Loading...
HomeMy WebLinkAboutRIGDEN FARM (CSU) ZONING - 56-98/A - CORRESPONDENCE -Lean_..___—_— Pa e 1 ' ne_�Harter - Rigden Farm __ __ _.._ _.____ _ _____— ____ _..j.. __ __ _...__.___ _ ___. __.____ _9_ C1CCV-P*4VJk1Ori From: Michelle Becker To: Leanne Harter Date: Wednesday, May 20, 1998 11:08AM Subject: Rigden Farm Hi Leanne Here are the additional comments for the Rigden Farm item from conceptual review on 5/4/98. Thanks Michelle 5a. They will need very strong reasons to change the current channel. It is already a water feature with wetlands! They need to investigate the irrigation rights which come with the property. 9. The Fossil Creek Inlet Ditch or any other lateral owners will need to approve the drainage plans. The City has an agreement with the ditch company. The Irrigation Company has water rights on the drainage Water so they can't necessarily reroute the water under the ditch. 10. There are fencing restrictions along the channel. No high fencing is allowed. 11. Please verify the landuse proposed matches assumptions used for calculating the channel design flows. Additional detention may be required to meet design flow. CC: Glen Schlueter, Susan Hayes i icy'-r� al/ to SllG Poudre Ridge Concept Plan Fort Collins, Colorado VV 1 GaN__1 ' _ _ F-evlttW e. We are planning to detain site water in the lake system to be constructed along the Fossil Creek Inlet ditch. Is there any problem with this? 3. Given that we plan to begin the project with the affordable housing portion, we would ask that the city allow Drake Road to function in its current state of improvement until some future point and thus delay our costs associated with the improvement of Drake Road. 4. Realizing that the City of Fort Collins has a policy regarding affordable housing, we look forward to discussing waivers, grants, delayed payments, etc. for the following fees associated with the affordable housing component of the project: a. Street oversizing fees b. Secondary service charge c. Capital expansion fees d. Water plant investment fee e. Raw water requirements f. Sewer plant investment fee g. Storm drainage fees h. Parkland fees i. Permit & plan check fees 5. We have two challenges with the west -to -east running storm drainage channel: a. We would like to improve the system and make the channel a permanent water feature with wetlands. We ask that the city provide water to do so. b. We will need the city's cooperation with the placement of roads across the channel. 6. In our first phase of the affordable housing we will need temporary secondary access. We would like the city's support to allow this temporary access to be gravel roads. 7. If, in the future, odor becomes a problem at the sewage treatment plant (located in the northeast corner of Drake and C. R. 9), we would like the city's cooperation and commitment to mitigate the problem. 8. We would appreciate the city's support in securing any available local, state and federal grant funds for affordable housing. Thank you for your consideration and cooperation with these matters. We look forward to working with you to provide the City of Fort Collins with a quality affordable project. We anticipate that the affordable housing component will become a model for other cities. Sincerely, �< t , A�-- Dave Pietenpol Project Manager WHEELER COMMERCIAL PROPERTY SERVICES, LLC May 4, 1998 Current Planning Department City of Fort Collins 281 North College Fort Collins, Colorado 80524 (HAND DELIVERED) Poudre Ridge (Formerly Rigden Farm) 228 acres Greetings; We appreciate the opportunity to talk to you about our Poudre Ridge project. We hope to develop a quality project which will include homes ranging from $120,000 to $300,000+, along with some multifamily dwellings. Fort Collins remains a very desirable place to live and a lot of press has addressed the issue of "affordable housing". In fact, we believe that the lack of affordable housing is the most serious residential real estate issue in the city. Because of this, we plan to begin our project with the development of homes which will sell for less than $125,000. As you are no doubt aware, providing a nice home priced under $125,000 is a challenge! In order to accomplish this, we are asking for the city's cooperation with a number of issues: 1. By starting this project with affordable housing in the northeast corner of the project, we want to make sure that it will not be considered "urban sprawl". 2. The project anticipates relocating County Road 9 to the west side of the Fossil Creek Inlet Ditch eliminating the need for two bridge improvements, and we need the city's help with the following: We would like the city to participate by sharing the cost of the realignment of C.R. 9. b. We will need the city's cooperation with realignment of the flood easements along the east side of the project. c. We would like the city's support for the creation of the lake(s) and associated wetlands along the Fossil Creek Inlet Ditch. d. We know that the city has expressed a desire to purchase the northeast corner of the project. We would like to know exactly what land the city wants and how much it is willing to pay. 149 West Harvard, Suite 401 - Fort Collins, Colorado 80525 - Telephone (970) 225-9305 - Fax (970) 225-9709 City of Fort Collins City of Fort Collins Capital Improvement Expansion Fees Effective January 1, 1998 Residential Capital Expansion Fees Up to 701 to 1201 to 1701 to Over 700 Sq. Ft. 1200 Sq. Ft. 1700 Sq. Ft. 2200 Sq. Ft. 2200 Sq. Ft. Community Parkland $ 580.00 $ 859.00 $ 1,002.00 $ 1,147.00 $ 1,404.00 Fire $ 78.00 $ 111.00 $ 130.00 $ 149.00 $ 181.00 General Governmental Services $ 99.00 $ 140.00 $ _:. 