR
MFR
MANUFACTURER
W
DBL
DOUBLE
MTD
MASONRY OPENING
DN
DOWN
MAX
MAX
MAXIMUM
WIT
WATER RESISTANT
DS
MECH
MECHANICAL
WP
WATERPROOF (ING)
DWG
DRAWING
MED
MEDIUM
WT
WEIGHT
OF
DRINKING FOUNTAIN
MEMB
MEMBRANE
WWM
WELDED WIRE MESH
01
DUCTILE IRON
MET
METAL
W
WEST, WIDE, WIDTH
MIN
MINIMUM
WO
WHERE OCCURS
E
MIR
MIRROR
WF
WIDE FLANGE
EA
EACH
RI SC
MISCELLANEOUS
WDW
WINDOW
EEW
E
MO
MOUNTED
WITH
F CH W
MTG
MOUNTING
W/0
WITHOUT
E
EAST
WD
WOOD
EP
ELEC. PATIEIBOARD
ELEC
ELECTRICAL
ABBREVIATIONS A LEGEND APPLY TO ALL SHEETS UNLESS
OTHERWISE NOTED
FC HA
FORT COLLINS
HOIl3', N0 AY!HORITI
REDTAIL PONDS PSN
FOP, I COLLINS
HOUSING AUT1-IOIUT)'
1715 WEST MOUNTAIN AVENUE
FORT COLLINS, CO.80521
PHONE: 970415.2919
FAX 91
ARCHITECT:
STUDIO T-0\II1J II\ \
8000 ZUNI STREET
DENVER CO80211
PHONE: 50N774158
FAX 3034774428
LANDSCAPE ARCHITECT:
azur ground
PO BOX 210
FORT COLLINS, CO.60522
PHONE'. 9704174E12
CIVIL:
1\ \
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.80524
PHONE: 971TIIZ 1199
FAX 970-2258927
STRUCTURAL:
ki'& \
421 EAST KTH STREET
LOVELAND, CO. 90527
PHONE: 970457-2A26
FAX 9MECHANICAL/PLUMBING:
\IOLINI \IN :MRI
2185 S. KALAwTH STREET
DENVER COLORADO WM
PHONE: �m
FAX: 300A62-3991
ELECTRICAL•
WAYNes ELECTRIC
2101 WRLDC0IRRTRIM n
FORTIRPFDKC0I111121
FNDNIE 31111404M
FAX:713 1,1pT
REVISION:
PROJECT NUMBER
DATE:
DRAWN BY:
CHECIG=D BY:
APPROVED BY:
130201.01
10/27/13
AC
BS
SHEET TITLE:
SHEET NUMBER:
ABBREVIATIONS AND
SYMBOLS
LS01
No Text
CENSERµ OLS N STANDARDS
ke,atan design and installation yell comfy with INe lomeirq Matters stadandf:
A Vrgation design shall M don by a certified vr'gotien design wYO otM1arife
wprofed by IN, Pats DoWtvI
B. kre align ,sM design and mlo,aUen Sean be montored. inspected, and appraved
by the CRY Pares D Tian. Wriqulan System add, be inftoWd and mainlaimd so that
krgoUon Saupmal Sill net spry ado arty SVHI aMaap. or Taylor., and
Sivas Dal Caud M dome" by Wafer.
C. Me imigalien "Stn, -.0 tarp" ailh the alenaeanal ".I" Code and .0
the CRY of Fat Wiry Eehraa Code.
D. A, darolion in laps Iran IN-Perared eanalructiw ptants mud be "Wooed by
Cry of Fort com" U ARgS pia 1. ialalblion. MY at., wernca Foe .Nall be
caa2mlel with CRY of Fort Collins UiNtih,
E. Any drviabn in ba,oul of IN krigoln ryplem fr. the approned IM1. Lion
pans mull M nerNwad and opwored by the CRY Parts DVeion prior 1. or dwiq
nYoblian.
F. IN Irrigation WM" "S b designed Ic prori0e Idl ca aroge and motched
WaPlaton at.,
G. Lateral painq Nall be Was Mled on Has demands in Mdbara per rI (gem);
SRN Isho, es has to ...ed 55 led Per wecand.
N. X.iscope prcip. Nall be ulill al o INe design of Ife krigat'en III
I. Al designs INS meal Imp mWlry. Bart Mmagemenl Aacloes Ilan Ind Irrigation
SSWR;dtan and ALCC (Associate Landscape Conan" al of Colorado).
J. Nwey ialotled krigolian a,dem, ab1 M wbjttl to gala a6O.
K. The minimum datreution p:lorN la .pay reads " M .55; fa rota Nadi it
ends M .55; lot Stream roles X elan M .75. ynd lot impoct heads it Shan M .m.
L. Design conideraMns Weal ncAde:
1) SMW and perennial beds as lip M Honed Sapolalely Tram tIof ones; 2) loped
ear Sill have operate Horvnq for heads at the hirer Serrations Tram those at IN
lower sl.sction; 3) awl eAh different ..pour. are to he Israel PWately, and s)
n-Mod c?I wlr. are to be used Ian all areas adjacent to rats" and at the
Mltam of berm. and POI a...
M. Xede krigauce and drq weI come n e aide .1011 all <enfqurelans. Ind
corfM application Nall Idd000ed Ian tech an,,," design by INS CRY Pats
Departmanl.
H. Irwes Pearled In non-Iwl k&*Nd andscape ... rear iw. dart-1-no am
"-harm ngal'an and shoal be on iidvidhsd se seperete tasty Suadannental
smRters Hal be nstalled on lap and award the mot MW for Hal lam Mahn.
plainest. i,ig to t a IM root to, aNA N iratalled for on, farm aI aermamnt
an.
O. conUaclor shat instal the sedge for the PIC or AC Poe.
P. line tock5aw peronUm deuce and .afar meter Nall at Ind CRY d Fart CdMa
stadarbs. and The Lae order stal M wt. kdaYrlal.
O. A curb Stop Yam be imtdyed bl.ten Has prefer PA ad the bactMv penman
dens la isabtan popes.. the cab st, Shot be asserted Iran IN fade Is grade
end conned .i1h a rout vane M..
R. A WINI Nub m anger, 1. 11'eral be Paced baleen UN meter Pit -cure dw
and lM back UPS prmwtan device. The injection pal so The Was out lob Sbl b
asset" al dtacring a lemale odopler Stith a Ibsoded boss pug.
S. A beswl t. Nont be 'installed imnhediatdY daamlrgn al the Witless Paewtion
dance.
MATERIALS STNDARDS
82.1 Pod
A Copper dal the type K rigid conlarmirq to ASTY Standard BBB.
B. kbiine asol by Closf 200 PVC. NSF approved. 1f 3 111 or lager, use foltite It".
C. INuaas Wham M acts 200 Pvc. NSf appowd.
D. No bless shot be arraMr Lean I -inch 1q.
E. TriCke tubing foal be feather and IN resistant material.
F. Pay.971I dt9 p4e Yee he NSF aWare 1. SOR pmune-reed Ppe, only as
approved Ise drip applications.
G. funny pipe that the used eny la, pop-up wra, heads, and fMII be seorpelbe With
INS abowe needed for UN ,pinker N.ah
H. Lot" ftl'.+gn shay be ScheEue 10. Type 1, INC W to I -geld, with ASSM Standards
D2e65 and DABS.
L Copper or cost bon,. MUNI. sddaad or thrseded per nstanotion ddde "I be
ufad for c1 topper Poe.
J. Mainline, Merge " be d w ion Ian 3-inch and eger pipe; and Shin b PVC
Sewule 80 la MANS' Pipe.
K. Me.Yg assay be ducts, ian or P.0 pig under, al paved m.axes San &NR M 0
hn;rarrum al No MISS target than The pipe WIN Was a .but shone in no case M Maw
Than 2-meth dameter pipe.
8.2.2 VuMI:
A Remole control cord, vodas they b eehruoly opooted, aWropriale for the vela
soppy, with moms sited deroe and floe central dim. Volvo shall lave a seas wrarq
ad sibs-cbSkq action Is, protection ogwal .9. pe.w,. Bnend ad madd old be
R.inb'i d PE Sall Rama Carrel Vohes, mnobbee W. SO salt hearing screen an4ss
City spec[;. wawaer band W rnI
B. V.Nes used la tea -own. sydeen She be propeM aowded Per maul«teas
ornmendoban.
C. Dip valves, bubbler vows, and micre-yray valma Shoe be occornpoded by
pr.fwe-reducnq deuces matched aith rwanvnanded l,Xes to dour. pope. operation
and reduced farur. of Such wuipmenL
D. IwWtion We valves srdl M Kennedy 1571K or III 1100u. ads to withstand a
cenliruws opemtiq passives of ISO Psi. Clear wlseaaY shaW be s" to IOU i.meter
d Pipe. Ssom b Opened by turning spare and to the Mt (aMd apevg a
umccept.w.).
E. Mania boar N. Nall be %-inch Me role with 1. halite. Wall, I8-6000. Pr
wp,s,Sd wad.
F. Ouok cooper vales ash be lirch bases, Rdrikd ISRC u^\s with rubber carer.
Sappy 1-nO boss key fa Raimir" W.
G. SpeaS Ira Union Ml wH. Y,all M .doled upstream d The name rental ION
who. Ewifobant substitutes Nall M accepted.
N. Vohe hI seal haw oralching tacking Caen .hnh they be Conan. Penlee or
sppowd wool. Bo. elm Nall b as w Hed 10 house one rsh,e Oa M.,
82.3 Caabd Steam:
A Confronters INS have farad coma I.CAnaloq and Yell be approved by the P.A.
Department. The rumba of StOCaa Y,aR kceude tee Of. atahanl la WaUe future
arse. The cse"e, M. aMR be aaather tight III wI resistant SO backing .Union
d ennecl One Ewan P9ted a corraoble mate C.ON Pylon dal be We" for
each 12 Stations.
e. The Central SySTM Esapum Yaw be Wotan Mood A242405IP with A2eP24 staN
peal, Yodel A-F 11203 Ma stand u and AL-2B1 lack Rio or oppTld Sa L
C. TM wqe paleclian asM be an 6- loal copper VoI real. /A Hold copper vie,
g,anSq buss rwplace. gonad Iseminal strip and kritrd SPD-m7 verge amotwla per
mosdoetose. epKifa.tiaN and ddds.
D. TM master ra1A Yes be rental/ owed.
E. Central eking Shall M Ise WAS copper dirxt bail UP or PE cube, U. aWannd, or
battler, pia ,plan ISI and praaAalwNW rwmms vaw
F. foe-wk. "Me sae law a conedad case wcheow thr u k t: Real - Its; Write
- grwl; Mock. Sue and Orem - Mw.
C. If tSI ml.m. IN used. wpaed .Inie[fed wine or mmulaclaren rNanmended
.it. Noll be owed.
H. Ayprwed was canal m and wise-praoyng seolant shall be Wed To On contra
.Ives To sae fade wives. The eire caysclas Nag be eMt each specify monufaclwer
rtcammada. Twwka Stetson dal We ness0 eas SpeciMd .it. Per la.ont,
pm siona.
8.2.4 Spinke, Nod.
AS S,I Nods Nan he of De wore rrwdoctwer as apwilied on the Phera, marked
rib The mar ldI ram and mold in each a .yip that mateal. can be identified
.;thaut removal from the spew. The GIY .il specily bade oM noodles Ian match and
SadymenU In on In PVbtic symem, n the r .;Iy. Oast drheel rotor heaps darn be
Hunla or approved Squat. Pop-up spay reeds Nol M IMnler, Roinead. or opprovel
Saud. A leads ✓and the Pressure rryAUng device intepaled In hem to mdnlan
Water spading pesawe They ded MM Nre anti water bair,inq vales to III water
wand .hen rot In operation. (EIMPW Rain hard IBM PRS/SW hems. A minimum of
A'pop-Ip a 1.1
1 IRRIGATION NOTES
SCALE: NTS LPl l.day
I. IYNMN THE DRIPLINE Or ANY PROTECTED EX6TNG TREE, THERE SISAL BE NO CUT OR
FILL MET A FOUR -NCH DEPTH UNLESS A OU SFED ARSONIST OR FORESTER HAS
EVALUATED AND APPRONED THE DISTURBANCE,
2. ALL PROTECTED EXISTING TREES SHILL BE PRUNED TO THE CITY OF FONT COUIMS
FORESTRY STANDARDS.
3. PRIOR TO AND DURING CO STRIUCTON, BARRIERS SHALL BE ERECTED MOUND ALL
PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A WHR
OF FOUR (C) FEET N NEW. SECURED WUM METAL T-POSTS. NO CLOSER MW SIX (6)
FEET FROM THE TRUNK OR AT THE DIIPUNE WHICHEVER 6 GREATER. THERE SMALL BE
NO STORAGE OR MOVEMENT OF EQUIPMENT. MATFRUL DEBRIS OR FILL WITHIN THE
FENCED TREE PROTECTION ZONE.
N. DURING THE CONSTRUCTION STAGE Of DEVELOPMENT, THE CONTRACTOR SHALL PREVENT
Tit CLEANING OF EOUPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE
MATERIAL SUCH AS PASHIM OM SOVENIS, ASPIWT, CONCRETE. MOTOR OR OR ANY
OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE MIPLINE OF ANY
PROTECTED TREE OR GROW Of TREES.
5, NO DAMAGING ATTACH ENT, WIRES, SCAM OR PERMITS MAY BE FASTENED TO ANY
PROTECTED TREE
8 LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM
CONSTRUCION OR LAND CLEN3HG AREAS. ROAD RK:HTS-OF-WAY AND UTILITY EASfYENTS
MAY BE 'RWDSED 01 RATHER IWN ERECTING PROTECTIVE FENCING AROUND EACH
IKE AS REOIARED IN NOTE 3 ABOVE. MIS MAY BE ACCOMPLSHED BY PLACING METAL
T-POST STARES A MAXIMUM OF THIRTY (30) FEET MART AND TYING RIBBON OR POPE
FROM STAKE -TO -STARE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING
CLEARED.
7. THE NSTNIATT N OF UTILITIES. IRRIGATION LINES OR ANY UNDERGROUND FIXTURE
REOUNIO EXUYADN DEEPER MAN SIX (6) INCHES SLALL BE ACCWUSHED IN
BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH
OF TWENTY-FOUR (N) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM ME FACE
OF THE TREE (OUTER BARK) AND 6 SCALED FROM DEE DIAMETER AT BREAST HEIGHT AS
DESCRIBED N ME GLARI BELOW
B. FREE PROTECTION MEASURES SHALL BE MAINTAINED CONTINUOUSLY FOR DURATION OF
TREE PROTECTION CONSTRUCTION ACTNITES.
