HomeMy WebLinkAboutSTORYBOOK, 2ND FILING - FDP - 49-98C - SUBMITTAL DOCUMENTS - ROUND 1 -S Vr4 60/0*1 OAY /AM7-/A
/40
7
Submittal Checksheet
Final Compliance Review
The following information is required to be submitted, unless waived, with all
applications. Any item waived must be dated and initialed by a planner with the
City of Fort Collins Current Planning Department.
dOO60., Application form and filing fee.
Final site plan. See the submittal requirements for specific information to be presented on
the final site plan. (30 copies 24" x 36" — folded).
woo ev Subdivision Plat (23 copies 24" x 36" —folded).
d0OVIC Architectural elevations (6 copies 24" x 36" —folded).
4:44 16 Landscape Plan. See the submittal requirements for specific information to be presented
on the landscape plan. (20 copies 24" x 36" — folded).
WQOVC e Soils report (2 copies).
Drainage and erosion control report (4 copies).
d®0C
An update of the Transportation Impact Analysis (TIA) (6 copies).
C
Final utility and drainage plans (13 copies 24" x 36" — unfolded).
d10#1jedam
Requirements for utility plans checklist (1 copy).
toj&* L*
Subsurface Hydrologic Study (4 copies).
doot r
Certification that notice has been provided to the mineral estate owner (1 copy).
Name and address of each owner of property within the boundaries of the development
plan area.
List of names of all general and/or limited partners, managers and directors and/or officers
and directors of the corporation involved as either applicants or owners.
do" & $ Executed deeds of dedication (contingent on final approval).
Revised May 31, 2002
Stewart & Associates, Inc. Letter of Transmittal
103 S. Meldrum St.
Fort Collins, CO 80521
Phone: (970) 482-9331
Fax: (970)482-9382
stewarts@H.com
Date: April 5, 2005
To: Planning Department
City of Fort Collins
From: Jack Blake
Re: Storybook 2nd Filing
We Are Sending You:
Application form and $1,000.00 filing fee
Final Site Plan ( 30 copies)
Subdivision Plat (23 copies)
Architectural elevations (6 copies)
Landscape Plan (20 copies)
Soils Report (2 copies)
Drainage and Erosion Control Report (4 copies)
An update of the Transportation Impact Analysis (TIA) (6 copies)
Final Utility and Drainage Plans (13 copies)
Requirements for utility plans checklist (1 copy)
Subsurface Hydrologic Study (4 copies)
Certification that notice has been provided to the mineral estate owner (1
copy)
Name and address of each owner of property within the boundaries of the
development plan area.
List of names of all general and/or limited partners, managers and
directors and/or officers and directors of the corporation involved as either
applicants or owners.
Executed deeds of dedication (contingent on final approval).
One New Easement for City signatures
Returned Storm Water Redlined Utility plans (1 set)
Returned Engineering Redlined Utility Plans (1 set)
Returned Redlined Subdivision Plat, Landscape Plans, Site Plans (5 copies)
Retumed Storm Drainage Redlined Report (1 copy)
Returned City Utility comments with Stewart & Associates Responses (4
copies)
Retumed E-4 Utility Plans checklist