HomeMy WebLinkAboutBRAZIL 99 (CAMPUS WEST REDEVELOPMENT) - PDP - 45-98 - REPORTS - TRAFFIC STUDY7mv --o"Oomw
IVlultimodal Transportation Level of Service Manual P. 18
LOS Standards for Development Review - Pedestrian
Figure 6. Pedestrian LOS Worksheet
project location classification: PEpL-S T12 f Ak) 1ST IC T (enter as many as :apply:)]
destination area level of service (minimum based on project location classification)
classification
.n.i
(see text) JirMnm :aav,uity F=s.
InlerylS F
ty
oneau..
��VSTI rUT/Orl nwunlun B .4 A
actual � C'
proposed A r�
I D�A11! II
— imi- --
proposed A- A 8 A A
amumrnun
actual
proposed
muvnum
actual
proposed
description of applicable
destination area within 1,320'
including address
J V
�DJi�CBNt
�C31DE�uT'
Wit
City of Fort Collins Transportation Master Plan
r IF, ;,. .
APPENDIX E
Multimodal Transportation Level of Service Manual
LOS Siandards for Development Review - Bicycle
Figure 7. Bicycle LOS Worksheet
level of service - connectivity
=n actual proposed
base connectivity: t2
specific connections to priority sites:
description of applicable
destination area within 1,320'
including address
�l WAcG0J 'r
)OESIDEouTrAL-
C�SU
destination area
classification
(see text)
2 u��T/T UTroc�L
INININI
IMINIE
p. 20
v— -- — - - - ..... -------- ...-- —-._..... ----
City of Fort Collins Transportation Master Plan
APPENDIX D
HCS: Unsignalized Intersections Release 2.1g CPACPLT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
384
Potential Capacity: (pcph)
885
Movement Capacity: (pcph)
885
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: IT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
400
Potential Capacity: (pcph)
1105
Movement Capacity: (pcph)
1105
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
632
Potential Capacity: (pcph)
456
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
450
Intersection Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------- -----
(sec/veh)
---------
-------- ------ ------ ------
WB L 29 450 >
554
7.1
0.2 B
7.1
WB R 18 885 >
SB L 12 1105
3.3
0.0 A
0.1
Intersection Delay = 0.5 sec/veh
3
HCS: Unsignalized Intersections Release 2.1g CPACPLT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
------------------------------------------------------------
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... mjd
Date of Analysis.......... 7/12 98
Other Information ......... am pm 1998 short long total
bkgrd
Two-way Stop -controlled Inters ion
----------------------------------------------------------------------
Northbound Southbound Eastbound westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (o)
SU/RV's (o)
CV's (%)
PCE's
------------
0 1 < 0
N
350 30
.95 .95
0
---------------
0 > 1 0
N
10 225
.95 .95
0
1.10
----------------
Adjustment Factors
0 > 0 < 0
25 15
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1g CPACNLT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
342
Potential Capacity: (pcph)
929
Movement Capacity: (pcph)
929
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
353
Potential Capacity: (pcph)
1164
Movement Capacity: (pcph)
1164
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
574
Potential Capacity: (pcph)
493
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
487
Intersection Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-----
(sec/veh)
---------
-------- ------ ------ -------------
WB L 29 487 >
-------
596
6.6
0.2 B
6.6
WB R 18 929 >
SB L 12 1164
3.1
0.0 A
0.1
Intersection Delay = 0.5 sec/veh
HCS: Unsignalized Intersections Release 2.1g----CPACNLT.HCO---- Page -1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... mjd AJ
Date of Analysis.......... 7/12/98
Other Information ......... pnr 1998 short long bkgrd otal
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RVIs ('s)
CVIs (.)
