Loading...
HomeMy WebLinkAboutBRAZIL 99 (CAMPUS WEST REDEVELOPMENT) - PDP - 45-98 - CORRESPONDENCE - (6)not exceed a height/width ratio of 1:3 without a substantial variation in massing that includes a change in height and projection/recessed elements. 13. Comments and redlined utility plans from the Engineering Department are attached. Please return all redlined documents with plan revisions. 14. Comments and redlined utility plans from the Stormwater Utility are attached. Please return all redlined documents with plan revisions. 15. Comments and redlined utility plans from the Water and Wastewater Utility are attached. Please return all redlined documents with plan revisions. 16. Comments and redlined utility plans from the Transportation Planning Department are attached. Please return all redlined documents with plan revisions. 17. A redlined landscape plan from the City Forester is attached. Please return all redlined documents with plan revisions. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Plan revisions may now be submitted at any time. Planning and Zoning Board dates will be assigned by City Staff when all issues have been addressed. Please contact me for the number of folded revisions required for each document prior to the submittal of plan revisions. Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, Michael Ludwig, AICP City Planner xc: Mark McCallum Stormwater Utility Current Planning File #45-98 COMMENT S City of Fort Collins Current Planning TRANSPORTATION PLANNING KATHLEEN REAVIS DATE: September 9, 1998 TO: ; PROJECT: #45-98 Campus West Redevelopment - Additions and Alterations to the Campus West Theater'- PDP - Type 1 All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesda , October 7,1998 ADA Ve 2/Vti'�r � r b 5 Gam- Cam' .&cam ,fin 41r:�v�^ e-v%- Date: CHECK HERE 1F YOU WISH TO RECEIVE COPIES OF REVISIONS _ PW _✓Sid _ Report _ Ola —U# —Rdn ffly st I . tr rpl I' PROJECT City of Fort Collins COMMENT SHEET Current Planning DATE: September 9, 1998 DEPT: Water & Wastewater PROJECT: #45-98 Campus West Redevelopment — Additions and Alterations to the Campus West Theater-PDP — Type I All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, October 7,1998 -Provide a 10-foot wide utility easement from property line to a point 1-foot beyond water shutoff valve on fire line. -Sanitary sewer service locations shown on utility plans do not correspond to that shown on either site or landscape plans. Coordinate all plan sheets so utility layouts match. -See site, landscape and utility plans for other comments. Date: I 0 I !�' �)� Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF RE X PLAT X SITE —DRAINAGE REPORT _OTI X UTILITY X REDLINE UTILITY X LANDSCAPE City of Fort Collins 3. On the plans, please indicate the size of the concentration pan, and sizes/types of inlets & storm sewer pipes. RESPONSE: Erosion/Sediment Control Comments 1. The proposed plan is OK. There should be a letter or note from the P.E. stating that the standard City erosion control calculations cannot be met on this site, but that in his professional opinion, the BMP plan shown will adequately prevent sediments from leaving this site. Please refer to the redlined plans and report for additional review comments. campuswestl .doc PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 9, 1998 TO: Stormwater Utility PROJECT: #45-98 Campus West Redevelopment - Additions and Alterations to the Campus West Theater - PDP - Type 1 All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, October 7,1998 1. Please provide supporting documentation for the 100-year base flood elevation on W. Elizabeth Street — essentially need to show proof that the finished floor elevation is at least 18" above the flood elevation. In addition, please indicate on the plat and drainage plan the limit of the floodway and 100-year floodplain. RESPONSE: 2. Please provide supporting calculations to show how the historic & developed composite runoff coefficients, and historic Q2 were computed. In addition, please compute the developed Q2. RESPONSE: Date: (continued on back) MAC Me.C.lw—W, CM HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS• 115,*4101 �,� �� """'J fT teA and City Park Avenue (5 feet f�). 0► A 9 foot utility easement should be dedicated for City Park Avenue. ❑► A 15 foot utility easement should be dedicated for W. Elizabeth Street. The building will encroach into the easement so the easement should extend to the building. Site Plan Comments: �► The redlined parking stalls at the entrance for W. Elizabeth Street should be omitted due to the 50 foot setback required along arterial streets with average daily traffic volumes between 100 and 750. ❑► The sidewalk width along W. Elizabeth Street should be a minimum of 6 feet. ❑► The Utility Plan does not depict the same locations for pans as the Site Plan. The utility plan does not depict the saw -cut and demolition of existing curb, gutter, sidewalk, and pan to the south of the City Park Avenue access. ❑► The access ramps should be a modified, one-way version of Detail 12.7. Date: �;l/�/D Signature. �` �l�G'11'1n-- PLEASE SEND COPIES OF. MARKED REVISIONS: CYPLAT 0 1/ SITE UTILITY LANDSCAPE Grading and Drainage Plan; Sheet 2 of 4: ❑► The redlined parking stalls at the entrance for W. Elizabeth Street should