165.00 $ 190.00 231.00 Police $ 54.00 $ 76.00 $ 90.00 $ 103.00 126.00 Library $ 143.00 $ 211.00 $ 247.00 $ 282.00 $ 346.00 Total Fees $ 954.00 $ 19397.00 $ 1,634.00 $ 1,871.00 ,$ 2,288.00 Commercial and Industrial Capital Expansion Fees Community Parkland Fire General Governmental Services Police Library Total Fees Commercial Industrial Per Sq. Ft. Per Sq. Ft. n/a n/a $ 0.16 $ 0.04 $ 0.17 $ 0.05 $ 0.11 $ 0.03 n/a n/a $ 0.44 $ 0.12 City of Fort Collins Neighborhood Parkland Fee Effective January 1, 1998 Residential Only Up to 701 to 1201 to 1701 to Over 700 Sq. Ft. 1200 Sq. Ft. 1700 Sq. Ft. 2200 Sq. Ft. 2200 Sq. Ft. $ 531.00 $ 787.00 $ 910.00 $ 1,041.00 $ 1,278.00 City of Fort Collins Community Planning and Environmental Services Building and Zoning Department BUILDING PERMIT FEE SCHEDULE Effective May 29, 1998 Building Fees: Plan Check & Permit Fees — see separate schedule (Table 3-A 1982 UBC) Neighborhood Parkland Fees: Residential only. Based on square footage of the new building. Please see attached schedule. City and County Sales/Use Tax: 3.65% on half of the total building valuation. Street Oversizing Capital Expansion Fees: Single Family Residence ........ $1,480.00 Duplex....................................$1,113.00 Townhouse .............................$ 901.00 Multi -Family Dwelling .......... $1,102.00 Apartment ...............................$ 948.00 Rates are PER DWELLING UNIT. For commerical rates, and further information contact Matt Baker at (970)221-6605. Water & Sewer Fees: Plant Investment Fees -- schedules and further information available by contacting Mary Young at (970) 221-6681. Stormwater Drainage Basin Fee: Varies per drainage basin. For further information contact Jean Pakech at (970) 221-6589. Electric Underground Secondary Service Charge: 150 AMPS or less .........................per Single Family Residence $416.00 200 AMPS or Electric Heat .........per Single Family Residence $494.00 Temporary Pedestal Service ......... per Single Family Res.(unattached) $100.00 Other development charges may apply. Contact Light & Power Engineering at (970) 221-6700. Capital Improvement Expansion Fees: Community Parkland Fire General Government Services Police Library Based on square footage of the new building. Please see attached schedule. Poudre School District Impact Fee $484.26.............per residential dwelling unit Thompson School District Impact Fee $446.00.............per residential dwelling unit 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6760 • FAX (970) 224-6134 REZONINGS (AMENDMENT TO TEXT OF LAND USE CODE AND/OR ZONING MAP) SUBMITTAL REQUIREMENTS (1) Petition for rezoning (6 copies). The petition must contain the following information: (a) Name and address of applicant. (b) Name and address of owner of subject property. (c) Legal description of property to be rezoned (if amending the zoning map). (d) Existing text of Land Use Code and proposed language amendments using strikethrough- (for proposed deletions) and underline (for proposed additions) format (if text amendment is proposed). (e) Requested zoning classification and any conditions to be voluntarily placed upon the rezoning (if amending the zoning. map). (2) Written justification of rezoning request addressing the review criteria contained in Section 2.8.3(H) of the Land Use Code (original and 5 copies). (3) Application form (1 copy) and filing fee. (4) Three lists of names and addresses of all owners of record of real property within five hundred (500') feet (see Supplemental Notice Requirements of Section 2.2.6 of the Land Use Code for further information) of the property lines of the parcel of land for which the overall development plan is proposed, exclusive of public right-of- way. Two lists shall be typed on mailing labels (33 labels per sheet), the other list shall be a reproducible copy of those labels. Revised May 15, 1997 1 Community Planning and Environmental Services Building Permits and Inspection Division City of Fort Collins Codes and Standards Beginning in April 1998, the City of Fort Collins will adopt the 1997 editions of the Uniform Building Code, Uniform Mechanical Code and Uniform Plumbing Code. The 1996 edition of the National electrical Code is enforced as mandated by the State of Colorado. The Fort Collins Nonresidential Energy Code is an amended version of the American Society of Heating, Refrigerating and Air -Conditioning Engineers and The Illuminating Engineering Society publication ASHRAE/IES 90.1-1989. The code governing energy conservation in residential