2 Scare: NTS LPI Idwq
PLANTING KEY
SYMBOL DESCRIPTION
CONIFER TREE _ - EXST TREE TO BE PROTECTED
DECIDUOUS TREE _ EXIST TREE TO BE REMOYCD W/
CALIPER NOTED N ACHES
SHRUBS GD (1)M PUNT SYMBOL, OTY( ). M FOR MITIGATION TREE
W.L ORNAMENTAL GRASSES 0 CLEAR MULCH BED - ALL BEDS UN
PERENNMLS/FORKS ® 1 1/2" STONE MULCH BED
® C} RESIORATION SEED MIX (RSSM) .iBLUEGRASS TURF
UPLAND SEED MIX (UPUX) FESCUE TURF
WET MEADOW SEED MIX (WISH) E] COMMUNITY GARDEN
�\ PLANTING PLAN - WEST "Iom—1 Agh
^ -.eia r-za-o- LPetAe9 0 10' 20' 40' \I
�� b
FCHA
FORT COLLINS
HOUSING AUTHOIITT
REDTAIL PONDS PSH
FORT COMNS
NOU;INCI �1U I I IORIT)
1715 WEST MOUMNN AVENUE
FORT COLLINS, 00. 80521
PHONE: VM4152910
FAM170-221L821
AROMTECT:
STUDIO CO\II'I I j 1\ \
3000 ZUNI STREET
DENVER, CO$0211
PHI 303411-9156
FAX: 3034774M
LANDSCME ARCHTECT.
azur ground
PO BOX 210
FORT COLLINS, CO. $0522
PHONE: 910417-3812
av1L:
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.3052/
PHONE: 970-ZZB-9W9
FAX: 970-2254923
STRUCTURAL:
KI.ti \
621 EAST 6TH STREET
LOVEW1Dh CO.105117
PHONE- NWEn,TA7A
FAX 1T0M1-M
14dWSCAL/PLUIANNQ
MOUNIMN Alltl
2166 L KAUMATN STREET
DRIVER, COLORAD080223
PRONE: 3634624990
FAZE: 303462-3991
ELECTRICAL:
N'.A1 NFS U.EC:I1Uk
2111 WELD COUNTY ROAD 27
FORT LUPTON, CO IMI
PHONE: 303659-7481
FAX 3034M4877
REVISION:
PROJECT NUMBER 130201.01
DATE: 10/27/13
DRAWN BY AG
CHECKED BY: BS
APPROVED BY:
1MEET TRIE:
IRRIGATION NOTES, TREE
PROTECTION AND
PLANTING PLAN — WEST
oeFTFRRIRD
LP11
1
1
LEGEND
- - - - MAINLINE
LATERAL PIPE
-------
SLEEVE
1 1/2"
PIPE SIZE
QPOC
2'
- BACKFLOW SIZE
QA
CONTROLLER - RAINB04D
®
WICK COUPLER-RB 44-LRC
As
HOSE BIB
y' 3' MIN
_ �.7YnMAINLINE
� Y-STRAINER
8�
C
:`- - _ - __ ., I dI
— — I
�D uD ` ' .
1
\ � The Fossil Creek Office Pork I I I I
ElEast P.U.D. Homeowners
\ Assoc. I I r
\ Rea No. 990214B7
IRRIGATION MAINLINE DIAGRAM
A scae 1'=30a pozae
IN
4IN
12'1}MIN DOUBLE CHECK VALVE ASSEMBL,
I
ELEVATION PLAN
NOTE:
1. Double check voNe, backflow assembly shall be
Febco Model 850, size 1,f"
2. Y-Strainer sholl be Febco Model 650A W/
20-mesh screen, size 1}f"
1 BACKFLOW PREVENTER ASSEMBLY
SCALf1"=l'-0" LP02.dwg
30-INCH LINEAR LENGTH OF WIRE,
COILED
o PLASTIC VALVE BOX: CARSON [NO.
CONTROLLER: RANBIRO ESP-24LXMEF: MODEL NO. 1419-18 W/ 1419-3
24-STATION CONTROLLER W/ METAL COVER
PEDESTAL _ FINISH GRADE
L=111-
f II I I— WATER TIGHT CONNECTION
CONTROL WIRING - �- (1 OF 2)
120 VAC, 1S AMP, SWITCHED RECEPTACLE OUSTER VALVE
W/GFIC INSTALLED IN CONTROLLER
PEDESTAL PVC MAINUNE PIPE
3' 120 VAC POWER WIRING
3-INCH MINIMUM DEPTH OF
'•.^ t�I:. �•'. _+ r 6-INCH THICK CONCRETE PAD 3/4-INCH WASHED GRAVEL
PVC SCH. 40 MALE ADAPTER
I J' PVC MAINLINE PIPE
NOTE
3-OUCH SWEEP EL AND CONDUIT FITTING SWILL BE SIZED IDENTICALLY WITH NOMINAL
VALVE SIZE.
1-INCH SWEEP EL AND CONDUIT
PEDESTAL MOUNT CONTROLLER MASTER VALVE/PRV ASSEMBLY
L SCALE, 1"=1'-0" I.P02.dwg J SCALE ' F--0" 1_1102.dwg
.SII II)IO C0AIPI I I IA A. INC C01'1 RI(,I II %_0 14
zvoll
FCHA
FORT COLLINS
HOUSING AUTHOHTV
REDTAIL PONDS PSN
FORT COLLINS
HOUSING ALAI IOlkI I)
171E WEST MOUNTAIN AVENUE
FORT COLLINS, CO. $0521
PHONE: m415-2910
FAX:97MI4821
ARCHITECT:
SILII)IOCO\11'II II\ \
3000 ZUNI STREET
DENVER CO 80211
PHONE: 303417-9155
FAX: 3034 77 4428
LANDSCAPE ARCHITECT:
azur ground
Po BOX 210
FORT COLLINS, CO. WM
PHONV II70417-3113
CIVIL:
I\ \
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.$0524
PHONE: 9/0-2254099
FAX: 970-2256923
STRUCTURAL:
M_&A
421 EAST 4TH STREET
LOVEWD, CO.1053T
PHONE:$794974429
FAIL IYMT-2493
IIEOVW-41PI AMM
NiOLF ANAIRF
2165 S. KAlAMATH STREET
DENVER COLORADO M223
RIONE: 3136110-M
FAX: 3134121
alcullil
WA1NL'S FLFCTRIC
I111 WELD COUNTY ROAD 27
POIa LLAP N,CDOW
PHUN1b 3111141111111674111
FAX:lpaewln
REVISION:
PR6ECTN MBEk
130201.01
DATE:
10/27/13
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET TIRE:
IRRIGATION DIAGRAM AND
DETAILS
SHEET NUMBER:
LP02
PUNTING KEY
DFsaavfnN
MIKE
r col R IREE
DIET IKE IU 9E PROTECTED
1,
�t DECIDUOUS TREE
EAST IR[F 10 BE REMDAD ill/
-
CALIPER NOTED N lif
5
00 (1)111
NMNI SWMN. DM I. M FOR MTIGATION TREE
Ali 0190,11FMIM CRItSSES
CID9t 19AM ® - Ml BIDS LON
7a4% PERENN90/101B5
®
1 1/2- SPENT YIACH BED
\� RMOMTON SEED IIW (RSSM) El aUCORI.IS ItpE
UPL" SLID M (L ) FESCLE RW
E]WET LEADD1 SEED M Won) ® Mq R GARDEN
Pali'.;T:i:.lii•�
1. Prar l0 F,;mi , wA alas an the Alen the contractor steal contact this norms Repemnlotire far spalcific
imlluclians malignant to The ANuencia, 01 gross.
2. Contractor shoe plasmas l ablr, molwioh,, lode and songs IM.+eeply 1. seams and imll partSlat N asehi
he in and as ✓form, M these plan
]. Furnish nungry-gnsn plants true to genus, sperci.s, ariet, cuNsor, stem form. Bhgarlis, and other features
Indicated in pool Ell, pant schedule. a plant Is," indecolN m dwa9ra ond compyllq fifth ANSI Z60.1; and
with hmarmay fact sHtems dwdopw A Ironspaning Or root Xuflirp, prosisfa sea -shaped. fuff, branched. healthy.
rigorous Macs, densely (dialed Shen in h,d and free of dsease, poll, agar, benoe, ond defeats such OF kMs.
ea, -oldnj.rin, o&and a asions. drarement.
♦. No ,matted srMtitutbns slid ba made silheat LOndscope Architect opplot'al. allerMt. mlin materiels of Fill
and crocler and, be conaidwad 0 .pacified pent mph,aro eridcl toreobtoihad LOrdacOpe Anhkost
Bid. elm
n the ryhl to Pont. plant list OF deemed necYwry.
5. Th. W if a0 bMacape eras. Including pprkfian and lidons, Bids he lho,"hi, loosened tO 0 depth al rot
We. Ilwn sight (8) inch as and Na onsummum. atoll Y Hwrdphly incorporated into The ee;l el ell bMecape
ores+ to a depth of 01 least de (6) inches by VAN. 6acng or other +dad. Pull of orate of at Wat
Pines (3) cubic ywd. of Beal unmndng,t pl, Om thousand (1.000) eaud. last d chased, ono.
6. A pafmil must ad wloined from The City Fore.ler before oM trees w shaubs as rotes on the pan ore panted,
or road or remoeM on Ind pbla right of soy. This includes sorts bebsen the eaal.dN madman. and curb. and
doer cif, p,Amrt, This w-1 ah.4 W. the location and spach,s to be planted fblure to a0loin Ilia park
may .null n lepb6ng or, robcolilq IfM end 0 hold o, Certificate d Occupancy.
>. The deaaloper Brad contact the Gly Farm. la aspect ell .(,.1 11. iont;,A d The complalan d each phase
of 1" aawbpmenE MI U. head to home been imldlad Os +Imm . the andecap. plan. Applosa OI +treat
I,. pooling is UN,j;Ud Eden final appeal of each phase Failure to obtain .,pool by We City Fpnlw for
almost Is. in 0 pbome droll .null An d hoe on CMifeas of Occupancy fro lut.n. proses of the derelopmenl.
6. prior 10 is. iaWMi OI easy Eerlilieat. Of o[Cuporic,, the pNkpec ins recipient of such CO61rSOIe d Occumers,
atoll abnit fihit. certification 10 the utilitm nnutbg dhotis Intl oil ponlad area, pl rows to he Isslnled,
how been Itwoughly baserned ON the Foil amended. consistent filch the nfiuiremenN fell forth in this section.
9. Qaonlili. of molerab Wen on The schedule bee placaderc. Ors 9eantiti. ".I an the Front materiel pi.Isrr
plan. Ldniscspe Contractor snall . rnponsible far Phil" all Ounnlkies an the pontiff plan.
10. UtPG . aw. Trot bxn ".I an Orion. Cmt,wor shot local. all uflUtiM Odor ral Uosmw im011 uL%ly
location, by contacting -cal Al you dig' at (800) 922-1987. Convector dal ba ruponuble fro Ind npdr of
wry damage their Pass, coma to utf;U.I.
11. Conlruclor shag ponide el amendments is oil pEmUng areas. Wode slwll W adjusted far red and mulch
Nicsnalss. LOndxapO Canlraclor Mall perform oil leash Warding.
M Protect and save the .enter, plant materials shofin an plan anNas noted to be remained,
I& MI wen d'atwbed by construction. dap W nmegelated m P0H of the EUse bid.
14. Rappl arty diecreponcies in The p rdth, pan immefiatior to The Lardacape Architect.
15. Comma 1p a responaLls for PalnlaaEmr nalan wncn coned merman as per spa.Fcotiam dpmg dMdan of
soak an -like.
16. The Contractor shee powde on voles, eateriN lots, and tabor seeded to hpate Pont malwah pea
specifications. The Contractor shad wooly mi grater to astabr.s the seeded Ofeos in o hei greed IN
condi1'ion.
17. Remora all Publish, egdpma,t and moteral and home the plea As 0 nnl. clean c0rf6tiarn each day. "Plan
parad wen WON for bluFng Ni ipnenl Ond materials by other trades in 0 aeon and unobalmciad condition d
.h ti1mn. Remains el Or fit that accumulated dus'rr, Or as Of anal of ponfxq opanlians Ni all
18. Compactor to raapmaioM (or compel. rep& el .ah,lin9 loaded, mg01an ryslem Flak, all wen of C haunt.
and .OnAthaclion Udr .
HYDROZONES AND WATER BUDGET
HYDR020fE MFJL WATER FEED ANMYL 0 ]Or 60' 12W
($F) (OFUSF2 WATER USE
HIGH
7.IAAI
1s
I40,011
WDERATE
I921891
t0
192,169
IDUROZONE LEGEND
LOW
34,14720
3
102.W
18 GAL/SF/YR
VERYLOW
1041S6/
0
0
TOTAL
74,563.44
434W
III 10 GAL/SF/YR
AVERAGE
$83
3 GAL/SF/YR
- 0 GAL/SF/YR
PLANE SCHEDULE
WAM
pFA
epAfSN(B
p2sI.BFI
%
OTY
bTM80L
BOTANIC NAME
Cp111M1 NAl1E
IIA7
{�
Yasanl
1wT®
0.ddmu
Trees
E,%
1
PC
a®r pnneb Frame
tome Amur LYps
As
WELT
10
W.Cbmp
Or S.
1
IG
Brial MepY
MYWeYi
IF HE
5
N9, Clump
IS%
2
AT
Asir Ybn<um Nor Whom
Uo IU,ra TeYbnL
Mi5pY9
TNT
3
W. Cheap
15i
2
A}
arnlrlar ar s yaIOrso. Ar.E,-B.111-'
Iuymn&gamrm5aaabwry
M
1-
10
W
.11e
1
CS
C+'pnur 0suros breams,
PpemWIEU m-termMmr
Maepom3
.15
le
Ne
I VI
2
CS
C..O. ma-
Vr..m C.bY.
As Faf1Ye
15.
3
W
a1%
6
co
came Omdenn"a
H.nah.,
MIItlIiYe
r
3
W.mX Inge+
15%
2
CC
Ca.1 un.denve
ReaDW
As
12r
3
W
t5%a
2
CY
Cornuem.l
Camek.MAmry Oa9'eaad
MY1anYG
12W
le
W
15%
2
CP
Cnlsepue pl,enopsrum
Vy.lvyMr WnErarn
MaF9YYE
1211E
3
W
Ir%
5
OT
GNfrhy Sul-arl, mamma iD.Nrnesb!
an.-marhonenH
3l
As
Y
10
W.mIq.FTM
22%
3
GO
G,mnpcJMusapraaEVn.so
FeN.a,cadea.e
ft a
IF
3
W. gash,
ilx
3
RP
FaiselXnapan.culas
Gamennm lm
MaebYO
3'
3
W, p
is,
.
PC
Rvnlhi celefus rbnmarencY'
AEnanwenry Cmwry
Mas11eYE
1Y
10
W
331
ea
W
DaawsphItar„
compel ae
MiWY11d
WHY
0
Tm,wpmp
37%
5
CJa
OUOrt'ua manoc.ry.
WrOu
MYWYI.p
E
3
Eager Mar 3r
52%
7
OH
Oui-In,tenhUse",
Cdnka,n We
MmIVYO
Is-
s
TO
31%
5
W
Qn2us unduub
MILUUI
MYNm1.B
16'
3
TIO
01.
1
SA
Snepnmbarpanta
&AFf.,
M
0
W
15%
2
SO
SwDuawapena rear -rho"
Ell., Ell MI
MCYIeYi
IIF
3
TA,
31#
5
UA
urmu.repm,ca r en -One Ab.bn
Arco'.. A.
MYrdpYd
3'
10
W,m11pe3mM
30.
A
UP
UmamprppnWe JFG&eaaMn'
Enfield Einar -End
MMtlYYO
I
to
Tub
30%
♦
AS
E-Ioal w,aibaum Omar coax
CAHen YeWwnom
Are
I
3
BBB
comeh rwa Trent
Is,
2
JS
Jun,peru, acapuhwm
RocaYEpumlem Amer
ft d
BHT
3
W
.5%
B
PA
Pnusamnm
Sim. P a
As YlaYled
♦'HT
0
W
629n
7
PE
Rnui.dulu,
Pisan Poe
MYtlYYd
9'11TE
3
us
22%
3
PIP
PnuipMdaroea
Pa..mse Per.
