HomeMy WebLinkAboutBRAZIL 99 (CAMPUS WEST REDEVELOPMENT) - PDP - 45-98 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWt
EL
11.9
g Y7. Fm
A
1—tA "IMP*q"MA IN
A*!
IRIIIIIIIJI. Ill I !I'g 11
III Me AII
liffill m
ILI I M JR M p
Mot IIIIE aM iff IIII=
IT, =11111 L
III fill; III
..Mrs Illy
11 milli 11",mm: -
to, a w Sell-
112
all Fit
VN dfz
0" Z
_� - _ �' it
...........
if
E EE
allik
lif
met,
review. If the applicant does not propose a nightclub with the initial
application, a new application (and review by the Planning and Zoning
Board) will be required to add the nightclub use. If the applicant wishes to
maintain maximum flexibility, staff suggests that the applicant submit a PDP.
application including a nightclub for a Type 2 review by the Planning and
Zoning Board. Then, if the applicant wishes to change the nightclub portion
of the building to a Type 1 use, it may be processed as a minor amendment.
C. If a nightclub is proposed, a neighborhood meeting will be required before
the development application may be submitted. Attached is a geographical
notification map. The applicant is responsible for obtaining the names and
addresses of property owners within the mailing area. The applicant pays
the City 50 cents per.name for the mailing. The City will set up and facilitate
the neighborhood meeting:iipon the applicant's request.
d. A neighborhood meeting will not be required if all proposed uses are subject
to a Type 1 review.
e. Please contact Dana Goode at 221-6750 to schedule a submittal
appointment for the development application.
Please contact Mike Ludwig at 221-6206 with any questions regarding these
comments. .. .
Investment Fees will be due for any additional services or for upgrades in the size
of existing services. The Water Conservation Standards for Landscaping and
Irrigation will apply to any additional landscaping required on the site. Please
contact Roger Buffington at 221-6681 with any questions regarding these
comments.
5. The Stormwater Utility stated that the property is located in the Spring Creek
Drainage Basin (inventory grid #5J). The stormwater development fees in this basin'
are $2,175 per acre subject to the runoff coefficient reduction. A standard drainage
and erosion control report must be prepared and submitted by a Colorado licensed
professional engineer. Existing imperviousness can be "grand fathered in" but the
floodplain along W. Elizabeth Street must be considered. Commercial sites must
be flood proofed 18" above the 100 year water surface. Establishment of the 100
year elevation may require an engineering study beyond the standard requirements.
Any existing drainage deficiencies should be corrected. Please contact Glen
Schlueter at 221-6589 with any questions regarding these comments.
6. The Engineering Department stated that the street oversizing fee is currently
$19,443 per acre for retail use. This fee may vary for other uses. The fee in effect
at the issuance of building permit will apply. Credit may be given for street
oversizing fees already paid for the existing use. Please contact Matt Baker at 224-
6108 to discuss the amount of any credits. A Transportation Impact Study will be
required. The study must address vehicle, bike, pedestrian and transit service to
the site. Please contact Eric Bracke at 224-6062 to schedule.a scoping meeting for
the transportation study. Utility plans must be prepared by a professional engineer
licensed in the State of Colorado. Additional comments may be made during the
review of the development application.
7. The Transportation Planning Department stated that bike parking must be
provided in an amount equal to 5% of the total vehicle parking spaces. Please
provide openings in any fencing in areas where potential pedestrian connections
could be made to adjacent properties. A context diagram will be required which
shows the existing circulation system (bike, pedestrian, vehicle, and transit) in the
surrounding area. Please contact Kathleen Reavis at 224-6140 with any questions
regarding these comments.
8. The Current Planning Department offers the following comments:
a. The C-C, Community Commercial District is described in Division 4.14 of the
Land Use Code (Article 4, pp. 94-100). General Development Standards
(such as setbacks, parking ratios, landscaping, etc.) are described in Article
3 of the Land Use Code. In the event of a conflict between a standard or
requirement contained in Article 3 and Article 4, the standard in Article 4 shall
prevail. .
b. As stated in the Zoning Department comments, all proposed uses indicated
are subject to Type 1 review, except for the nightclub which is a Type 2
M
MEETING DATE:
ITEM:
APPLICANT:
- March- ..16, 1998.
