HomeMy WebLinkAboutDELLENBACH SUBARU - PDP - 50-98 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner: IE-
Engineer: IzA ,,, /-����,
Trall'ic Operatlom:
Date:
Engineering
Itormwater
Site
land
Items Requested
Plat Ildlity Drainage Rpt Other Items Required
x
Redlined Items Being Returned
Site land Plat Hilly Drainage R t Other Ito Being Returned
X
Water/Wastewat
X
,�
Traffic Operations
franc. Planning
X
,�
fran*rt
1atural Resources
'ark Planning
3
totals
3
3
a
��
I
��
I Tote: All WNW items should be returned with the resubmittal/ revisions.
r
Item: [ OD-
X-N i
rip cE F Pry � JUN 1 Sao
Revisions Routing Sheet,
ENGINEERING: PAVEMENT
]BUILDING INSPECTION
MAPPING / DRAFTING
Ebmi
ADVANCE PLANNING
•R.OJV PLANNING
WATER CONSERVATION
==--�-----I
POST OFFICE
-----.----1
PUBLIC --.-1
STATE HIGHWAY DEPARTMENT-----.----1
COMPANYDITCH ..--------1
.RAILROAD: UP or BNICS
.--..-..-■
:MM•..-.--.
TOTA
M"O,
cammmummon
Rer. S-07-97