PCEIs
------------
0 1 < 0
N
315 20
.95 .95
0
---------------
0 > 1 0
N
10 210
.95 .95
0
1.10
---------------
Adjustment Factors
0 > 0 < 0
25 15
.95 .95
0
1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.,00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1g WEACPLT.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
286
258
Potential Capacity: (pcph)
992
1025
Movement Capacity: (pcph)
992
1025
Prob. of Queue -Free State:
0.95
0.97
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
573
515
Potential Capacity: (pcph)
844
907
Movement Capacity: (pcph)
844
907
Prob. of Queue -Free State:
0.93
0.97
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
1125
1146
Potential Capacity: (pcph)
240
233
Capacity Adjustment Factor
due to Impeding Movements
0.91
0.91
Movement Capacity: (pcph)
218
211
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: IT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
1094
1072
Potential Capacity: (pcph)
212
218
Major IT, Minor TH
Impedance Factor:
0.90
0.90
Adjusted Impedance Factor:
0.93
0.93
Capacity Adjustment Factor
due to Impeding Movements
0.89
0.88
Movement Capacity: (pcph)
--------------------------------------------------------
190
193
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------- -----
(sec/veh)
---------
-------- ------ ------ ------
NB L 58 190 >
NB T 1 218 > 295 18.8
1.6 C
18.6
NB R 46 992 >
SB L 18 193 >
SB T 1 211 > 409 10.1
0.4 C
10.1
SB R 35 1025 >
EB L 23 907 4.1
0.0 A
0.1
WB L 58 844 4.6
0.1 A
0.4
Intersection Delay =
2.0 sec/veh
f
HCS: Unsignalized Intersections Release 2.1g WEACPLT.HC0 Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-------------------------------------------------------------------
Streets: (N-S) mcd acc/site access (E-W) west elizabeth
Major Street Direction.... EW
Length of Time Analyzed... 15 (min)
Analyst ................... mjd
Date of Analysis 7 12 98
Y /
Other Information ......... am p 1998 short lon bkgrd total
Two-way Stop -controlled Intersection
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (o)
SU/RV's ('s)
CV's (0)
Eastbound
L T R
1 2 < 0
N
20 474 70
.95 .95 .95
0
Westbound Northbound
L T R L T R
1 2 < 0 0> 1 < 0
N
50 459 30
.95 .95 .95
0
50 1 40
.95 .95 .95
0
Southbound
L T R
0 > 1 < 0
15 1 30
95 .95 .95
0
PCE's 11.10 11.10 11.10 1.10 1.1011.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1g WEACNLT.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street. NB SB
Conflicting Flows: (vph)
321
278
Potential Capacity: (pcph)
952
1001
Movement Capacity: (pcph)
952
1001
Prob. of Queue -Free State:
0.95
0.95
--------------------------------------------------------
Step 2: IT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
642
557
Potential Capacity: (pcph)
775
861
Movement Capacity: (pcph)
775
861
Prob. of Queue -Free State:
0.94
0.94
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
1259
1254
Potential Capacity: (pcph)
200
201
Capacity Adjustment Factor
due to Impeding Movements
0.88
0.88
Movement Capacity: (pcph)
177
178
Prob. of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
1191
1196
Potential Capacity: (pcph)
183
182
Major IT, Minor TH
Impedance Factor:
0.88
0.88
Adjusted Impedance Factor:
0.91
0.91
Capacity Adjustment Factor
due to Impeding Movements
0.87
0.86
Movement Capacity: (pcph)
--------------------------------------------------------
158
157
Intersection Performance Summary
Avg.
95o
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------- -----
(sec/veh)
---------
-------- ------ ------ ------
NB L 58 158 >
NB T 1 177 > 249 24.6
1.9 D
24.6
NB R 46 952 >
SB L 52 157 >
SB T 1 178 > 259 22.2
1.7 D
22.2
SB R 46 1001 >
EB L 52 861 4.4
0.1 A
0.3
WB L 46 775 4.9
0.1 A
0.3
Intersection Delay =
3.2 sec/veh
HCS: Unsignalized Intersections Release 2.1g WEACNLT.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) mcd acc/site access (E-W) west elizabeth
Major Street Direction.... EW
Length of Time Analyzed... 15 (min)
Analyst ................... mjd /Jo-o Aj
Date of Analysis.......... 7/12/98
Other Information........ 1998 short long bkgrd tota
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T -R-- L T R -L-- T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (o)
SU/RVIs (o)
CV's M.)
