HomeMy WebLinkAboutHICKORY COMMONS - FDP - FDP130014 - CORRESPONDENCE -Comment Number: 2
Comment Originated: 05/28/2013
05128/2013: What is the 1" water service between Bldgs 6 & 7? If this is needed, the curb stop
and meter pit must be located near the drive in a location comparable to the other curb
stop/meter pits.
Comment Number: 3 Comment Originated: 05/28/2013
05/28/2013: All sanitary sewer with less than 4 feet of cover must be insuloated. Show
insulation in the plan & profile. Provide a detail showing the placement of the insulation.
Include a specification for the insulation suitable for underground applications. Provide the
design showing the thickness and width of the insulation.
Comment Number: 4
05/28/2013: Add stationing on the sewer services.
Comment Number: 5
05/28/2013: Show all water & sanitary crossings on the storm profiles.
Comment Number: 6
05/28/2013: Where is the profile for the storm extending east from Inlet 1?
Comment Number: 7
05/28/2013: Correct the north arrows on Shts C4 & C5.
Department: Zoning
Contact: Peter Barnes, 970416-2355, pbarnesna fcgov.com
Topic: General
Comment Originated: 05/28/2013
Comment Originated: 05/28/2013
Comment Originated: 05/28/2013
Comment Originated: 05/28/2013
Comment Number: 1 Comment Originated: 05/09/2013
05/09/2013: no comments
Comment Number: 16 Comment Originated: 05/29/2013
05/29/2013: Please add leaders to define the City property to the east of this project.
Comment Number: 17
Comment Originated: 05/29/2013
05/29/2013: Please include the beneficiary ("to the owners of Hickory Commons") of the
easements outside of the boundary.
Topic: Site Plan
Comment Number: 18 Comment Originated: 05/29/2013
05/29/2013: Please correct the titles in the index on sheet 1, to match the actual sheet title.
See redlines.
Comment Number: 19 Comment Originated: 05/29/2013
05129/2013: Please rotate the text 180 degrees on sheet 2, so that it is plan readable. See
redlines.
Comment Number: 20 Comment Originated: 05/29/2013
05129/2013: There are line over text issues on sheet 2. See redlines.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanfordnafcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Please revise the related notes in your Signs & Pavement Marking Notes (Sht C2)
to read as shown below:
6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE
CONTRACTOR SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND
PLACEMENT OF THE SAME, THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF
FORT COLLINS TRAFFIC ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING
AND SYMBOLS.
11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE
PERFORMED BY THE CITY OF FORT COLLINS TRAFFIC ENGINEER OR HIS/HER
DESIGNATE. ALL DISCREPANCIES INDENTIFIED DURING THE FIELD INSPECTION MUST BE
CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD BEGINS.
14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY THE INFORMATION AVAILABLE
AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF
FORT COLLINS TRAFFIC ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL
SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS TRAFFIC ENGINEEER
DETERMINES THAT AN UNFORSEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING
TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) OR CDOT M AND S
STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF
THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FOR TRAFFIC
MARKINGS).
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(c�fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Show/label all fittings and valves on the water mains and services.
Contact: Jeff County, 970-2,ct-6588, 'countyo( fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Please change the grayed out text to a solid text on sheets 6, 7 & 8. See redlines.
Comment Number: 2 Comment Originated: 05/28/2013
05/28/2013: Please mask the text shown in hatched areas. See redlines.
Comment Number: 3 Comment Originated: 05/28/2013
05128/2013: Please increase the text size on sheet 7. See redlines.
Comment Number: 4 Comment Originated: 05/28/2013
05/28/2013: There are line over text issues on sheets 7, 8 & 9. See redlines.
Comment Number: 5 Comment Originated: 05/28/2013
05/28/2013: The details on sheet 9 are fuzzy. Please sharpen up the text and linework.
Comment Number: 6 Comment Originated: 05/28/2013
05/28/2013: Please add a north arrow to sheet 9.
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 05/28/2013
05/28/2013: Please correct the direction of the north arrow on sheets C4 & C5. See redlines.
Comment Number: 8 Comment Originated: 05/28/2013
05/28/2013: There are line over text issues on sheets C1, C4, C5, C6, CT C8, C9, C10 & C11.
See redlines.
Comment Number: 9 Comment Originated: 05/28/2013
05/28/2013: Please rotate the text 180 degrees on sheets C5, so that it is plan readable. See
redlines.
Comment Number: 10 Comment Originated: 05/28/2013
05/28/2013: There are cut off text issues on sheet C8. See redlines.
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 05/29/2013
05/29/2013: There are line over text issues on sheets 3 & 5. See redlines.
Topic: Lighting Plan
Comment Number: 12 Comment Originated: 05/29/2013
05/29/2013: Please add a north arrow to sheet 10.
Comment Number: 13 Comment Originated: 05/29/2013
05/29/2013: The details on sheet 10 are fuzzy. Please sharpen up the text and linework.
Topic: Plat
Comment Number: 14
Comment Originated: 05/29/2013
05/29/2013: Are there any Lienholders? We need more than the response 'Please see the
revised plat." for this comment.
Comment Number: 15 Comment Originated: 05/29/2013
05/29/2013: Please correct the spelling of "separate" on sheet 2. See redlines.
