Comment Number: 2
11/13/2015: There are line over text issues. See redlines.
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/13/2015
Comment Originated: 11/02/2015
11/02/2015: Note that his round has been reviewed and no comments at this
time.
Comment Number: 1 Comment Originated: 11/17/2015
11/17/2015: No comments specific to the proposed wireless facility use.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder(Wfc4ov.com
Topic: General
Comment Number: 1
Comment Originated: 11/17/2015
11/17/2015: Transformer clearance and access requirements need to be
maintained. A clearance of 8' front and 3' side/rear needs to be given for
transformer. Also crews need to have access to the transformer with equipment
and vehicles. Vehicles used to install/remove transformers have booms that
extend out Win width. Are the gates going to be locked? Transformer &
meter location cannot be in a locked area unless permission is granted by the
City.
Comment Number: 2 Comment Originated: 11/17/2015
11/17/2015: Meter location needs to be shown on Utility drawings.
Comment Number: 3
Comment Originated: 11/17/2015
11/17/2015: Please reference our Electric Construction Policies, Practices and
Procedures for guidance on our transformer and meter requirements. A link to
this document is below.
hftp://www.fcgov.com/uti lities/business/bui lders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 4
Comment Originated: 11/17/2015
11/17/2015: Please fill out and submit a Commercial Service Information Form
(C-1). Along wtih a C-1 form please provide a copy of a one -line diagram
showing transformer and meter to ensure our meter requirements are met. A
link to a blank C-1 form is below.
hftp://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam(a7fcaov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated:
11/0912015: No Comment from Erosion Control. This revision does not result in
significant erosion, sediment and pollutant concerns. If you need clarification
concerning the erosion control section, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountv(cDfcgov.com
Topic: General
Comment Number: 1
11 /09/2015
Comment Originated: 11/13/2015
City of
art W[Ins
November 19, 2015
Greg Dibona
VERIZON WIRELESS
16360 TABLE MOUNTAIN PKWY
Golden, CO 80403
RE: Verizon Wireless Facility -- Lifepointe Church, PDP150022, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. coWdevelopmentre view
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126orjholland@fcgov.com.
Comment Summary.
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland(cDfcgov.com
Topic: General
Comment Number: 1 Comment Originated:
11/18/2015: Can you please clarify on the plans what the paint color will be for
the equipment mounted on the outside of the fence on the north side of the
building. Also please clarify the color for the roof "doghouse" and
conduit/sleepers/pipes on the roof. If all of the above comes pre -painted that
may be fine. The roof is a charcoal/grey color, so a stock grey color may be fine
or a desert tan or similar color. Please clarify.
Comment Number: 2 1 Comment Originated:
11/18/2015: Existing roof mounted lighting is still an issue. We will need design
documents showing how this is will be resolved.
Comment Number: 3 Comment Originated:
11/1812015: Thank you for moving the equipment and eliminating the pre-fab
building, as well as providing a four-sided screen at the tower. This addresses
the majority of staff and neighborhood comments.
Department: Engineering Development Review
Contact: Marc Virata, 970.221-6567, mvirata fc ov.com
11/18/2015
11/18/2015
11/18/2015