Loading...
HomeMy WebLinkAboutSILO STORAGE (EAST VINE STORAGE) - ODP - ODP120003 - CORRESPONDENCE - (3)• It would be beneficial to contact Karen McWilliams, historic, preservation planner in the Advance Planning Department, to determine if there is any significant historic value to the property (buildings, etc.) that will be affected by redevelopment or new development. Karen can be reached at 224-6078. • The proposed new uses on this property are: an enclosed mini -storage facility; and, an outdoor storage facility. A neighborhood meeting may or may not be required for this development request, depending on whether the PDP request is to be a Type 1 or Type 2 review. 9. This development request will be subject to the Development Review Fee Schedule that is available in the Planning & Zoning Department office. The fees are due at the time of submittal of the required documents for the appropriate development review process (overall development plan, project development plan, final compliance, etc.) by City staff and affected outside reviewing agencies. 10. This development proposal is subject to the requirements as set forth in the City's LUC, specifically Articles 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Division 4.28 - Industrial Zoning District. Copies of Article 3 and Division 4.28 are available in the Current Planning Department or on the City of Fort Collins website @ www.fcgov.com. Go to City Services A-Z, then Departments, then Planning & Zoning. 11. The proposed land uses (self -storage and outdoor storage) will be subject to an administrative (Type 1) review. If any uses are proposed that would be subject to a Planning and Zoning Board (Type 2) review, as set forth in Section 4.28(B)(3) of the LUC, then the developer/applicant may be required to hold a neighborhood meeting prior to formal submittal of the project. This is set forth in Section 2.2.2 of the LUC. The required notification area, depending on the land uses, is set forth in Section 2.2.6 of the LUC. In this case (if there is more than 25,000 square feet of new non-residential uses), the notification area would be a minimum of 1,000' in all directions from the property boundaries. Please contact Steve Olt, at 221-6341, to assist you in setting a date, time, and location for the meeting if one is requested or necessary. 12. The City's Planning & Zoning Department will coordinate the development review process. The required submittal package will be submitted to the Development Review Center, at 281 North College Avenue, and distributed accordingly to other City departments and outside reviewing agencies involved in development review. 9 W � � i 14J 1, g. A copy of the Aerial Site View (provided by the applicant) of the property, showing the required Cooper Slough buffers, is attached to this comment letter. Please contact Dana, at 224-6143, if you have questions about these comments. 7. Carle Dann of the Poudre Fire Authority offered the following comments: a. Water supply and emergency access to this development will be required. b. All structures must be within 300' of a fire hydrant. C. The drive aisles must be Fire Lanes, with emergency access easements, at least 20' wide unobstructed. d. The drive aisles must be able to support 40-ton trucks. At least recycled asphalt surfaces will be needed. e. PFA must be able to get through the electric gate; therefore, a Knox Box is required. There is a lock system that could work but it is not as good. Please contact Carie, at 416-2869, if you have questions about these comments. 8. The Planning & Zoning Department has significant comments regarding this proposed development: • With redevelopment or new development being proposed, please be aware of the requirements set forth in Section 3.5.1 - Building and Project Compatibility in the LUC. Also, if any buildings are to be more than 40' in height then the development request is subject to a Building Height Review as set forth in Section 3.5.1(G) of the LUC. • If other than industrial uses, any new non-residential development on this property would be subject to the requirements and standards set forth in Section 3.5.3 - Mixed -Use, Institutional and Commercial Buildings of the LUC. • The request will have to comply with all the applicable regulations and standards set forth in Article 3 - General Development Standards and the Permitted Uses, Land Use Standards and Development Standards in Division 4.28 - Industrial District of the LUC. This property is located within the City's adopted East Mulberry Corridor Plan study area; therefore, a development request will be subject to the rules, regulations, requirements, standards, and guidelines set forth in this plan. I:.i�,L•f%i:LiKf� :.{�,'� .�r���C�-U'�' o�.il.:la�,t,f� `11.:�T.tia•*,-ti :J iJ � AA—C } 6. Dana Leavitt of the Natural Resources Depart ent offeredf the following SF>x comments: a. The East Mulberry Corridor Plan calls for a consistent policy for the protection and preservation of the Cooper Slough. As such; it is incumbent upon the applicant to propose similar protection methods for Cooper Slough. b. Per the corridor plan a regional trail is envisioned adjacent to the Cooper Slough. C. Native plants and grasses should be used in the Landscape Plan, particularly within the buffers for the Cooper slough and associated wetlands. d. This development request will be subject to a PDP review. Therefore, it will be subject to the requirements set forth in the following sections of the LUC: • Section 3.4.1(D)(1) - An Ecological Characterization Study must be submitted to the City for review. Several such studies have been completed for various sections of the Cooper Slough and will be