Ma9mlad
Il
3
me
22%
3
PS
lI-Parammmmll
Burs., Per,
MMdiYi
if
3
us
Oa.ldarm Snob
APN Aran 1., neam,.,cane
Ile.lh,we Af.s
Ile
N O
ACA Ame/enG,er uneWnvs
SnPbba'6eNa0e,ry
A. YrapYC
N W
N.0 Aas.uni'lo, wanava
U. Samubn,
As
N 5
Al Amorynerenmren,
Ieadplit"
3'
N 0
MN Amorpna none
Prerl ...doom
S'
N 3
OFF Cmaana+ums LAeale
GoPe Rmabn Paphnp
Y
N 3
CAE Cmm ., rede A.
Cufbel.aunMn WnoponY
♦'
05 0
CW armnrpna mmmrne
earn. a snaps,
A
N 0
ESP Cnaengnare, sam-Twes sCMer
Ten. Ylntarni
a
N 3
ESE camas Mel., AraaF
Aas Fie Do,..
s
n 10
ED, C'abmmebrdnanwbo
Bonsai IcOb-.1
0'
03 3
EEO FM.dfa.vu'wen
BIu.Pm Nma Fu
A'
a5 3
EN EPWwa nnfa
Moral -le.
A'
AI 0
ENA 4namena neweosaw wrNOY
MmI&w 0.gRruan
3'
et 0
EHS Essam.na-eamme lea sass
T. &„g edgWan
5'
At 0
FPA FasupioP moose
Aaade Push.
a
.3 0
PPP FOnNwa puDeewre w pubemn,
New Mean Pasid
5'
N 3
NPA Raaons.' mOM
Re. Feat Yu¢.
A'
N a
AMA Jem.ae am.rmcaa
NYMo.er
A
N to
I.C. L9uWm w.pen LMpnno
Ch.,ann.PAW
A'
N 3
uo tpuaum ripen Insane
L... Post
A
N 3
wA Awhople r'sbum Emaak, Wund
Finaaa Your lbnyaudua
3
N 3
Put P.daa v,pmmsna
Cnwmany
A
AI 10
Fro PM,. mpmone mdaocw.
cwnmanmaehokeaFa
A
N 3
PLE Ferrell .-I Cnal-E
Cnapnve llalonrre
5
N 3
POP PMnpna euncoea rat na+uric.
PreuY slq POYnw
♦'
N 3
Past Pones.maocana
home, Plum
A
N 3
PPe Punuse..'P...5,de,
PAIC-Pnil3emlChom
r
N 3
W Rno, E'.ec. liru{.,
Gass Repass Sismaa
A
N 3
RAT Rno, alNmaa[a mrdeeb
TmMM1SumN
3
B1 0
RCI IS,., prao. nsmyrbne
ROa, WunYmn Sumac
f
Al 3
RT0. PIP, Iskohma Autumn Amber
PmareY Tnmae.I sumac
e
N 0
RAL Raiaounwn
Goan C.I.
A'
e1 3
R. h..1
VpNa Rw.
A
s, 3
ME Rubuiddmws
YwtlweliµFry
f
At 3
SOC S3mpnmrrpo, wvdemn[
Me*. S leav y
!
N 3
BAC Ssmpnu2wpwa aanaurb Nn[ea'
IWma[wMenY
iE
N
SPA Slash, pbe...
Mn em Omart Llw
I
N 3
WE Vrbumumhansom,
Nann3bn3Wimum
MFN,iYO
A'NT 3
WL Wilma. pNn,rm bmenq[um MWabpY
AlOpuplOgY Naunum
W
P5 10
WH Vmumum.ml'FannJ,bNia,wepnFY
wepniny Muaan
S'
N 3
113A Y-U.
U.. Y.
f
N 0
us,CYmp
NATBI
M.
SPACING
(GeLAW
On sTYe01 won w
cglalax NAPE
1GC3
sin
mom) IOIEs
0erpunY
Poo Amb,YFDNw[cabNnamommerctib
PUWIm Wnanb
a'
e5
3
DAB Da,n.eadaapoew Ya+'
C.lMo. Daam
T
N
10
EFO Fuwymu, berrre. £mrMl GNey
Eme ..1Eum/nu,
25'
e3
10
LE Junp.uf mnmux>FVY
Else Cammm Ammon
5'
e3
J FrbM some b a'M
JR Arupahm au Avna..
0.MJaame Junpm
A
e3
3
JW hnrperv, ua-&Ado
Bdress; as
5'
el
3
JTA Jump.m alma In wmbne
Tbnm2Junmer
5'
03
3
JET Jumpeni, soma von Tao se Tap&w
I. Ta III Amgen
T'
.1
0
WL Stamm sm.4mum¢mPNb
2'
WF LLMua Msion.
Mery
M F}OYd
es
0
1M1 WwuillIs
Crxpnq Uloredo llWT
2'
FIB
3
PAa 15.wa1ni mramM G,am.
Game Eisler
a
A3
3
ACIADNanmYY
Amaaanba,[dmi'
salwas ee Yanagr
IF
AI
3
MILE A,WmIuroMYq user, Firms
MILE
v.Ym F,na s.9•
le'
As
3
ARPO itineraries Awn OF.
PDam Ce.Nsq
IF
e,
3
AtSL AYm;me am.
sdYrFbMmeape
IF
n
3
WAY BmbMYre rynb
CAOmbY lbnl
IS
If
3
CETO Canaum ormnbum
Sro.arSmmee
IF
FIB
3
ERIM Empwmm umD.namm I. Cna
FmnN 6wk Wpnur Paver
IS
FIB
0
E3&NL Erwaon-wooer wgnN
Svaual.&OeMw
Is'
FI5
0
lade bnardum.mmrmeda onne.'
PnfnseLeander
Is'
FIB
3
LEbu Lunnnemr,m s-e..m same
Nwbupa,
IV
Ell
3
IJwo emm.-0,um mbMiA,hm
s9wyHwaand
IF
Ell
0
WI alocia ube:n
Dan FmF4Dz.
IF
FIB
0
(FAN W,romn mmoarpe Cars. CampN'
CbnbW C✓npM PM1nmae
IF
Sr
3
(FM alone.. mbNwMnY[
Eanmp Pbmm[.
IF
n
3
Mot hnaromonpmbi
HnebelRnYmon
Ile
115
3
MST hn,NmOn,llia[
R., EbunYln PMeInam
IF
Ell
I
POEFU Mpwrum,ua.n,
StlwLq Nrm
IF
FI5
3 Norm eaucnr.
NP11 RepDOO MumnrArapukMmme
R.gran Carysoaw
IV
FIB
0
SEMI Saabs. me Avumn ply
AAenn gsarvop
Sher SPavars. munmmm.
Oepe dRe Wlw
1Y
a,
0
Pnmemnl....
(AGE million .Is
Bgdw♦Ym
fla
FIB
3
HESE Ns6.-ampercnna
Elul Mna Glee
11'
et
3
ALC.s ALlmmnaempatmpiDa„Wp,I YY
RepN MH WhhGwa
N'
11
3
.0 MrNm vyNm ld,hFamtlu,M'
PaYnmWmma Saialltlr lea,.
21
FIS
3
. Ranuse, el;eameae sbrrtV
N ftw 1n(Yv,
IF
F15
3
SCPB bna[wsnum'ins Phase Bea,'
0 Noe Lse LH,alem
IF
i15
3
Bar Somsemum numv T.qun Baer
taco.,Sm, Mw1 Gram.
IS
An
3
S. Spnoaolma nsl
S.Sgbn Graa.
1.
AI
3
o"Poe era
.1c Evwemu, Mrm. Cabapra
Wnmmnpar. gnpl
3T
F33
3
EYOp Gai.maMmm
seW WWuF
IS
FJ]
10
.A .ngna
chomemo CaarWalMy
IT
Fv
3
TARE TmmNss bno-amen
Pmelye F.Mr
f
F13
0
1 l
RBTpYTEIIJb®YAIWSIs)
_
-8
W
O
Cs
`
a
CSgILM NA3E SLBGNLIYl1E
ne
as
Ahern. ludanclh. P1H1 e sleb,usn
sa00 10
BID
Mrhlem"comad ramp Winamed
SO ♦
2N
W
somiri iasgro,a Ss,-,Mkmeed
SS ♦
3N
O
Sukbua cvdpeMUW 3amaYplama
IN ID
229
mutbuaprwm W. parr,
e25 I5
019
Buse Wdahoodesmwrr Sumer'..
N IS
IIa7
loom -ruder- Cenw'MpM
1is IO
379
imamp-lies, OpaMGafbemw
IN ♦
IN
3bn.m. e,(um. M,wlhaabelm
lead ♦
DI3
0
Panwm ngawm Scotus,..
200 ♦
as,
Paiiysnun Loma VlUnhoMayrua
IN 10
3N
SoHgoo,+bwa C...aa fabnmd
INY 5
Olt
mva N
is"
IFIA,O SEED MIA IIFSN)
i
00
`oi
e<
I.Y,mlw Xws
Sc6Lirc PAYE
as
m
ACArmeemrvm nlmenwfn'Pdbn,'
Man Myrna
lei
5
IN
Am,frearnams
Leadp,nl
for
5
110
sbmmes nadambwa
PwA Spears
sAN
5
006
spobbuacunpmaula
Seeoab paama
10
10
2"
M,rhWapatiea lrtl,A'
sew pram•
N5
30
IN
BWrbe dsY/bJe,mmO
BumserOno.
N
20
Ism M
Pazopynm mF.'AmOa'
Masmeheagatt
IN
10
3N
rmx
7s
NA
Ell
��• �1111
� S`Y
II//�//J
u
cGYNAINAME
B®nnc NadE
y e
Aril inramab
&agrmpke-
N
A
I
2N I I I I
II IIIIIII
.a.t.c«co
aanYew.e
N
♦
3m (III
I I
III
cams babbu
ewer tram
TAN
t0
am I
j
Elyma39anma
Ins F4,
1Be
2D
aAd I I
I I I
1 I I
Efirs-itr®d walp br.wmem
Tampas F..gras.
IN
to
2413
hation. m,psnm.
Prphe Ampnn
tons
IQ
a33
Litmueuanu.
�Pa-as-asaval,rn
Ban aab am
slmNgaes
lie
]e9
Is
is
aN I I I
fors ( I I I ( I I I I I) 1
I I
"is.mr;,,m,fAp«bm
L1WBsr,YYm
2N
10
IN II I I I II IIIII
I
I mAal
w
II I I (III
II , II IIIiIII!Iliiii
?� �. III�II
�III111�1
I I I
�NInIIIIIIIIIII�III
I I IIIIIIIIfI�II�I
/I . .
FCHA
FORT COLLINS
NOISING AUTHOEITT
RECITAL PONDS PSH
FORT GOWNS
IIOUSING AU I I IOIlIII
1715 WERT MOUNTAIN AVENUE
FORT COLUNS, CO. $0521
PHONE:910414B10
FAXIETI-M4821
AMOYTECT3
STUDIO C O\illl.I I I\':\
300D ZUNISTREET
DENVER Co 60211
PHONE: W3411.9155
FAA: 3034774428
LANDSCAPE ARCHITECT:
azur ground
PO ON 210
FORT COLLRS, GO. UM
"Me: UH17-MIZ
CIVIL:
I\ \
25 OLD TOWN SQUARE SURE 200
FORT COLLINS, CO.8052/
PHORE, 970-Z25�9099
FAX 970-2254923
STRUCTLIRAL:
klI& \
621 EAST 6TH STREET
LOVELAND, CO.$0537
PHONE: 970661-2426
FAX: 970467-2493
MECHANCAL/PL(1MBN C,
\k"U\I \I\' 111,11
2165 S. KAIAMATH STREET
DENVERf COLORADO WM
PHONE: 303862,3M
FAX 303-0623991
ELECTRICAL:
\1 %)Nl',ILLCIRIB=.
2121 WIELD COUNTY ROAD 27
FORT LUPTON, CO III
PHONE: W34591401
FAX 3031W O677
REVISION: _.._
PROJECT NUMBER 130201.01
DATE: 10/27/13
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET TIM;
PUNT SCHEDULE, LEGEND
AND WATER BUDGET
SHEET NUMBER:
LP01
�: b
i'a'e�
It biq Pill
4 •
$ ' F
reds
I
- , C64E'lTI-L`i,.',,.
IMAGE t CEMENT FIBERBOARD
IMAGE 2 CEMENT FIBER BOARD 8 PUNK
CEMENT FIBER CLADDING
n
IMAGE A. RUSTED CORRUGATED METAL ."-..
CORRUGATED METAL CLADDING
-----------------------
IMAGE B BRICK &4VPIE
MASONRY
jE -B. CK, aeYF�E
COLOR PALETTE
1. OFF-WHITE BASE COLOR
2. SECONDARY COLOR
3. CONTEXTUAL GREEN #1
4. CONTEXTUAL GREEN#2
5. HIGHLIGHT GREEN
6. BIKE CHALETBUILDING ENTRY ACCENT COLOR
MIAGE 8: EXPANDED METAL MESH FENCE Q &KE BARN
METAL SCREEN
IMAGE 9. BIKE BARN SCREEN - EXPANDED METAL MESH
MATERIAL EXAMPLE
PRELIMINARY DEVELOPMENT PLAN
REDTAIL PONDS
PERMANENT SUPPORTIVE HOUSING
SITE PLAN
FORT COLLINS, COLORADO
SHEET!
BUILDING MATERIALS
S llll �4AiRL TIVA%', 3000 ZUNI STREET DATE OCT 31 2013
DENVEA, CO 9211
RN. 301
FA303 An.SAM
0
kt�
CMU (STAIR)
154' U'
T. 0 CMU
15U-0�
0 PARAPET
146-0o
TO PLATE
14Z-0'�
4TH FIN FLR
137 - 01
3RD FIN FLR
127-0$
2ND FIN FLR
T17. 0o
1ST FIN FLR
10U-a"�
PDP - EAST ELEVATION
v,5.1'P 2
u. urnu Iswrcl
15/'-Od
T.O. CMU
15U-0o
T0. PARAPETS
146-D'
T0. PLATEs,
147-n'
4TH FIN FLR ISI
137 IF
3RDFINFLR
12Z-or
2ND FIN FLR
117-0'
iSTFIN FLR
100-Uo
PDP- EAST COURTYARD ELEVATION
+nc=ra 4
PDP-WEST ELEVATION 8
1/16-• I'Q
TO CMU(STAIR) Q
154.0
T 0, CMU&
150' o°
T.O. PARAPET
146-0
TO PLATE
142'-Vo
4TH FIN FLR
�
137-P
3RD RN_FUR op.
