Loading...
HomeMy WebLinkAbout231 S. GRANT STREET CARRIAGE HOUSE - PDP - PDP130007 - CORRESPONDENCE -Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/18/2013 03/18/2013: No TIS was recieved nor any contact to discuss the need of such that I can find evidence of. Reviewing the site though provides that we would have waived the TIS. I assume the applicant may not have contacted Transportation Planning to determine any ped/bike needs. If not I would recommend the applicant contact them at 970-221-6376. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221-6854, rbuffington@fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/26/2013 03/26/2013: No comments on the site plan. I will check on the covenant that will need to be executed at or prior to building permit. Department: Zoning Contact: Noah Beals, 970-416-2313, nbealsa()fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/27/2013 03/27/2013: On the site plan please label that one of the garage parking spaces is for the Carriage House. Also indicate the pedestrian path from the garage to the carriage house. Comment Number: 2 Comment Originated: 03/27/2013 03/27/2013: Is the 2nd floor accessed from within the building? Is there a required landing area for the stairs and should that landing be on the property? Comment Number: 3 Comment Originated: 03/27/2013 03/27/2013: Remove the existing building that will not remain from site plan. need to be dedicated behind the right-of-way for Grant Avenue (9 feet), Olive Street (9 feet), and the alley (8 feet). If comments are made from the utility providers during this review requiring the dedication, Engineering will review the easement and require fees associated with its processing and recordation. Note in reference to the previous comment that if a conduit is to be provided instead of undergrounding, the utility provider might need an easement. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lexaa�fcgov.com Topic: General Comment Number: 1 Comment Originated: 03/22/2013 03/22/2013: No comments. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/12/2013 03/12/2013: The existing underground electric service to the existing house appears to where the carriage house is planned. This electric service line will need to be field located by calling the 1-call locating system at 811. The electric service will need to be moved by Light & Power at the owner's expense if it conflicts with the carriage house. Comment Number: 2 Comment Originated: 03/12/2013 03/12/2013: Electric development charges will apply for the new electric service to the carriage house. These are estimated to be about $3,500. Please coordinate power locations and charges with Light & Power Engineering at 221-6700. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarguecDfcgov.com Topic: General Comment Number: 1 Comment Originated: 03/26/2013 03/26/2013: Please include more detailed grading just north of the proposed carriage house. There looks to be close to a 2 foot drop within the 5 foot area to the property line Department: Technical Services Contact: Jeff County, 970-221-6588, icountyditgov.com Topic: Building Elevations Comment Number: 2 Comment Originated: 03/26/2013 03/26/2013: Please change the title from "Street" to "Avenue". Grant is an Avenue, not a Street. Topic: Site Plan Comment Number: 1 Comment Originated: 03/26/2013 03/26/2013: Please change the title and the reference in the R.O.W. Plan of "Street" to "Avenue". Grant is an Avenue, not a Street. City of F6rt Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview March 29, 2013 Kevin Brinkman Brinkman Development, LLC 3003 E. Harmony Rd., Ste. 300 Fort Collins, CO 80528 RE: 231 S. Grant Avenue Carriage House, PDP130007, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com. Comment Summary: Department: Current Planning Contact: Seth Lorson, 970-224-6189, slorson(a fcgov.com Topic: Site Plan Comment Number: 1 Comment Originated: 03/27/2013 03/27/2013: The north arrow on the site plan is incorrect. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata(aDfcctov.com Topic: General Comment Number: 1 Comment Originated: 03/26/2013 03/26/2013: Please add "Excavation Permit required through City Engineering Department' after the "New Sewer Line to Carriage House" indication. Comment Number: 2 Comment Originated: 03/26/2013 03/26/2013: The plan will need to either indicate that the exsiting overhead line along the alley will be undergrounded abutting the property, or conduit installed to accommodate the future undergrounding, in accordance with 3.3.2(D)(7)(b). Verification should be made with the overhead utility provider. Comment Number: 3 Comment Originated: 03/26/2013 03/26/2013: Engineering will defer to the individual utility providers whether utility easements