PAGE 5
PROJECT: SPAGEDDIES DATE: 01/24/94
PROJ.NO. 1270-03-93
BY : MEO
PROD. DESCRIPTION: DETERMINE DETENTION VOLUME REQUIRED BASED ON MASON
STREET SID REQUIREMENTS
PROD. LOCATION: FORT COLLINS
FILE NAME: SPAG
CUMULATIVE HYDROGRAPH METHOD
FOR
SIZING DETENTION PONDS
DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.88
RELEASE RATE: 0.59 CFS AREA: 1.17 ACRES
INITIAL TIME: 5 MINUTES
TIME INCREMENT: 5 MINUTES
INFLOW INFLOW RELEASE STORAGE
TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME
min sec iph cis cf cf cf
5 300 8.70 8.96 2687.3 177.0 2510.3
10 600 7.14 7.35 4410.8 354.0 4056.8
15 900 6.06 6.24 5615.4 531.0 5084.4
20 1200 5.21 5.36 6437.1 708.0 5729.1
25 1500 4.63 4.77 7150.6 885.0 6265.6
30 1800 4.20 4.32 7783.8 1062.0 6721.8
35 2100 3.81 3.92 8237.8 1239.0 6998.8
40 2400 3.60 3.71 8895.7 1416.0 7479.7
45 2700 3.28 3.38 9118.1 1593.0 7525.1
50 3000 3.02 3.11 9328.2 1770.0 7558.2
55 3300 2.80 2.88 9513.5 1947.0 7566.5 *t
60 3600 2.60 2.68 9637.1 2124.0 7513.1
65 3900 2.43 2.50 9757.5 2301.0 7456.5
70 4200 2.30 2.37 9945.9 2478.0 7467.9
75 4500 2.17 2.23 10054.0 2655.0 7399.0
80 4800 2.07 2.13 10230.1 2832.0 7398.1
85 5100 1.96 2.02 10291.9 3009.0 7282.9
90 5400 1.87 1.93 10396.9 3186.0 7210.9
95 5700 1.77 1.82 10387.6 3363.0 7024.6
100 6000 1.70 1.75 10501.9 3540.0 6961.9
105 6300 1.63 1.68 10573.0 3717.0 6856.0
110 6600 1.57 1.62 10668.7 3894.0 6774.7
115 6900 1.50 .1.54 10656.4 4071.0 6585.4
120 7200 1.44 1.48 10674.9 4248.0 6426.9
No Text
APPENDIX IV
Stuffer Envelope
DRAINAGE AND EROSION CONTROL PLAN
90 CONCRETE PIPE DESIGN MANUAL I TABLES 91
I
TABLE 3:
FULL FLOW COEFFICIENT VALUES
CIRCULAR
CONCRETE PIPE
R
ValueofC,Q-n
xAx1114
U
Pipe
A
. Area
Hydraulic
n
Diameter
(Square
Radius
(Feet)
n=0.010
n=0.011
n=0.012
h=0.013
(inches)
Feet)
8
0.349
0.167
15.8
14.3
13.1
12.1
10
0.545
0.208
2.8.4
25.9
23.6
21.8
12
6.785
0.250
46.4
42.1
38.6
35.7
15
1,227
0.31E
84.1
76.5
70.1
�•7
18
1.767
0.375
137
124
114
105
Y1
2.405
0.437
2N
187
172
158
24
3.142
0.500
294
267
245
226
Y7
3.976
0.562
402
366
335
30
4.909
0.625
533
485
444
410
33
5.940
0.698
686
624
574
530
36
7.069
0.750
861
188
722
42
9 621
0.875
1308
1189
1090
006
1006
48
12.566.
1.000
1867
1698
1556
1436
54
15.904
1.12.5
2557
2325
2131
1967
60
19.635
1.250
3385
3077
2821
2604
66
23.758
1.375
4364
3967
3636
3357
72
28.214
1.500
5504
5004
4587
4234
78
33.183
1.625
6815
6195
5679
5242
84
38.465
1.750
8304
7549
6920
6388
90
44.170
1.875
9985
-9078
8321
7681
96
50.266
2.000
11850
10780
' 9878
9119
302
56.745
2.125
13940
12670
11620
10720
108
63.617
2.250
16230
14760
13530
12490
114
70.882
2.375
18750
17040
15620
14426
120
78.540
2.500
21500.
19540
17920
16540
126
86.590
2.625
24480
2E260
20400
18830
132
95.033
2.750
97720
25200
23100
21330
138
103.870
2.875
31210
28370
26010
24010
26890
144
113.100
3.000
M960
31780
29130
TABLE 4:FULL FLOW COEFFICIENT VALUES
ELLIPTICAL CONCRETE PIPE
Approximate
Equivalent
A
R
Value of C,-1486 x A x R"�
Pipe Size
Circular
Area
Hydraulic
n
R x S
Diameter
(Square
Radius
(Inches)
(Inches)
Feet)
(Feet)
n-0.010
n-0.011
n-0.012
n=0.013
14 x 23
18
1.8
0.367
138
125
116
108
19 x 30
24
3.3
0.490
301
274
252
232
22 x 34
27 .
4.1
0.546
405
368
339
313
24 x 38
30,
5.1
0.613
547
497
456 .
