TABULAR SUMMARY OF VEHICLE COUNTS
Date; 11/2312004 Observer; Joseph
Day: Tuesday_ Jurisdiction; City of Fort Collins
Intersection: LemayIVine
Time
Begine
Northbound:
Scuthbound:
Total
northlsouth
Eastbound:
Westbound:
Total
eastlwest
Total
All
L
S
R
Total
L
S
R
ToW
L
S
R
Total
L
S
R
Total
7:30
2
84
5
92
21
147
9
176
268
4
17
16
47
18
28
3T
83
130
398
7:45
4
108
4
116
21
152
8
t81
297
4
20
14
44
9
34
36
79
123
420
$10
5
89
2
97
22
19E
6
ISO±236
233 t 2
25
14
41
16
35
26
77
i1B
351
8:15
7
8T
3
97 _
17
ii8
4
139
5
21
15
41
11
31
26
68
_ 109
345
T:30 8:30
~
19 368
15
402
81
$25
26
632
1034
15
99
59
173
54
128
125
301
46Q 1514
PHF
s
0.87
0.87
_
0.92
0.9 T
2
4:30
li
151
23
105
+31
3
152
347
6
40
25
71
8
37
41
35
157
504
4:45
9
126
8
143111
fQ
1
124
267
10
50
t8
76
15
18
31
64142
4a9
5:00
12
198
'8
229117
1
136
364
9
51
20
6o
6
2530
61
1413515
14
172
9
19513D
2
147
342
?.
34
17
63
1D
39
32
01
Y 144
4$6
�4::10 �i 30
4b
65T
58
761
63
489
7
459
1320
3T
1T5
80
292 39
119
134
292
$84
1904
WPHt
0.83
0.92
0.91
0.85
Page 5 of 5
Table 3
Lemay Nine Short -Term Total Peak Hour Operation
Movement
LOS
Level of Service
AM
Delay LOS
PM
I Delay
Eastbound L / TR
C / D
31.9 / 35.7
D / D
41.2 / 47.2
Eastbound Approach
D
t 35.4
D
! 46.6
Westbound L / TR
E / F
66.6 / 83.6
F / F
91.7 / 94.5
Westbound Approach
E
78.9
F
j 94.0
Northbound
A
8.9
E
65.7
Southbound
D
37.4
F
I 139.3
Overall Intersection
D
42.9
F
j 88.0
The percent difference in overall intersection delay due to the development is 1.66 % in the am
peak and 1.97 % in the pm peak. As both of these percentages are less than 2%, the
proposed Storybook development is NOT constrained by the APF limitation of this intersection.
CONCLUSIONS AND SUMMARY of FINDINGS
The following conclusions can be drawn from this refinement of the ACF analysis due to revised
background traffic volumes provided by the City -
This analysis showed an increase in overall intersection delay due to the Storybook
development of 1.66% in the am and 1.97 % in the pm peak hour. As these
percentages are less than the allowable 2%, this development does NOT create a
significant negative impact.
Please contact me with any questions.
Sincerely,
Martina G. Wilkinson, P.E. PTOE
IPage 4 of 5
i 764
% 55� 176\
zoI 11is
is 152
40 235
162 252 M
281 212 74 � 1_`�4 N
66 as
45
1,174
3W
\ 646
IY
Vine Dr.
Figure 4 — Short Term Total Traffic — Lemay and Vine
A level of service analysis was completed to determine the impact that the site traffic has on the
operation (and especially the delay) of the intersection. The results of this analysis is shown in
Table 2 and 3 while the analysis sheets are attached.
Table 2
Lemay Nine Short -Term Background Peak Hour Operation
Movement
Level of Service
AM PM
LOS Delay LOS Delay
Eastbound L / TR
C / D
31.9/35.7
D / D 40.1/46.7
Eastbound Approach
D
35.4
D 46.1
Westbound L / TR
E / F
164.6 / 82.4
F / F 84.1 / 93.8
Westbound Approach
E
77.5
F 92.2
Northbound
A
8.9
E 63.8
Southbound
D
36.6
F 137.1
OveralllntersecUon
D
42.2
F 86.3
Page 3 of 5
■ / 3 I
z 011
W
/o o 0
�o ' `�
z 2
�\ o �z
3
Vine Dr.
