Loading...
HomeMy WebLinkAboutVERIZON WIRELESS FACILITY, LIFEPOINTE CHURCH - PDP - PDP150022 - CORRESPONDENCE -11/13/2015: Please make changes to the legal description as marked. See redlines. Comment Number: 2 11/13/2015: There are line over text issues. See redlines. Department: Zoning Contact: Gary Lopez, 970-416-2338, glopez fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/13/2015 Comment Originated: 11/02/2015 11/02/2015: Note that his round has been reviewed and no comments at this time. Comment Number: 1 Comment Originated: 11/17/2015 11/17/2015: No comments specific to the proposed wireless facility use. Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder(Wfc4ov.com Topic: General Comment Number: 1 Comment Originated: 11/17/2015 11/17/2015: Transformer clearance and access requirements need to be maintained. A clearance of 8' front and 3' side/rear needs to be given for transformer. Also crews need to have access to the transformer with equipment and vehicles. Vehicles used to install/remove transformers have booms that extend out Win width. Are the gates going to be locked? Transformer & meter location cannot be in a locked area unless permission is granted by the City. Comment Number: 2 Comment Originated: 11/17/2015 11/17/2015: Meter location needs to be shown on Utility drawings. Comment Number: 3 Comment Originated: 11/17/2015 11/17/2015: Please reference our Electric Construction Policies, Practices and Procedures for guidance on our transformer and meter requirements. A link to this document is below. hftp://www.fcgov.com/uti lities/business/bui lders-and-developers/development-fo rms-guidelines-regulations Comment Number: 4 Comment Originated: 11/17/2015 11/17/2015: Please fill out and submit a Commercial Service Information Form (C-1). Along wtih a C-1 form please provide a copy of a one -line diagram showing transformer and meter to ensure our meter requirements are met. A link to a blank C-1 form is below. hftp://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam(a7fcaov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 11/0912015: No Comment from Erosion Control. This revision does not result in significant erosion, sediment and pollutant concerns. If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, icountv(cDfcgov.com Topic: General Comment Number: 1 11 /09/2015 Comment Originated: 11/13/2015 City of art W[Ins November 19, 2015 Greg Dibona VERIZON WIRELESS 16360 TABLE MOUNTAIN PKWY Golden, CO 80403 RE: Verizon Wireless Facility -- Lifepointe Church, PDP150022, Round Number 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. coWdevelopmentre view Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126orjholland@fcgov.com. Comment Summary. Department: Planning Services Contact: Jason Holland, 970-224-6126, jholland(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 11/18/2015: Can you please clarify on the plans what the paint color will be for the equipment mounted on the outside of the fence on the north side of the building. Also please clarify the color for the roof "doghouse" and conduit/sleepers/pipes on the roof. If all of the above comes pre -painted that may be fine. The roof is a charcoal/grey color, so a stock grey color may be fine or a desert tan or similar color. Please clarify. Comment Number: 2 1 Comment Originated: 11/18/2015: Existing roof mounted lighting is still an issue. We will need design documents showing how this is will be resolved. Comment Number: 3 Comment Originated: 11/1812015: Thank you for moving the equipment and eliminating the pre-fab building, as well as providing a four-sided screen at the tower. This addresses the majority of staff and neighborhood comments. Department: Engineering Development Review Contact: Marc Virata, 970.221-6567, mvirata fc ov.com 11/18/2015 11/18/2015 11/18/2015 Topic: General