HomeMy WebLinkAboutHOWELL BUILDING - PDP - 46-98 - CORRESPONDENCE - (5)No Text
r . V
proposal will remain a Type 1.
b) Throughout the development review process, we will required the
proposal to comply with the Building and Project Compatibility
standards located in Article 3 of the Land Use Code. A
recommendation would be to contact Carol Tunner or Karen
McWilliams with the Historic Preservation Office (221-6376) for some
history as to the former architecture of surrounding buildings.
c) All entrances will be required to be covered in some manner.
d) The parking will be required to comply with the parking lot interior
landscaping requirement (6%).
e) Please submit two sets of mailing labels and $0.50 per each label prior
to the neighborhood meeting. The APO (affected property owner) list
should be derived from the attached map.
Please contact Leanne Harter at 221-6750 if you have questions about
these comments.
b) There will be development charges based on the number of units and
these fees run roughly $1,200/unit.
Please contact Janet McTague at 221-6700 if you have questions about
these comments.
5. The Engineering Department offered the following comments:
a) The street oversizing fees is $948/dwelling unit, based on trip
generation. Please contact Matt Baker if you have any questions
regarding the street oversizing programs. A transportation impact
study will be required and Matt Baker or Kathleen Reavis should be
contacted for more information as to what must be included as part of
the study.
b) A site visit will be conducted by one of our engineers to determine the
quality of the pavement in the alley. If it is not to our current
standards, the proposal may be required to overlay the existing
material with asphalt.
c) We will require the submittal of a site and landscape plan for review. A
development agreement will most likely not be required, however, we
will require that all the necessary improvements are completed prior to
issuance.of a Certificate of Occupancy.
Please contact Tim Blandford at 221-6750 if you have questions about
these comments.
6. The Park Planning Department offered the following comments:
a) You will be required to pay community and neighborhood parkland
fees, due at the time of building permit. These fees are based on
square footage and vary, however the averages are as follow:
neighborhood parkland fee=$950/dwelling unit and community
parkland fee=$1,002/dwelling unit.
Please contact Janet Meisel at 221-6367 if you have any questions on
these comments.
8. The Current Planning Department offered the following comments:
a) Since the time of submittal, we have had additional discussion
regarding the nature of the approval for this particular proposal (Type 1
vs. Type 2 review.) Peter Barnes with the Zoning Department has
determined that as there is more than one dwelling unit (the proposal
includes four), the proposed use does not comply with the definition of
a mixed use dwelling. Therefore, the uses include multi -family and
commercial/retail. Multi -family is a Type 1 review, and if the proposed
commercial/retail use is a permitted use as a Type 1 review, the entire
M
2. The Water/Wastewater Utility offered the following comments:
a) The existing mains are as follows: 4-inch water in College; 8-inch
sanitary sewer in alley to the east
b) Since the water main in College is a 4-inch, the capacity may be
limited. If a fire line is needed, a hydraulic analysis may be necessary.
This should be discussed with the Poudre Fire Authority.
c) The feasibility of individual water/sewer services for each unit will
require further discussion.
d) The water conservation standards for landscape and irrigation will
apply to the development.
e) PIF's and water rights will be due at time of building permit.
Please contact Roger Buffington at 221-6854 if you have questions about
these comments.
3. The Stormwater Utility offered the following comments:
a) This site is located within the Old Town basin where the new
development fee is $4,150/acre and the fee is subject to the runoff
coefficient reduction. The site is also located in inventory grid #81.
This fee applies only if there is an imperiousness increase of more
than 350 square feet.
b) The standard drainage and erosion control reports and plans are
required if there is an increase in imperiousness of more than 350
square feet. There would still be a need to document the existing
drainage and down spouts as well as compare them to the new
building. Construction erosion control will need to be addressed.
c) The drainage engineer will need to verify the flood plain status of the
structure. If the structure is increased in value greater than 50% of the
value of the existing structure, the elevation and flood proofing codes
may apply. The engineer must be a Professional Engineer registered
in Colorado. Please contact Marsha Hilmes at 224-6036.
d) Water Quality measures are required by the Land Use Code. This
.may need to be addressed as a variance since the site is existing and
all imperious.
Please contact Glen Schlueter at 221-6589 if you have questions about
these comments.
4. Light and Power offered the following comments:
a) This site is currently served with an overhead line. Light and Power is
in the process of undergrounding all overhead lines. At the time that
this site is redeveloped, we would require that the lines be placed
underground.
MEETING DATE: July 13, 1998
ITEM: Proposed remodel and add apartments above the
current building
APPLICANT: Mikal S. Torgerson
211 Jefferson
Fort Collins, Colorado 80524
LAND USE DATA:
This is a request to add two (2) stories to an existing one (1) story building
located at 816 South College Avenue. The additional two stories will comprise
four dwelling units (three two -bedroom units and one one -bedroom unit.) The
proposed architecture includes palladian windows and cantilevered balconies
patterned after the architectural detailing of many of the Colorado State
University buildings.
COMMENTS:
1. The Zoning Department offered the following comments:
a) The property is located in the CC -Community Commercial zone
district. In that particular zone district, mixed use dwellings are a type
2 review (Planning and Zoning Board review.) Additional discussions
regarding the approval process have occurred since the time of
conceptual review. Please refer to the Current Planning comments for
more information.)
b) The minimum number of parking spaces you will be required for the
residential component is 7 spaces, with at least one (1) handicapped
space.
c) Please provide bicycle racks for the residential uses as well as the
proposed commercial use.
Please contact Jenny Nuckols at 221-6760 if you have questions on these
comments.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Commu y Planning and Environmental
Current Planning
City of Fort Collins
July 17, 1998
( Mikal S. Torgerson, AIA NCARB
211 Jefferson
Fort Collins, Colorado 80542
RE: Conceptual Review Comments
Dear Mikal:
'vices
For your information, attached is a copy of the Staff's comments concerning the
proposed commercial/residential development that was proposed to the
conceptual review team on July 13, 1998.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
C&A/6,,;
Leanne Harter, AICP
City Planner
xc: Eric Bracke
Stormwater Utility/Glen Schlueter
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020