occupancies is an amended version of the 1995 edition of the Model Energy Code. Copies of the FCNREC and packets for documenting compliance with the commercial and residential energy conservation codes are available from the building inspection office. The standard for accessible design for the physically disabled is the Council of American Building Officials and American National Standards Institute publication CABO/ANSI Al17.1-1992 titled Accessible and Usable Buildings and Facilities. A copy of local amendments to the codes are available from the building inspection office. Staff Contacts For questions pertaining to commercial construction projects please contact Sharon Getz by telephone at 970.221.6760 or by E-mail at sgetz@ci.fort-collins.co.us. For questions pertaining to residential construction call Dick Valdez at 970.221.6760. Submittals Two complete sets of construction documents and a completed City building permit application form should be submitted for each building. A presubmittal meeting is recommended for new construction, additions or substantial alteration of commercial buildings. The city's building permit covers the work of the general contractor and subcontractors such as electricians, plumbers and mechanical installers. Separate permits need not be obtained by the subcontractors. General contractors must hold a valid license from the City prior to obtaining permits or performing work. Subcontractors are registered or licensed by the City depending on trade. Please contact the contractor licensing secretary at 970.221.6767 with questions regarding contractor licenses. YY.Wwu 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6760 tached, and I recommend that you contact me to set up a meeting to further discuss staff's position regarding the UE zone district. e) Please contact Ann Watts, the 6376, regarding the affordable available for such projects. affordable housing planner, at 221- housing portion and the programs f) Once the rezoning request has been to a hearing by the City Council, you may submit a Overall Development Plan. As this project is a sub- stantial size and will be completed in more than two project• develop- ment plans, and ODP will be required. g) Please contact Carol Tunner or Karen McWilliams regarding the John- son Farmhouse site and any regulations that may be imposed by the City's Landmark Preservation Commission. h) A neighborhood meeting will be required. Please contact me when you are ready to proceed with the scheduling of that meeting. Please contact Rob Wilkinson or Leanne Harter at 221-6750 if you have questions about these comments. of this park. Currently, we are in the design phase (1998) for this park, and anticipate that construction will begin in 1999. b) The Land Use Code (in the LMN zone district) requires that all units must be within 1/3 mile distance to a park. In some areas of the pro- posal, it appears as if it may be difficult to comply with this require- ment. Therefore, you may need to provide open space and/or park fa- cilities that comply with the requirements of the Code. c) The average park fees are as follows: neighborhood park fee- $955/unit; and community park fee-$1,002/unit. This fees are based upon the square footage of the units. 10.The Current Planning Department offers these following comments: a) Rob Wilkinson, Environmental Planner with the Current Planning De- partment, offered the following comments: • We would like to see the channel be created -and remain as more of an open corridor. This may mean the acquisition of some lands along the channel. • There do appear to be some opportunities for creating wetlands, and we encourage you to talk with Stormwater Utility for the design and to keep the Natural Resources Department involved in the process. • It may be necessary to do a site visit to further discuss the channel. b) You will need to submit an A.P.O. (a list of affected property owners) for notification of affected owners. Included with this letter is an area of notification for the proposal. c) The request to rezone the property will be weighed against City Plan, including the City Structure Plan. Following the conceptual review meeting, I brought this issue forth to the Growth Management Lead Team. The direction given at that meeting was that the Urban Estate designation on the City Structure Plan was based upon a number of factors (including the Poudre River plan/study currently underway which anticipated lower densities to "feather" out to the River), and it is unlikely that staff could support a request to zone this area something other than the UE zone district. The recommendation was made to contact Tom Shoemaker to discuss the possibility of acquisition of this property. It was mentioned that there are mine reserves located be- neath the area designated as affordable housing that could limit de- velopment activities. d) As the property is currently zoned T and CSU, you may submit a re- quest for rezoning at any time. The submittal requirements are at- Please contact Tim Blandford at 221-6750 if you have questions about these comments. 