HomeMy WebLinkAboutSILO STORAGE (EAST VINE STORAGE) - ODP - ODP120003 - SUBMITTAL DOCUMENTS - ROUND 1 - LUC REQUIREMENTSPOLICY EMC.ONL-1.3 — COOPER SLOUGH
The wetlands and Cooper Slough on and adjacent to the property are protected
and left in the native state. Efforts will be taken to reduce the impact of nuisance species
that abut the slough and wetlands. A buffer zone protects both sensitive features and sets
development at a safe distance to protect these features.
POLICY EMC.OLN-1.4 — STORM DRAINAGE
The storm drainage features for this project provide a safe method to handle
drainage and at the same time protect the sensitive areas on the site. The detention system
limits the flow of water during a storm so that the sensitive areas receive no additional
flows then would have occurred prior to development. Extended detention provides the
opportunity to treat the storm water and remove heavy particles, debris, and some
contaminates. Enhanced wetlands that will add area to the existing wetland will be used
for absorptive type drainage and detention. These features help to keep the drainage water
clean as it is being released.
PROJECT SUMMARY
The Owners are committed to working to achieve the goals and policies of the
City's Structure Plan. Our intentions are to have a high quality development that is
functional, economically feasible and visually pleasing to the public. They understand
that it is a commitment to excellence that they are taking and are willing to take these
steps for the project and the Community.
TRANSPORTATION
POLICY EMC.T-1.1 — STREETS
The project is providing construction of the arterial portion of E. Vine Drive with
this project. This provides the level of improvement on site to provide the Community
with a well connected vehicle transportation system.
POLICY EMC.T-1.4 — MULTI -MODAL
The project provides bike lanes with the construction of Vine Drive. The
sidewalks along Vine are detached to add to the safety and comfort of the pedestrians.
POLICY EMC.T-2.3 - COOPER SLOUGH
Due to the sensitive nature of the Cooper Slough and associated wetlands, streets
are not shown to cross the property to maintain the quality of these natural areas. In this
case, just as the situation at Weicker Drive, the protection of the natural features is more
important then connectivity. The adjacent properties being large have multiple options to
provide excellent levels of transportation services without passing through this property.
POLICY EMC.T-3.1 - COMPACT MIXED -USE DEVELOPMENT
The design of this project along Vine Drive provides services to the residential
neighborhoods to the north. The link of the transportation corridor, Vine Drive, and the
adjacent residential uses helps keep this emerging neighborhood compact.
POLICY EMC.T-2.4 — SAFETY
The design of the project positions the access between the existing two access
point on the north side of Vine Drive at a spacing greater that the LUC minimum
standard. This provides for safe and orderly access for the transportation corridor. The
detached walkways and site lighting add to the safety features of the design.
COMMUNITY APPEARANCE AND DESIGN
POLICY EMC.CAD-1.2 — COMPATABLITY
The project utilizes a variety of materials, color, roof forms, building massing,
varied wall heights, and wall feature elements to keep the scale of the project human
oriented. The project is upgraded in appearance to the industry standard for this building
type. The low profile appearance of the project reduces the significants of the building
massing.
POLICY EMC.CAD-1.5 — LANDSCAPING
The landscaping materials used for this project maximize the efficiency of the
water used for irrigation. Up to twelve acres of the project will be maintained as native
habitat. Drought tolerant materials are used throughout the property with just the areas
adjacent to Vine Drive having a manicured look. These areas will use grasses that have a
medium demand for water based on species. These green areas are balanced with
xeriscaped areas in the `front yard' further reducing the need for irrigation.
EAST MULBERRY CORRIDOR PLAN
This review of the document demonstrates how the design of the project meets the
intentions of the plan.
LAND USE
❑ The project will be scaled to the neighborhood to be a service component of the
existing residential and commercial uses. The project adds to the diversity of the area.
❑ The project will provide a portion of the openspace provided around the Cooper
Slough to protect this natural feature.
❑ The project will become part of a healthy industrial hub for the City in an area that
has not yet developed. It will provide stable employment opportunity for the life of
the project.