421
27 x 42
1 33
6.3
0.686
728
662
607
560
29 x 45
36
7.4
0.736
891
810
746
686
32 x 49
39
8.8
0.812
1140
1036
948
875
34 x 53
42
10.2
0.875
1386
1260
1156
1067
38 x 60
48
12.9
0.969
1878
1707
1565
1445
43 x 68
54
16.6
1.106
2635
2395
1 2196
2027
48 x 76
60
20.5
1.229
3491
3174
2910
2686
53 x 83
66
24.8
1.352
4503
4094
3753
3464
58 x 91
72
29.5
1.475
5680
5164
4734
4370
63x98
78
34.6
1.598
7027
6388
5856
5406
68 x 106
84
40.1
1.721
8560
7790
7140
6590
72 x 113
90
46.1
1.845
10300
9365
8584
7925
77 x 121
.96
52.4
1.967
12220
11110
10190
9403
82x128
102
59.2
2.091
14380
13070
11980
11060
87 x 136
108
66.4
2.215
16770
15240
13970
12900
92 x 143
114
74.0
2.340
19380
17620
16150
14910
97 x 151
120
82.0
2.461
22190
20180
18490
17070
106 x 166
132
99.2
2.707
28630
26020
23860
22020
116x180
144
1 118.6
2.968
1 36400
33100
30340
28000
TABLE 5: FULL FLOW COEFFICIENT VALUES
CONCRETE ARCH PIPE
Approximate
Value of C, _ x A x R'�'
Equivalent
A
R
n
Pipe Size
Circular
Area
Hydraulic
R x S
Diameter
(Square
Radius
(Inches)
(Inches)
Feet)
(Feet)
n-0.010
n-0.011
n=0.012
n-0.013
11 x 18
15
1.1
0.25
65
59
54
50
13% x 22
18
1.6
0.30
110
100
91
84
15% x 26
21
2.2
0.36
165
150
137
127
18 x 28;i
24
2.8
0.45
243
221
203
187
22% x 3644
30
4.4
0.56
441
401
368
339
26% x 43;'a
36
6.4
0.68
736
669
613
566
31Y,.x 51Ve
42
8.8
0.80
1125
1023
938
866
36 x 58;r2
48
11.4
0.90
.1579
1435
1315
1214
40 x 65
54
14.3
1.01
2140
1945
1783
1646
45 x 73
60
17.7
1.13
2851
2592
2376
2193
54 x 88
72
25.6
1.35
4641
4219
3867
3569
62 x 102
84
34.6
1.57
6941
6310
5784
5339
72 x 115
77;1a x 122
90
44.5
1.77
9668
8789
8056
7436
87%
96
51.7
1.92
11850
10770
9872
9112
z138
108
66.0
2.17
16430
14940
13690
12640
0.8
0.7
4 0.6
fL
z 0.5
at
w
> 0.4
O
F
a 0.3
w
0
c�
? 0.2
0
z
O
a 0.1
00
0 1 2 3 4 5
FLOW INTO INLET PER SO. FT. OF OPEN AREA (CFS/FT2)
Figure 5-3
CAPACITY OF GRATED INLET IN SUMP
(From: Wright -McLaughlin Engineers, 1969)
5-11
DESIGN CRITERIA
FORT COLLINS
RAINFALL INTENSITY CURVE DATA FOR CITY OF FORT COLLINS
FIG 3-1
NOVEMBER 1975
INTERPRETED DECEMBER 21, 1992 BY MARK OBERSCHMIDT
SHEAR ENGINEERING CORPORATION
DO NOT INTERPRET BEYOND ROW 40
2
5
10
25
50
100
TIME
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
5
3.29
4.70
5.64
7.02
7.95
8.70
10
2.54
3.65
4.45
5.50
6.35
7.14
15
2.14
3.07
3.75
4.60
5.29
6.06
20
1.85
2.65
3.25
4.00
4.60
5.21
25
1.63
2.34
2.87
3.54
4.08
4.63
30
1.47
2.11
2.60
3.17
3.67
4.20
35
1.32
1.92
2.38
2.88
3.35
3.81
40
1.20
1.76
2.19
2.67
3.08
3.60
45
1.12
1.62
2.02
2.46
2.84
3.28
50
1.04
1.51
1.87
2.27
2.65
3.02
55
0.97
1.40
1.73
2.12
2.46
2.80
60
0.90
1.32
1.62
1.99
2.32
2.60
65
0.88
1.24
1.52
1.84
2.18
2.43
70
0.82
1.18
1.44
1.72
2.05
2.30
75
0.79
1.11
1.38
1.62
1.93
2.17
80
0.74
1.07
1.30
1.53
1.82
2.07
85
0.70
1.00
1.23
1.46
1.73
1.96
90
0.68
0.97
1.20
1.40
1.67
1.87
95
0.64
0.91
1.13
1.32
1.59
1.77
100
0.61
0.88
1.09
1.27
1.51
1.70
105
0.60
0.83
1.04
1.22
1.46
1.63
110
0.57
0.80
1.00
1.18
1.40
1.57
115
0.54
0.78
0.96
1.14
1.33
1.50
120
0.52
0.76
0.91
1.10
1.19
1.44
I
DRAINAGE CRITERIA MANUAL
RUNOFF
IdEf
30
F- 20
z
W
U
it
III
a. 10
z
w
a
O 5
to
w
acc 3
O
U 2
cc
w
F-
3
1
_MMOtMEN
1111��I1�1�1111I�
►�.i
������
MFMMII■VA
�MWAME
i�ii�iiiiuiiiii�
.. AMW..,►�■N.......s....■�..■.
2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING `UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
i
5 =1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
3.1.7 Time of Concentration
In order to use the Rainfall Intensity Duration Curve, the time of concentration most be
f known. This can be determined either by the following equation or the "Overland Time of
Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See
Figure 3-2).
Tc=1.87 (1.1 —CC,) D' (111.1
"�
Where Tc =Time of Concentration, minutes
S = Slope of Basin, %
C =Rational Method Runoff Coefficient
D = Length of Basin, feet
C, = Frequency Adjustment Factor
Time of concentration calculations should reflect channel and storm sewer velocities as well
as overland flow times.
3.1.8 Adjustment for Infrequent Storms
The preceding variables are based on the initial storm, that is, the two to ten year storms. For
storms with higher intensities an adjustment of the runoff coefficient is required because of
the lessening amount of infiltration, depression retention, and other losses that have a
proportionally smaller effect on storm runoff.
These frequency adjustment factors are found in Table 3-4.
Table 3-4
RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS
Storrs Return Period
Frequency Factor
(years)
Ce
2 to 10
1.00
11 to25
1.10
26 to 50
1.20
51 to 100
1.25
Note: The product of C times C, shall not exceed 1.00
3.2 Analysis Methodology
The methods presented in this section will be instituted for use in the determination and/or verification
of runoff at specific design points in the drainage system. These methods are (1), the Rational Method
and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as
SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where
applicable, drainage systems proposed for construction should provide the minimum protection as
determined by the methodology so. mentioned above.
3.2.1 Rational Method
For drainage basins of 200 acres or less, the runoff may be calculated by the Rational
Method, which is essentially the following equation:
Q = C,CIA
Where Q = Flow Quantity, cfs
A =Total Area of Basin, acres
C, = Storm Frequency Adjustment Factor (See Section 3.1.8)
C = Runoff Coefficient (See Section 3.1.6)
I = Rainfall Intensity, inches per hour (See Section 3.1.4)
3.2.2 Colorado Urban Hydrograph Procedure
For basins larger than 200 acres, the design storm runoff should be analyzed by deriving
synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph
Procedure be used for such analysis. This procedure is detailed in the Urban Storm Drainage
Criteria Manual, Volume 1, Section 4.