122'-0'
2ND FIN FLR
417-0"�
_ 1ST FIN FIR
iw. '
NORTH
H
�ptp TH
MATERIAL NOTES:
TO PARAPETs,
146-0
O
FIBER CEMENT BOARD PANEL
TO PLATE
14Z-0'�
O
STEEL POSTS
4TH FIN FLR
O
ALUMINUM STOREFRONT
3T-0�
O
METAL N1ftE MESH FENCE
3RD PLR
Oe
MNYLNINDOM
1z2-r
Q
PREFINSHED METAL RAJUNG
2ND FIN FLRo
112-01
Oi
PREFINI SHED METAL COPING
Q°
HM DOOR
1ST FlN FLR�
lw-6'
Q
CONCRETE COLUMN
PDP-SOUTH ELEVATION
,na•=,a 5
Tn r-1.'I (STAIRI�
54'-0
0. CMU�
150-0
ARAPET�
146.0
PLATE,
147-0
FIN FLR Q
13Z-0'
FIN FLR,
127.0
FIN FLR�
117.T
FIN FIRS
10U-0
PDP - NORTH ELEVATION /,j
IMF-,0 1
PDP - SOUTH COURTYARD ELEVATION 3
• IMF ra
10 METAL DECKING
,1
OVERHANG I SUNSHADE
rs
TPO ROOFING
n
PTAC UNIT
u
BRICK
+OS
RUSTED CORRUGATED METAL PALL
le
ROOFTOP UNIT SCREEN
IT
FIBER CEMENT BOARD PLANK
PRELIMINARY DEVELOPMENT PLAN
REDTAIL PONDS
PERMANENT SUPPORTIVE HOUSING
SITE PLAN
FORT COLLINS, COLORADO
SHEET2
BUILpHB ELEVATIONS
STUDCOMPI. TIVA 3DD]ZUMSTHEET DATE: OCT.91,2511
DENER, CO W211
PH'. W34"91%
iz2D3 In !Ha
AA
CONEJOSI
GENERAL NOTES
1. ALL NEW EXTERIOR SITE AND BUILDING LIGHTING SHALL CONFORM TO CITY
STANDARDS TO INCLUDE FULL CUTOFF LAMPS,
ALL EXTERIOR LIGHTING HALL BE DOWN DIRECTIONAL a DESIGNED FOR NO
"OFF -SITE" TRESPASS.
2 COMMON OPEN SPACE AREAS AND ARTERIAL STREETSCAPES WILL BE
MAINTAINEDBYAPROPERTYOWNERSASSOCIATION. PROPERTYOVMERS
ASSOCIATION WILL BE RESPONSIBLE FOR SNOW REMOVAL ON THE
STREET SIDEWALKS.
3, FIRE HYDRANTS TO MEET OR EXCEED FOUDRE FIRE AUTHORITY
STANDARDS, ALL BUILDINGSWILLSE PROVIDEDVATH ANAPPROVED FIRE
EXTINGUISHING SYSTEM.
4. REFER TO UTILITIES PLAN FOR LOCATION OF UTI UTIES, DRAINAGE,
EASEMENTS AND SIDEWALKS.
5. SIDEWALKS AND RAMPS WILL CONFORM TO CITY I ANSI STANDARDS
e, ALL SONAGE SHALL COMPLY WITH CITY SIGN CODE AND LOLL BE APPROVED
THROUGH SEPARATE PERMIT.
T. BIKE RACKS ARE TO BE PERMANENTLY ANCHORED.
B. STANDARDS FOR PROTECTION DURING CONSTRUCTION -THE DIRECTOR
SHALL ESTABUSH A'LIMITS OF DEVELOPMENT" ("LOD) LINEIS) TO
ESTABUSH THE BOUNDARY OF THE PROJECT OUTSIDE OF MICH NO LAND
DISTURBANCE ACTIVITIES WALL OCCUR DURING THE CONSTRUCTION OF
THE PROJECT
S. SEE SECTION 3 4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN
THE BUFFER ZONE.
10. CONSTRUCTION SHN.L BE ORGAOMD AND TIMED TO MINIMIZE THE
DISTURBANCE OF SENSITIVE SPECIES OCCUPYING OR USING OWSITE AND
ADJACENT NATURAL HABITATS OR FEATURES,
11. CONSTRUCTION OF WRIER FENCING SHALL BE PROVIDED AT THE UNITS
OF THE DEVELOPMENT DURING CONSTRUCTON
12. COVERED BIKE PMWNG PROVIDED.
13. TRASH SERVICE BINS TO BE PROVIDED BY LOCAL TRASH COLLECTING
COMPANY
14. MY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO
CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS,
DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT.
SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE
DEVELOPERS EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED
IMPROVEMENTS ANDIOR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
OCCUPANCY.
NORTH
® OVERALL SITE PLAN
I••]Ba
o• s• Ta za as sa
LAND USE STATISTICS
iOTNSREGOVEPAOE
SO.
f8RAi®OPB]SPALE
FT
ACRE
xRLOT
BOB
13i,elA50R
Etl
100%
umao Fr
o01
13
LEGAL! DESCRIPTION
IafIFFN WR t]INwR111e W TTab D.N KRFDNIL
MmAV mM W �AVPNFf.3APd Nudbn Ha.11RW WSWBtlM RnaM d WYm CONry.SLP
d fen uu... cO.dr d mn�.r. 3m a cm]eR
IBtlupxc TNERETRw] a p.rt.l dl.oe anme.aurolron.
APwldbm °nno �>^P�v4>+Peso, d rnelc. a pneond W lo. aw au dlp n.N le a o1M
M1rM emwn� aPn n[wdtlA°pvn].m.e R.ew. xo aoFaomnde. Wrupa eLamnr
FgfRy,.N W iny.xab,l mNm Semon:, IwmeMp 6 N°RI Wipe ®VMndm. Wi PIN., Cny dMCdlln,
Gffy d I�nnn.5lne d Cobntlo, uve pomcJvlr Eeambe as mllon:
®OIMVNL allb SeWMroN Cwnm dLN I: oI1M WMa119ulnrvblm uqu.YMepn. WMXIy IM d!W LN
tt.IMMlIp xmn ax ra, w.el. 6:ep a ON BOHov a ua cb°nJasnbNbv rowdn4 Mlxwm
bn, NOTAP.rlran mrvm 1MIl^Wl. rlA al cqx tranye [wWIM Mi1M11wtlnIM[ 11pFENptli
}IyY' W W Yaq Ev vMMv lin>,aN La t: a danw, ✓q9.W MbtilYlb.dal.Bn.K
N W 1]>Orm'm PaA
adln.n lrmf. N.
LEGEND
INNpGPPMMIIG S]ALL
a PARNIIJG SIGN
6P BINE RAIX
LP LGHi PGIE
SHEET INDEX
6HEEi I
WFANLBIIE RNI
SHEET 3-LS11
NNR9wPEATEPLW-NEST
SHUT 3-1911
NNB34wIS9TEPLNN-F/ST
SHEET A-Upl
PUM RHBAILEIFfi@OANDVAtBVRIDOM
SHEET fi.lrn
tANO0WEBIEPIAN-NEST
SHEEN B-LP12
LNIDSCAPE 9ITEPUN-FAST
SHEET T
AADIrtECTURN ELEVATCN6
SHEET I
BUII➢WG N.AIERWS
bHEll B
PEREPECTNES
SNEET IGE1.1
RTEPHOfOMETHICPUN
SHEET IIE-13
PXOTOMEIPC SRC SHEETS
]euRAP
PAL? -
VICINITY MAP
NOT TO SCALE
PLANNING
APPROmD BY THE O'RECTOR OF FUNNNO FOR THE CITY OF FORT COLLM COUl
ON7w6_O1YCf ._
DIRECTOR OF PLANNING
ENVRa1MEMALPIANMR
AE OWNER'S CERTIFICATION
THE UNDERSIw DOES I DO HERGY MUIR 7MT VAE ARE THE UFML ONNERS OF
IIENP.IL PROPERTY OESCIONOON THIS SOEPWI AND DO HEREBY MUIR THAT II
v4:Aclfvr rN±caxmab6AraAEsmDTIox66Er A1RMIXewD611EPLW.
DAN&tswom 0]TE
ONNB]ISDNFCI CITE
oN,ER IfiGI1E01 LATE
WNER ISCNEDI D.1E
THE
FOREGOING MISTRUMENi W16 AfYNONtEpOEDBEFORE ME
MI6 DAY 11i_wGA_BY
IPRIM NAME
4
KY WMNIE6CN IXPR6.
VARJEfiB MY RANG ANOORCRL SFAL
PRELIMINARY DEVELOPMENT PLAN
REDTAIL PONDS
PERMANENT SUPPORTIVE HOUSING
SITE PLAN
FORT COLLINS, COLORADO
1 MIE: OCT A/, 3Bti
iIUUI T�VA'� 3000 ZUN1 STREET
I I DENVER, CO BD211
P11',303.1]T.G198
Redtail Ponds Permanent Supportive Housing. PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 38
11. View Analysis Images
12. Shadow Analysis
13. Ecological Characterization Study
14.Transportation Impact Study
15.Traffic memorandum — sidewalk connection
16. Street Turn Variance
17. Neighborhood Meeting Minutes, comments and responses
18.1 Letters from Neighbors
18.21-etters from Neighbors
19 Drainageway Easement Agreement
20 Application Form
21 Submittal Checklist
22 PDP Comment Responses
23 Preliminary Geotech Report
24 TIS Appendices
25 Depiction of Block Requirements
26 Preferred and Alternative Site Plan-TOD modification
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 37
E. The P.D.P. complies with relevant standards located in Article 3 — General
Development Standards (i) provided that either compliance with Section
3.8.30(D)(1) Block Structure is deemed infeasible or that the Modification
of Standard to Section 3.8.30(D)(1) Block Structure is approved; and (ii)
provided that the Modifications to Section 3.10.3(A) Building Orientation
and Section 3.10.4(C) Off -Street Parking are approved.
F. The P.D.P. complies with relevant standards located in Division 4.21,
General Commercial District (C-G) of Article 4 — Districts, subject to the
approval of the modifications of standard that are part of TOD Overlay
Zone requirements for the C-G District — specifically the Modification of
Standard to Section 3.10.3(A) Building Orientation and Section 3.10.4(C)
Off -Street Parking that are proposed with this P.D.P. are approved.
RECOMMENDATION:
Staff recommends approval of Redtail Ponds Permanent Supportive Housing Project
Development Plan, PDP #130030, a determination of infeasibility as to the Block
Requirement regarding block structure in Section 3.8.30(D)(1), and Modifications of
Standard to Sections 3.8.30(D)(1) Block Structure, ,
3.10.3(A) Building Orientation and 3.10.4(C) Off -Street Parking.
ATTACHMENTS:
1. FCHA Memo to P&Z
2. Statement of Planning Objectives
2.1 Modification Request — Block Requirements
2.2 Modification Request — Block Requirements, map exhibit
2.3 Request for Reasonable Accommodation
2.4 Modification Request — TOD Parking Standards
3. Site Plan, Building Elevations, Building Materials, Building Perspectives
4. Landscape Plans
5. Aerial Perspective
6. Lighting Plan
7. Lighting Details
8. Plat
9. Utility Plans
10. Building Height Review
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 36
B. Section 3.10.3(A) Building Orientation and Section 3.10.4(C) Off -Street
Parking that are proposed with this P.D.P. meet the applicable
requirements of Section 2.8.2(H)(1) and (2), and the granting of these
Modifications would not be detrimental to the public good.
This is because (i) the strict application of such standards would render the
project practically infeasible, the granting of the modification does not
impair intent and purpose of the LUC, and the granting of the modification
would substantially alleviate an existing, defined and described problem of
city-wide concern including: LIV 7.5- Plan for and meet the housing needs
of special populations within the community. Disperse residential -care
facilities, shelters, group homes and senior housing throughout the Growth
Management Area, LIV 8- The City will encourage the creation and
expansion of affordable housing opportunities and preservation of existing
affordable housing supply, and LIV 8.5- Encourage the integration and
distribution of affordable housing as part of individual neighborhoods and
the larger community rather than creating larger concentration of
affordable units in isolated areas; and (ii) the entrance drive and parking
area provides street -like enhancements similar to a street -like private drive
including narrower travel lanes, tree -lined borders, tree grates, sidewalks,
angled parking, generous landscaped medians, corner plazas, pedestrian
lighting and benches that create an appropriate alternative to a street. The
strict application of such standards would render the project practically
infeasible, and the granting of the modifications do not impair intent and
purpose of the TOD Overlay Zone to foster and promote attractive street -
oriented developments with enhanced design details, and the granting of
the modification would substantially alleviate an existing, defined and
described problem of city-wide concern by permitting the project to meet
the housing needs of special populations within the community.
C_The P.D.P. complies with process located in Division 2.2 — Common
Development Review Procedures for Development Applications of Article
2 — Administration.
D. The P.D.P. complies with the Block Requirements of Section 3.8.30(D)(2)
and (3) for Block Size and Minimum Building Frontage. It is infeasible for
the P.D.P. to comply with the block requirement of Section 3.8.30(D)(1)
Block Structure due to existing development.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 35
provided supplemental information that describes the project's public engagement
process and outlines comments from neighbors and the responses throughout the
design process.
8. Findings of FacVConclusion
In evaluating the request for the Redtail Ponds Permanent Supportive Housing Project
Development Plan, Staff makes the following findings of fact:
A. The Modifications of Standard to Section 3.8.30(D)(1) Block Structure}
that are proposed with this P.D.P. meet the
applicable requirements of Section 2.8.2(H)(2) and (3), and the granting of
these Modifications would not be detrimental to the public good.
This is because LiLthe strict application of such standards would render
the project practically infeasible, the granting of the modifications does not
impair intent and purpose of the LUC, and the granting of the
modifications would substantially alleviate an existing, defined and
described problem of city-wide concern by PeFFAi++ Rg the pFejeGt W
the hOUSORg needs of speGial populations within the GGFnR4WPitY
including:
LIV 7.5- Plan for and meet the housing needs of special populations within
the community. Disperse residential -care facilities shelters, group homes
and senior housing throughout the Growth Management Area, LIV 8- The
City will encourage the creation and expansion of affordable housing
opportunities and preservation of existing affordable housing supply, and
LIV 8 5- Encourage the integration and distribution of affordable housing
as part of individual neighborhoods and the larger community rather than
creating larger concentration of affordable units in isolated areas; and ii
the project site cannot contribute towards any strict requirement to form a
"complete block" without adding a street connection through the site,
connecting to either South College Avenue to the east or , Coronado
Court to the south— or through the Woodley's development to the north.
Making such a connection is both an exceptional practical difficulty,
because the block pattern surrounding the site has already been
established by existing development and natural areas, and
because the change in topographic elevation between the site and South
College Avenue is an exceptional physical condition that makes the
construction of a complete street connection and complete block an undue
hardship upon the owner not caused by act or omission.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 34
This is because the entrance drive and parking area provides street -like
enhancements similar to a street -like private drive including narrower travel
lanes, tree -lined borders, tree grates, sidewalks, angled parking, generous
landscaped medians, corner plazas, pedestrian lighting and benches that create
an appropriate alternative to a street. The result is a project in which the overall
design and building entrance is not dominated by a standard parking
configuration, but rather achieves a unique identity consistent with the urban
character promoted by the standards of the TOD Overlay Zone. The stigma and
negative design impacts of a design dominated by a standard parking lot have
mitigated by the enhancements provided. If the project were not in the TOD
Overlay Zone, the building/parking/street configuration proposed would be
permitted by the LUC General Development Standards without the significant
enhancements proposed by the plan as modified.
B. The request satisfies Criteria 4 (2.8.2(H)(2) because the granting of a
modification from the strict application of the standard would, without impairing
the intent and purpose of this Land Use Code, substantially alleviate an existing,
defined and described problem of city-wide concern or would result in a
substantial benefit to the city by reason of the fact that the proposed project
would substantially address an important community need specifically and
expressly defined and described in the city's Comprehensive Plan or in an
adopted policy, ordinance or resolution of the City Council, — including: LIV 7.5-
Plan for and meet the housing needs of special populations within the
community. Disperse residential -care facilities, shelters, group homes and senior
housing throughout the Growth Management Area, LIV 8- The City will
encourage the creation and expansion of affordable housing opportunities and
preservation of existing affordable housing supply, and LIV 8.5- Encourage the
integration and distribution of affordable housing as part of individual
neighborhoods and the larger community rather than creating larger
concentration of affordable units in isolated areas, and the strict application of
such a standard would render the project practically infeasible.