Comment Number. 3
Comment Originated: 05/28/2013
05/2812013: Chokecherry is typically specified as a clump and not by caliper. Consider
specifying it as a 6 foot height clump form.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartinecbfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 05/09/2013
05/09/2013: In order to confirm that the electric utility plan will be viable, and to determine the
electric development charges, Light & Power Engineering will need specifics concerning the
electric service to the commercial/industrial component. Light & Power Engineering can be
reached at(970)221-6700.
Comment Number: 2
Comment Originated: 05/09/2013
05/09/2013: Upon final approval, please send an AutoCad drawing of the utility plan to Terry
Cox at TCOX@FCGOV.COM.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam(Dfcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 05/29/2013
05129/2013: The erosion control requirements are in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. The current Erosion Control Materials
Submitted does not meet these requirements. See redlines for corrections in the Erosion
Control Plan. The Erosion Control Plan should be separated out from the Grading and Drainage
because it is overcrowded and impossible to determine what all BMPs are called out for. It was
also noted that there was no Inlet or Outlet Protection, Straw bales were called out for and are
not a valid BMP. The Plan could also use a Key to better understand the symbols. Every BMP
called out for on the plan should have a detail to match it. The site will also have to supply
Erosion Control Escrow Calculations. If you need clarification concerning this section, or if there
are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue(cDfcgov.com
Topic: General
Comment Number: 2 Comment Originated:
05/31/2013
05/31/2013: The grading along the south edge of the property is not clear. It looks like the
detention HWL can not be met. Please clarify the grading with additional spot elevations and
revise the grading where necessary.
Comment Number: 3 Comment Originated:
05/31/2013
05/31/2013: Please add a drainage easement for the storm sewer taking off -site flows from the
west.
Comment Number: 4 Comment Originated:
05/31/2013
05/3112013: Please remove the storm sewer from the utility set that is taking flows from the
property to the east.
Comment Number: 5 Comment Originated:
05/31/2013
05/31/2013: Please see redlined plan set for other minor comments.
Department: Technical Services
Comment Numbt 4 Comment Originated: 05/28/2013
05/28/2013: Sheet C3 - There is a storm drainage pipe shown on this sheet and a couple other
sheets that extends from the access drive to the east and across the eastern property line.
There is no design or callout for this pipe and it is not mentioned in the drainage report.
Comment Number: 5 Comment Originated: 05/28/2013
05/28/2013: Sheet C6 - The plans callout a 42" North Weld County Water District Ductile Iron
Pipe that crosses the proposed storm sewer. Please contact NWCWD to discuss there
crossing requirements, signature block, pipe clearance, etc. The pipe needs to be shown in
the profile.
Comment Number: 6
Comment Originated: 05/28/2013
05/28/2013: Sheet C6 - The storm profile appears to show inadequate cover over the storm
pipe. Please include the proposed grade along Hemlock street in this profile and ensure that
a minimum of 36" of clearance will be met in the ultimate condition.
Comment Number: 7
Comment Originated: 05/28/2013
05/28/2013: Sheet C7 - The low point at the south end of the project does not appear to be a
true low point. Please add additional spot elevations in this area to make it clear that no more
than 750 square feet of private drainage is draining out the driveway and off the project.
Comment Number: 8
Comment Originated: 05/28/2013
05/28/2013: Sheet C7 - The water surface elevation of the detention pond is 74.62 but in
looking at contours and spot elevations it appears that the pond may spill prior to 74.62.
Please add additional information.
Topic: General
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: The natural area easements have been paid for but will need to be recorded when
the project is reaching final mylar. Original copies of the
Topic: Plat
Comment Number: 2 Comment Originated: 05/28/2013
05128/2013: There is a proposed storm pipe that extends to the west project lot line and is not
shown to be within an easement. Does this line need to be within a drainage easement?
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex(J�fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: No comments.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanannafcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 05/28/2013
05/28/2013: Please label Bur Oak in the plant as bullet gall resistant by including in list right
after the name Bur Oak (only bullet gall resistant trees)
Comment Number: 2 Comment Originated: 05/28/2013
05/28/2013: Change landscape note number 9 to say ...... Prune plants only as recommended
by a qualified horticulturist.
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
June 13, 2013
Troy Jones
MTA Planning & Architecture
608 S. Mason St.
Fort Collins, CO 80524
RE: Hickory Commons, FDP130014, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston, at
970416-2283 or clevingston@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston fcgov.com
Topic: Building Elevations
Comment Number: 1
Comment Originated: 05/17/2013
05/17/2013. The elevations saying "right and left side" are confusing. The concern is with which
elevations will be facing the street for buildings 1 and 2 and 7.
Topic: General
Comment Number: 1
Comment Originated: 05/17/2013
05/17/2013: Note number 18 on the site plan should be reworded per the November 7, 2012
discussion stating that the ground Floor is not be be leased out separately or separately
occupied from the residential unit above because the upper and lower Floors are not fire
separated.
Topic: Site Plan
Comment Number: 1
Comment Originated: 05/17/2013
05/17/2013: Note 13 needs to be clairified saying that all meters, vents, conduit ect. will be
painted to match. Which elevation will the meters be located? On buildings one, two and
seven, they should not be facing the street.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerichd)fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 05/28/2013
05/28/2013: Sheet C3 - Does the storm pipe that extends to the western lot line require a
drainage easement?