❑ The centralized location of the project will serve the needs of current commercial
developments, current residential uses, and future residential uses that will develop in
this area.
TRANSPORTATION
❑ The property will offer a multi -modal transportation network. A combination of City
streets and private drives will provide a safe circulation route for all vehicles using
the property. The system will be safe and efficient. It will meet all design standards
applied by the City currently and the Fire Authority.
❑ Pedestrian travel will be supported with detached walks and separate pedestrian links
to the project office and caretakers unit. Space will be.provided within the arterial
street width for bike lanes that promote alternate means of circulation.
OPEN SPACE
❑ This property is a key component to establishing an openspace corridor along the
Cooper Slough. This is the first property between Mulberry and Vine, the lower
Cooper Slough, to be under the control of the City as it develops. A good balance
between Open Space and land use will allow this community asset to be protected.
❑ The major elements of plant live, animal habitat, and clean water are all supported by
the design of the property.
EAST MULBERRY CORRIDOR PLAN
PRINCIPLES AND POLICIES
POLICY EMC.LU-4.2 — INDUSTRIAL
The project meets the requirements set in this section for location, building
design, distribution of uses on the site and buffering.
POLICY GM-6.1 — FEES AND DEVELOPMENT REQUIREMENTS
The property will be paying its fair share of development cost through
development related fee. These fees will be paid by the project at the time of Planning
Department review through the filing fees for the project. More importantly the project
will be accessed fees for street over sizing, electrical fees, building permit fees, and sales
tax as part of the development process. In addition the project will provide the
infrastructure of streets, sidewalks, bicycle paths, water lines, sanitary lines, and open
spaces that are programmed to be completed in accordance to the Development
Agreement.
INDUSTRIAL DISTRICTS
POLICY ID- 1.1 — LAND USE
The mini -storage and out -door storage of vehicles are uses that are intended to be
located in this district. This project is the right fit for the location.
POLICY ID- 1.3 — LAND USE TRANSITION
This land use is a low intensity, low traffic generator, and a quiet business. This
land use allows the long-term storage of personal property both large and small items.
Typically the users of the property visit three to four times a year. This intensity provides
a great buffer for the residential uses located north of Vine Drive and existing industrial
uses functioning off Mulberry and the Frontage Road. This property provides separation
from the noise that industrial properties may generate.
POLICY ID-11.4 — DESIGN CHARACTER AND IMAGE
This project has a rather simple design in form and function. The buildings are
small in stature according to the needs of the users. Though the buildings are simple in
form variety of shapes allows a character to be developed.
NATURAL AREAS AND OPEN LANDS
POLICY OL-2.1 CONSERVATION TOOLS
This property development plan calls for 64% of the land to be developed in all
three phases. The development of phase three will be dependent upon off -site work that
would change the FEMA and City defined floodway some time in the future. The
development of phases one and two consist of only 45% of the property. The majority of
the open space will be maintained in a natural planting within the setback for the
sensitive areas. The wetland areas will be protected from uses and be enhanced as part of
a natural drainage approach to the design. The Cooper Slough will be protected with
substantial setbacks. No activity, outside of landscaping will happen in the sloughs
defined area of influence. The Owners will consider placing a conservation easement on
the property set to be openspace after they determine the legal entity that will best serve
the establishment of the easement.
POLICY OL-3.1 — CORRIDORS
The Cooper Slough will be maintained as a wildlife corridor. It will have minimal
access from the public to allow it to flourish as a natural area.
GROWTH MANAGEMENT
POLICY GM-1.2 — MANAGEMENT AREA BOUNDARY
The property is also within the boundaries of the Urban Growth Area. From a
long-term growth management plan the City has recognized that this land should be
developed as industrial property and that it should be developed within the City. The
property will serve a residential district that the City has established by previous planning
actions. This development enhances the district diversity concept.