MAY 1984 3-5 DESIGN CRITERIA
R-M-P Medium Density Planned Residential District — designation for medium density .
areas planned as a unit (PUD) to provide a variation in use and building placements
with a minimum lot area of 6,000 square feet.
R-L-M Low Density Multiple Family District— areas containing low density multiple family
units or any other use in the R-L District with a minimum lot area of 6,000 square feet
for one -family or two-family dwellings and•9,000 square feet for multiple -family
dwellings.
M-L Low Density Mobile Home District — designation for areas for mobile home parks
containing independent mobile homes not exceeding 6 units per acre.
M-M Medium Density Mobile Home District — designation for areas of mobile home
parks containing independent mobile homes not exceeding 12 units per acre.
B-G General Business District — district designation for downtown business areas,
including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total
floor area of the building.
B-P Planned Business District — designates areas planned as unit developments to
provide business services while protecting the surrounding residential areas with
minumum lot areas the same as R-M.
H-B Highway Business District — designates an area of automobile -orientated busi-
nesses with a minimum lot area equal to 1 /2 of the total floor area of the building.
B-L Limited Business District — designates areas for neighborhood convenience
centers, including a variety of community uses with minimum lot areas equal to two
times the total floor area of the building.
C Commercial District —designates areas of commercial, service and storage areas.
I-L Limited Industrial District— designates areas of light industrial uses with a minimum
area of lot equal to two times the total floor area of the building not to be less than
20,000 square feet.
I-P Industrial Park District —designates light industrial park areas containing controlled
industrial uses with minimum lot areas equal to two times the total floor area of the
building not to be less than 20,000 square feet.
I-G General Industrial District — designates areas of major industrial development.
T Transition District — designates areas which are in a transitional stage. with regard
to ultimate development.
For current and more explicit definitions of land uses and zoning classifications, refer to the
Code of the City of. Fort Collins, Chapters 99 and 118.
Table 3-3
RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS
Character of Surface Runoff Coefficient
Streets, Parking Lots, Drives:
Asphalt ...........0.95
Concrete............................................................................................ 0.95
.
Gravel................................................................................................. 0.50
Roofs .........................................................................................
................. 0.95
Lawns, Sandy Soil:
0.1
Flat <2% ..........................................................................
to 7%
...................
0. 5
Average2 ..................................................................................
0.20
Steep>7%..........................................................................................
Lawns, Heavy Soil:
0.20
Flat <2% ...........................................................................
7%
..................
0.25
Average2 to ..................................................................................
0.35
Steep>7%......... :..................................................................
..............
MAY 1984
3-4 DESIGN CRITERIA
APPENDIX III
Tables and Figures
Table 3-3 Rational Method Runoff Coefficients
Table 3-4 Rational method frequency adjustment factors
Figure 3-2 Travel Time Velocity for Rational Method
Figure 3-1 City of Fort Collins Rainfall Intensity Curve November
1975
Fig. 5-3 Capacity of Grated Inlet in Sump
Table 3 Full Flow Coefficient Values for
Circular Concrete Pipe
CONSTRUCTION SEQUENCE
P"nJECT:
SPAGEDDIES
STANDARD FORM C
SEQUENCE
FOR 19 94 ONLY
COMPLETED BY: M EO/Shear Engineering
DATE: 1/24/94
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
YEAR
MONTH I M I A I M I J I J( A( S 1 O 1 N' .1 DI I
OVERLOT GRADING I-"'
WIND EROSION CONTROL
Soil Roughening _
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving —
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
Other
STRUCTURES: INSTALLED BY Owner MAINTAINED BY Owner,
VEGETATION/MULCHING CONTRACTOR Owner
DATE SUBMITTED Jan. 1994 APPROVED BY CITY OF FORT COLLINS ON
MARCH 1991 8-16 DESIGN CRITERIA
�—
EFFECTIVENESS CALCULATIONS
PROJECT: STANDARD FORM B
COMPLETED BY: DATE: 1 Z4)Q
Erosion Control
C-Factor
P-Factor
-.Method
Value
Value
Comment
51�i>+�511\J Z Orvl,
\, t•.,•'�?F. �'C
LU
U;dU
_ S.li Fe ,aes
I,J
O•"
S��o %'n5\>.� 2 � 1-r„N r/
sob
O•ul
1.0
IBASINI (-%) JBASINJ (Ac)_I CALCULATIONS
Sol, {
0o IO ,l W-7 ASpNh1` - CS<c
x ix'
0.0004 �( 1
�= 0,4)(1 7 (CC, -
D.tU
Erf: = CI C,Zk•b)� KIUO
. � � cX)f-RA>_t wcI6)."reM eFF = 1Z,4h°/o , S�°�o ok
MARCH 1991
8.15
DESIGN CRITERIA
K
n
TABLE 8-A
RAINFALL PERFORMANCE STANDARDS FOR FORT COLLINS, COLORADO
FLOW
LENGTH
SLOPE ($)
(FT)
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
6.0
7.0
8.0
9.0
10.0
20.0
30.0 40.0 50.0
100
70.9
74.6
76.8
78.4
79.5
80.3
81.1
81.6
82.1
82.5
83.0
83.4
83.6
83.8
84.0
84.7
84.8 84.9 84.9
200
72.0
76.3
78.2
80.