This is because the strict application of such a standard would render the project
practically infeasible, and the granting of the modification does not impair the
intent and purpose of the TOD Overlay Zone to foster and promote attractive
street -oriented developments with enhanced design details, and the granting of
the modification would substantially alleviate an existing, defined and described
problem of city-wide concern by permitting the project to meet the housing needs
of special populations within the community.
7. Neighborhood Meeting
A City neighborhood meeting was held for the proposed project, and detailed meeting
minutes and letters from the neighbors are attached with this staff report. FCHA has
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 33
conditions such as exceptional narrowness, shallowness or topography, or
physical conditions which hinder the owner's ability to install a solar
energy system, the strict application of the standard sought to be modified
would result in unusual and exceptional practical difficulties, or exceptional
or undue hardship upon the owner of such property, provided that such
difficulties or hardship are not caused by the act or omission of the
applicant.
The Project is located amidst existing development in the Cameron
Park/Redtail Ponds office park development on a narrow rectangular
(approx. 225' by 555) 2.97-acre parcel with steep slopes down to College
Avenue. Direct street access to the Project is only possible at its west end,
where there is very limited frontage; street access to College Avenue on
the east is not possible. Due to these unique conditions, it is not possible
to position the building in close proximity to the street on either the west or
the east. Finally, if FCHA were required to install a street into the Project
to satisfy the TOD Overlay Zone development standards regarding
building orientation and off-street parking, the result would create the
following practical difficulties for the Project:
• More pavement within the Project
• 62% reduction in parking (13 vs. 34)
• 23% reduction in amount of functional open space for use by
tenants
• Closer proximity to and greater visibility of parking lot from College
Avenue
• HeighUmass are emphasized with location of building closer to
steep slope
• Less buffer to Woodley's Furniture
• Increased construction costs to deal with change in elevation
between building and College Avenue
• Increased street maintenance costs to City
E. Staff Finding:
Staff finds that the request for Modifications of Standard to Sections 3.10.3(A)
Building Orientation and 3.10.4(C) Off-street Parking are justified by the
applicable standards in 2.8.2(H). The granting of the Modifications would not be
detrimental to the public good and:
A. The request satisfies Criteria 4 (2.8.2(H)(1) because the plan as submitted
will promote the general purpose of the standard for which the modification is
requested equally well or better than would a plan which complies with the
standard for which a modification is requested.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 32
4.3 Goal: Increase Housing and Facilities for People with Special Needs.
This broad category includes those who are homeless, seniors, persons
with disabilities, veterans, and victims of domestic violence. These groups
generally require housing units tailored to specific needs not typically
addressed by market -driven development. Many times a network of
support services is needed to keep these populations stable and
independent.
4.3.1 Justification.
Homeless. . . . Research has shown the sooner people can enter a
stabilized shelter situation, the sooner they can start dealing with the other
problems that accompany homelessness, which also decreases costs to
providing community services for this populations. .. . suggests single
room occupancy housing as a more effective alternative to traditional
homeless shelters.
Persons with Disabilities: . . . organizations which provide supportive
services or housing for disable customers do not have enough low -rent
options for the number of people who need them.... it is important to
expand the supply of housing that is both accessible and affordable.
Partners in Affordable Housing. While the City of Fort Collins is an
important player in addressing the affordable housing needs of its citizens,
there are other partners that also contribute important resources.... the
City cannot solve all of the community's affordable housing needs alone.
Policies:
AHSP-11 The City will support community initiatives identifying homeless
needs and developing action plans to reduce the homeless population in
Fort Collins, The City will also participate in partnerships exploring
solutions for homelessness.
AHSP-12 The City will support projects producing affordable units to serve
persons with disabilities, and "cost -burdened" senior citizens.
Conclusion: . . . A lack of affordable housing affects everyone. . . .
Affordable housing is greater than a social issue; it is also about economic
development and environmental protection. . . . The Fort Collins City
Council made a commitment to affordable housing through the adoption of
many programs and the allocation of General Fund revenue into the
Affordable Housing Fund.... affordable housing must be elevated so it is
discussed on par with such topics as economic development,
environmental protection, and public safety ... Every discussion regarding
a sustainable community must include the consideration of affordable
housing.
4. As required by Land Use Code Sec. 2.8.2(H)(3), by reason of
exceptional physical conditions or other extraordinary and exceptional
situations, unique to such property, including, but not limited to, physical
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 31
substantial benefit to the city by reason of the fact that the proposed
project would substantially address an important community need
specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of
the City Council, and the strict application of such a standard would render
the project practically infeasible. "
The Project meets both alternative requirements of Land Use Code Sec.
2.8.2(H)(2). The Project is a permanent supportive housing community
designed to meet the special housing needs of homeless individuals with
disabilities, homeless veterans and other low-income individuals. The
need for housing units tailored to the specific needs of these types of
individuals is defined in City Plan and the Affordable Housing Strategic
Plan, and the opportunity to provide such housing for 60 individuals is a
significant steps towards addressing this important community need and
provides a substantial benefit to these individuals and the community as a
whole. Please see the following excerpts. -
City Plan:
Principle LIV 7: A variety of housing types and densities for all income
levels shall be available throughout the Growth Management Area.
LIV 7.5 — Plan for and meet the housing needs of special populations
within the community. Disperse residential -care facilities, shelters, group
homes, and senior housing throughout the Growth Management Area.
Principle LIV 8: The City will encourage the creation and expansion of
affordable housing opportunities and preservation of the existing
affordable housing supply.
LIV 8.5 — Encourage the integration and distribution of affordable housing
as part of individual neighborhoods and the larger community rather than
creating larger concentration of affordable units in isolated areas.
Affordable Housing Strategic Plan:
Executive Summary: Increase housing and facilities for people with
special needs.
Introduction: Affordable housing is a critical asset contributing to the
social, economic, and environmental sustainability of a community... The
overall wellbeing of an individual can be significantly improved with stable
housing conditions, which leads to more stable families and stable
neighborhoods.
4.1 Goal: Increase the Inventory of Affordable Rental Housing Units. The
first priority should be to increase the inventory of affordable rental units . .
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 30
2. Land Use Code Sec. 2.8.2(H)(1): "the plan as submitted will promote
the general purpose of the standard for which the modification is
requested equally well or better than would a plan which complies with the
standard for which a modification is requested."
Stated purposes of the TOD Overlay Zone development standards
include:
"to encourage land uses, densities and design that enhance and support
transit stations, "
". allow for a mix of goods and services within convenient walking
distance of transit stations, "
"encourage the creation of... attractive residential... environments.
The enhancements to the entrance drive/parking area contribute to the
intent of the TOD Standards as well as a site layout that complies with the
standards in that the Project continues to support the transit station by
virtue of its location in an area of mixed uses within convenient walking
distance to the transit station. In addition, the greatest visibility of the
building will be from vehicles traveling along South College Avenue where
there will not be any pavement or parking between the building and the
street.
If FCHA installed a public street with a cul-de-sac to access the building
within the Project (see Altemative Plan attached) to comply with the TOD
standards, the resulting layout, in comparison with the proposed layout,
would be less desirable for the following reasons:
• More pavement within the Project
• 62% reduction in parking (13 vs. 34)
• 23% reduction in amount of functional open space for use by
tenants
• Closer proximity to and greater visibility of parking lot from College
Avenue
• Height/mass are emphasized with location of building closer to
steep slope
• Less buffer to Woodley's Furniture
• Increased construction costs to deal with change in elevation
between building and College Avenue
• Increased street maintenance costs to City
3. Land Use Code Sec. 2.8.2(H)(2): "the granting of a modification from
the strict application of the standard would, without impairing the intent
and purpose of this Land Use Code, substantially alleviate an existing,
defined and described problem of city-wide concern or would result in a
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 29
street frontages to the maximum extent feasible, with highest priority given
to east -west streets that lead from transit stations to destinations.
3.10.4(C) Off-street Parking. Off-street parking shall be located only
behind, above or below street -facing buildings. No parking will be allowed
between the street and the front or side of a building.
In response, FCHA redesigned the Project to have an entrance
drive/parking area that more closely resembles a street like private drive
with numerous enhancements that mitigate the impacts of a standard
parking lot and create a unique design with a strong urban building/street
relationship. The redesign includes angled parking spaces, tree -lined
borders, and a detached sidewalk. Four (4) additional parking spaces
(head -in style) are provided in close proximity to the building entrance for
handicapped accessible vehicles. The parking area will function like a
public street, and the multi -family building will front on and offer primary
orientation to such drive. Other features in the design of the parking area
drive include an adjacent multi -use path, a landscaped median, a wide
plaza between the drive the building entrance, street trees, and site
benches.
2. Request for Modification of Standards
FCHA requests the Planning and Zoning Board grant a modification of the
TOD Overlay Zone development standards cited above. The Land Use
Code requires that all modifications not be detrimental to the public good,
and provides four (4) alternative specific grounds for granting the
modification, of which, we are citing three (3) as justification for approval
of this request.
In support of its request, the applicant asserts.
1. Land Use Code Sec. 2.8.2(H): "the granting of the modification would
not be detrimental to the public good. "
The overwhelming majority of people coming and going from the Project
will be tenants, management, employees, and service providers. There is
no reason for members of the public to be coming to the property or
traveling through the Project, particularly since there are no services
available to the public nor is there a through street, so there will be no
detriment to the public good. In addition, the enhancements to the
entrance drive/parking area contribute to the intent of the TOD Standards
and are, therefore, not detrimental to the public good.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 28
physical conditions such as exceptional narrowness, shallowness or topography,
or physical conditions which hinder the owner's ability to install a solar energy
system, the strict application of the standard sought to be modified would result
in unusual and exceptional practical difficulties, or exceptional or undue hardship
upon the owner of such property, provided that such difficulties or hardship are
not caused by the act or omission of the applicant; or
(4) the plan as submitted will not diverge from the standards of the Land Use
Code that are authorized by this Division to be modified except in a nominal,
inconsequential way when considered from the perspective of the entire
development plan, and will continue to advance the purposes of the Land Use
Code as contained in Section 1.2.2.
Any finding made under subparagraph (1), (2), (3) or (4) above shall be
supported by specific findings showing how the plan, as submitted, meets the
requirements and criteria of said subparagraph (1), (2), (3) or (4).
D. Applicant's Justification:
The applicant has provided the following justification for the modification request:
1. Background.
The Redtail Ponds Supportive Housing Project ("Project"), proposed by
the Fort Collins Housing Authority ("FCHA'), is located on a narrow
rectangular (approx. 225x555) 2.97-acre parcel in the Cameron
Park/Redtail Ponds office park development. Direct street access to the
Project is not possible to/from the north or south due to existing
development (Woodley's Furniture and the approved Cameron Park 2nd
Subdivision), or from the east, where the number and kind of accesses
to/from College Avenue are limited. The sole point of access to/from the
Project is from the west end at the intersection of the public streets,
Conejos Road and Fossil Blvd.
The Project was originally designed to have a typical 40-space parking lot
between the Conejos Road/Fossil Blvd. intersection and the entrance to
the building, however, it was pointed out by City staff during the
conceptual review process that this configuration would not be in
compliance with the following two Transit Oriented Development ("TOD")
Overlay Zone development standards:
3.10.3(A) Building Orientation. Primary commercial and residential
building entrances shall face streets, connecting walkways, plazas, parks
or similar outdoor spaces, but not parking lots. Buildings shall face all
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 27
3.10.4(C) Off-street Parking. Off-street parking shall be located only behind,
above or below street -facing buildings. No parking will be allowed between the
street and the front or side of a building.
B. Description of the Modifications:
The applicant has submitted a request for approval of two related Modifications
of Standard to Sections 3.10.3(A) Building Orientation and 3.10.4(C) Off-street
Parking. Together these standards require parking areas to be located in areas
that are behind the building as well as not located between the front entrances of
the building and the street.
The standards are part of the Site Planning and Streetscape and Pedestrian
Connections criteria for the TOD Overlay Zone. The intent of the TOD standards
is to foster and promote attractive street -oriented developments with enhanced
design details such as outdoor plazas with public art, walkways with benches,
trees with tree grates, and street -oriented parking design.
The Site Planning and Streetscape and Pedestrian Connections standards
promote the intent of the TOD Overlay Zone by encouraging the use of buildings
to define streets. as opposed to having streets defined by parking lots, in order to
create an enhanced urban character that typical parking lot designs don't
provide.
C. Land Use Code Modification Criteria:
"The decision maker may grant a modification of standards only if it finds that the
granting of the modification would not be detrimental to the public good, and that:
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan which
complies with the standard for which a modification is requested; or
(2) the granting of a modification from the strict application of any standard
would, without impairing the intent and purpose of this Land Use Code,
substantially alleviate an existing, defined and described problem of city-wide
concern or would result in a substantial benefit to the city by reason of the fact
that the proposed project would substantially address an important community
need specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of the City
Council, and the strict application of such a standard would render the project
practically infeasible; or
(3) by reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property, including, but not limited to,
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 26
integration and distribution of affordable housing as part of individual neighborhoods
and the larger community rather than creating larger concentration of affordable
units in isolated areas, and the strict application of such a standard would render the
project practically infeasible.
This is because the strict application of such a standard would render the project
practically infeasible, the granting of the modification does not impair intent and
purpose of the LUC deSGFibed iR SeGtFOR 1.2.2 Purpose, and the granting of the
modification would substantially alleviate an existing, defined and described problem
of city-wide concern by permitting the project to meet the housing needs of special
populations within the community.
B. The request satisfies Criteria 4 (2.8.2(H)(3): By reason of exceptional physical
conditions or other extraordinary and exceptional situations, unique to such property,
including, but not limited to, physical conditions such as exceptional narrowness,
shallowness or topography, or physical conditions which hinder the owner's ability to
install a solar energy system, the strict application of the standard sought to be
modified would result in unusual and exceptional practical difficulties, or exceptional
or undue hardship upon the owner of such property, provided that such difficulties or
hardship are not caused by the act or omission of the applicant.
This is because the project site cannot contribute towards any strict requirement to
form a "complete block" without adding a street connection through the site,
connecting to either South College Avenue to the east or Coronado Court to the
south. Making such a connection is both an exceptional practical difficulty, because
the block pattern surrounding the site has already been established by existing
development and natural areas through prior approvals as referenced in this staff
report, and because the change in topographic elevation between the site and South
College Avenue is an exceptional physical condition that makes the construction of a
complete street connection and complete block an undue hardship upon the owner
not caused by act or omission.
6. Modifications of Standard to Sections 3.10.3(A) Building Orientation and
3.10.4(C) Off-street Parking.
A. The standards:
3.10.3(A) Building Orientation. Primary commercial and residential building
entrances shall face streets, connecting walkways, plazas, parks or similar
outdoor spaces, but not parking lots. Buildings shall face all street frontages to
the maximum extent feasible, with highest priority given to east -west streets that
lead from transit stations to destinations.
Redtail Ponds Permanent Supportive Housing. PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 25
This PDP is consistent with the Master Street Plan, and provides the
required internal street connections..."
To summarize, the network of streets and parcels already planned with the
surrounding existing development makes compliance with the block standard
structure infeasible along the north and south boundaries of the project.
Adjacent to the west of the project, the Redtail natural drainage area represents
a substantial physical feature that forms part of the western block, and south
College Avenue forms the block to the east. Staff recommends that a
determination be made that compliance with the standard for Block Structure is
infeasible due to existing development.
