Loading...
HomeMy WebLinkAboutSTORYBOOK - PDP - 49-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject.�9 Planner: SrFve� ejc� Traffic Operations: Engineer: I ^Qy, ✓ c-L�� Date: Loll aLr,? t Items Requested Site Land Plat Utili Drainage R t Other Items Required l4neering - — Redlined Items Being Returned lire land I Plat Utility I Drainage R t Other Items Being Returned Stormwater ,i re /Opp Water/Wastewate Traffic 0perations ITran*rt Trans. Planning flatural Resources Park Planning Totals y Other: ! Mote: All redilned items should be returned with the resubmittal/ revisions. i Revisions Routing Sheet •• -f. lz M 10 / / ��•rL� .. �LI / ,ice t j',uq Date: G L2 G FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE / THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY o a� asc cL�cc RAILROAD: UP or BN/CS REA/DOE /PAPA y 4 4��° AllIse 144? 4 4 Xlx o� 6