8 1. 2
82.1
82.5
82.8
83.2
83.6
83.9
84.0
84.2
84.3
84.8
84.9 84.9 84.9
300
72.4
77.0
78.8
80.0
80.9
81.6
82.5
82.8
83.1
83.5
83.8
84.1
84.2
84.3
84.4
84.8
84.9 84.9 85.0
400
72.6
77.4
79.1
80.3
81.2
81.8
82.7
83.0
83.3
83.7
84.0
84.2
84.3
84.4
84.5
84.8
84.9 84.9 85.0
500
72.7
77.7
79.4
80.5
81.3
81.9
82.8
83.1
83.4
83.8
84.1
84.3
84.4
84.5.84.6
84.9
84.9 85.0 85.0
600
72.8,77.9
79.5
80.6
81.4
82.0
83.0
83.2
83.5
83.9
84.1
84.3
84.4
84.5
84.6
84.9
84.9 85.0
700
72.8
78.0
79.7
80.8
81.5
82.1
83.0
83.3
83.5
84.0
84.2
84.4
84.5
84.5
84.6
84.9
84.9 85.0
800
72.7
78.1
79.7
80.8
81.6
82.2
83.1
83.4
83.6
84.0
84.2
84.4
84.5
84.6
84.6
84.9
84.9 85.0
900
72.7
78.2
79.8
80.9
81.7
82.2
83.2
83.4
83.6
84.1
84.3
84.4
84.5
84.6
84.7
84.9
84.9.85.0
1000
72.7
78.3
79.9
81.0
81.7
82.3
83.2
83.5
83.7
84.1
84.3
84.4
84.5
84.6
84.7
84.9
84.9 85.0
1100
72.6
78.3
79.9
81.0
81.7
82.3
83.3
83.5
83.7
84.1
84.3
84.5
84.6
84.6
84.7
84.9
84.9
1200
72.6
78.4
80.0
81.0
81.8
82.3
83.3
83.5
83.7
84.2
84.3
84.5184.6
84.6
84.7
84.9
84.9
1300
72.6
78.4
80.0
81.1
81.8
82.4
83.3
83.6
83.8
84.2
84.4
84.5
84.6
84.6
84.7
84.9
85.0
1400
72.5
78.5
80.1
81.1
81.8
82.4
83.4
83.6
83.8
84.2
84.4
84.5
84.6
84.7
84.7
84.9
85.0
1500
72.4
78.5
80.1
81.1
81.9
82.4
83.4
83.6
83.8
84.2
84.4
84.5
84.6
84.7
84.7
84.9
85.0
1600
72.4
78.5
80.1
81.1
81.9
82.4
83.4
83.6
83.8
84.2
84.4
84.5
84.6
84.7
84.7
84.9
1700
72.3
78.5
80.1
81.2
81.9
82.4
83.4
83.6
83.8
84.3
84.4
84.5
84.6
84.7
84.7
84.9
1800
72.3
78.6
80.1
81.2
81.9
82.4
83.4
83.7
83.8
84.3
84.4
84.5
84.6
84.7
84.7
84.9
1900
72.2
78.6
80.2
81.2
81.9
82.5
83.5
83.7
83.9
84.3
84.4
84.5
84.6
84.7
84.7
84.9
2000
72.2
78.6
80.2
81.2
81.9
82.5
83.5
83.7
83.9
84.3
84.4
84.6
84.6
84.7
84.7
84.9
2500
71.9
78.6
80.2
81.3
82.0
82.5
83.5
83.7
83.9
84.3
84.5
84.6
84.7
84.7
84.8
3000
71.6
78.7
80.3
81.3
82.0
82.5
83.6
83.8
84.0
84.4
84.5
84.6-
84.7
84.7
84.8
3500
71.4
78.7
80.3
81.3
82.0
82.6
83.6
83.8
84.0
84.4
84.5
84.6
84.7
84.7
84.8
4000
71.1
78.6
80.3
81.3
82.0
82.6
83.6
83.8
84.0
84.4
84.5
84.6
84.7
84.8
84.8
4500
70.9
78.6
80.3
81.3
82.0
82.6
83.7
83.9
84.0
84.4
84.6
84.6
84.7
84.8
84.8
5000
70.6
78.6
80.3
81.3
82.0
82.6
83.7
83.9
84.0
84.4
84.6
84.7
84.7
84.8
84.8
d�
sz ZXZ
112sz'13 ,74
?3 , Zz
RAINFALL PERFORMANCE STANDARD EVALUATION
PROJECT:STANDARD FORM A
COMPLETED BY: MEO / 5 1j6-A Z ENG INE Esz iO& DATE: -4 S f
DEVELOPED
ERODIBILITY.
Asb
Lsb
Ssb
Lb
Sb
PS
SUBBAgIN
ZONE
(ac)
(ft)
($)
(feet)
M
M
MARCH 1991 B-14 DESIGN CRITERIA
tl ut tl
•m. 1(r taFN •tl. ••
.. , •, 1 ..
Re
, .w..• e••1 i .r I 1 / V • lam. ... I. `�� 1 .
I 4 w b 1 r.. i. .w .••.
( t. 1. • . a i L 1'.•.1 1
\L• ~ ]�` 1, t\• - a:� fib' • o• •t ^ \'..••�• • n�. Pf' ,�„ a - w 1 �:.
FwJ:.i•' � •w �, y .�li N w\v + � Y �:. •� w•'• D.N•,.1. o t 1 \.. � �l �• •' Y � '
We
i .. • Y %. ;I ..1 •11' • •W.• y
cl-
" Y I' ell•• 4 • ' • 11�
44
N .
rw,,
• • f
lO
It
he
w N p (•..1.u. 1
.� • �I y • •• � iML•wUUD
�f •s J . • 4y • nl.r. . 'I n• 1
f1 �� . � / r (1 I ) �• V.. ♦ u, J r •ram O' 1 I
1:
Y ' fl •
V• :j�1I1 • I : (b•'nl C• I
1 ,
t. o
� + I. SITE ' 11 .�••�, ��` r .� 1 f_
ROD ILITY ZONEva
`.
• �,�� �'�• ° r i LOW �t �
MODERATE
HIGH
fts
\� 1 Syr t•�..—, ,.� ' ( ' � �
x �t :L-,:CV�@Psis. �. �illt�� ` W��.a:V °tt�. t..r"��}.: •>Fi• 4.<•i. .r1 �..�:..i •tc \4`' 1':'t.�:. ,. t.:=.iL rw .4.... :fi ...�. A•G. .�-.:. �.A�C/r.1 �:4 �1 iL h•r.i 5:::-:. ..
APPENDIX II
Erosion Control Calculations
SP�1G C-�JO\�S • - - PRGIARED13Y MEv --1
II Y G 6z qv� c.�vR A oE' • L.'_L
3
1��Ula�
WATER GLev - 31,�,�
,�,�
TOP Z7.9,C
P ��E
�LA�G7� � -7b L•� .
�.
,2
T-177,
14
fill I I i i
I
TETER-
EEH_F
-71
�L L
L
_T"r
. . .
. . . . . . . . . . . .
..........
71
!_LLL__
. . . . . . . . . . . . . . . . . . .
i-4-
-4
1 fit
_-A
T
f i if i
Lj_
--- - - 7_7 .. r__
T__.. T
i I I
I I If
i
it lit 1 1
1 1
-7 -F!
