Date: 2.12.99
Cam McNair
City Engineer
City of Fort Collins
RE: Brazil 99 Renovation (Campus West Theaters)
Mr. McNair,
It is Kenney & Associates understanding that there will be a 10 foot utility
easement required along the West Elizabeth Avenue frontage as measured
from the new Right of Way location (57.5 feet from the centerline of West
Elizabeth Ave.). This utility easement will be the same distance from the
new Right of Way line as the proposed building setback.
It is Kenney & Associates understanding that the airspace above the
required utility easement can be vacated above 10 feet as measured from
existing grade as it meets the building. This vacation will allow us to extend
our signage canopy and sloped storefront support trellis into the vacated
airspace located above the required utility easement/setback area.
Kenney & Associates also understands that a modification will be required to
allow the signage canopy to extend into the building setback as it is
designed current!y.
Best regards,
Birdsall
KENNEY & ASSOCIATES
Approved By:
Signed
CAt.(I Mitt¢. , caTY �rS�,i►,1�t�
2 9 Dated