HomeMy WebLinkAboutBRAZIL 99 (CAMPUS WEST REDEVELOPMENT) - PDP - 45-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: Ze-c;t/c---/ y
Engineer. /,1 � &/-
Ftb 1 t 1999
U — (L�
Traffic Operations:
FEB 17 1999
Date: � �z yF-
Items Requested
Site I land I Plat NO I Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site I [and Plat Utility Drainage R t Other Items Being Returned
Stormwater
Water/Nastewate
✓
,z'
Traffic Operations
Trans. Planning
Transibrt
Natural Resources
Park Planning
Other:
Hate: All redlined items should be returned with the rewbmittal/ revisions.
No Text