7-1
17'
L
7-1-7r I
..J
I
I
if
if I
f
I I I if I it I z
1 1 1
1
I lit
it
L!
I I
Lf
1-1 1-7
r 4-L
7-
I
i it LL
4
T-1
ILL i
';T-177
'7�-1-J.'
7'1 F-
77—,
TI
F"
T
--
--------
J
-JU --
-------- ,7
t
i I
L-L
-T
F'
1;ow
14-4
_�'T_T
T
�
r--rA(
.-SJOR"A'
J
L
_L_L I
L!
tj I F
-7-
PAGE 7a
CHECK FOR HIGH WATER ELEVATION 0100 = 0.59 cfs
START AT ELEV. = 36.940 FEET
DELTA HEAD = 0.001 FEET
HEAD HEAD HEAD
ELEV. OVER LOWER OVER UPPER OVER WEIR TOTAL
LOWER ORIFICE UPPER ORIFICE WEIR FLOW FLOW
ORIFICE FLOW ORIFICE FLOW
ft ft cfs ft cfs ft cfs cfs
30.940 4.530 0.589 0.000 0.000 0.000 0.000 0.589
30.941 4.531 0.590 0.000 0.000 0.600 0.000 0.590 ><'t
30.942 4.532 0.590 0.000 0.000 0.000 0.000 0.590
30.943 4.533 0.590 0.000 0.000 0.000 0.000 0.590
30.944 4.534 0.590 0.000 0.000 0.000 0.000 0.590
30.945 4.535 0.590 0.000 0.000 0.000 0.000 0.590 '.
30.946 4.536 0.590 0.000 0.000 0.000 0.000 0.590
30.947 4.537 0.590 0.000 0.000 0.000 0.000 0.590
SHEAR ENGINEERING CORPORATION
PAGE : 7
PROJECT: SPAGEDDIES DATE: 01/24/94
PROJECT NO 1270-01-93
PROJECT LOCATION :FORT COLLINS BY MEO
FILE NAME: SPAG
INPUT FOR OUTLET STRUCTURE
STRUCTURE TYPE: ** WEIR TYPE
LOWER ORIFICE DIAM. (ft) = 0.26 WEIR LENGTH (ft) = 0.00
LOWER ORIFICE INV. (ft) = 26.41 WEIR INVERT (ft) = 0.00
LOWER ORIFICE COEF. (CL) = 0.65 WEIR COEF. (Cu) = 0.00
UPPER ORIFICE DIAM.(ft) = 0.00 TOP OF BERM (ft) = 32.00
UPPER ORIFICE INV. (ft) = 0.00 INIT. DELTA (ft) = 2.59
UPPER ORIFICE COEF. (Cu) = 0.00 DELTA HEAD (ft) = 0.25
100 YR RELEASE RATE (cfs)= 0.59
OUTLET PIPE 18" RCP
PIPE DIAM (ft) =SEE ABOVE HYD. RAD. (ft) = 0.38 HGL SLOPE (X) = 5.37
PIPE INV. (ft) = 26.41 n = 0.013 SEE PAGE 8a
SLOPE (Y.) = 0.50 Qcap (cfs) = 7.42 Opresscap (cfs) = 24.33
AREA (sf) = 1.767 PRESSURE FLOW EXPECTED
GRATE ELEV. (ft) = 29.00 TOP OF PIPE (ft) = 28.16
REFER TO TABLE 5 COVER a INLET(ft)= 0.84
** ******** *OUTPUT* ******** ******** ******** *k******
LOWER ORIFICE AREA (A) = 0.0531 SQUARE FEET
UPPER ORIFICE AREA (A) = 0.0000 SQUARE FEET
******* ******* ******* *OUTPUT* ******* ******* ******* *******
HEAD HEAD HEAD
ELEV. OVER LOWER OVER UPPER OVER WEIR TOTAL
LOWER ORIFICE UPPER ORIFICE WEIR FLOW FLOW
ORIFICE FLOW ORIFICE FLOW
ft ft cfs ft cfs ft cfs cfs
26.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.00 2.59 0.45 0.00 0.00 0.00 0.00 0.45
29.25 2.84 0.47 0.00 0.00 0.00 0.00 0.47
29.50 3.D9 0.49 0.00 0.00 0.00 0.00 0.49
29.75 3.34 0.51 0.00 0.00 0.00 0.00 0.51
30.00 3.59 0.52 0.00 0.00 0.00 0.00 0.52
30.25 3.84 0.54 0.00 0.00 0.00 0.00 0.54
30.50 4.09 0.56 0.00 0.00 0.00 0.00 0.56
30.75 4.34 0.58 0.00 0.00 0.00 0.00 0.58
31.00 4.59 0.59 0.00 0.00 0.00 0.00 0.59
31.25 4.84 0.61 0.00 0.00 0.00 0.00 0.61
31.50 5.09 0.62 0.00 0.00 0.00 0.00 0.62
31.75 5.34 0.64 0.00 0.00 0.00 0.00 0.64
32.00 5.59 0.65 0.00 0.00 0.00 0.00 0.65
******** ******** ******** *A****** ******** ******** ******** ********
ORIFICE EQUATION: CA(2gH)AI /2 WEIR FLOW EQTN. : CWLHA3/2
SHEAR ENGINEERING CORPORATION
PAGE: 6
PROJECT :SPAGEDDIES DATE: 01/24/94
PROJ. NO:1270-03-93
LOCATION:FORT COLLINS BY MEO
NOTES :PARKING LOT STORAGE VOLUME ONLY
FILE NAME SPAG
AVERAGE END AREA METHOD
FOR DETENTION BASIN
VOLUMES
CONSTANT: 64 = 1 SQ IN. FIRST.EVEN CONTOUR 29 FEET
INVERT 29 FEET TOP ELEV 31 FEET
INCREMENT 1 FOOT SCALE: 1" = 20 FEET
******** ******** ******** ******** ******** '***A**** ******** ********
ELEV PLANI- AREA AREA VOLUME CUM. CUM. CUM.