PCE's
------------
1 2 < 0
N
45 555 55
.95 .95 .95
0
1.10
1 2 < 0
N
40 465 65
.95 .95 .95
0
1.10
----------------
0 > 1 < 0
50 1 40
.95 .95 .95
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
45 1 40
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g
02-18-1999
Center For Microcomputers In Transportation
Streets: (E-W) west elizabeth (N-S) city ark
Analyst: Matt File Name: EC,�PPLT.HC9
Area Type: Other 7-12-98 noon(a)
)
Comment: 1998 bkgrnd C.t
short
-----------------------------------------------------------------------
--long-
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T R
L T R
---- ----
No. Lanes
---- ---- ----
1 2 < 0
---- ---- ----
1 2 < 0
---- ---- ----
1 1 < 0
----
1 1 < 0
Volumes
105 685 80
70 720 100
140 145 85
100 85 120
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4
5
6 7 8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
NB Right
EB Right
SB Right
WB Right
Green
30.OP
Green 20.OA
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group: Adj Sat v/c g/C
Approach:
Mvmts
Cap Flow Ratio Ratio Delay LOS
---
Delay LOS
----- ---
-----
EB L
----------- ----- ----- -----
154 272 0.721 0.567 16.2 C
6.8 B
TR
1975 3703 0.428 0.533 5.6 B
WB L
181 320 0.409 0.567 5.6 B
5.7 B
TR
1970 3694 0.460 0.533 5.7 B
NB L
352 880 0.418 0.400 8.9 B
9.1 B
TR
652 1777 0.371 0.367 9.2 B
SB L
317 792 0.331 0.400 8.3 B
8.8 B
TR
629 1716 0.342 0.367 9.0 B
Intersection Delay = 7.0 sec/veh Intersection
LOS = B
Lost Time/Cycle, L = 2.0 sec Critical v/c(x) = 0.596
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 02-18-1999
Center For Microcomputers In Transportation
----------------------------------------------------------
Streets: (E-W) west elizabeth (N-S) city park
Analyst: Matt File Name- ECPNLT.HC9
Area Type: Other - 2-98 noon pm
Comment: 1998 short long bkgrnd Ctotal
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 2 < 0 1 2 < 0 1 1 < 0 1 1 < 0
Volumes 135 825 85 75 675 130 150 115 70 125 60 130
Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
RTOR Vols 0 0 0 0
Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00
Signal Operations
Phase Combination 1
2
3 4
5
6
7
8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
NB Right
EB Right
SB Right
WB Right
Green
30.OP
Green 20.OA
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length:
60 secs
Phase combination
order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS
---
Delay
-----
LOS
---
-----
EB L
----
160
-------
283
-----
0.885
----- -----
0.567 35.0
D
9.6
B
TR
1979
3710
0.508
0.533 6.0
B
WB L
125
221
0.630
0.567 12.3
B
6.2
B
TR
1958
3671
0.455
0.533 5.7
B
NB L
373
934
0.423
0.400 8.9
B
8.8
B
TR
651
1774
0.300
0.367 8.8
B
SB L
380
949
0.348
0.400 8.3
B
8.7
B
TR
619
1688
0.323
0.367 8.9
B
Intersection
Delay =
8.2 sec/veh Intersection LOS
= B
Lost Time/Cycle, L
-----------------------------------------------------------------------
= 2.0
sec Critical v/c(x) =
0.694
APPENDIX C
HCS: Unsignalized Intersections Release 2.1g CPACPST.HCO Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
353
Potential Capacity: (pcph)
917
Movement Capacity: (pcph)
917
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
369
Potential Capacity: (pcph)
1144
Movement Capacity: (pcph)
1144
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
585
Potential Capacity: (pcph)
485
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
479
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
-------- ------ ------ -------------
WB L 29 479 >
------- -----
---------
586 6.7
0.2 B
6.7
WB R 18 917 >
SB L 12 1144 3.2
0.0 A
0.1
Intersection Delay =
0.5 sec/veh