POLICY GM-4.1 - CAPITAL FACILITIES
Transportation patterns for the property are established. Vine Drive provides safe
and covenant access from the site as a classified arterial street. Essential services of
water, sanitary, natural gas, communications, and power are all present on site to a level
to support the project. No major infrastructure cost to the City are required to develop the
property.
POLICY GM-5.1 PHASING OF DEVELOPMENT
All essential services are provided to this portion of the City and the site by
previous development. This project does not extend services beyond current capabilities
POLICY ENV-4.3 — WATER DEMAND
The total property is a little over thirty-five acres. Approximately twenty acres of
the property is to be maintained in its native state. Most landscape areas of the property
will be drought tolerant type and be low water consuming type. A combination of
xeriscape and native grasses will be used for the turf cover. Limited areas of blue fescue
grasses will be used within the parkway of Vine Drive and adjacent to the entry. This
treatment will be the only portion of the landscaping requiring a medium demand for
irrigation. The property has existing irrigation wells and more than adequate water rights
that will be used for on -site irrigation. The site will not use domestic water for landscape
irrigation. The project will more than likely have a smaller demand for domestic water
when the existing rental unit is removed.
POLICY ENV-6.1 — PROTECTION AND ENHANCEMENT
The project is designed to provide a native setback from identified wetland areas
that are on the property and on adjacent properties. Enhancement and additions to the
wetlands will be designed as part of the storm drainage system.
POLICY ENV-6.2 — FLOODPLAINS
The Cooper Slough flows through the property from north to south. The project
limits development within the floodway and maintains a natural setback from the Slough.
There are no uses on the site that are considered Essential. All work for phases one and
two will be outside of the floodway. The buildings for phase two that are within the
floodplain will be constructed to FEMA and City standards.
POLICY ENV-7.1 — COMMUNITY NOISE
The nature of a storage facility is a low to very low intensity land use from the
standpoint of vehicle and human activity. The noise generated from the property is less
than what would be generated by residential uses developed over the equivalent area of
ground. Noise pollution is not an issue of concern for this project
POLICY ENV-8.1 — BALANCE OF ENVIRONMENTAL AND ECONOMIC
CONCERNS
The development of this property is a balance between environmental concerns
and economic rights. The low intensity of the land use provides a buffer between the
sensitive areas and the more intense uses that the Zoning allows adjacent properties to
provide. The development allows a business to operate and utilize the property with the
understanding that the environmentally sensitive areas will be protected. Generous
setbacks from these features provide the balance.
ECONOMIC
POLICY ECON-1.1 — BALANCE OF EMPLOYMENT OPPORTUNITY
This is a new business opportunity that can provide minimal skilled workers for a
stable long-term opportunity.
POLICY ECON-1.2 — ECONIMIC DEVELOPMENT
The project meets the goals set by the City by increasing private investment in the
community, by providing primary employment opportunities and by creating a positive
environment for businesses to locate.
POLICY ECON-1.3 — INFRASTRUCTURE
The property allows for easy access to arterial streets through the existing and
established transportation grid system. The property fills into the existing grid and does
not cause the grid to be expanded.
POLICY ECON-2.2 — ECONOMIC SUSTAINABI LI TY
The project meets the goal of the City to provide development within the existing
Urban Growth Area.
ENVIRONMENT
POLICY ENV- 1.1 — AIR QUALITY OBJECTIVES
The property is so located to serve an emerging residential district that has limited
access to essential and support services. The project is located so that residents and
businesses can take advantage of the services provided. Currently people need to travel
great distances to obtain the services that will now be locally available. This location will
allow for the reduction of vehicle -miles traveled to and from the site over other sites that
offer the same commercial opportunities. Because the property is part of the
neighborhood, reduction of travel time will mean reduction in emissions from burning
fossil fuels. The site development will enhance pedestrian and bicycle travel helping
people reduce their dependence on fossil fuels.
POLICY ENV-3.2 — REDUCE GREENHOUSE EMMISSIONS
No new sources of fossil fuel consumption will be provided with this project. This
project has a very small carbon footprint aiding the City in achieving its goal of reducing
emissions by 30%.