8. Transportation Planning offered the following comments: a) Once a TIS is prepared and reviewed as part of the submittal, addi- tional comments may be forthcoming. The TIS needs to address other modes.of transportation in addition to vehicles. b) We will need to coordinate and engage in further discussions with Stormwater Utility regarding trail connections along the channel. c) Please provide pedestrian connections to the church site. Please contact Kathleen Reavis at 221-6140 if you have questions on these comments. 9. The Advance Planning Department offers the following comments: a) Please show the edge of the bluff on any plans. There was a decision regarding the designation of UE on the City Structure Plan. The re- zoning proposal does not include the UE zone district. Staff will need to further discuss this proposal. Please contact Clark Mapes at 221-6376 if you have questions on these comments. 10. The Poudre Fire Authority offers the following comments: a) Fire hydrants will be required spaced at 300' (600' on center) for com- mercial development. b) Any buildings 5000 square feet or greater will be required to be fire sprinklered or fire contained. c) For the residential component, if streets are 24'-36' wide, hydrants will be required to be spaced at 600' intervals. If streets are wider, the hy- drants may be spaced 800' apart. Please contact Ron Gonzales at 221-6570 if you have questions on these comments. 10. The Park Planning Department offers the following comments: a), The nearest neighborhood park to the development proposal is Case Park. Any fees collected from the proposal will go to the maintenance 30'). c) Stormwater master plan improvements may affect the routing of sani- tary sewers on the project. d) A repay will be due on the 24" water main in Drake and south of Drake. e) The water conservation standards for landscape and irrigation will ap- ply to the development of this site. f) Plant investment fees and water rights will be due at building permit (except for qualified affordable housing projects.) Please contact Roger Buffington at 221-6854 if you have questions about these comments. 5. The Engineering Department offered the following comments: a) The street oversizing fee is varied for the number of different land uses. These fees are based on trip generation. Please contact Matt Baker for more information on the applicable street oversizing fees. b) A Transportation Impact Study (TIS) will be required. Please contact Eric Bracke to schedule a scoping meeting. c) Improvements will be required along Drake Road, Timberline Road, and County Road 9 to the current street standards. In addition, any required intersection improvements to Drake and Timberline Roads will be required. d) You will be required to construct bridge crossings. e) We will examine access locations in order to determine if they are lo- cated at feasible locations. You will be required to provide connec- tions to the First Assembly of God site (they have two (2) connections to the north.) f) You will be required to provide sidewalks to connect to the nearest im- proved streets. g) Utility plans and a development agreement will be required. h) You may need to dedicate ROW on Timberline, Drake and County Road 9. - f) The Poudre River Land Use Plan identifies the land below the bluff to be left natural and not developed. Please refer to that plan and ad- dress the issue. g) A sanitary sewer was abandoned to some CSU buildings and is in our agreement. The sanitary sewer does still stub into the site. h) The CSU access road culvert was designed to pass the 100 year flow rate so the culvert would need only to be lengthened for street width. i) The Fossil Creek Inlet Ditch or any other lateral owners will need to approve the drainage plans. Please contact Glen Schlueter at 221-6589 if you have questions about these comments. 3. Light and Power offered the following comments: a) There is existing power at the comer of Timberline and Drake as well as Horsetooth and CR 9. Service will come from one or both of these areas. Given the distance to the affordable housing site in the north- east comerof-the proposal, there may be some problems getting power further into the site. In order to get all the power in, it will be necessary to develop and improve the roads. It may be possible that Light and Power will accept a "no fault" letter submitted to the depart- ment that states to the effect that the developer is responsible for all costs. b) Normal development charges and policies will apply. Please contact Bruce Vogel at 221-6150 if you have questions about these comments. 