HCS: Unsignalized Intersections Release 2.1g CPACPST.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------------------------------------
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... mjd
Date of Analysis.......... 7/1 8
Other Information.........am pm 1998 short long bkgrd total
Two-way Stop -controlled Inter tion
-----------------------------------------------------------------------
Northbound Southbound Eastbound westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (o)
SU/RV's (o)
CV's (%)
PCEIs
------------
0 1 < 0
N
320 30
.95 .95
0
0 > 1 0
N
10 210
.95 .95
0
1.10
---------------
Adjustment Factors
0 > 0 < 0
25 15
.95 .95
0
1.101.10
------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1g CPACNST.HCO
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
316
Potential Capacity: (pcph)
958
Movement Capacity: (pcph)
958
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
Conflicting Flows: (vph)
326
Potential Capacity: (pcph)
1199
Movement Capacity: (pcph)
1199
Prob. of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -Free State:
0.99
--------------------------------------------------------
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
532
Potential Capacity: (pcph)
521
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
515
Intersection Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- -----
(sec/veh)
---------
-------- ------ ------ -------------
WB L 29 515 >
626
6.2
0.1 B
6.2
WB R 18 958 >
SB L 12 1199
3.0
0.0 A
0.1
Intersection Delay = 0.5 sec/veh
Page 2
HCS: Unsignalized Intersections Release 2.1g CPACNST.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
--------------------------------------------------------------- - -- -
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 15 (min) - 1
Analyst ................... mj d AJeT0 AJ
Date of Analysis.......... 7/12/98
Other Information ........ szm==pm 1998 short long bkgrd total
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T -R-- L -T-- R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's ($)
CV's (96)
PCE's
------------
0 1 < 0
N
290 20
.95 .95
0
---------------
0 > 1 0
N
10 195
.95 .95
0
1.10
---------------
Adjustment Factors
0 > 0 < 0
25 15
.95 .95
0
1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.lg WEACPST.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
236
214
Potential Capacity: (pcph)
1051
1079
Movement Capacity: (pcph)
1051
1079
Prob. of Queue -Free State:
0.96
0.97
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
472
427
Potential Capacity: (pcph)
957
1011
Movement Capacity: (pcph)
957
loll
Prob. of Queue -Free State:
0.94
0.98
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
936
957
Potential Capacity: (pcph)
309
301
Capacity Adjustment Factor
due to Impeding Movements
0.92
0.92
Movement Capacity: (pcph)
284
276
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
904
884
Potential Capacity: (pcph)
280
288
Major LT, Minor TH
Impedance Factor:
0.91
0.91
Adjusted Impedance Factor:
0.93
0.93
Capacity Adjustment Factor
due to Impeding Movements
0.90
0.89
Movement Capacity: (pcph)
--------------------------------------------------------
253
257
Intersection Performance Summary
Avg.
95$
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------------- -----
(sec/veh)
---------
-------- ------ ------
NB L 58 253 >
NB T 1 284 > 380 13.1
1.2 C
13.1
NB R 46 1051 >
SB L 18 257 >
SB T 1 276 > 509 7.9
0.3 B
7.9
SB R 35 1079 >
EB L 23 1011 3.6
0.0 A
0.2
WB L 58 957 4.0
0.1 A
0.4
Intersection Delay =
1.7 sec/veh
HCS: Unsignalized Intersections Release 2.1g WEACPST.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
Streets: (N-S) mcd acc/site access (E-W) west elizabeth
Major Street Direction.... EW