Staff Finding for the Modification:
Staff finds that the request for a Modifications of Standard to Section 3.8.30(D),(1)
Block Structure, is justified by the applicable
standards in 2.8.2(H). The granting of the Modifications would not be detrimental to
the public good and:
A. The request satisfies Criteria 4 (2.8.2(H)(2) because the granting of a
modification from the strict application of the standard would, without impairing the
intent and purpose of this Land Use Code, substantially alleviate an existing, defined
and described problem of city-wide concern or would result in a substantial benefit to
the city by reason of the fact that the proposed project would substantially address
an important community need specifically and expressly defined and described in
the City's Comprehensive Plan or in an adopted policy, ordinance or resolution of the
City Council, — including: LIV 7.5- Plan for and meet the housing needs of special
populations within the community. Disperse residential -care facilities, shelters, group
homes and senior housing throughout the Growth Management Area, LIV 8- The
City will encourage the creation and expansion of affordable housing opportunities
and preservation of existing affordable housing supply, and LIV 8 5- Encourage the
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 24
unusual topographic features, existing development, and a natural area or feature.
This is because:
1. Series of Blocks
It is infeasible for the project to be further bisected to create a "series of blocks"
or even one additional block by installing a street that would divide the property
into more than one block: The site is significantly higher in elevation than South
College Avenue and the extension of a new street to South College Avenue is
infeasible. The highest portions of the site are at 5,005 to 5,000 feet, and if the
site is lowered to an average of 4,998 feet, which is the proposed elevation of the
FCHA building, then the site would still be 18 feet above the South College
Avenue at the center of the site. This change in elevation is significant and
prohibits the site from being
bisected to create an additional complete block.
2. Bounded by Streets
The east and west sides of the property comply with the standard as they are
either bounded either by streets or a combination of streets and a natural feature.
To the north and south, Tthe street network, development parcels and resulting
block structure surrounding the subject site have already been designed and
platted. This existing development structure was first designed as the Cameron
Park First Filing and Cameron Park Second Filing. These commercial
developments were planned in the County in 1981 and included the construction
of Cameron Drive and Coronado Court. The two filings were later annexed into
the City with the Cameron Park Annexation in April, 1992.
As part of the 2006 Redtail plans approved in the City, the remaining west portion
of Cameron Drive was constructed. Conejos Road was also constructed,
running north/south and connecting Cameron Drive to the existing portion of
Fossil Boulevard to the north. Although no buildings were constructed with the
previously approved Redtail plans, building sites were graded and a system of
ponds were constructed to connect drainage from the west from the Applewood
subdivision through to the City -owned Redtail Grove Natural Area to the south.
The staff report from the original Redtail approval in 2003 explains that the
project (which the FCHA site is part of) provided the required street system,
stating:
"The South College Access Management Plan designates Cameron Drive
and Fairway Lane as signalized intersections with College Avenue, and
specifically calls out the need for an internal street network connecting
Cameron Drive and Fairway Lane without the use of College Avenue.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 23
hardship upon the owner of such property, provided that such difficulties
or hardship are not caused by the act or omission of the applicant. "
The Project is an infill development located in the existing Cameron
Park/Redtail Ponds office park on an exceptionally narrow, rectangular
(approx. 225' by 550) 2.97-acre parcel which slopes steeply down to
College Avenue. The combination of these conditions, all of which are
unique to the property, together with the infeasibility of meeting the Block
Structure requirement, results in unusual and exceptional practical
difficulties in designing a series of complete blocks bounded by streets.
With a single possible point of access (Fossil Blvd./Cone* s Road on the
west), the installation of a street through the Project to divide the property
and create and additional block would result in a dead end, as there are
no opportunities to connect the street on any of the three other sides of
the property. An on -site street of sufficient length to divide the Project into
more than one block would consume approximately .76 acres of the 2.97-
acre property (25%), leaving only approximately 1.1 acres on either side,
making it extremely difficult to construct any financially feasible
commercial or multi -family project and leaving insufficient space for
construction of the size and type of facility (single building with controlled
access and consolidated on -site supportive tenant services) necessary to
adequately serve the special needs of the tenant population. Finally,
designing the Project around the additional street right-of-way that would
be required to divide the property into more than one block bounded by
streets would not allow for many of the site amenities, recreation, natural
areas and urban agriculture currently planned for the Project.
3. Summary.
FCHA believes that the Project complies with the Block Size and Minimum
Building Frontage standards, and that it is infeasible, due to existing
development, to comply with the Block Structure requirement. FCHA also
believes that if a modification of standards is required because of the
inability to meet the Block Structure requirement, that the modification
would be justified. Therefore, FCHA requests that the Planning and
Zoning Board make a determination regarding both requests.
E. Staff Finding:
Recommendation of Infeasibility:
Staff recommends that a determination be made that compliance with the standard
for Block Structure. BlGGk Size and Minimum Building F=Foptage is infeasible due to
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 22
require housing units tailored to specific needs not typically addressed by
market -driven development. Many times a network of support services is
needed to keep these populations stable and independent.
4.3.1 Justification.
Homeless: . . . Research has shown the sooner people can enter a
stabilized shelter situation, the sooner they can start dealing with the other
problems that accompany homelessness, which also decreases costs to
providing community services for this populations.. . . suggests single
room occupancy housing as a more effective alternative to traditional
homeless shelters.
Persons with Disabilities: . . . organizations which provide supportive
services or housing for disable customers do not have enough low -rent
options for the number of people who need them.... it is important to
expand the supply of housing that is both accessible and affordable.
Partners in Affordable Housing. While the City of Fort Collins is an
important player in addressing the affordable housing needs of its citizens,
there are other partners that also contribute important resources.... the
City cannot solve all of the community's affordable housing needs alone.
Policies:
AHSP-11 The City will support community initiatives identifying homeless
needs and developing action plans to reduce the homeless population in
Fort Collins, The City will also participate in partnerships exploring
solutions for homelessness.
AHSP-12 The City will support projects producing affordable units to serve
persons with disabilities, and "cost -burdened" senior citizens.
Conclusion: . . . A lack of affordable housing affects everyone. . . .
Affordable housing is greater than a social issue, it is also about economic
development and environmental protection. . . . The Fort Collins City
Council made a commitment to affordable housing through the adoption of
many programs and the allocation of General Fund revenue into the
Affordable Housing Fund.... affordable housing must be elevated so it is
discussed on par with such topics as economic development,
environmental protection, and public safety ... Every discussion regarding
a sustainable community must include the consideration of affordable
housing.
C. Exceptional Conditions
Land Use Code Sec. 2.8.2(H)(3): "By reason of exceptional physical
conditions or other extraordinary and exceptional situations, unique to
such property, including, but not limited to, physical conditions such as
exceptional narrowness, shallowness or topography, or physical
conditions which hinder the owner's ability to install a solar energy system,
the strict application of the standard sought to be modified would result in
unusual and exceptional practical difficulties, or exceptional or undue
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 21
purpose of this Land Use Code, substantially alleviate an existing, defined
and described problem of city-wide concern or would result in a
substantial benefit to the city by reason of the fact that the proposed
project would substantially address an important community need
specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of
the City Council, and the strict application of such a standard would render
the project practically infeasible."
The Project meets both alternative requirements of Land Use Code Sec.
2.8.2(H)(2). The Project is a permanent supportive housing community
designed to meet the special housing needs of homeless individuals with
disabilities, homeless veterans and other low-income individuals. The
need for housing units tailored to the specific needs of these types of
individuals is defined in City Plan and the Affordable housing Strategic
Plan, and the opportunity to provide such housing for 60 individuals is a
significant steps towards addressing this important community need and
provides a substantial benefit to these individuals and the community as a
whole. Please see the following excerpts:
City Plan:
Principle LIV 7: A variety of housing types and densities for all income
levels shall be available throughout the Growth Management Area.
LIV 7.5 — Plan for and meet the housing needs of special populations
within the community. Disperse residential -care facilities, shelters, group
homes, and senior housing throughout the Growth Management Area.
Principle LIV 8: The City will encourage the creation and expansion of
affordable housing opportunities and preservation of the existing
affordable housing supply.
LIV 8.5 — Encourage the integration and distribution of affordable housing
as part of individual neighborhoods and the larger community rather than
creating larger concentration of affordable units in isolated areas.
Affordable Housing Strategic Plan:
Executive Summary: Increase housing and facilities for people with
special needs.
Introduction. Affordable housing is a critical asset contributing to the
social, economic, and environmental sustainability of a community ... The
overall wellbeing of an individual can be significantly improved with stable
housing conditions, which leads to more stable families and stable
neighborhoods.
4.1 Goal: Increase the Inventory of Affordable Rental Housing Units. The
first priority should be to increase the inventory f affordable rental units ...
4.3 Goal: Increase Housing and Facilities for People with Special Needs.
This broad category includes those who are homeless, seniors, persons
with disabilities, and victims of domestic violence. These groups generally
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 20
urban agriculture) is approximately 1,110 lineal feet, or 68% of the total of
all block faces, which is in excess of the minimum of 50%.
2. Request for Modification of Standards
Although FCHA believes that the Project meets the infeasibility criteria for
the Block Structure standards, the language could also potentially be
interpreted in a way that a modification would be required. In order to
cover all of the bases, and because FCHA also believes that a
modification would be justified, if needed, FCHA submits this modification
request to the Planning and Zoning Board.
The Land Use Code requires that all modifications not be detrimental to
the public good, and provides four (4) alternative specific grounds for
granting the modification, of which, we are citing two (2) as justification for
approval of this request.
In support of its request, the applicant asserts
A. Not Detrimental to Public Good
Land Use Code Sec. 2.8.2(H). "the granting of the modification would not
be detrimental to the public good."
The stated purposes of the multi -family development standards in Land
Use Code Sec. 3.8.30 (several of which are not applicable to development
in the TOD Overlay District) are "to promote variety in building form and
product, visual interest, access to parks, pedestrian -oriented streets and
compatibility with surrounding neighborhoods. " Granting a modification
from the Block Structure standards requiring "a series of complete blocks
bounded by streets" would not be a detriment to the public good in that
none of the overall purposes of the standard are diluted. With the
modification of standards, FCHA will be able to construct a building with
excellent design and high quality materials to create variety, vibrancy and
eclectic ambience in the neighborhood, the South College Corridor and
the TOD Overlay District. Access to parks is not affected by a modification
of these standards, and the Project is able to incorporate pedestrian -
oriented features like tree -lined borders, connecting walkways, plazas,
outdoor spaces, pedestrian lighting and direct pedestrian access to the
building entrance.
B. Alleviate City Problem/Address Community Need
Land Use Code Sec. 2.8.2(H)(2): "the granting of a modification from the
strict application of the standard would, without impairing the intent and
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 19
A. Section 3.8.30(D)(1) Block Structure. This section sets forth the
requirements for the "block structure" and states that all projects are to be
"developed as a series of complete blocks bounded by streets (public or
private)", although "natural areas, irrigation ditches, high -voltage power
lines, operating railroad tracks and other substantial physical features may
form up to two (2) sides of a block. "
Series of Blocks: It is infeasible to create a series of blocks or even one
additional block by installing a street that would divide the property into
more than one block.
The sole point of access to/from the Project is on its west end at the
intersection of Conejos Road and Fossil Blvd. Using this only possible
point of access, the extension of a street into the Project far enough to
divide the property and create an additional complete block could only
result in a dead end and not a complete block, as there are no
opportunities for connections due to the existing development on the north
(Woodley's Fine Furniture) and south (Cameron Park 2nd Filing), and the
College Avenue frontage on the east where the number and kind of
accesses are limited because of safety factors.
Bounded by Streets: The east and west sides of the Project comply with
the standard as they are bounded by either streets or a combination of
streets and a natural feature or substantial physical feature (College
Avenue and the steep slope to College Avenue on the east; Fossil Blvd.
and the ReAd Ponds wetland and natural area on the west). The north
and south sides of the property are not bounded by streets, nor are they
bounded by natural areas, irrigation ditches, high -voltage power lines,
operating railroad tracks or another substantial physical feature, but rather
by existing development (Woodley's Fine Furniture on the north and
Cameron Park 2nd Filing on the south), making it infeasible to meet this
requirement.
B. Section 3.8.30(D)(2) Block Size. The Project satisfies this standard as
the gross acreage of this one -block Project is 2.97 acres, which is less
than maximum seven (7)-acre size imposed by Sec. 3.8.30(D)(2).
C. Section 3.8.30(D)(3) Minimum Building Frontage. The Project satisfies
this standard requiring that 40% of each block side or 50% of the block
face of the total block shall consist of either building frontage, plazas or
other functional open space.
The approximate total length of all block faces combined is approx. 1,640
lineal feet. The combined length of the building frontage, plaza, and
functional open space (multi -use paths, walkways, lawns, terraces and
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 18
physical conditions such as exceptional narrowness, shallowness or topography,
or physical conditions which hinder the owner's ability to install a solar energy
system, the strict application of the standard sought to be modified would result
in unusual and exceptional practical difficulties, or exceptional or undue hardship
upon the owner of such property, provided that such difficulties or hardship are
not caused by the act or omission of the applicant; or
(4) the plan as submitted will not diverge from the standards of the Land Use
Code that are authorized by this Division to be modified except in a nominal,
inconsequential way when considered from the perspective of the entire
development plan, and will continue to advance the purposes of the Land Use
Code as contained in Section 1.2.2.
Any finding made under subparagraph (1), (2), (3) or (4) above shall be
supported by specific findings showing how the plan, as submitted, meets the
requirements and criteria of said subparagraph (1), (2), (3) or (4).
D. Applicant's Justification:
The applicant has provided the following justification for the modification request
as well as a justification that the compliance with the standards is infeasible:
1. Compliance with Block Requirements based on Infeasibility.
The Redtail Ponds Supportive Housing Project ("Project'), proposed by
the Fort Collins Housing Authority ("FCHA'), is a permanent supportive
housing community designed to meet the special housing needs of
homeless individuals with disabilities, homeless veterans and 'other low-
income individuals, and is categorized by the City as a multi -family
development. The Project is located on a narrow, rectangular (approx.
225' by 550) 2.97-acre parcel in the Cameron Park/Redtail Ponds office
park development surrounded by Woodley's Fine Furniture on the north,
College Avenue on the east, Cameron Park 2nd Filing on the south, and
Fossil Blvd./Conejos Road and the Redtail drainage area and pond on the
west.
All multi -family projects are required to comply with the Block
Requirements in Sec. 3.8.30(D) of the Land Use Code unless "compliance
with a specific element of the standard is infeasible due to unusual
topographic features, existing development, safety factors or a natural
area or feature." The following analysis of the specific elements of the
standard show that it is infeasible, due to existing development, to comply
with the Block Structure requirement of Section 3.8.30(D)(1), and that the
Project complies with the Block Size and Minimum Building Frontage
requirements of Sections 3.8.30(D)((2) and (3).
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 17
C. Land Use Code Block Structure Infeasibility and Modification Criteria:
With Regards to Block Structure infeasibility, the LUC states:
Section 3.8.30(D) Block Requirements. All development shall comply with
the applicable standards set forth below, unless the decision maker
determines that compliance with a specific element of the standard is
infeasible due to unusual topographic features, existing development,
safetV factors or a natural area or feature.
