HomeMy WebLinkAboutMCCLELLAND OFFICE PARK II - PDP - 54-98 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject��-y���«����
Planner: -�ryC cx-7—
Engineer: _ItP�K 111
Traffic Operations:
Date:
Items Requested
Site I land Plat Utility Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site [and Plat Utility Drainage R t Other Items Being Returned
Wrmwater
�
Water/Raitewaterl��
✓
r
TraMc Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
Other:
Hote: All redlined items should be returned W the mubmittal/ revisions.
r
Item: [#
Date: - [3
Revisions Routing Sheet,
lfvC. _-t e_u 4 =771 7,77 ZL �P
Ln-Ave, -T- — L7 71
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
y d a
0
Rev. 5-07-97
���
mom m®�Nmmml