Length of Time Analyzed... 15 (min)
Analyst ................... mjd
Date of Analysis.......... 7/12 98
Other Information ......... am Ckm 1998 short long bkgrd total
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T -R-- L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI (%)
SU/RV's M
CV' s M. )
PCEIs
------------
1 2 < 0
N
20 378 70
.95 .95 .95
0
1.10
1 2 < 0
N
50 375 30
.95 .95 .95
0
1.10
----------------
0 > 1 < 0
50 1 40
.95 .95 .95
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
15 1 30
.95 .95 .95
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1g WEACNST.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
269
234
Potential Capacity: (pcph)
1012
1054
Movement Capacity: (pcph)
1012
1054
Prob. of Queue -Free State:
0.95
0.96
--------------------------------------------------------
Step 2: IT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
538
469
Potential Capacity: (pcph)
882
960
Movement Capacity: (pcph)
882
960
Prob. of Queue -Free State:
0.95
0.95
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
1067
1062
Potential Capacity: (pcph)
259
261
Capacity Adjustment Factor
due to Impeding Movements
0.90
0.90
Movement Capacity: (pcph)
232
234
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: IT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
999
1004
Potential Capacity: (pcph)
243
241
Major IT, Minor TH
Impedance Factor:
0.89
0.89
Adjusted Impedance Factor:
0.92
0.92
Capacity Adjustment Factor
due to Impeding Movements
0.88
0.88
Movement Capacity: (pcph)
--------------------------------------------------------
213
211
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------------------- -----
(sec/veh)
---------
-------- ------ ------
NB L 58 213 >
NB T 1 232 > 326 16.2
1.4 C
16.2
NB R 46 1012 >
SB L 52 211 >
SB T 1 234 > 336 15.1
1.3 C
15.1
SB R 46 1054 >
EB L 52 960 4.0
0.0 A
0.3
WB L 46 882 4.3
0.0 A
0.4
Intersection Delay =
2.6 sec/veh
HCS: Unsignalized Intersections Release 2.1g WEACNST.HCO Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------------
Streets: (N-S) mcd acc/site access (E-W) west elizabeth
Major Street Direction.... EW
Length of Time Analyzed... 15 (min)
Analyst ................... mid /1rl`o00
Date of Analysis.......... 7/12/98
Other Information......... 1998 short long bkgrd total
Two-way Stop -controlled Intersection
-------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's M
CVIs (°s)
PCEIs
------------
1 2 < 0
N
45 456 55
.95 .95 .95
0
1.10
1 2 < 0
N
40 381 65
.95 .95 .95
0
1.10
----------------
0 > 1 < 0
50 1 40
.95 .95 .95
0
1.10 1.10 1.10
----------------
Adjustment Factors
0 > 1 < 0
45 1 40
.95 .95 .95
0
1.10 1.10 1.10
--------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g
02-18-1999
Center For Microcomputers
In Transportation
Streets: (E-W) west elizabeth
(N-S) city ark
Analyst: Matt
File Name: ECPPST.HC9
Area Type: Othe
Comment: 1998 short long
12-98 noon pm
bkgrnd tota
_____----------
Eastbound
------------
Westbound
----------------------------
Northbound
Southbound
L T R
L T R
L T R
L T R
No. Lanes
---- ---- ----
1 2 < 0
---- ---- ----
1 2 < 0
---- ---- ----
1 1 < 0
---- ---- ----
1 1 < 0
Volumes
95 570 75
65 595 95
130 135 75
95 80 110
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2
3 4
5
6 7 8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
NB Right
EB Right
SB Right
WB Right
Green
30.OP
Green 20.OA
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length: 60 secs Phase
combination order: #1 #5
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane
Group: Adj Sat
v/c g/C
Approach:
Mvmts
Cap Flow
Ratio Ratio Delay LOS
----- ----- ----- ---
Delay LOS
-----
-----
EB L
-----------
223 393
.
