HomeMy WebLinkAboutDELLENBACH SUBARU - PDP - 50-98 - CORRESPONDENCE - (6)This completes the staff comments at this time. Additional comments will be
forthcoming as they are received from City departments and outside reviewing
agencies.
Under the development review process and schedule there is no revision date
mandated by the City. The amount of time spent on revisions is up to the
applicant. Upon receipt, the revisions will be routed to the appropriate City
departments and outside reviewing agencies, with their comments due to the project
planner no later than the third weekly staff review meeting (Wednesday mornings)
following receipt of the revisions. At this staff review meeting the item will be discussed
and it will be determined if the project is ready to go to the Planning and Zoning Board
for a decision. If so, will be scheduled for the nearest Board hearing date with an
opening on the agenda.
Red -lined copies of plans and reports, with additional comments, are being forwarded
to the applicant. Please return all documents red -lined by all documents red -lined by City staff with submission ofwith submission of
your revisions. The number of copies of revisions for each document to be resubmitted
is on the attached Revisions Routing Sheet. You may contact me at 221-6341 to
schedule a meeting to discuss these comments.
Sincerely,
Steve Olt
Project Planner
cc: Engineering
Stormwater Utility
Zoning
Water & Wastewater
Traffic Operations
Transportation Planning
Advance Planning
McNutt & Associates
Stewart & Associates
Prom ject File ,
result of just on -site lighting for the auto dealership?
A letter of request for consideration of an alternative lighting plan under the
Alternative compliance section of the Code [Section 3.2.4(E)] has been
submitted to the City for review. The request references the recent Spradley Barr
Auto Dealership as an example of an alternative lighting plan that the City found
acceptable. In that instance, the applicant presented a plan that incorporated a
lighting system that ensured no off -site light spillage, absolute down directional
cutoffs on the light fixtures, and a computerized system that progressively shuts
down the system at certain times after dark so that the effect of the lighting
eventually is minimized and negated at night. The mere comparison of one auto
dealership to another, without specific information about the system for the
Dellenbach Dealership, is not sufficient justification for the acceptance of the
alternative compliance request.
21. The vehicle use areas must be adequately screened as per Section
3.2.1(E)(4)(b) of the LUC.
Engineering
22. The proposed fire access lane on the Site Plan needs an access to be dedicated
on the subdivision plat.
23. There needs to be a landscaped strip between the tier of 13 visitor parking
spaces and the auto display spaces south of the building.
24. There are issues surrounding the request to vacate the frontage road. Some
issues involve the bicycle lanes, access to the area from South College Avenue,
and the sidewalk width for multi -uses. Does the midpoint access from South
College Avenue have to occur?
25. The minimum 50' setback requirement for on -site parking spaces from the street
may necessitate the loss of the first two spaces south of West Swallow Road on
the west side of the site.
26. Repair or replace damaged sidewalk along West Swallow Road. This may
include detaching the sidewalk.
Water/Wastewater
27. There is existing water and sanitary sewer mains in the frontage road. There
may be some conflicts with the proposed trees and shrubs.
4
The following comments and concerns were expressed at the Staff Review meeting on
October 28th:
Transportation Planning
14. Are the lots (or a portion of) to be gated for security at night?
15. The existing transit stop adjacent to this site on South College Avenue should be
upgraded to include a shelter, if one does not already exist.
Stormwater Utility
16. The proposed finish floor elevations for the buildings on this site are too low and,
therefore, a floodplain use permit will be required.
17. The majority of the surface of the site is already impervious. This proposed new
development will need to look at the surface storm drainage patterns and how
they may change from the existing.
Planning
18. The timing for moving and relocating some of the trees on -site is critical.
19. There is a need to discuss the possible vacation of the existing frontage road
and effects on the potential streetscape along South College Avenue at a weekly
transportation coordination meeting.
20. The overall Lighting Photometric Plan shows an average foot candle value of
9.63 for the site. However, it would appear that the majority of the site [far]
exceeds the maximum allowance of 10 foot candles as set forth in Section
3.2.4(D)(7) of the LUC. This section of the Code defines maximum on -site
lighting levels, not an overall site average. There are numerous "hot spots" that
range from 10.2 to 69.1 foot candles.
The aforementioned section of the Code also states that the maximum lighting
level allowed for loading and unloading platforms is 20 foot candles. The "hot
spots" in the proposed loading/unloading area range from 41.5 to 68.0 foot
candles.
Section 3.2.4(D)(8) of the LUC states that lighting levels measured 20' beyond
the property line adjacent to public rights -of way shall not exceed 0.1 foot candle
as a direct result of the on -site lighting for the development. There are "hot spots"
along the frontage road ranging from 0.11 to 0.23 foot candles and "hot spots"
along West Swallow Road ranging from 0.12 to 2.37 foot candles, all exceeding
the Code requirement. Is this a result of combined on -site and street lighting or a
building. Coordinate the Landscape Plan and the civil engineering plan.
b. Will the existing sanitary sewer service be used or abandoned? Define
this on the overall utility plan set.
C. Show all water and sanitary sewer mains and services on the Landscape
Plan and provide the required separation distances between plant
materials and utility lines.
d. Provide a 5' minimum separation between the 12" water main and the
curb flowline along the east edge of the parking lot.
e. Provide a sanitary sewer service detail with the next submittal.
g. Red -lined copies of plans, with additional comments, are being forwarded
to the applicant.
Please contact Roger, at 221-6681, if you have questions about these
comments.