METER (Al) (A2) (V1) VOLUME VOLUME VOLUME
ft READING sq in sq ft cf cf cy ac-ft
******** ******** ******** ******** ******** *kk*i*** ******** ********
29 0.00 0.00 0 0 0 0 0.00
30 732.00 11.44 4575 2288 2288 85 0.05
31 2951.50 46.12 18447 11511 13798 511 0.32
FORMULAE:A1= (PLANIMETER READING)/CONSTANT
A2= (A1)*SCALE SQUARED
CONCLUDE:VOLUME PROVIDED IN PARKING LOT IS GREATER THAN VOLUME REQUIRED
VOLUME REQUIRED = 7566.5 cf
PA(76A B
A
S/a i tC%4'e
ID OPATTERN KON-
SKIGALVANIZED
STEWL PLATE
(AA3M10 M-111)
9
A
wtL
.9
r-4�
OETAIL'A7 I' x)x
r• 4•
a x
Xxx n
A +-*d
PLAN VIEW
SECTION A -A
2:I SLOPE 3, 2:1 SLOPE
OAS.G.
SECTION B-8
CXIi16IT �6�
For, 4� Wlura SJW CULV6KT CAPWeIT}
�2x,oz)
0,31b3
N 0,0)6
5
(��
'` A
UlCc,lo' �li�r1' 6)C,3163��,o0i
0, 01-6
- 6,SI Gfs
e
I
r pr
i T.
77
i A
... .......
if!
14t;
T-1
-10:11, .......
-14
1' 3--
4 Ri=
5,3 -7 --o
-!,., I f)—i- I i I . I A -1Q.-
I � " 4-
1 3. , I.. 1.677_.�
14, io
I " ! } ! I ( 1 1 IN ; '' ! , ! ' � i i y I 4 I G� ' : i ' ! t r i" I ' 7
OF
Ij
SHEAR ENGINEERING CORPORATION
PAGE 4
PROJECT: SPAGEDDIES DATE 01/24/94 PROJ. NO.1270-1-93
BY MEO
FILE NAME SPAG
AREA (A)= 0.04 ACRES SUBBASIN:Ic
NOTE: TOTAL CONTRIBUTING AREA TO PARKING LOT INLET
INCLUDES SOME OFFSITE FLOWS
RUNOFF COEF. (C)
2 YEAR 10 YEAR 100 YEAR
C = 0.76 0.76 0.95
SEE SPREAD SHEET ATTACHED ON PAGE 2
TIME OF CONCENTRATION (TO
TRAVEL DISTANCE TO BASIN BOUNDARY = 27 Lf
THEREFORE ASSUME Tc = 5 min
INTENSITY (I) (iph)
2 YEAR 10 YEAR 100 YEAR
I = 3.29 5.64 8.70
NOTE:' INTENSITIES TAKEN FROM FIGURE 3-1
RUNOFF (0= CIA) (cfs)
2 YEAR 10 YEAR 100 YEAR
0 = 0.10 0.17 0.33
CONCLUDE:FLOWS OFFSITE UNDETAINED. PLATTED AREA IS 1.02 ac
CONTRIBUTING AREA TO ONSITE INLET = 1.17 ac
UNDETAINED FLOW IS COMPENSATED FOR
e
PAGE 3
PROJECT: SPAGEDDIES
BY MEO
FILE NAME SPAG
SHEAR ENGINEERING CORPORATION
DATE 01/24/94 PROJ. NO.1270-1-93
AREA (A)= 0.17 ACRES SUBBASIN:Ib
NOTE: TOTAL CONTRIBUTING AREA TO SIDE WALK CULVERT
INCLUDES SOME OFFSITE FLOWS
AREA IS SPLIT BY BERM ALONG EAST SIDE OF BUILDING
RUNOFF COEF. (C)
2 YEAR 10 YEAR 100 YEAR
C = 0.29 0.29 0.36
SEE SPREAD SHEET ATTACHED 1
TIME OF CONCENTRATION (TO
OVERLAND TRAVEL TIME (Ti)(1.87(1.1-CCf)*(L)AO.5)/(S)A0.33
LENGTH = 24 FEET SLOPE = 6.46 X
2 YEAR 10 YEAR 100 YEAR
C = 0.20 0.20 0.25
Ti (min)= 4.45 4.45 4.21
TRAVEL TIME (TO=L/(60*V) FLOW TYPE
L (ft) = 22 S (X) = 4.50 GUTTER
L (ft) = 8 S (X) = 0.50 GUTTER
L (ft) = 108 S (Y.) = 0.50 GUTTER
NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2
Tc =Ti+TOTAL TRAVEL TIME
2 YEAR 10 YEAR
Tc (min)= 6.17 6.17
URBAN BASIN CHECK LtotaL = 162
USE Tc = 6 6
V (fps) = 1.50 Tt(min)=
V (fps) = 0.50 Tt(min)=
V (fps) = 1.50 Tt(min)=
TOTAL TRAVEL TIME (min) _
100 YEAR
5.92
L/180+10= 10.90
6
INTENSITY (I) (iph)
2 YEAR 10 YEAR 100 YEAR
I = 3.14 5.4 8.39
NOTE: INTENSITIES TAKEN FROM FIGURE 3-1
RUNOFF (Q= CIA) (cfs)
2 YEAR 10 YEAR 100 YEAR
Q = 0.15 0.27 0.51
CONCLUDE: INSTALL 4' WIDE SIDEWALK CULVERT
INSTALL 3' WIDE CONCRETE LOW FLOW CHANNEL AT 0.5%
CULVERT CAPACITY = 3.24 cfs REFER TO EXHIBIT B
CHANNEL CAPACITY = 0.48 cfs REFER TO EXHIBIT A
0.24
0.27
1.20
1.71
NOTES
SURFACE
CHARACTERISTICS
STREETS
ASPHALT
CONCRETE
GRAVEL
ROOFS
LAWNS SANDY SOIL
FLAT < 2%
AVERAGE 2 - 7%
STEEP > 77
LAWNS HEAVY SOIL -
FLAT < 2%
AVERAGE 2 - 7%
STEEP > 7%
TOTAL AREA
SHEAR ENGINEERING CORPORATION
PAGE 2
PROJECT :SPAGEDDIES DATE: 01/24/94
PROJ.NO. :1270-01-93 LOCATION FORT COLLINS
FILE NAME:SPAG BY: MEO
MINOR BASIN Ic CONTRIBUTES FLOW TO TARGET PARKING LOT
RUNOFF
COEF.