0.449 0.567 5.9 B
5.4 B
TR
1972 3697
0.362 0.533 5.3 B
WB L
246 434
0.276 0.567 4.5 A
5.3 B
TR
1965 3685
0.388 0.533 5.4 B
NB L
373 934
0.367 0.400 8.5 B
8.8 B
TR
653 1780
0.339 0.367 9.0 B
SB L
344 860
0.291 0.400 8.0 B
8.6 B
TR
630 1718
0.318 0.367 8.9 B
Intersection
Delay = 6.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 2.0
-----------------------------------------------------------------------
sec Critical v/c(x) = 0.415
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g
02-18-1999
Center For Microcomputers
In Transportation
Streets: (E-W) west elizabeth
(N-S) city ark
Analyst: Matt
File Name: ECPNST.HC9
Area Type:
Other
7-12-9 noon m
Comment: 1998 short long
bkgrnd tota
Eastbound
Westbound
Northbound
Southbound
L T R
L T R
L T R
L T R
---- ----
No. Lanes
---- ---- ----
1 2 < 0
---- ---- ----
1 2 < 0
---- ---- ----
1 1 < 0
----
1 1 < 0
Volumes
125 680 80
70 560 120
140 105 65
115 55 120
Lane W (ft)
12.0 12.0
12.0 12.0
12.0 12.0
12.0 12.0
RTOR Vols
0
0
0
0
Lost Time
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
1.00 3.00 3.00
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2
3 4
5
6 7 8
EB Left
*
NB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
WB Left
*
SB Left
Thru
*
Thru
Right
*
Right
Peds
*
Peds
NB Right
EB Right
SB Right
WB Right
Green
30.OP
Green 20.OA
Yellow/AR
5.0
Yellow/AR 5.0
Cycle Length: 60 secs Phase
combination order: #1 #5
-----------------------------------------------------------------------
Intersection
Performance Summary
Lane
Group: Adj Sat
v/c g/C
Approach:
Mvmts
Cap Flow
Ratio Ratio Delay LOS
---
Delay LOS
----- ---
-----
EB L
-----------
228 402
----- ----- -----
0.580 0.567 8.1 B
5.9 B
TR
1975 3703
0.425 0.533 5.6 B
WB L
184 324
0.403 0.567 5.5 B
5.4 B
TR
1954 3663
0.384 0.533 5.4 B
NB L
393 983
0.374 0.400 8.5 B
8.6 B
TR
650 1774
0.275 0.367 8.7 B
SB L
400 999
0.303 0.400 8.1 B
8.5 B
TR
619 1688
0.297 0.367 8.8 B
Intersection Delay = 6.4 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 2.0
