Loading...
HomeMy WebLinkAboutSTORYBOOK - PDP - 49-98 - CORRESPONDENCE - PRIVATE ENTITIES (7)our ditch. This situation will drain a large number of developed acres and will discharge developed waters into our ditch. We will not accept these plans. These comments and the position of my client are respectfully submitted pursuant to the invitation of your Revision Comment Sheet on this project dated December 10, 1998. Our office will inquire of your department relative to the time of the proposed staff review meeting, and we will appreciate the opportunity to attend. Yours very truly, MAYO SO RMEYER, P.C. ////tMayo Sommermey MS/hb cc: Donn Engel, Secretary, WRCC Robert Smith, Stormwater Utility Manager, City of Fort Collins TIMOTHY J. DOW, MBA, JD PATRICIA T. DOW, CPA, LLM MAYO SOMMERMEYER, PC* OF COUNSEL -ALSO ADMITTED M W OMMG Mr. Steve Olt City of Fort Collins Current Planning Department 281 N. College Ave. Fort Collins, CO 80524 THE DOW LAW FIRM, LLC ATTORNEYS AND COUNSELORS AT LAW P.O. BOX 1578 FORT COLLINS, COLORADO 80522-1578 (970) 498-9900 FAX: (970) 498-9966 E-MAIL: dow@dowlawfim.com December 29, 1998 Re: Your Project No: 49-98 / Storybook, Type 1 (LUC) - PDP Our Client:. Windsor Reservoir & Canal Company # 7 CLOCK TOWER SQUARE 323 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80524 2312 CAREY AVENUE CHEYENNE, WYOMING 82001 (307) 634-0541 Dear Mr. Olt:. . I represent Windsor Reservoir & Canal Company-(WRCC). WRCC owns the ditch which runs north and south along the line which would, be• an extension of County Road 9E (Summit View). This ditch is the outflow ditcli'for No. 8 Reservoir and terminates at the Larimer & Weld Canal (Eaton Ditch) a little south'of midway between Mountain Vista and Vine Drive. This developer appeared before the Board of Directors of WRCC a number of months ago preliminarily asking for their input or attitude relative to draining surface water runoff from their project into our ditch system. They were told at that time that the ditch was not going to take any surface water runoff from developed grounds. At that time the ditch was committed to the Richard's Lake subdivision, and that commitment was worked out satisfactorily and honored. However, it is the policy of the ditch company (both WRCC and Larimer & Weld Irrigation Co. (LWRC)) that we are not accepting any more surface water discharge from the development of lands. My review of the plans submitted clearly indicates that the surface water runoff from this subdivision will flow into our ditch. Sheet No. 3 of the. drawings submitted for this project developed by Stewart & Associates' clearly shows the outflow from the Tract A Holding Pond basically, running under Little John Lane, and presumably from that point, simply down the ditch which parallels Mountain Vista Drive, which discharges into our ditch. It is further interesting to note that this developer contemplates extensive and further expansion of this Holding Pond and discharge into our ditch by Sheet No. 24, showing future development and a proposed Detention Pond B. Thus, the water. from Detention Pond A flows into Detention Pond B and ultimately into