AREA C C*A
(acres)
0.000 0.950 0.000
0.030 0.950 0.029
0.000 0.500 0.000
0.000 0.950 0.000
0.000 0.100 0.000
0.000 0.150 0.000
C.000 0.200 0.000
0.010 0.200 0.002
0.000 0.250 0.000
0.000 0.350 0.000
0.040 0.031
C2 C5 C10 C100
COMPOSITE C VALUE 0.763 0.763 0.763 0.953
USE 0.76 0.76 0.76 0.95
SHEAR ENGINEERING CORPORATION
PAGE 1
PROJECT :SPAGEDDIES DATE: 01/24/94
PROJ.NO. :1270-01-93 LOCATION FORT COLLINS
FILE NAME:SPAG BY: MEO
NOTES TOTAL CONTRIBUTING AREA TO THE PARKING LOT INLET (SUB BASIN I)
RUNOFF
SURFACE COEF.
CHARACTERISTICS AREA C C*A
(acres)
STREETS
ASPHALT 0.630 0.950 0.599
CONCRETE 0.000 0.950 0.000
GRAVEL 0.000 0.500 0.000
ROOFS 0.160 0.950 0.152
LAWNS SANDY SOIL
FLAT < 2% 0.000 0.100 0.000
AVERAGE 2 - 77 0.000 0.150 0.000
STEEP > 7% 0.000 0.200 0.000
LAWNS HEAVY SOIL
FLAT < 2% 0.380 0.200 0.076
AVERAGE 2 - 7% 0.000 0.250 0.000
STEEP > 77 0.000 0.350 0.000
TOTAL AREA 1.170 0.827
C2 C5 C10 C100
COMPOSITE C VALUE 0.706 0.706 0.706 0.883
USE 0.71 0.71 0.71 0.88
NOTES
TOTAL CONTRIBUTING AREA TO THE SIDEWALK CULVERT ON EAST SIDE (MINOR BASIN Ib)
RUNOFF
SURFACE COEF.
CHARACTERISTICS AREA C C*A
(acres)
STREETS
ASPHALT 0.000 0.950 0.000
CONCRETE 0.000 0.950 0.000
GRAVEL 0.000 0.500 0.000
ROOFS 0.020 0.950 0.019
LAWNS SANDY SOIL
FLAT < 2% 0.000 0.100 0.000
AVERAGE 2 - 77 0.000 0.150 0.000
STEEP > 7% 0.000 0.200 0.000
LAWNS HEAVY SOIL
FLAT < 2% 0.150 0.200 0.030
AVERAGE 2 - 77 0.000 0.250 0.000
STEEP > 7% 0.000 0.350 0.000
TOTAL AREA 0.170 0.049
C2 C5 C10 C100
COMPOSITE C VALUE 0.288 0.288 0.288 0.360
USE 0.29 0.29 0.29 0.36
APPENDIX I
Storm Drainage Calculations
Detention pond Mass Diagram calculations
Stage -Storage curve for detention area
PAGE 6
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
VII. CONCLUSIONS: (continued)
B. Drainage Concept
1. The drainage design for Spageddies has been prepared in accordance with the City
of Fort Collins requirements, particularly those of the Mason Street Improvement
District.
2. There are no adverse downstream effects due to the development of the site.
VIM REFERENCES:
1. Fort Collins Storm Drainage Criteria Manual
2. Urban Drainage and Flood Control District Drainage Criteria Manual
3. City of Fort Collins Erosion Control Reference Manual
4. Final drainage report for Fossil Creek Commercial Plaza; M&I Consulting
Engineers
5. Drainage calculations for the Target Store site; M&I Consulting Engineers; dated
09/20/78
PAGE 5
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
VI. EROSION CONTROL:
A. General Concept
1. Generally accepted erosion control measures are specified and included with the
Utility plans. These may include, perimeter silt fencing, area inlet hay bale
protection and right turn lane type R inlet gravel filter.
2. An Erosion control security deposit will be required according to current City of
Fort Collins policy as presented in the City of Fort Collins Development Manual.
a. The security deposit is based on one and one-half times the estimated cost to
reseed the actual affected property area during overlot grading activity.
Currently, security deposit estimates are based on $1,300.00 per acre to reseed
sites that are 1 acre and less. Reseeding cost estimates have been provided by
the City's Storm Water Utility and are based on recent experience.
i. The estimated security deposit for the entire 1.039 acre site would be
$2,026.00 (1.039 acres x 1.5 x $1,300.00 / acre).
u. The security deposit is reimbursed upon completion of erosion control
measures or completion of the project.
B. Specific Details
1. A Gravel filter will be required with the proposed type R inlet provided with right
turn lane improvements and located at the new east entry to the Target site. The
gravel filter may only be removed when fmal grade, base and paving operations
proceed for the right turn lane.
2. Baybale protection of the onsite area inlet will be provided until the time that final
grade, base and paving operations proceed for the parking area.
3. Silt fencing will be placed along the majority of the perimeter of the site in order to
maximize
mze erosion protection of the Target site inlets and the Troutman Parkway
inlet.
VIL CONCLUSIONS:
A. Compliance with Standards
1. All drainage analysis has been performed according to the requirements of the City
of Fort Collins Storm Drainage Criteria Manual and City of Fort Collins policy.
2. All Erosion Control design complies with the City of Fort Collins Erosion Control
Reference Manual and generally accepted practices.
PAGE 4
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
IV. DRAINAGE FACILITY DESIGN:
B. Specific Details
1. The site specific detention pond will be constructed in the north parking area.
a. The net area contributing to the detention pond is 1.17 acres.
b. The required storage volume, based on the mass diagram method, is 7,566 cubic
feet.
c. The available storage volume, based on the stage -storage curve, is 13,798 cubic
feet.
d. The maximum release rate has been restricted to 0.59 cfs based on the net
contributing area of 1.17 acres and the 0.50 cfs per acre restricted release rate.
2. A three (31 foot wide concrete channel is to be constructed on the east side of the
building.
a. The channel will be built on both sides of the proposed landscape berm.
c. The channel has a capacity of 0.44 cfs. (refer to Exhibit A)
3. A four (4') foot wide sidewalk culvert is to be built at the confluence of the concrete
channel.
a. The culvert has a capacity of 3.24 cfs based on Mannings formula (refer to
Exhibit B)
b. The 100 year peak flow to the culvert (concentration point b) is 0.51 cfs
V. VARIANCE REQUEST:
A. This a request for a variance from the requirement that one-half (1/2) of street
contributing areas be considered with detention requirements.