-----------------------------------------------------------------------
sec Critical v/c(x) = 0.495
APPENDIX B
o�
o eon
m �\
m
McDonalds
0 C) `
N
o
-- riaf /20�93 o o --- 65/30
,n
— 635/625
70/65 � i �
/�4d/oov W. ELIZABETH
125/95 —�
45/20 - }
6gb5-70 665 f 555��
80/75 —�
n 760/6451 Z
- 35/50 —�
59�70
0
f Site I
Ish 5-
Y
cc
a
o
C� Noon/PM
}
N Rounded to the Nearest
5 Vehicles.
YEAR 2000 TOTAL
PEAK HOUR TRAFFIC Figure 9
�10 4k�
�\ McDonalds
oN N
` o �,
n } 3a/ioo 0 0 65/30
f g (07517� o- z 775/765
/— 75/70 + W. ELIZABETH
135/105
4�20 —f
f
$2$/�Di3S
85/80
,n 925 790--r
T I o0
55/70
z
o
Site
I
LE
YEAR 2018 TOTAL
PEAK HOUR TRAFFIC
Noon/PM
Rounded to the Nearest
5 Vehicles.
Figure 10
14
o NN
I
an 30%-35% _ W. ELIZABETH — 30%-35% _
Y
lY
a
lWj
TRIP DISTRIBUTION Figure 5
aMcDonalds
N
37147
—94 - 31/3 I /`— W. ELIZABETH
Site
i4/l4 _ to"
a ` Noon/PM
SITE GENERATED TRAFFIC Figure 6
10
APPENDIX A
Table 2
Short Range Total Peak Hour Traffic Operation
Level of Service
Intersection NOON P
Elizabeth/City Park (signal) B B
Elizabeth/Access (stop sign)
NB LT/T/RT C C
SB LT/T/RT C B
EB LT A A
WB LT A A
OVERALL A A
City Park/Access (stop sign)
WB LT/RT B B
SB LT A A
OVERALL A A
Table 3
Long Range Total Peak Hour Traffic Operation
Level of Service
Intersection NOON PM
Elizabeth/City Park (signal) B B
Elizabeth/Access (stop sign)
NB LT/T/RT D C
SB LT/T/RT D C
EB LT A A
WB LT A A
OVERALL A A
City Park/Access (stop sign)
WB LT/RT B B
SB LT A A
OVERALL A A
TABLE 1
Trip Generation
AWDTE
Noon Peak Hour
PM Peak Hour
Code
Land Use
Size
Rate Trips
Rate
In Rate Out
Rate
In ! Rate I Out
814
Retail Center
11.2 KSF
40.67 455
3.08
34 3.33 1 37
2.81
31 ' 2.12 24
832
Restaurant & Bar
11.2 KSF
130.34 j 1450
7.16
80 1 7.46 ' 83
10.66
119 1 8.72 } 97
Totals
1905
114 i 120
15o r 121
minute service for approximately 12 hours per day. Route 11 travels
between the Elizabeth/Constitution intersection and CSU. It provides
20 minute service for approximately 12 hours per day. According to
the Fort Collins - 2015 Transit System map, West Elizabeth Street
will be a high frequency corridor with 20 minute service. This site
does and will have excellent transit service to CSU and the Fort
Collins CBD. These destinations will have a level of service B
rating. The Foothills Fashion Mall and Fort Collins High School will
have a level of service D rating. Transit level of service for this
site is/will be acceptable.
•
CO
CM
LO
O
CC) CY)
0
Ln
0 0)
o co
CD
a o
o r
• X
a
o LL
z
a
J
W
0
J
• �p
W 0
> N
Q)
0 C.0
z T
W p
z
W z
J O
C7 =
N LL
r
N
N
W
a
Z
cc
i W
W
Z
U_
z
J
Z
W o
cc
F
o
•� a
Z
Z
a
5 ¢
H
W otf
U
U.
Ca '-
G
TO: Rex Miller
Jim Birdsall, Kenney Associates
City of Fort Collins Staff
FROM: Matt Delich�
DATE: February 18, 1999
SUBJECT: Brazil 99 Renovation --Response to staff comments
(File: 9861ME02)
This memorandum responds to staff comments pertaining to the
"Campus West Redevelopment Transportation Impact Study," July 1998.
The Campus West Redevelopment has been renamed Brazil 99 Renovation.
The floor area of the building -is- slightly higher than that
used in the transportation study_ _The previous floor area was 14,260
square feet. The new _ floor area is!22,257 square feet. For analysis
��__ _
purposes, it is assumed that_the building would have 50% retail and
50% restaurant. Table 1 shows the recalculated trip generation. The
additional traffic was reassigned to the key intersections. Figures
6, 9, and 10 in Appendix A show the revised traffic forecasts with
the new trip generation. Tables 2 and 3 show the short range
operation and long range operation, respectively, at the key
intersections. All of the key intersections are expected to operate
acceptably. Calculation forms for the short range operation and the
long range operation are provided in Appendix B and C, respectively.
A bicycle level of service worksheet for this proposed use is
provided in Appendix D. This worksheet includes evaluation of nearby
residential uses who would have the opportunity to access this land
use by bicycle and Colorado State University. These land uses are
connected to the site via bicycle lanes/routes on West Elizabeth
Street, City Park Avenue, Plum Street, and Shields Street.
The Brazil 99 Renovation is in the `Pedestrian District"
category. Level of service criteria for this category are A for all
measures except for street crossings which is B. The sidewalk system
is essentially in place, but parts of it do not meet current City
standards. As other properties redevelop in the future, it is
expected that the sidewalk system will be improved. A revised
pedestrian level of service worksheet is provided in Appendix E. The
revisions assume that improvements will be made to the sidewalk
system adjacent to nearby properties. The assumed sidewalk
improvements will elevate the level of service in the continuity,
visual interest and amenities, and security categories.
This site is served by Transfort Routes 2, 3, and 11, which
have stops within 1320 feet of the site. Route 2 is a loop route
that goes by the site in the eastbound direction on West Elizabeth.
It provides 30 minute service for approximately 12 hours per day.
Route 3 is a loop route that travels on Plum Street, City Park
Avenue, and West Elizabeth Street. It generally travels westbound
on West Elizabeth Street near City Park Avenue. It provides 30