This letter is to inform you of the outcome of our transportation coordination meeting January 7,
1999. As you are aware, we discussed the Palmer Design Center, more specifically, the
landscaped median in Horsetooth Road. City staff understands that an administrative hearing has
been scheduled for January 28, 1999 to discuss this project. We do not see a problem with
keeping this schedule. If, however, the design of the median has not been completed before the
hearing, a condition will be placed on the decision. The condition will state that the design needs
approval by the City before obtaining any building permit. The construction of the landscaped
median is the responsibility of the Developer but will be reimbursed by the Street Oversizing
Department. The median will need to be constructed and accepted by the City before the issuance
of any certificate of occupancy.
If you need clarification on anything, or have any additional questions or concerns, please do not
hesitate to contact me at 221-6605.
Si
Tim R. Blandford
Development Review Engineer
City of Fort Collins
tblandford@ci. fort -col [ins. co. us
cc: Steve Olt, City Planner
Eric Bracke, Traffic Systems Technician
Matt Baker, SID Coordinator
File
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605