be omitted due to the 50-foot setback required along arterial streets with average daily traffic volumes between 100 and 750 vehicles. E The driveway/access radii should not exceed 15 feet. 0 The access ramps should be a modified, one-way version of Detail 12.7 in the City Street Design Manual. See redline sketch. Erosion Control Plan; Sheet 3 of 4: 0 See comments made above for the Grading and Drainage Plan (Sheet 2 of 4). Site Utility Plan; Sheet 4 of 4: ❑► See comments made above for the Grading and Drainage Plan (Sheet 2 of 4). ❑► The site utility plan must show the complete horizontal alignment including but not limited to the following: driveway/access radii, street, sidewalk, and ROW dimensions, and indication of all locations of outfall curb and gutter and where transitions occur back to inflow curb and gutter. ❑► Show all easements. ❑► All existing and proposed sanitary sewer lines should show where applicable the following, but not limited to: Type of pipe, slopes, lengths of segments, manholes, and clean -outs. �► Include note pertaining to the depth of cover and polywrapping of D.I.P., and depth of cover. Also, show the type of pipe and length of pipe between all fittings. Detail Comments; (Detail Sheet optional at this point): E See redlined comments. The following comments correspond to the redlined comments: • The street intersection detail needs to be modified to specify that it is a driveway detail. The cross-section should be retrofitted to the driveway detail shown in the City design standards as D-15. • For details 3 and 4, it should be indicated that these curbs will be used internally and not in the ROW. • The access ramp details at the driveways should be a modified, one-way version of Detail 12.7. See redline sketch on sheet 2 of 4. Plat Comments: E Additional ROW will have to be dedicated for both W. Elizabeth Street (17.5 feet PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: 9 September, 1998 DEPT: Engineering PROJECT: #45-98 Campus West Redevelopment -Additions and Alterations to the Campus West Theater-PDP-Type I PLANNER: Mike Ludwig ENGINEER: Mark McCallum All comments must be received by: 10/07/98 B / No Problems Problems or Concerns (see below or attached) General Comments: 0► See the redlined comments on all sheets of the utility plan. More specific comments and concerns will be mentioned below. ❑► Show surrounding features for 150 feet around the entire site. ❑► It would be helpful to depict all details on a separate sheet. If any more details are added to the utility plan, it will be required. Utility Plan Comments: Cover Sheet; Sheet 1 of 4: O Include the date prepared and a legal description under the title. 19 Reference the current soil investigation report. ❑► The subdivision plat should be included with the utility plans. [E There is a new vertical control listing for the City which negates the use of the black bolt as a benchmark. Call Wally Muscott at 221-6605 for more information. p► The General Notes should include the redline comments on the cover page. A five foot wide planting bed for foundation plantings is required along the west facade in accordance with Section 3.2.1 [E][2][d]. M. Trees along the lots lines and parking are to be at a maximum of 40 foot - spacing. Please revise. n. The sidewalk from City Park Avenue to the building adjacent to the parking lot must be 6 feet wide. o. Enhanced pedestrian crosswalks are needed at the access drives along City Park Avenue and West Elizabeth Street. P. Please revise landscape note #8 to reflect that the bond or escrow shall be for 125% of the landscaping materials and installation. q. Landscape note #16 states that all existing landscaping is to be removed. Has the City Forester been contacted to determine to acceptability of these proposed removals? If removal is allowed, mitigation must be provided in accordance with Section 3.2.1 [F] of the Land Use Code. Please specify building colors on the building elevations. Please provide color samples. S. Can high-pressure sodium light sources be utilized rather than metal halide? t. Please specify on the lighting plan that all light fixtures will be sharp cut-off, down -directional. U. An additional 17.5 foot of right-of-way dedication is required along West Elizabeth Street. V. The first two parking stalls at the entrance from West Elizabeth Street must be eliminated as there must be a 50 foot setback from the West Elizabeth right-of-way. W. _ An additional 5 foot of right-of-way must be dedicated along City Park Avenue. X. Please note the locations of transit stops within the area on the Site Plan. Y. An attached walk with tree grates is suggested on the south side of the building. This would also address the full tree stocking requirements for the south side of building. Z. It appears that the west building elevation may fail to satisfy Section 3.5.3[C][1] of the Land Use Code which states that horizontal masses shall gallons of water per minute at a residual pressure of 20 psi. Hydrants shall be of an approved type as defined by the Water Utility and the Poudre Fire Authority. No commercial building can be greater than 300 feet from a fire hydrant. 