Loading...
HomeMy WebLinkAbout231 S. GRANT STREET CARRIAGE HOUSE - PDP - PDP130007 - CORRESPONDENCE - (3)Department: Technical Services Contact: Jeff County, 970.221-6588, icountv(dlfcgov.com Topic: Site Plan Comment Number: 3 Comment Originated: 01/28/2014 01/28/2014: Please rotate the marked text 180 degrees. See redlines. Department: Traffic Operation Contact: Ward Stanford, 970-221.6820, wstanford(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/18/2013 03/18/2013: No TIS was recieved nor any contact to discuss the need of such that I can find evidence of. Reviewing the site though provides that we would have waived the TIS. I assume the applicant may not have contacted Transportation Planning to determine any ped/bike needs. If not I would recommend the applicant contact them at 970-221-6376. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington(afcgov.com Topic: General Comment Number: 1 Comment Originated: 03/26/2013 ✓/ 03/26/2013: No comments on the site plan. I will check on the covenant that will need to be executed at or prior to building permit. Page 3 of 3 Comment Number: 3 Comment Originated: 03/26/2013 01/28/2014: 1 did not find comments in Accela that would indicate utility providers require the additional dedication(s) and will presume this comment is no longer applicable. 03126/2013: Engineering will defer to the individual utilityproviders whether utility easements need to be dedicated behind the right-of-way for Grant Avenue (9 feet), Olive Street (9 feet), and the alley (8 feet). If comments are made from the utility providers during this review requiring the dedication, Engineering will review the easement and require fees associated with its processing and recordation. Note in reference to the previous comment that if a conduit is to be provided instead of undergrounding, the utility provider might need an easement. Department: Environmental Planning Contact: Lindsay Ex, 970.224-6143, lex(5.fcoov.com Topic: General Comment Number: 1 03/22/2013: No comments. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartineOfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/22/2013 Comment Originated: 03/12/2013 03/1212013: The existing underground electric service to the existing house appears to where the carriage house is planned. This electric service line will need to be field located by calling the 1-call locating system at 811. The electric service will need to be moved by Light & Power at the owner's expense if it conflicts with the carriage house. Comment Number: 2 Comment Originated: 03/12/2013 03/12/2013: Electric development charges will apply for the new electric service to the carriage house. These are estimated to be about $3,500. Please coordinate power locations and charges with Light & Power Engineering at 221-6700. Department: Stormwater Engineering Contact: Jesse Schlam, 970.218-2932, ischlam(�fcgov.com Topic: Erosion Control Comment Number: 2 Comment Originated: 01/28/2014 01/28/2014: No Comment from Erosion Control. This site; disturbs less than 10,000 sq-ft, is not in a sensitive area, and is not in a larger development under construction. Therefore, no submittal of erosion control material is needed. However, the site still must still be swept and maintained to prevent dirt, saw cuttings and other pollutants from entering the storm sewer or else BMPs will be required of the site. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamaraueafcoov.com opic: General Comment Number: 1 Comment Originated: 03/26/2013 03/2612013: Please include more detailed grading just north of the proposed carriage house. There looks to be close to a 2 foot drop within the 5 foot area to the property line Page 2 of 3 i"�tf a of January 29, 2014 Kevin Brinkman Brinkman Partners 3003 E. Harmony, Suite 300 Fort Collins, CO 80528 QJ�S�IL 4`/2tt, }k bNE D ar t_ Z/2-T RE: 231 S. Grant Avenue Carriage House, PDP130007, Round Number 2 Community Development and Neighborhood SeMces 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.8134 - fax rcgov. com/developmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com. Comment Summary: Department: Current Planning Contact: Seth Lorson, 970.224.6189, slorson(a fcgov.com Topic: General Comment Number: 1 01/28/2014: Ready for hearing. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mviratat7a.fcgov.com Topic: General Comment Number: 1 Comment Originated: 01128/2014 Comment Originated: 03/26/2013 01/28/2014: The intent was to add "Excavation Permit required through City Engineering Department" after the phrase indicating "NEW SEWER LINE TO CARRIAGE HOUSE", instead a new label was added indicating '"Excavation Permit required through City Engineering Department" after the "New Sewer Line to Carriage House" indication'. Please tweak this on the plan. 03/26/2013: Please add "Excavation Permit required through City Engineering Department" after the "New Sewer Line to Carriage House" indication. Comment Number: 2 Comment Originated: 03/26/2013 01/28/2014: The note that was added should remove "verification to be made with the overhead utility provider". The "veirification" pertained to verifying whether the utility provider preferred conduit installation or undergrounding of the utility line. 03/26/2013: The plan will need to either indicate that the exsiting overhead line along the alley will be undergrounded abutting the property, or conduit installed to accommodate the future undergrounding, in accordance with 3.3.2(D)(7)(b). Verification should be made with the overhead utility provider. Page 1 of 3