Loading...
HomeMy WebLinkAboutPALMER DESIGN CENTER - PDP - 47-98 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner. �—Y" �,J� Engineer: --p-)-)p TraM( Operations: Date: Engineering Stormwater Site Land x x Plat x x Items Requested Utility x�ec-3 Drainage Rpt Other Items Required V `2c s Site R(dlined Land Items Plat X Being Utility n Returned Drainage R t I Othe r Items Being Returned Water/Wastewate Traf (Operations Trans. Planning /x x x x ri X x x X iransfort Natural Resources Park Planning A Other: Note: All redlined items should be returned with the resubmittal/ revisions. r r" Revisions Routin'Sheet Item: [# 4/7- Date: 10 2I 4e) FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER ' MAPPING / DRAFTING FORESTRY FCLWD/ELCO/BOXELDER FIRE POLICE ADVANCE PLAINNING STREETS R.O.W. PUNNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE/THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY LAr Z:0-2_ RAILROAD: UP or BN/CS REA/DOE/PRPA lit _ V m°p r er pio 4 �-� Git� TOTAL �I Rev. S-07.97 L % % % fte� r Wx AJA rzA• G%v%� r-A anS .