With Regards to Modification of Standard Criteria, the LUC states:
"The decision maker may grant a modification of standards only if it finds that the
granting of the modification would not be detrimental to the public good, and that:
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan which
complies with the standard for which a modification is requested; or
(2) the granting of a modification from the strict application of any standard
would, without impairing the intent and purpose of this Land Use Code,
substantially alleviate an existing, defined and described problem of city-wide
concern or would result in a substantial benefit to the city by reason of the fact
that the proposed project would substantially address an important community
need specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of the City
Council, and the strict application of such a standard would render the project
practically infeasible; or
(3) by reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property, including, but not limited to,
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 16
and will be altered from LCUASS detail with the south lane on Conejos Rd. being
tapered and a 37' radius to tie -into the existing east flow line. The proposed
layout has a total roadway width at the midpoint of the radius of approximately
42.5'. City Engineering has reviewed the variance request and found it
acceptable. The proposed variance will not be detrimental to the public health,
safety and welfare, will not reduce design life of the improvement nor cause the
Local Entity additional maintenance costs.
��c��zaw-�rra
LZ
Block Requirements: Block Structure Infeasibility Determination and
Modification of Standard Request to Section 3.8.30(D)(1)
A. The standard:
Section 3.8.30(D)(1)(2)(3) Block Requirements
All development shall comply with the applicable standards set forth below,
unless the decision maker determines that compliance with a specific element of
the standard is infeasible due to unusual topographic features, existing
development, safety factors or a natural area or feature:
(1) Block Structure. Each multi -family project shall be developed as a series of
complete blocks bounded by streets (public or private). (See Figures 16A through
16F...). Natural areas, irrigation ditches, high -voltage power lines, operating
railroad tracks and other similar substantial physical features may form up to two
(2) sides of a block.
(2) Block Size. All blocks shall be limited to a maximum size of seven (7) acres.
(3) Minimum Building Frontage. Forty (40) percent of each block side or fifty (50)
percent of the block faces of the total block shall consist of either building
frontage, plazas or other functional open space.
B. Description of the Infeasibility Request and Modification:
The applicant has asserted that the protect meets the infeasibility criteria for the
block structure standard of Section 3.8.30(D)(1). The applicant has also
submitted a request for approval of a Modification of Standard to Section
3.8.30(D)(1) Block Structure requesting that the project not be required to comply
with this standard. The applicant requests approval of both the infeasibility
request and the modification request.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 15
(1) Predominant exterior building materials shall be high quality materials,
including but not limited to brick, sandstone, other native stone,
tinted/textured concrete masonry units, stucco systems or treated tilt -up
concrete systems.
(2) All building facades shall incorporate stone, stone veneer, brick, brick
veneer, stucco, corrugated metal, wood and/or equivalent accent material
in a manner that highlights the articulation of the massing or the base and
top of the building. An all -brick building does not need to incorporate an
accent material, though soldier courses and banding or other brick, stone
or metal detailing are encouraged in order to subdivide masses and
establish human scale.
(3) Predominant or field colors for facades shall be low reflectance, subtle,
neutral or earth tone colors. The use of high -intensity colors, black or
fluorescent colors shall be prohibited.
(4) Building trim and accent areas may feature brighter colors, including
primary colors, and black, but neon tubing shall not be an acceptable
feature for building trim or accent areas.
(5) Exterior building materials shall not include smooth -faced concrete
block, untreated or unpainted tilt -up concrete panels or prefabricated steel
panels
The project features a brighter yellow and green color used in accent areas in
additional to the earth tone color scheme for the majority of the building. Accent
colors are brighter than the field colors to provide appropriate contrast and
interest, but are not considered excessively bright. Brick veneer and corrugated
metal are used generously and incorporated into all facades as a base feature as
well as to highlight and articulate the building massing.
T Section 3.6.4 Transportation Level of Service Requirements
The Traffic Operations and Engineering Departments have reviewed the
Transportation Impact Study that was submitted to the City for review and have
determined that the vehicular, pedestrian and bicycle facilities proposed with this
P.D.P are consistent with the standards contained in Part II of the City of Fort
Collins Multi -modal Transportation Level of Service Manual.
A variance request was submitted to City Engineering requesting to reduce the
inside radius of the Conejos Road/Fossil Boulevard intersection from 20' to
approximately 17' to match the existing flow line radius. A variance is also being
requested for the radius R2 and R3 to maintain a uniform radius around the
corner to tie into existing flow lines. The minimum radius R2 is 44' and R3 is 52'
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 14
the sloping grades in the foreground, with views toward the building receding in
the background.
Q. Section 3.5.2 Residential Building Standards
The project complies with the general standard of this section by achieving a high
level of architectural articulation that meets and exceeds the multi -family design
standards.
R. Section 3.8.30(F) Design Standards for Multi -Family Dwellings
1. 3.8.30(F)(3) Variation in Color. The building design features a palette
of earth tone and natural colors in accordance with the standards.
2. 3.8.30(F)(4) Entrances. The building entrance is emphasized with an
accent roof that is clearly identifiable from the public space.
3. 3.8.30(F)(5) Roofs. Rooflines include at least two distinct features to
provide variation and articulation in accordance with this standard.
Main roof lines are punctuated with secondary accent roofs that are
pitched so that there are no unbroken rooflines. Rooflines are further
mitigated by building modules that project above the eave. Main
rooflines are terminated at the top with a substantial parapet overhang
and change in color.
4. 3.8.30(F)(6) Facades and Walls. This standard requires that multi-
family buildings feature sufficient articulation through a variety of
techniques. All building faces are highly articulated. Areas of wall
plane where stories are expressed over large expanses receive
recessed and projected wall modules with contrasting materials
parapet accents. Parapet sunshades and vertical columns add detail
and interest. The building accents are generous and include repeating
patterns that contribute human scale combined with off -center accents
that add interest and variety. The use of brick as a high quality
material is extensive along higher visibility areas of the building to the
east and west. The overall appearance of the building is balanced with
a high level of detail that maintains a high level of quality for the area.
S. Section 3.10.5 TOD Overlay Zone — Character and Image
The standards of this section share many of the same requirements as
3.8.30(F) Design Standards for Multi -Family Dwellings, with some
distinctions as follows:
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 13
the site also allows windows to not face directly south, with sight lines from
the windows directed to more open areas of the site and away from the
adjacent office building's windows to the south.
4. Neighborhood Scale. Buildings or structures greater than 40 feet in height
shall be compatible with the scale of the neighborhoods in which they are
situated in terms of relative height, height to mass, length to mass, and
building or structure scale to human scale.
Staff analysis Compatibility is defined in Article 5 of the LUC:
Compatibility shall mean the characteristics of different uses or activities
or design which allow them to be located near or adjacent to each other in
harmony. Some elements affecting compatibility include height, scale,
mass and bulk of structures. Other characteristics include pedestrian or
vehicular traffic, circulation, access and parking impacts. Other important
characteristics that affect compatibility are landscaping, lighting, noise,
odor and architecture. Compatibility does not mean "the same as. " Rather,
compatibility refers to the sensitivity of development proposals in
maintaining the character of existing development.
The building achieves neighborhood scale by using a high standard of
articulation, so that massing is divided both in height and length in a manner
that achieves a human scale compatible with the scale of existing buildings in
the neighborhood. While the overall size of the proposed building faces is
not the same as some of the building faces in the surrounding neighborhood,
height to mass and length to mass are reduced to smaller modules within the
overall length and height of proposed facades through the use of projected
metal panels, projected parapet accents, variations in colors, and brick
material along the ground level.
P. Section 3.5.1(H) Land Use Transition
A key component of Building and Project Compatibility for this project is the
buffer space provided around the perimeter of the building. The central position
of the building on the site, as well as the building's rotated orientation, creates a
separation between the proposed multi -family use and adjacent uses. Along the
south, the nearest four-story corners of the building faces are 93 feet and 62 feet
away from the southern edge of the project. The open space separation then
recedes further towards the interior portions of the site. This represents a
significant separation of building faces from surrounding land uses. The site's
elevation above adjacent areas is also a significant factor that provides increased
privacy and transition. Due to the grade change, eye -level sight lines looking
towards the property are more directly focused on open space landscaping along
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 12
Within the neighborhood context surrounding the site, the existing building
materials colors and textures are varied. The proposed materials include brick,
metal cladding, lap siding, scored cement panels and steel accents. Colors are
sufficiently muted and earth -tone with a restrained use of accent colors in
appropriate areas. Accent colors are brighter than the field colors to provide
appropriate contrast and interest, but are not considered excessively bright.
Materials and colors have sufficient similarity with the materials used in the
surrounding area while also reinforcing a high standard of detail and quality
consistent with the standards set for the area.
O. Section 3.5.1(G) Special Height Review
This Section requires that buildings or structures that exceed 40 feet in height
provide a view analysis, which is included as an attachment with this Staff
Report. The view analysis must satisfy the following review criteria:
1. Views. A building or structure shall not substantially alter the opportunity
for, and quality of, desirable views from public places, streets and parks within
the community. Desirable views are views by the community of the foothills,
mountains and/or significant local landmarks (i.e., Long's Peak, Horsetooth
Mountain).
Staff analysis: Opportunities for views by the community from public places
are not substantially altered by the proposed project.
2. Light and Shadow. Buildings or structures greater than 40 feet in height
shall be designed so as not to have a substantial adverse impact on the
distribution of natural and artificial light on adjacent public and private
property.
Staff analysis: The rotation of the proposed building has been used as a
technique to mitigate shadowing. The shadow analysis provided
demonstrates that the proposed buildings do not cast shadows onto a
substantial area of the Woodley's property to the north. While there is some
shadowing seen on the southwest corner of the Woodley's property, this area
is already shadowed by large mature shade trees located along the south of
the Woodley's parking lot.
3. Privacy. Buildings or structures greater than 40 feet in height shall be
designed to avoid infringing on the privacy of adjacent public and private
property, particularly adjacent residential areas and public parks.
Staff analysis: Privacy is achieved by the building's angled orientation and
positioning on the site, which allows windows to be more than 75 feet away
from the southern property line. The building's rotated angle and position on
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 11
mass and scale of the building faces are fairly uninterrupted and lacking in
detailed articulation typically seen in retail buildings intentionally planned
in close proximity to residential dwellings. Exterior articulation is limited
and fairly uniform in use of material except for use of color. Most of the
surrounding buildings are neutral in their specific color palette, with
exception of the Carpet Exchange building which includes multiple brighter
colors.
• No buildings are adjacent to the west, where the natural drainage area is
located with open water and riparian habitats.
In conformance with the General Standard of this section, the architectural
character of the area varies significantly and a consistent architectural character
has not been definitively established — therefore in terms of the General
Standard, the project is required to set an enhanced standard of quality for future
projects or redevelopment in the area.
Building Size, Height, Bulk, Mass, Scale. In accordance with the standards, the
building is articulated and subdivided into massing that is proportional to the
mass and scale of adjacent buildings. Along the southern portion of the project,
the building footprint steps down from four-story to one-story and includes a one-
story bike chalet canopy. This one-story area has an overall building envelope
size that is similar in size to the existing 2-story office that is directly adjacent to
the south, providing massing that is proportional to the massing of this existing
office building. This one-story area subdivides the massing of the overall building
form and provides a substantial transitional element. The southern elevation also
includes substantial articulation through the use of projected metal panels,
projecting parapet accents, variations in colors, and brick material along the
ground level to further break up the mass and scale of the southern fagade into
modules that are at a minimum consistent with the scale of the adjacent office
building.
Articulation of accent details, recesses and projections are used consistently
throughout all faces of the building to subdivide the massing and create
appropriate forms and proportions in relation to the adjacent building context
surrounding the site.
Privacy is achieved by the building's angled orientation and central positioning on
the site, which allows windows to be more than 75 feet away from the southern
property line. The building's rotated angle also allows windows to not face
directly south, with sight lines from the windows directed to more open areas of "
the site and away from the adjacent office building to the south. Techniques
described in the LUC — including landscaping, open space, change in grade,
fencing, and building orientation — are all utilized to reinforce the level of privacy,
particularly along the southern boundary of the site.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 10
area, which will enhance the overall value of the site. Finally, no site lighting will
spill over into the 100' buffer zone.
N. Section 3.5. 1 (B)(C)(D)(E)(F) Building and Project Compatibility
The General Standard of this section states that:
New developments in or adjacent to existing developed areas shall be
compatible with the established architectural character of such areas by
using a design that is complementary. In areas where the existing
architectural character is not definitively established, or is not consistent
with the purposes of this Land Use Code, the architecture of new
development shall set an enhanced standard of quality for future projects
or redevelopment in the area. Compatibility shall be achieved through
techniques such as the repetition of roof lines, the use of similar
proportions in building mass and outdoor spaces, similar relationships to
the street, similar window and door patterns, and/or the use of building
materials that have color shades and textures similar to those existing in
the immediate area of the proposed infill development. Brick and stone
masonry shall be considered compatible with wood framing and other
materials. Architectural compatibility (including, without limitation, building
height) shall be derived from the neighboring context.
The character of the surrounding architectural context can be described as
follows:
• The adjacent building to the north is Woodley's Fine Furniture, which is a
one-story building of large retail proportions, approximately 20 feet in
height with an exposed aggregate finish. The exterior wall facing the
FCHA project is uniform with no windows and minimal articulation.
• To the south, the Cameron business park has one and two-story buildings
with sloped roofs. Materials are mid -tone brick and light stucco along with
wood/vinyl siding painted with earth tones of grayish blues and sage
greens. The building closest to the project site is two-story with steeper
gable roof pitches that add to the height and overall scale and mass of the
building. Portions of the building faces are sloped and taller, with a third
row of windows in the gable portion of the building. Facades of this
building are not as articulated as buildings further south, with fewer
recesses and projections provided.
• To the east across South College Avenue, buildings are retail oriented
with parking located in the foreground. The buildings are composed of
mainly storefront, stucco, and a low flagstone veneer base. Overall, the
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 9
Section 3.2.3(D) Access to Sunshine
The proposed project is in conformance with the standards of this section with a
design orientation that protects access to sunshine and will accommodate solar
systems that may be installed in the future.
J. Section 3.2.3(E) Shading
This section requires that the physical elements of the development plan shall
be, to the maximum extent feasible, located and designed so as not to cast a
shadow onto structures on adjacent property greater than the shadow which
would be cast by a twenty -five-foot hypothetical wall located along the property
lines of the project between the hours of 9:00 am and 3:00 pm, MST, on
December 21. The shadow analysis provided by FCHA demonstrates that a
portion of the adjacent structure to the north (Woodley's Fine Furniture) is
shaded between the hours of 9:00 am and 3:00 pm, MST, on December 21, but
not more than what would be cast by a twenty -five-foot hypothetical wall located
along the property line. The project is therefore in compliance with this standard.
K. Section 3.2.4 Site Lighting
A photometric plan was submitted for the project. The design complies with the
lighting design standards with no foot-candle levels that exceed the maximum
allowable. Parking lot and drive lighting is provided by down -directional and
sharp cut-off fixtures.
L. 3.2.5 Trash and recycling encloses
Adequate trash and recycling space is provided by a central receiving room
within the building. No outside trash enclosures are proposed.
M. Section 3.4.1 Natural Habitats and Features
The project's Ecological Characterization Study reports that the Redtail Ponds
site is just east of a riparian woodland and a wetland larger than 1/3 of an acre.
The proposed site is highly disturbed and currently consists of smooth brome,
kochia, cheatgrass, and field bindweed amongst other non-native species. The
buffer standards for the wetland and riparian woodland are a 100' wide buffer
zone from the edge of the wetland.
To meet the standards associated with Section 3.4.1, the proposed parcel has
provided for a 10 — 30 foot -wide buffer area, even though the site is greater than
100 feet from the edge of the wetland. In addition, native species have been
proposed for the western edge of the property and in the stormwater detention
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 8
C. Section 3.2.2(C)(3) — Site Amenities
The proposed project provides adequate site amenities in accordance with the
requirement of this section, including bike racks, benches, and canopy
structures.