12. Eric Bracke of the Traffic Operations Department offered the following
comments:
a. The proposed access location on South College Avenue meets the
approved South College Access Plan. However, the design of the new
right-in/right-out on College does not meet the Code.
b. Need to see the south end of the frontage road with these plans.
Please contact Eric, at 224-6062, if you have questions about these comments.
13. Matt Baker of the Engineering Department offered the following comments:
a. There will not be oversizing fees with this project, since the change of use
is less intensive.
b. The acceleration lane is for Dellenbach only.
C. There are concerns about the design of the deceleration lane. It must
meet the City and CDOT specifications.
d. The sidewalk must be T wide. The City's oversizing department will pay
for 2.5' of the width of the walk.
Please contact Matt, at 224-6108, if you have questions about these comments.
C. The applicant will need to coordinate the transformer location and
relocation of existing equipment.
d. Any unpaid development charges on the new parking lot at the southeast
corner of West Swallow Road and McClelland Drive will also be due at
this time.
Please contact Rob, at 221-6700, if you have questions about these comments.
8. Kathleen Reavis of the Transportation Planning Department offered the
following comments:
a. The Transportation Impact Study (TIS) states that the project will bring all
adjacent sidewalks up to current standards. This needs to include a new
detached walk along the West Swallow Road frontage.
b. The TIS states that the Dellenbach Subaru project will provide ADA
approved handicapped ramps adjacent to their site.
C. The TIS indicates that the existing transit stop may have to be relocated.
The applicant will have to discuss this possibility with GayLene Rossiter of
Transfort. She can be reached at 221-6620.
d. If the frontage road is vacated then the sidewalk along South College
Avenue will need to be widened to 10' to allow for bicycle traffic to share
the walk (bicycles currently use the frontage road). Please see the red -
lined copy of a PDP Site Plan, with details and additional comments, that
is being forwarded to the applicant.
Please contact Kathleen, at 224-6140, if you have questions about these
comments.
9. A copy of the comments received from Mark McCallum of the Engineering
Department is attached to this letter. Red -lined copies of plans, with additional
comments, are being forwarded to the applicant.
10. A copy of the comments received from Donald Dustin of the Stormwater Utility
is attached to this letter. Red -lined copies of plans and reports, with additional
comments, are being forwarded to the applicant.
11. Roger Buffington of the Water/Wastewater Department offered the following
comments:
a. Overall utility plans show water service on the east side of the building
and the Landscape Plan shows the water service on the north side of the
f. A detail and elevation of the trash enclosure should be provided and
included on one of the plans (Building Elevations, Site, or Landscape).
g. The areas below the operable windows and between the columns on the
north elevation of the Building Elevations Plan are not service bay doors,
are they?
Please contact Peter, Gary, or Jenny at 221-6760 if you have questions about
these comments.
3. Susan Peterson of U. S. West stated that any relocations of U. S. West facilities
required by this project will be paid by the developer. Please contact her for
conduit specifications for service to the new/remodeled building. She can be
reached at 970-224-7473.
4. Jim Slagle of Public Service Company offered the following comments:
a. Any rerouting, reinforcement, etc. of PSC gas lines caused by this
development will be at the developer's expense.
b. No trees are to be planted within 4' of the IP gas line. This is a "high"
pressure line, so this requirement (restriction) is critical.
5. Ron Gonzales of the Poudre Fire Authority offered the following comments:
a. Fire hydrants are required with a maximum spacing of 600' along an
approved roadway. Each hydrant must be capable of delivering 1,000
gallons of water per minute at a residual pressure of 20 psi. Hydrants shall
be of an approved type as defined by the water department and the fire
department. No commercial building can be greater than 300' from a fire
hydrant.
b. Provide fire hydrants on 600' centers along the proposed fire lane.
Please contact Ron, at 221-6570, if you have questions about these comments.
6. A copy of the comments received from Sharon Getz of the Building Inspection
Department is attached to this letter.
7. Rob Irish of the Light & Power Department offered the following comments:
a. KVA, relocating of all electric facilities, and any system modifications will
be at the owner's expense.
b. The applicant will need to complete a Commercial Service Form.
Comm- 'ty Planning and Environmenta' -rvices
Current 1-ianning
City of Fort Collins
November 3, 1998
Carr Bieker
The Architects Studio
151 West Mountain Avenue
Fort Collins, CO. 80524
Dear Carr,
Staff has reviewed your documentation for the DELLENBACH SUBARU, Project
Development Plan (PDP) development proposal that was submitted to the City on
September 25, 1998, and would like to offer the following comments:
This development proposal, being in the C - Commercial Zoning District, is
identified as a Planning and Zoning Board (Type II) review under the City's Land
Use Code (LUC). Vehicle sales and leasing establishments with outdoor storage
are permitted uses subject to a Type II review in the District.
2. Representatives of the Zoning Department offered the following comments:
a. Provide handicapped ramp at the West Swallow Road entrance.
b. This site is not in the Residential Neighborhood Sign District and,
therefore, the building signage should not be shown at all on the building
elevations. The P & Z Board has no authority to review and comment on
the locations and content of the building signage.
C. The City would prefer to see the areas marked "turf' on the Landscape
Plan to be sodded instead of seeded. This should be noted on the plan.
d. Will there be any type of border (raised concrete, etc.) between the
asphalt and the turf areas to prevent autos from driving across or parking
on the grass?
e. Autos cannot be parked in the area between West Swallow Road and the
building. Displayed vehicles on the north side of the building cannot be in
the street right-of-way.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020