HomeMy WebLinkAboutDELLENBACH SUBARU - PDP - 50-98 - CORRESPONDENCE -,! 16. Is the fire access issue resolved regarding this site? Please check with Ron Gonzales of the Poudre Fire Authority about this. He can be reached at 221- 6570. This completes the staff comments at this time. Additional comments will be forthcoming as they are received from City departments and outside reviewing agencies. This item has been scheduled for the August 5' Planning and Zoning Board public hearing. Please return all documents red -lined by City staff with submission of revisions. The number of copies of revisions for each document to be resubmitted is on the attached Revisions Routing Sheet. The revisions need to be resubmitted as soon as possible to ensure that staff can review them prior to going to public hearing. You may contact me at 221-6341 to schedule a meeting to discuss these comments, if necessary. Sincerely, AMLW Steve Olt Project Planner cc: Engineering Stormwater Utility Zoning Water & Wastewater Transportation Planning Dellenbach Motors Subaru McNutt & Associates Stewart & Associates Project File #50-98 College Avenue. Pedestrian improvements are needed to the north and east of this site. 9. There appears to be no direct pedestrian access from West Swallow Road to the front entry of this project. It would be better to have an entrance to the building from West Swallow Road. Planning 10. The overall Lighting Photometric Plan shows an average foot candle value of 7.02 for the site. The overall site lighting exceeds the maximum allowance of 10 foot candles and lighting levels measured 20' beyond the property line adjacent to public rights -of way not exceeding 0.1 foot candle as a direct result of the on -site lighting for the development, as set forth in Sections 3.2.4(D)(7) and (8) of the LUC. A letter of request for consideration of an alternative lighting plan under the Alternative Compliance section of the Code [Section 3.2.4(E)] has been submitted to the City for review. Staff will be recommending that the Board approve the alternative lighting plan. 11. The vehicle use areas must be adequately screened as per Section 3.2.1(E)(4)(b) of the LUC. The Landscape Plan dated 6/15/99 does not appear to comply with this requirement. The Tammy Junipers in the planting bed along the Frontage Road are sufficient in height and opacity. The Blue Mist Spirea are sufficient in the winter in height and opacity. The rest of the materials (Potentilla, Hughes Juniper, Wilton Carpet Juniper, Snow in Summer) are not tall enough to meet the 30" minimum height requirement. The necessary 75% opacity and 70% of the length of the parking area requirement is not being met. 12. A minor amendment to the existing Dellenbach Motors PUD is needed for the new islands at the driveway connection between the two sites (southwest corner of this current development request). Engineering 13. Is there an existing sidewalk along the Frontage Road frontage of this property? 14. Handicapped ramps should be provided at the corners of the street crossings for the Frontage Road and West Swallow Road, if not already there. 15. Is a replat needed for this development proposal? The west line of this project needs to be clarified. A non -regulated land transfer between Lot 3 and Lots 1 & 2 may be needed. Hopefully the recorded plat will not have to be affected. b. Enhanced pedestrian crossings are needed to the north across West Swallow Road and to the east across the Frontage Road to South College Avenue. Please contact Kathleen, at 224-6140, if you have questions about these comments. 4. Bruce Vogel of the Light & Power Department stated that any relocation existing electric facilities, and any system modifications, will be at the owner's expense (this includes an oval vault and transformer, plus all related cable and fittings). 5. A copy of the comments received from Mark McCallum of the Engineering Department is attached to this letter. Red -lined copies of plans, with additional comments, are being forwarded to the applicant. Please contact Mark, at 221- 6750, if you have questions about his comments. 6. Basil Hamdan of the Stormwater Utility stated that there is a minor typo on the utility plan cover sheet. Please correct the error. The mylars for this project will be accepted with the Final Compliance submittal. Red -lined copies of plans and reports, with additional comments, are being forwarded to the applicant. Please contact Basil, at 221-6035, if you have questions about his comments. 7. Jeff Hill of the Water/Wastewater Department offered the following comments: a. Coordinate the landscape design with the civil design and maintain the. .required landscape/utility separation distances on the Landscape Plan. b. Show locations of existing curb stops and meter pits on the overall utility plan. C. Add a note to the utility plans stating that The developer must contact City Utilities 48 hours prior to water service abandonment. d. Red -lined copies of plans, with additional comments, are being forwarded to the applicant. Please contact Jeff, at 221-6681, if you have questions about these comments. The following comments and concerns were expressed at the Staff Review meeting on July 7th: Transportation Planning (Kathleen Reavis) 8. Please address the pedestrian crossings at the Frontage Road and South Commui j Planning and Environmental vices Current Planning City of Fort Collins July 14, 1999 Carr Bieker The Architects Studio 151 West Mountain Avenue Fort Collins, CO. 80524 Dear Carr, Staff has reviewed your revisions for the DELLENBACH SUBARU, Project Development Plan (PDP) development proposal that were submitted to the City on June 16, 1999, and would like to offer the following comments: 1. - This development proposal, being in the C - Commercial Zoning District, is identified as a Planning and Zoning Board (Type II) review under the City's Land Use Code (LUC). Vehicle sales and leasing establishments with outdoor storage are permitted uses subject to a Type II review in the District. 2. Representatives of the Zoning Department offered the following comments: a. Add patterned crosswalk (preferred) or painted crosswalk at entrance the entrance from the Frontage Road and the entrance from West Swallow Road. b. Is there any building -mounted lighting proposed? If yes, please show the light fixtures on the building elevations, with type and source. The BUILDING LIGHTING MUST BE DOWN DIRECTIONAL and properly shielded to prevent glare and spillage. Please contact Gary or Jenny, at 221-6760, if you have questions about these comments. 3. Kathleen Reavis of the Transportation Planning Department offered the following comments: a. The project should have a direct pedestrian from the building entrance to West Swallow Road. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020