HomeMy WebLinkAboutSTORYBOOK - PDP - 49-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject.�9
Planner: SrFve� ejc� Traffic Operations:
Engineer: I ^Qy, ✓ c-L��
Date: Loll aLr,?
t
Items Requested
Site Land Plat Utili Drainage R t Other Items Required
l4neering - —
Redlined Items Being Returned
lire land I Plat Utility I Drainage R t Other Items Being Returned
Stormwater
,i
re /Opp
Water/Wastewate
Traffic 0perations
ITran*rt
Trans. Planning
flatural Resources
Park Planning
Totals
y
Other:
! Mote: All redilned items should be returned with the resubmittal/ revisions.
i
Revisions Routing
Sheet
•• -f. lz
M
10
/ / ��•rL� .. �LI / ,ice
t j',uq
Date: G L2 G
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
o a� asc cL�cc
RAILROAD: UP or BN/CS
REA/DOE /PAPA
y 4
4��° AllIse
144?
4 4
Xlx
o�
6