POLICY CAD-1.5 — STREET LIGHTING
Street lighting for the project will provide for the safety and wellbeing of the
pedestrian. Pedestrian paths will be lit with down directed type fixtures. The project will
provide security level lighting properly spaced to limit the scatter of lighting off -site.
Lights will be down directed to preserve dark sky conditions as best as possible. No
lighting will be provided in the RV parking areas to limit the hours of operation and to
reduce the impact of the project. This will in affect increase the feel of the openspace
setback.
POLICY CAD-2.3 — ENTRYWAYS
The extended landscaped setback provided along Vine Drive presents the quality
and visual expanse to set a good impression for travelers entering our Community. This
feature will exist whether or not an interstate connection is constructed for Vine Drive.
POLICY CAD-3.1 — MODIFICATION OF STANDARD ARCHITECTURE
This project has upgraded its Architecture from the standard mini -storage project
found through out the country. This standardized look has been modified to provide
visual interest. The character of the project promotes the uniqueness of the Community.
POLICY CAD-3.2 — COMPATIBLTTY
The massing, colors, and detailing used in the project will set the stage for other
industrial uses that will develop in the future. This project's attention to detail will
require other projects to contribute to the distinctive quality of the neighborhood. The
buildings associated with the second phase and the entry feature constructed with the first
phase meet the requirements set in the 1-25 Corridor plan for building massing, colors,
and roof forms.
POLICY CAD-4.1 — CRIME PREVENTION AND SECURITY
The design of the project will promote crime prevention. The project will limit
access to a controlled point that limits the opportunity for criminal mischief. The project
will have a caretaker on -site 24n that will deter criminals from attacking the property.
The fencing and placement of buildings reduce the opportunity for criminals to enter the
property. The design orientation of the project limits the view of the function of the
project reducing the criminal observance of property that they may want to steal.
POLICY CAD-4.2 — LIGHTING AND LANDSCAPING
Lighting levels for the project will be kept low and even maintaining the current
dark sky found in the area. Landscaping is placed so not to create dangerous enclaves that
could harm Community members.
POLICY T-1.10 —CONTEXT SENSITIVE DESIGN
The design of the transportation systems for this property takes into consideration
the sensitive areas that cross and surround the property. The need for connectivity of
streets is superceded by the need to preserve wetlands and the Cooper Slough in as native
a setting as possible. Plenty of opportunities exist on the adjacent properties to achieve
coherent circulation without traveling through these sensitive areas.
POLICY T-4.1 — BICYCLING WILL SERVE AS A PRACTICAL ALTERNATIVE TO
AUTOMOBILE USE FOR ALL TRIP PURPOSES.
Bike lanes within the design of Vine Drive will provide the opportunity for
alternate means of travel for all using the area.
POLICY T-5.1 — LAND USE
This project promotes a mix of uses in a developing residential area that is lacking
in services. The location of this project in proximity of the developing residential
neighborhood allow support services to be located within walking distance of a new
population center.
POLICY T-5.3 — CONTINUITY
The project will promote pedestrian circulation with the construction of the bridge
crossing the Cooper Slough in Phase III. This provides a safe and continuous path along
Vine Drive that will have a path vertically and horizontally separated from the vehicle
traffic lanes.
POLICY T-5.4 — SIDEWALKS
The project provides detached walks for the,public streets. We also provide
detached paths to the facility's office and caretakers unit from the public R.O.W.
POLICY T-8.2 — SITE IMPROVEMENTS
The design of the pedestrian system with this project will promote the safety of
the individuals by avoiding construction of potentially dangerous facilities that will need
to be corrected in the feature.
POLICY T-9.1 — VEHICLE MILES TRAVELED
The location of this project in a nodal neighborhood area will help reduce the
VMT for people living in the area because services will be available in proximity to a
neighborhood that has limited services available.