Campus West Theater Redevelopment.
Rex Miller
3833 Spruce Drive
Fort Collins, CO 80526
LAND USE DATA: Request to convert the existing Campus West Theater building
into a 14,260 square foot multi -tenant retail building (possibly
including a nightclub and/or a church). The property is located
at 1325 W. Elizabeth Street.
COMMENTS:
1. The Zoning- Department stated that the property is zoned C-C, Community
Commercial District. Standard restaurants, places of worship or assembly, and
retail uses (except for those exceeding 25,000 square feet and those with vehicle
servicing) are permitted subject to Administrative (Type 1) Review. Nightclubs are
permitted subject to Planning and Zoning Board (Type 2) Review. Landscaping
requirements are provided Division 3.2.1 and Division 3.2.2 of the Land Use Code.
Handicap accessible ramps and bike must be provided. Please contact Jenny
Nuckolls at 221-6760 with any questions regarding these comments.
2. The Light and Power Utility stated that a C-1 Commercial Usage form must be
submitted. Any changes to the transformer or service will be at the developer's
expense. Please contact Alan Rutz at 221-6700 with any questions regarding these
comments.
3. The Poudre Fire Authority stated that the building exceeds 5,000 square feet and
must be equipped with a fire suppression system or fire contained in sections of less
than 5,000 square feet. In addition, the occupancy (type of tenant) may dictate the
need for automated fire suppression systems. For maximum flexibility, the Poudre
Fire Authority recommends that the entire building be equipped with an automated
fire suppression system. Please contact Ron Gonzalez at 221-6570 with any
questions regarding these comments. J°E
4. The Water and Wastewater Utility stated that there is an 8" water main in W.
Elizabeth Street and a 12" water main in City Park Avenue. There is an 8" sanitary
sewer in W. El.izabeth Street. Grease interceptors will be required for any
restaurant(s). Water Rights Acquisition charges and Water and Sewer Plant
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box580 Fort Collins, t080522-0580'(970)221-6750
CURRENT PLANNING DEPARTMENT
Comma ty Planning and Environmental ,. rvices
Current Planning
City of Fort Collins
March 20, 1998
Rex Miller
3833 Spruce Drive
Fort Collins, CO80526 -
Dear Rex,
For your information, attached is a copy of the Staff's comments concerning the Campus
West Theater Redevelopment, which was presented before the Conceptual Review Team
on March 16, 1998.
This is a request to convert the existing Campus West Theater building into a 14,260
square foot multi -tenant retail building (possibly including a nightclub and/or a church). The
property is located at 1325 W. Elizabeth Street.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6206.
Sincerely,®
Michael Ludwig, AICP
City Planner
xc: Stormwater Utility
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
Campus West Redevelopment
Additions and Alterations to the Campus West Theatre
(g) Response to Conceptual Review Staff Comments
1. All proposed uses at this point are permitted uses. It will be the tenant's
responsibility to receive approval if a nightclub is desired. The landscape plan
was designed to meet the requirements of the Land Use Code. Handicap
accessible ramps and bike racks are provided.
2. A C-1 Commercial Usage form will be submitted with the building permit
submittal.
3. The entire structure will be sprinklered as required by the Poudre Fire
Authority.
4. Additional fees will be paid as required for the addition or upgrade of any water
or wastewater service.
5. This building is well above 18" above the 100-year floodwater surface. The
reduction of impervious surface will reduce the amount of runoff from this project.
6. Required street impact fees will be paid at the time of building permit. A traffic
impact was prepared for this project and is included with this submittal. Utility
plans were prepared by a registered engineer and are included with this
submittal.
7. Bike parking is provided in excess of 5% of the total vehicle parking spaces..
A context diagram was prepared and is included with this submittal.
8. a) This site was designed to meet all applicable General Development
Standards as described by Article 3 and Article 4 in the Land Use Code.
b) At this time it is not anticipated that a nightclub will be an intended use.
However, if at a later time a tenant wishes to propose a nightclub use it
will be that tenants responsibility to receive all required approval.
c) If a tenant proposes a nightclub use it will be their responsibility to meet
all requirements of a type 2 review.
d) All proposed uses meet the requirements for a type 1 review.