6. The Building Inspections Department stated that a change in use or character of occupancy of an existing building is allowed if the building is made to comply with current code requirements for the proposed use and a new certificate of occupancy is issued by the City of Fort Collins. Subsequent to approval of the project development plan, building plans detailing how the building will be occupied and any proposed alterations should be submitted for review and approval by the Building and Zoning Division. 7. The Current Planning Department offers the following comments: a. Please add building square footage and proposed land uses within the building envelope on the Site Plan. b. Please re -number the sheets of the plan set consecutively. C. Please change the name of the proposed redevelopment as the current name implies redevelopment of an entire region and the project will not be a theater anymore. d. The Site Plan indicates a proposed total of 22, 257 square feet. However, the TIS assumes a total of 14,200 square feet. The TIS also lists a bar as a potential use. This use is not indicated on the Site Plan. Please clarify. e. Please add vicinity map to the Site Plan. Please add a Planning Certification and signature block to the Site Plan. g. Please clarify dimensions on the Site Plan (i.e. some of the sidewalk dimensions, etc. are not legible). h. Please provide easements for public sidewalks that are outside of the public right-of-way. Full tree stocking is required along the west and south building facades as per Section 3.2.1 [D][1][c] for the Land Use Code. (Revise this comment to reflect request for easement from gas station property for a sidewalk and landscaping area.) Please add a street tree at the northwest corner of the building along West Elizabeth Street. k. Tree species diversity is needed in accordance with Section 3.2.1 [D][3] of the Land Use Code. . Please show the TCI cable on the utility plans so that TCI can comment with specific concerns. 3. The Street Oversizing Department stated the following: a. The Street Oversizing Capital Expansion fee is calculated to be $14,544.00. This due solely to the additional impacts of the redevelopment. Credit was given for the existing theater use. However, this fee may be revised as it does not appear that the square footage assumed in the TIS matches the square footage information provided on the Site Plan. b. Right-of-way must be dedicated along West Elizabeth Street to meet the new arterial street standards. Additional right-of-way also needs to be dedicated along City Park Avenue. C. Street oversizing will participate in the cost of sidewalk construction on West Elizabeth Street and City Park Avenue. 4. Public Service Company stated that any relocation and/or reinforcement of existing PSC facilities will be at the developer's expense. 5. The Poudre Fire Authority stated the following: a. Fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. The fire lane shall be visible by painting and signage and maintained unobstructed. A fire lane plan shall be submitted for approval prior to installation. Any building not meeting this criteria shall be fire sprinklered. The building is out of fire access. Therefore, it is required to be fire sprinklered, regardless of the new occupancy classification (due to change in occupancy and/or character). Please add a note to the Site Plan indicating that .the building will be equipped with an automated fire suppression system.. b. Address numerals shall be visible from the street fronting the property, and posted with a minimum 6-inch numerals on a contrasting background (bronze numerals on brown brick is not acceptable). C. The proposed building exceeds 5,000 square feet for Type V construction and must be fire contained or fire sprinklered. d. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1000 Commu- ''y Planning and Environmental -vices Current Planning City of Fort Collins October 14, 1998 Jim Birdsall Kenney and Associates 343 E. 4th Street Loveland, CO 80537 Dear Jim, Staff has reviewed your documents for the Campus West Redevelopment, that were submitted on September 9, 1998, and offers the following comments: 1. The Zoning Department stated the following: a. Please clarify building dimensions and the relative distances to the property lines. Some of the dimensions are not legible. b. Please indicate the total number of parking spaces per row or rather than numbering the individual parking spaces. C. Solid fencing is required along the south property line. Please provide a fence detail. d. Please provide a detail (elevations) of the trash enclosure(s). e. Please notify St. Elizabeth Seton Church of the proposed redevelopment of the Campus West Theater. f. Please provide bicycle parking at each of the building entrances without impeding pedestrian circulation. g. Is the handicap parking space on the northeast end of the building for temporary drop-off or a permanent space. h. Please add a tree in the plaza area on west side of the Elizabeth Street entrance. i. Please differentiate the proposed additions from the existing building footprint on the site and landscape plans. 2. TCI of Fort Collins stated that after reviewing the plans for the Campus West Redevelopment, the utility plans do not show the TCI cables that run along City Park Avenue. There appears to be a major conflict with the plans in this area. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020