4. The Water and Wastewater Departments offered the following comments: a) The existing mains are as follows: Water: 16" in Timberline; 24" in Drake for the west 3/a mile; 12" in Drake for the east 1/a mile; 24" through the east portion of the site in a north/south direction. Sewer: 24/27" through the east portion of the site in a north/south direction (parallel to the 24" water main); 18/24" in Drake Road. b) You will be required to maintain the easements for the large water and sewer mains through the site (minimum widths: water-20' and sewer- • The possibility of rebates of waives associated with the affordable housing component of the project. COMMENTS: 1. The Zoning Department offered the following comments: a) The property is located in the T-Transition zone district and CSU prop- erty. A request for rezoning must occur prior to approval of any devel- opment application. Both the NC and MMN zone districts include block standards and requirements, and the LMN zone district requires a minimum of three housing types as well as a maximum density of eight (8) dwelling units per acre overall. b) Handicapped parking must be provided for any commer- cial/office/multi-family uses. Please contact Jenny Nuckols at 221-6760 if you have questions about these comments. 2. The Stormwater Utility offered the following comments: a) The site is located within the Foothills basin where the new develop- ment fees are $6,525/acre which is subject to the runoff coefficient re- duction. b) The standard drainage and erosion control reports and plans are re- quired and they must be prepared by a professional engineer regis- tered in Colorado. A site this size needs to be modeled using a SWMM model. The overall model is available for the consultant to use. Modification of the easement will require HEC-2 and possibly other models to assure the drainage system does not negatively im- pact other properties. c) The Pinecone PUD reports need to be reviewed in conjunction with the drainage submittal. d) The North Tributary Outfall easement must also be maintained and the outfall may need to be built with this development. The "Affordable" area is the first proposed area to develop so close coordination with Stormwater Utility is necessary. We may be building it during next year's construction season. e) The Foothills Channel was designed to have the "natural' prairie theme so Stormwater is supporting that theme and would hot allow a path to be built in the channel area. 6aCONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: May 4, 1998 ITEM: Proposed Rezoning and Development of the Former Rigden Farm (CSU Experimental Farm) APPLICANT: Fred Haberecht Jim Sell Design 153 West Mountain Avenue Fort Collins, Colorado 80524 LAND USE DATA: Request for rezoning of the CSU Environmental Farm located at the southeast corner of Drake Road and Timberline Road. The requested zone districts are NC, MMN, and LMN. The proposed land uses include the following: Commer- cial (25 acres); Office Park (8 acres); Multi -Family (20 acres); Single -Family Residential (86 acres); Patio/Town Homes (14 acres); Patio Homes (7 acres); Community Center; and Affordable Housing (80 acres). The size of the entire proposal is approximately 228 acres, with a proposed 1,100 + dwelling units (of which, approximately 400 would be affordable). The development proposal would be phased, and the applicant proposes to be- gin with the affordable housing component, located at the northeast of the site. There are a number of additional issues identified by the applicant at conceptual review, including the following: • The relocation of CR 9 and improvements associated with this development to the road as well as the bridge improvements. • The possibility of creating a series of lakes and wetlands associated with the Fossil Creek Reservoir Inlet as well as the storm drainage channel that crosses the property from west to east. The applicants propose to turn the channel into a natural resources area and examine the possibility of obtaining water year -around in the site. • Whether the City has an interest in the possible acquisition of property at the northeast corner of the site. • The timing of improvements along Drake Road, Timberline Road, and the intersection of the two. The applicant proposed a second access to the af- fordable housing site to remain as gravel temporary. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT Community Planning and Environmental Services Current Planning City of Fort Collins. E May 11, 1998 Fred Haberecht Jim Sell Design 153 West Mountain Avenue Fort Collins, Colorado 80524 RE. Conceptual Review Comments for Proposed Rezoning and Development of the Former Rigden Farm (CSU Experimental Farm) Dear Fred: For your information, attached is a copy of the Staff's comments regarding the Proposed Conceptual Review Comments for Proposed Rezoning and Develop- ment of the Former Rigden Farm (CSU Experimental Farm) presented before the Conceptual Review Team on May 4, 1998. The comments are offered informally by Staff to assist you in preparing the de- tailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, qk__Z�O Leanne A. Harter, AICP City Planner xc: Dave Pietenpol, Project Manager, Wheeler Commercial Property Services, LLC, 149 West Harvard, Suite 401, Fort Collins, Colorado 80525 Patricia P. Kroetch, P.E., Project Manager, JR Engineering, Ltd., 2620 East Prospect Road, Suite 190, Fort Collins, Colorado 80525 Eric Bracke Stormwater Utility/Glen Schlueter Project Planner rile 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020