D. Section 3.2.2(C)(4) — Bicycle Parking
Both enclosed bicycle parking and fixed bicycle racks are provided that meet the
minimum requirements, with 56 enclosed bike garage spaces provided in the
Bike Chalet south of the main building and 8 uncovered convenience bike
spaces.
E. Section 3.2.2(C)(4) — Walkways
Sidewalk connections are planned for the site from the building entrances to
existing streets with "directness and continuity" as required by this section. A
minimum 6' wide sidewalk connection is provided with walkways on both sides of
the entrance drive isle into the property.
F. Section 3.2.2(C)(6) — Direct On -Site Access to Pedestrian and Bicycle
Connections
The proposed on -site pedestrian and bicycle circulation system provides for
direct connections to major pedestrian and bicycle destinations surrounding the
site by linking the development to the surrounding street sidewalk system.
G. Section 3.2.2(E) — Parking Lot Layout
The parking layout and sidewalk system provided contributes to the
attractiveness of the development with an overall form that is enhanced, using
design features typically found with urban street patterns and as described in
Section 3.6.2(N)(1)(C) with the use of street -like private drives, including:
reduced travel lane widths, angled parking, tree -lined borders, wide sidewalks,
landscaped medians, corner plazas and pedestrian -scaled lighting.
H. Section 3.2.2(E) — Parking Minimum Number of Spaces
At the time of this development application submittal, multi -family dwellings within
the Transit Oriented Development (TOD) Overlay Zone had no minimum parking
requirements. The project provides 36 parking spaces to satisfy FCHA parking
requirements for the residents and employees within the context of close
proximity of the MAX South Transit Center.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 7
3. Compliance with Article 3 of the Land Use Code — General
Development Standards
The project complies with all applicable General Development Standards with two
modifications of standard; with the following relevant comments provided:
A. Section — 3.2.1 Landscaping and Tree Protection
The project proposes a high quality treatment of all landscaped areas, with
landscape elements provided in the parking lot, building foundation, and
throughout the site meeting and exceeding the minimum requirements.
Deciduous and evergreen shrubs are used extensively to define enhance the
quality of outdoor spaces and to contribute to screening and buffered views into
the property from adjoining uses. Low -water -use perennials, ornamental grasses
and native seed mixes are used extensively, with higher -water -use plants used in
limited areas associated with appropriate functional activities. Street trees are
provided along South College Avenue in accordance with the minimum spacing
requirements.
A total of four existing trees are proposed to be removed, located in the
southeast corner of the site, ranging in caliper from four to twelve inches. The
applicant has conferred with the City Forester concerning these trees and the
project provides new upsized three-inch caliper trees in accordance with the
mitigation requirements. The project meets and exceeds the minimum plant size
requirements for affordable housing projects.
"Full Tree Stocking" is required in all landscape areas within 50 feet of the
building, with a minimum/maximum spacing requirement ranging from 20 to 40
feet for shade, evergreen and ornamental trees. Trees are provided along all
high use and high visibility areas of the proposed building, meeting or exceeding
the requirements of this section, with 38 trees located around the perimeter of the
building within 50 feet of the sides of the building face. A significant number of
additional trees are located beyond the 50 foot building perimeter and contribute
to a layered visual screen that softens views looking into the property from
adjacent parcels. The project also meets the minimum trees species diversity
requirement of this section.
B. Section 3.2.2 — Access, Circulation and Parking
In conformance with the Purpose, General Standard, and Development
Standards described in this section, the parking and circulation system provided
with the project is well designed with regard to safety, efficiency and convenience
for vehicles, bicycles, pedestrians and transit, both within the development and to
and from surrounding areas.
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 6
personal mobility in many forms, with planning and design that
accommodates pedestrians.
B. Section 4.21(B) — Permitted Uses
The proposed multi -family land use is permitted in the district and is classified as
a "Type 2" use which is subject to Planning and Zoning Board approval. This is
because more than 50 dwelling units are proposed. If less than 50 dwelling units
are proposed, then the project would be subject to a "Type 1" administrative
hearing approval with a Hearing Officer.
C. Section 4.21(D) — Land Use Standards
The only land use standard stated in the LUC for the district is a maximum
building height requirement limited to four stories. The project proposes four
stories and is compliance with this district standard.
D. Section 4.21(E)(2)(a) — Site Design
This section requires that outdoor spaces be created with the project and that the
development link outdoor spaces to and make them visible from streets and
sidewalks. Sculpture, kiosks, or shelters are encouraged to be prominently
placed in outdoor spaces. The project provides two outdoor spaces -- a
landscaped plaza space at the building entrance and an outdoor space with the
bicycle storage shelter (bike chalet). The spaces are linked together with an
enhanced sidewalk along the front of the building with a 10' wide walking surface
lined with trees in tree grates and benches. The spaces are linked to the Fossil
Boulevard street frontage by two direct sidewalk routes, both 6' in width. This
location and design of outdoor spaces provided with the proposed project, and
their linkage to streets and sidewalks, is in conformance with the standard.
E. Section 4.21(G) — Development Standards for the Transit -Oriented
Development (TOD) Overlay Zone
This section states that the project is subject to the TOD Overlay Zone
requirements in Division 3.10. The project proposes two modifications of
standard to Division 3.10 and these modifications are discussed later in this
Staff Report. Should the modifications be approved with this P.D.P., then the
project will be in compliance with Section 4.21(G).
Redtail Ponds Permanent Supportive Housing. PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 5
the County in 1981 and included the construction of Cameron Drive and Coronado
Court. The two filings were later annexed into the City with the Cameron Park
Annexation in April. 1992.
The site previously received development approval in 2006 as part of the Redtail Final
Plan which included 51 units in 10 buildings with a mix of single-family attached
(townhomes), two-family (duplexes) and multi -family units within the boundaries of the
site area. The majority of the dwellings were two bedroom units with six one -bedroom
units. The extension of Fossil Boulevard through the site was planned and dedicated;
however the street was never built. Vesting of this Final Plan approval for the site
lapsed and the site is no longer part of an approved development plan.
The original Redtail plan also included an additional 90 multi -family and two-family units
within 12 additional buildings to the west and southwest of the proposed FCHA site.
These buildings were also never constructed. A Major Amendment was also approved
in 2007 which proposed office buildings to the south and southwest of the FCHA site,
however these building were also not constructed.
Although no buildings have been constructed with previously approved Redtail plans,
building sites were graded and a system of ponds were constructed to connect drainage
from the west, from the Applewood subdivision, through to the City -owned Redtail
Grove Natural Area to the south. City streets were also constructed — an extension of
Cameron Drive was constructed to the west and Conejos Road was also constructed,
running north/south and connecting Cameron Drive to the existing portion of Fossil
Boulevard to the north.
2. Compliance with Article 4 — General Commercial (C-G):
The project complies with all applicable Article 4 standards with the following relevant
comments provided:
A. Section 4.21(A) — Purpose
The proposed multi -family land use is consistent with the purpose of the C-G
District, which is intended to accommodate housing with design that
accommodates pedestrians.
The General Commercial District is intended to be a setting for
development; redevelopment and infill of a wide range of community
and regional retail uses, offices and personal and business services.
Secondarily, it can accommodate a wide range of other uses including
creative forms of housing.
While some General Commercial District areas may continue to meet the
need for auto -related and other auto -oriented uses, it is the City's intent
that the General Commercial District emphasize safe and convenient
Redtail Ponds Permanent Supportive Housing. PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 4
• The P—TRserP:;96 4t; retevaRt 6ta^ards lesated in AlFtisle 3GeReFffl
The P.D.P. complies with relevant standards located in Article 3 — General
Development Standards (i) provided that either compliance with Section
3.8.30(D)(1) Block Structure is deemed infeasible or that the Modification of
Standard to Section 3.8.30(D)(1) Block Structure is approved: and (ii)
provided that the Modifications to Section 3.10.3(A) Building Orientation and
Section 3.10.4(C) Off -Street Parking are approved.
• The P.D.P. complies with relevant standards located in Division 4.21, General
Commercial District (C-G) of Article 4 — Districts, subject to the approval of
the modifications of standard that are part of TOD Overlay Zone requirements
for the C-G District — specifically the Modifications of Standard to Section
3.10.3(A) Building Orientation and Section 3.10.4(C) Off -Street Parking that
are proposed with this P.D.P.
COMMENTS:
1. Background:
The surroundinq zoninq and land uses are as follows:
Direction
Zone District
Existing Land Uses
North
General Commercial (C-G)
Commercial (Woodley's Fine Furniture,
Weburg P.U.D.)
South
General Commercial (C-G)
Commercial (Cameron Second Filing,
Cameron First Filing)
East
General Commercial (C-G)
South College Avenue; Commercial
West
General Commercial (C-G)
Wetland Buffer (Formerly Redtail Final Plan)
The property is vacant and is covered predominantly with disturbed soil and fill material,
rock, waste, non-native grasses and weedy plant material.
The subject property was annexed in January of 1987 through the Mill First and Second
Annexations.
Adjacent to the south of the site is the Cameron Park Second Filing and further to the
south is Cameron Park First Filing. These commercial developments were planned in
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21, 2013
Page 3
Multi -family:
Dwelling, multi -family shall mean a dwelling containing three (3) or more dwelling units,
not including hotels, motels, fraternity houses and sorority houses and similar group
accommodations.
These definitions explain to how this project's use is defined as "multi -family", due to the
fact that each of the 60 units proposed provide a separate bathroom and kitchen for the
use of a single family. If the units did not provide separate bathrooms and kitchens, the
use would be considered a group home. Further, the proposed use is not a hotel,
motel, fraternity/sorority house or a similar group accommodation.
Approval of Redtail Ponds Permanent Supportive Housing Protect Development Plan,
PDP #130030, a determination of infeasibility as to the Block Requirement regarding
block structure in Section 3.8.30(D)(1), and Modifications of Standard to Sections
3.8.30(D)(1) Block Structure, 3.10.3(A) Building Orientation and 3.10.4(C) Off -Street
Parking.
EXECUTIVE SUMMARY:
The approval of Redtail Ponds Permanent Supportive Housing Project Development
Plan complies with the applicable requirements of the City of Fort Collins Land Use
Code (LUC), more specifically:
• The P.D.P. complies with process located in Division 2.2 — Common
Development Review Procedures for Development Applications of Article 2 —
Administration.
• The Modifications of Standard to
RfqPPJ:;r4s Section 3.8.30(D)(1) Block Structure, Section 3.10.3(A) Building
Orientation and Section 3.10.4(C) Off -Street Parking that are proposed with
this P.D.P. meet the applicable requirements of Section 2.8.2(H), and the
granting of these Modifications would not be detrimental to the public good.
• The P.D.P. complies with the Block Requirements of Section 3.8.30(D)(2) and
(3) for Block Size and Minimum Building Frontage. It is infeasible for the
P.D.P. to comply with the block requirement of Section 3.8.30(D)(1) Block
Structure due to existing development.
0
Redtail Ponds Permanent Supportive Housing, PDP #130030
Planning & Zoning Hearing November 21. 2013
Page 2
The site is approximately 2.82 acres, and the applicant proposes a four-story building,
with a portion of the building transitioning to one-story to the south. The total building
coverage proposed is 14,680 square feet, which is approximately 12% of the site. 36
parking spaces are provided and 66 bicycle spaces. The site is within the General
Commercial District (C-G), and is also within boundaries of the Transit -Oriented
Development (TOD) Overlay Zone and the South College Corridor Subarea Plan. The
proposed multi -family use is permitted in the C-G zone district, subject to Planning and
Zoning Board approval.
The project is consistent with the South College Corridor Subarea Plan. Objectives of
the plan support the proposed residential use, encouraging higher intensity uses,
increased densities and high quality design as part of a transit -oriented district at this
location. The Plan describes residential uses as being envisioned to occur on vacant
or underutilized lands, with residential growth helping the Corridor become a more
complete district.
As part of the project description some background on Land Use Code (LUC) definitions
may be helpful. While the tenant classifications for the 60 units provide project
information, these classifications are not defined in the LUC. In terms of occupancy of
dwelling units, the LUC is less specific and uses language such as household, family
and persons. In terms of use, this project is defined by the following definitions in Article
5 of the LUC:
Family:
Family shall mean any individual living alone or any number of persons who are all
related by blood, marriage, adoption, guardianship or other duly authorized custodial
relationship, and who live together as a single housekeeping unit and share common
living, sleeping, cooking and eating facilities.
Dwelling Unit:
Dwelling unit shall mean one (1) or more rooms and a single kitchen and at least one
(1) bathroom, designed, occupied or intended for occupancy as separate quarters for
the exclusive use of a single family for living, cooking and sanitary purposes, located in
a single-family, two-family or multi -family dwelling or mixed -use building.
Dwelling:
Dwelling shall mean a building used exclusively for residential occupancy and for
permitted accessory uses, including single-family dwellings, two-family dwellings and
multi -family dwellings, and which contains: (a) a minimum of eight hundred (800) square
feet of floor area, or (b) in the case of a dwelling to be constructed on the rear portion of
a lot in the L-M-N, M-M-N, N-C-L, N-C-M, N-C-B, C-C-N, C-C-R, H-C or E zone districts,
a minimum of four hundred (400) square feet of floor area, so long as a dwelling already
exists on the front portion of such lot. The term dwelling shall not include hotels, motels,
tents or other structures designed or used primarily for temporary occupancy. Any
dwelling shall be deemed to be a principal building.
f
City of
F6rt Collins
ITEM NO _3
MEETING DATE Nov. 21, 2013
STAFF Holland
PLANNING & ZONING BOARD
STAFF REPORT
6m��
PROJECT: Redtail Ponds Permanent Supportive Housing Project Development
Plan, PDP #130030
and Modifications of Standard to Sections:
3.8.30(D),(1), (2)and (3; Block Standards Structure,
3.10.3(A) Building Orientation and,
3.10.4(C) Off -Street Parking.
APPLICANT: Fort Collins Housing Authority
1715 West Mountain Avenue
Fort Collins, CO 80521
OWNER: Redtail Ponds Permanent Supportive Housing, LLLP
1715 West Mountain Avenue
Fort Collins, CO 80521
PROJECT DESCRIPTION:
This is a request from the Fort Collins Housing Authority (FCHA) for consideration of a
Project Development Plan (P.D.P.) for the Redtail Ponds Permanent Supportive
Housing located at an undeveloped parcel at 5046 Fossil Boulevard. The proposed
project has approximately 225 feet of frontage on the west side of South College
Avenue and is south of and adjacent to Woodley's Fine Furniture. The site is accessed
by the current terminus of Fossil Boulevard. The South Transit Center for the MAX Bus
Rapid Transit System is located one block northwest of the site. The Redtail and
Cameron Park Office Parks are located to the south. A drainage tributary supporting
wetland, riparian and open water habitats exists to the west of the site and flows into
Fossil Creek to the south.
The project includes 60 multi -family dwelling units with a proposed purpose to provide
housing for adult men and women. The 60 units proposed are dedicated to three
tenant classifications. with 25 of the units intended for currently homeless individuals, 20
units intended for individuals who qualify as low/middle income and are not currently
homeless and 15 units for currently homeless veterans. The project proposes 24-hour
on -site staff to provide supportive services for the residents; FCHA has provided
supplemental information with the development application that describes the project
services, management and operations.
Planning Services 281 N College Ave — PO Box 580 — Fort Collins, CO 80522-0580
fcgov.com/developmentreview/ 970.221.6750