relevant to this application. • Section 3.4.1(D)(2) - A Wetland Boundary Delineation must be submitted to the City for review. • Section 3.4.1(E) - This request will be subject to the Buffer Zone Standards set forth in this section. There is a 300' buffer zone standard along the Cooper Slough. In addition associated wetlands require buffering based upon the size and value of the wetland. • Section 3.4.1(F) - This request will be subject to the sensitive or specially valued plant and / or animal species requirements set forth in this section. • Section 3.4.1(1) - The Design and Aesthetics of any development on this property must comply with the standards set forth in this section, such as fencing, lighting and mitigation of visual impacts. e. As the emergency access is required to be an all-weather surface capable of carrying a 40-ton fire truck, it is recommended that porous pavement be considered for this project. f. Any future upstream improvements will not affect the requirements for a buffer zone for the Cooper Slough. 6 e. On -site detention is required, with a 2-year historic release rate, for water ug antity and extended detention is required for water ug alitY treatment if there is an increase in imperviousness greater than 1,000 square feet on the property. The majority of the property is in the FEMA-designated Cooper Slough floodplain. There is both floodway and flood fringe on the site. g. Non-residential construction and outdoor storage is allowed in the flood fringe. Any structure must have the lowest floor and all HVAC & electrical equipment elevated or floodproofed at least 18" above the 100-year flood level. h. Non-residential use is only allowed in the floodway if "no -rise" to the water surface elevation can be shown. Both the structures and the outdoor storage must be included in the analysis. Critical facilities are not allowed. Any waste facility for the RV's must be out of the floodplain. Each structure and sits element in the floodplain will require a Floodplain Use Permit and $25.00 permit fee. If any floodplain modeling is done to show "no -rise" then the permit fee is $325.00. k. A FEMA Elevation Certificate or a Floodproofing Certificate is required to be submitted and approved prior to the issuance of a Certificate of Occupancy for each structure. The floodplain administration contact is Marsha Hilmes-Robinson, at 224-6036. Please contact Wes, at 416-2418, if you have questions about these comments. 5. Alan Rutz of the Light & Power Department offered the following comments: a. The City has power on the south side of East Vine Drive in this location. There is an existing electric transformer on this property, which currently has single-phase power. b. Please coordinate any new transformer and meter locations with Light & Power. C. The normal electric development charges will apply to this development request. d. A C-1 Commercial Form may be needed to help determine the power needs for this development. Please contact Alan, at 224-6153, if you have questions about these comments. F Redman Drive to the south, as they are developable or redevelopable properties. n. The driveway ai it parking area for the office for the facility must be paved. o. A Development Agreement (between the developer/property owner and the City) and a Development Construction Permit will be required with development on this'property. P. Because of signifi,.ant ;_:Sues associated with development on this property, it is being recommended that the applicant schedule a Design Scoping Meeting (or r"xtent of Design Meeting) with City staff and affected outside reviFwing agencies to discuss this project before submittal of the ; aql sired PDP documentation package. q. More commems will follow when an actual site layout as part of a PDP submittal is provided. The City's adopted Transportation Development Review Fee will apply to this development. Plea:ae contact Susan, at 221-6605, for the actual amount of the fie that will be due. The fee is to be paid to the Engineering Department at time of submittal of the PDP. Please contact Susan, at 221-6605, if you have questions about these comments. 3. Roger Buffington of tine City's Water[Wastewater Department indicated that this property is in the East Larimer County Water District (ELCO) and the Boxelder Sanitation District service areas. Please contact these two service providers directly for infermr;tion about their requirements. 4. Wes Lamarque of the Stormwater Utility offered the following comments: a. The design of tl Iis site must conform to the drainage basin design of the Boxelder & Cooper Slough Master Drainage Plan, as well as the City's Design Criteria and Construction Standards. b. The Cit;/-wide development fee is $3,070 per acre ($0.0705 per square foot) for new impervious area over 350 square feet. No fee is charged for existing impervious area. The fee is to be paid at the time of issuance of building permits. C. The site is on Stormwater Utility Inventory Map #15G. A copy of the map can be obtained at the City's Utilities Building, 700 Wood Street. d. The standard drainage and erosion control report and construction plans are required for any new development on this property. The documents must be prepared by a professional engineer registered in the State of Colorado. 