1. Approval of the Utility Plans will represent approval of this variance request by the
City of Fort Collins Storm Water Utility.
a. A note has been provided on the Drainage and Erosion Control Plan as follows:
A variance request was made to the City of Fort Collins Storm Water Utility in
SECTION V. - VARIANCE REQUEST of the Final Drainage and Erosion
Control report. The variance request is related to the inclusion of one-half street
right-of-way contribution in the determination of detention requirements. These
approved Utility Plans represent approval of said variance request by the Storm
Water Utility.
PAGE 3
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA:
A. Regulations (continued)
3. All erosion control design criteria is from the City of Fort Collins Erosion Control
Reference Manual.
III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA:
B. Development Criteria Reference and Constraints
1. Previous studies which were considered include:
a. Final drainage report for Fossil Creek Commercial Plaza prepared by M&I
Consulting Engineers, dated August 1978.
b. Drainage calculations for the Target Store site; M&I Consulting Engineers;
dated 09/20/78.
c. Mason Street Improvement District detention and release rate recommendations.
C. Hydrological Criteria
1. The Rational method (Q = CIA) was used to determine the post development peak
flows for the 2, 10 and 100 year storm events at specific locations (commercial
requirements).
2. The mass diagram method was used to determine the required detention volume
utilizing an outflow rate of 0.59 cfs.
D. Hydraulic Criteria
1. Orifice and weir equations and coefficients suggested by the City of Fort Collins
Storm Drainage Criteria Manual were used.
IV. DRAINAGE FACILITY DESIGN:
A. General Concept
1. A combination of overland, concrete channel and gutter flow will be used to convey
a majority of the storm runoff to the center of the north parking area. An inlet will
be provided with a restriction device to create a detention facility in the north
parking area.
2. A minor portion of site runoff (0.04 acres) will be conveyed to the Target parking
lot detention area. Some offsite runoff will contribute to the Spageddies detention
pond.
PAGE 2
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
II. DRAINAGE BASINS AND SUB -BASINS:
A. Major Basin Description (continued)
a. The Basin fee rate for this basin is $ 3,717.00 per gross acre according to the
development fee section of the City of Fort Collins Development Manual.
b. Our understanding is that the above mentioned fees may be reduced with the
provision for detention (Please refer to 11/15/93 conceptual review comments).
2. The site was a part of the South Mason Street Special Improvement District. Our
understanding is that there is a detention requirement within this area and that
release rates are restricted to 0.50 cfs per acre.
B. Sub -Basin Description
This site was originally addressed with the final drainage report for Fossil Creek
Commercial Plaza. This report was prepared by M&I Consulting Engineers and is
on file with the City of Fort Collins Engineering Department.
2. There is an existing 36" storm sewer paralleling the east side of the site adjacent to
South College Avenue. An existing 18" RCP storm sewer connects existing catch
basins on Troutman Parkway to the 36" RCP storm sewer. Our understanding is
that the 36" storm sewer was designed with the South Mason Street Special
Improvement District.
3. The Spageddies site will be considered as a self contained sub -basin, with
provisions for detention and the appropriate restricted release rate. Because of the
existing adjacent street and storm sewer system, a variance will be requested so that
one-half (1/2) street contribution will not be considered with the 0.50 cfs release
rate requirement (Please refer to 11/15/93 conceptual review comments).
4. Detention'release will be to the existing 18" storm sewer located at the northwest
corner of the Spageddies site.
5. An access, utility and drainage easement will be defined for the site access and
detention areas. These will be noted on the final plat.
A. Regulations
1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria
Manual was followed.
2. Storm Drainage design criteria modification was considered based on data provided
by City of Fort Collins Storm Water Utility personnel concerning allowable Mason
Street Improvement District detention release rates.
PAGE 1
Project No. 1270-03-93
Lot 2, Fossil Creek Commercial Plaza First Replat
INTRODUCTION:
This report presents the pertinent data, methods, assumptions and calculations used in analyzing
and preparing the grading, drainage, and erosion control design and plans for the Spageddies
restaurant; Lot 2, Fossil Creek Commercial Plaza First Replat. The project is being submitted as
a Use -by -Right.
L GENERAL LOCATION AND PROJECT DESCRIPTION:
A. Location
1. The Spageddies Restaurant will be located on Lot 2, of the Fossil Creek
Commercial Plaza First Replat in the southeast quarter of Section 35, 17N, R69W
of the 6th PM, Ft. Collins, (Larimer County), Colorado.
2. More specifically, it is located on the currently vacant site at the southwest corner
of the intersection of Troutman Parkway and South College Avenue in the Target
Center.
3. There will be a replat of Lots 2 (Spageddies) and 3 (Target) of the Fossil Creek
Commercial Plaza in association with this project. The replat will allow for the
description of further dedicated easements and Right -of -Way. A right turn lane to
the Target site will be provided on College in association with this project.
B. Description of Property
1. A 6,888 square foot restaurant with accompanying parking, loading areas. and
landscaping, is proposed for the 1.039 acre site.
2: The site is bounded on the west and south by the existing Target Store parking
area, on. the north by Troutman Parkway and on the east by South College
Avenue.
3. There are no major drainageways located on or within the project site.
4. To our knowledge, there are no irrigation canals or systems located on or within
100' of the project site.
5. The site is currently not in use and is covered with native grasses and trees. The
site is fully serviced with utilities.
H. DRAINAGE BASINS AND SUB -BASINS:
A. Major Basin Description
1. The site is situated within the McClelland -Mail Creek Drainage Basin as designated
on the City of Fort Collins Stormwater Basin Map.
IWo13M
L GENERAL LOCATION AND PROJECT DESCRIPTION:
IL DRAINAGE BASINS AND SUB -BASINS:
M. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA:
IV. DRAINAGE FACILITY DESIGN:
V. VARIANCE REQUEST:
VL EROSION CONTROL:
0
v-II
APPENDIX
Storm Drainage Calculations
APPENDIX II
Erosion Control Calculations
APPENDIX III
Tables and Figures
APPENDIX IV
Stuffer Envelope
DRAINAGE AND EROSION CONTROL PLAN
11
Final Drainage and Erosion Control Report
for
SPAGEDDIES RESTAURANT
(LOT 2, FOSSIL CREEK COMMERCIAL PLAZA FIRST RE PLAT)
Ft. Collins, Colorado
Prepared. for:
BRINKER INTERNATIONAL
6820 LW Freeway
Dallas, Texas 75240
own!.
Prepared by:
J, SHE, ENGINEERING CORPORATION
Project No: 1270-03-93
Date: January, 1994
4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334