Figure 2 — Site Traffic at Lemay and Vine
Future Volumes and Traffic Analysis
Traffic volumes to be assumed for the short-term background time frame were provided by City
of Fort Collins Traffic Engineering Staff. The numbers provided were for the year 2010. Since
the background year for this report is 2009, a 2% reduction in the volumes provided was taken
' (a conservative growth estimate for one year). This resulted in the short-term background
traffic volumes shown in Figure 3. and adding in the site traffic results in Figure 4
701
54 539 76
i\
zo I `s
% f II �
15 152
3s
162 J 250 ca
279 /—211
152 J
64 144
\\ �72
299
834
�. Vine Dr.
Figure 3 — Short Tenn Background Traffic — Lemay and Vine
1,
Page 2 of 5
525
/ 26 489 81
� 63
% 15 � ��,� 125
134
99 37 �f — 128
175 _ 119
59 A ^54
80 N 39
19 \l 115
4s 368 Se
657
Vine Dr.
Figure I — Existing Traffic Volumes at Lemay and Vine
Table 1
Lemay Nine Existing Peak Hour Operation
Movement
LOS
Level of Service
AM
Delay LOS
PM
Delay
Eastbound
C
24.7
C
27.8
Westbound
C
29.0
C
28.2
Northbound
B
14.0
C
26.0
Southbound
C
21.0
B
19.4
Overalllntersection
C
21.2
C
24.7
Site Volumes
The site generated peak hour traffic volumes were followed through the street network to
determine the site traffic volumes likely to utilize the Lemay/Vine intersection. The entering and
exiting traffic at Country Club Road and Timberline was the starting point for the determination
of #jese volumes. At irdersecboris such as Timberline and Vine and along Lemay Avenue,
existing traffic distributions were used to determine the site traffics movement. Figure 2 shows
the peak hour site traffic due to Storybook POP a Fing.at this kienocMm
MARTI NA 3405 Harbor way
Fort Collins, CO 80524
G.
+^ \ phone:970-988-0143
V V/ I L K i i V SIO l \I `� , 6x: 970-472-0223
L 1 ma rti nawil kinsonPmsn.com
M E M O R A N D U M
Date: February 25, 2005
RE: Revised APF An?
Usis for
Storybook PDP 2 Filing
1; This memorandum serves as an addendum to the originally submitted Traffic Impact Study
entitled: "TIS — Storybook PDP — 2nd Filing" dated December 6, 2004.
II The original TIS included an Adequate Public Facilities analysis at the intersection of Lemay of
l' Vine, which was identified during the scoping meeting as being constrained by the APF
management system. However, City Staff has since then provided revised background traffic
volumes to be used at the intersection for the short-term background time horizon. The
following addresses the impact of the proposed Storybook development on the intersection at
Lemay and Vine using the revised volumes_
Existing Roadways
Vine Drive is an east -west street designated as a four -lane arterial on the Fort Collins Master
Street Plan. Currently, it has a two-lane cross section with a speed lrmit of 35 mph. The
approaches to the intersection have just one lane, although a second approach lane will be built
in the near future and should be assumed to be in place in the short-term time horizon (2009).
Lemay Avenue runs north -south, is currently a two-lane roadway with just a single approach
lane to the intersection. This area has a speed limit of 30 mph. The roadway is classified as a
four4ane arterial and the master street plan indicates an eventual grade separated overpass
with srght re -a ignment at the rai road. This overpass is not Mmly to be complete in the short-
term time horizon and was not assumed to be in place.
The intersection is signal controlled.
Peak hour traffic turning movement counts were completed in November 2004 and are shown
in Figure 1. Raw trcounts are attached. An intersection level of service analysis provided
the level of service and is shown in Table 1.
f4 * iR