4 thirty (30) pe-cent of the building frontage. Such a building face shall not consist of a blank wall." d. The development will be subject to the minimum landscaped yard standard set forte; ir. Section 4.8(E)(3)(a)2 of the LUC. This section states: "A minimum thirty-foot deep landscaped yard shall be provided along all arterial sheets, and along any district boundary line that does not adjoin a , esidential land use. Is a district boundary line abuts upon or is within a street right-of-way, then the required landscaped yard small commence at the street right-of-way line on the district side of the street, rather than at the district boundary line. This requirement shall not apply to development plans that comply with the standards contained in Section 3.5.3." e. The development will be subject to the screening of storage standard set forth in Section 4.8(E)(3)(b)1 of the LUC. This section states: "Storage, loading, and work operations shall be screened from view along all district boundary lines and all public streets." f. The internal driveways & vel iicular use areas in this development are not required to be paved, other than the parking area for the office for the self -storage. g. Section 3.2.2(C)(4) of the LUC sets forth the bicycle parking requirements for development. h. Section 3.2.2(K)(2)(a) of the LUC sets forth the maximum parking allowance for tl ie office use in the facility. i. The required number of handicapped parking spaces for the office use will apply to this development proposal, per Section 3.2.2(K)(5)(d) of the LUC. Section 3.5.2(B) of the LUC sets forth the requirements for areas and design of any trash/recycle enclosures. Please contact Jenny, at 416-2313, if you have questions about these comments. Susan Joy of the Engineering Department offered the following comments: a. The standard utility plan submittal requirements will apply to this development request. b. Street oversizing fees will apply to this development request. The fees are based on vehicle trip generation for the proposed land uses in the CQNII _.? ='Fi-AE REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: September 10, 2007 ITEM: 3801; East Vine Drive — Self -Storage and Outdoor Storage APPLICANT: Bob Paterson P.O. Box 461 Windsor, CO. 80550 LAND USE DATA: Request for Self -Storage and Outdoor Storage on a partially developed property at 3805 East Vine Drive. The proposed new 00,000 — 80,000 square'feet of enclosed self - storage would occur on the cui rently developed 5 - 6 acres, being a portion of a 36-acre property that is located on the south side of East Vine Drive between the Cooper Slough drainage area (to the west) and the Intersiate 25, West Frontage Road (to the east). The outdoor storage of motor homes, boats, and campers. would be on the balance of ��►�' developable ground. The two existing single-family residences on the property would eliminated. The entire 36-acre property is in the I - Industrial Zoning District. COMMENTS: Jenny Nuckols of the Zoning Department offered the following comments: a. This property is in the I - Industrial Zoning District in the City of Fort Collins. The I District permits enclosed mini -storage facilities and outdoor storage facilities, subject to an administrative (Type 1) review, which results in a public hearing, kNhere a decision on the development proposal is given. b. As a Type 1 review, the request will have to comply with all the regulations and standards set forth in Article 3 - General Development Standards and the Permitted Uses, Land Use Standards and Development Standards in Division 4.28 - Industrial District of the Land Use Code (LUC). A PDP request is also subject to the rules, regulations, standards, ani guidelines set forth in the East Mulberry Corridor Plan adopted by City Council. C. The development will be subject to the building orientation standard set forth in Section 4.28(E)(2)(b) of the LUC. This section states: "Along arterial streets and any other streets that directly connect to other districts, buildings shall be sited so that a building face abuts upon the required minimum landscaped yard. for at least COMMUNITY PLANNING AND ENVIRONT\dl-uTALS?'i:7r'-:'3 1'_51N.C11IIrgeAve.1'.(1I;L",=.°��Fo, tC��IlinsCOF05"-OFO(970)'_21-(730 PLANNING DEPA RI MEN r Plannin, ; as-d TL"ansportatio. e:n,-ices Planning ::n,'. City of Fort Collins September 14, 2007 Bob Paterson P.O. Box 461 Windsor, CO. 80550 Dear Bob: For your information, attached is a copy or the Staff's comments for 3805 East Vine Drive — Self -Storage acid Outdoor Storage, which was reviewed by the Conceptual Review Team on Monday, Sspternber 10, 2007. This is a request Self -Storage and Outdoor Storage on a partially developed property at 3805 East Vine Drive. The proposed new 60,000 — 80,000 square feet of enclosed self - storage would occur on the currently developed 5 - 6 acres, being a portion of a 36-acre property that is located or, the south side of East Vine Drive between the Cooper Slough drainage area (to the west) and 'he Interstate 25, West Frontage Road (to the east). The outdoor storage of motor homes, boats, and campers would be on the balance of developable ground. The two exiswig single-family residences on the property would be eliminated. The entire 36-acre property is in the I - Industrial Zoning District. The comments are informally ofloDied by staff to assist you in preparing the detailed components of a project applicatiun. Modifications and additions to these comments may be made at the time of `orrnal rer.evv of this project. The City's Current Planning Depbrtrnent coordinates the development review process. I will be the Project Planner for ;inul project. I will be commenting as well as assisting in the coordination proces3. li ycu hay,e any questions regarding these comments or the next steps in the review prc; ess, please fe::l free to call me at 221-6341. Sincerely, Steve Olt, City Planner cc: Stormwater Traffic Operations Project File 281 North College Avenue • 10. Pox `SO • i u, t "ollins, CO 511522-0580 ^ (97 0) 221-6750 • FAX (970) 416-2020