COMMUNITY APPEARANCE AND DESIGN
POLICY CAD-1.4 — STREET TREE DESIGN
The streetscape along the property will follow a formalized pattern to reinforce
the patterns of the site -specific design of the buildings and pedestrian ways. The
pedestrian experience walking along the property will be enhanced by the placement of
shade trees at regular intervals. The human scale to the project will be enhanced by the
placement of full stocking of the street frontage and that of the buildings.
POLICY LU-3.1 — GENERAL AREA DESIGNATIONS
The Structure Plan for the City has identified this property as being within the
boundaries of the existing Urban Growth Area. The Structure Plan further defines this
area as being proper for Industrial land uses. This character and nature will allow the
property to relate to the Community on a neighborhood service level. It is the intention of
the Owner to develop the property consistent with these overall goals.
POLICY LU-3.3 — DEVELOPMENT REGULATIONS ESTABLISHED
The Policies require that development be designed to meet specific standards for
the land use. These controls the intensity of the uses, the character, and the detailing
required to mesh properly into the Community. It is the Developers intention to meet or
exceed these Policies with the design of this project.
POLICY LU-4.1 — PLANNING WITHIN THE CONTEXT OF CITY PLAN
The City has further refined the requirements for development in this subarea with
the adoption of the Mulberry Corridor Plan. The project will incorporate the additional
constraints placed on the property by this document in the project design.
TRANSPORTATION
POLICY T-1.1 — LAND USE PATTERNS
The property will be developed in accordance to the current standards for efforts
to support mass transportation, alternative modes, and logical traffic patterns. The project
is providing for all of these components of the Structure Plan by providing public right of
ways and easements for regional trails.
POLICY T-1.2 — MULTI -MODAL SREETS
The design of this property will incorporate means of circulation that will make
travel equally covenant for people no matter which means of transportation they choose.
These design features will be provided for all modes of transportation in the construction
provided with this project.
POLICY T-1.3 — STREET DESIGN CRITERIA
The streets within the project will be designed to City Standards that will
minimize conflict between transportation means. The design criteria of LCUASS will be
met in the design of the transportation network for the project.
POLICY T-1.4 — ADEQUATE FACILITIES
The project provides for the continuity of arterial streets by designing and
constructing the adjacent public streets.
the property with landscaping and fencing. The first phase will be all exterior storage.
Phase II would construct approximately 65,000 square feet of interior storage at a time
that this project would be economically feasible. Phase III would proceed at such time as
the floodway definition on the property is changed. This would occur after off site
drainage improvements would be provided to the storm water basin. Phase III could in
theory occur prior to Phase H. Phase I would provide parking for approximately 410
vehicles. At the time that Phase II would be developed this would reduce to 270 vehicles.
Phase III would provide an additional 380 spaces. Depending on the timing of the project
there could be between 400 and 780 vehicles on the property if Phase III is constructed. If
all three phases are completed there would be approximately 650 vehicles on the site. The
Project will be constructed in three phases as the market for services demands.
PRINCIPLES AND POLICIES
COMMUNITY -WIDE
WAZLI111.` M
POLICY LU-2.1 - CITY-WIDE STRUCTURE
Regional plans for this area, being the Structure Plan and the Mulberry Corridor
Plan anticipate light industrial type uses on the property. These land uses are to be low
impact and sensitive to the environmental features that are on and adjacent to the
property. Development of this property will help provide services to a developing
residential neighborhood and service the needs of commercial land uses in the region as
well. The Structure Plan identifies the property to be developed as industrial uses. The
property Owners intend to develop the land in accordance to these standards, which will
insure that the goals of a compact development occur. The property being adjacent to an
existing major City arterials and the regional transportation spine allow for logical
developed to compliment the driving force of the residential uses in the neighborhood.
All means of transportation will be addressed by the project design so the project will
link into the transportation networks existing and planned modes for the area.
POLICY LU-2.2 — URBAN DESIGN
The design and uses for this property will fit into the development fabric that has
been generated by the City in its Mulberry Corridor Plan and the existing development
patterns of the region. This inclusion of design elements and features unique to the
project in tune to the standards of the LUC will allow this new property to plug into the
developing and existing fabric of the area and at the same time provide its own identity.