Loading...
HomeMy WebLinkAboutCSU ENV. LEARN. CENT. - SITE PLAN ADVISORY REVIEW - 55-98 - CORRESPONDENCE - (3)Buildinq Inspection (a) Accessible exterior wheelchair routes and parking facilities shall be provided with each phase of the development in accordance with the Uniform Building Code Chapter 11, Appendix Chapter 11, Division I and the American National Standards Institute Publication Al 17.1-1992 titled Accessible and Usable Buildings and Facilities. Accessible parking spaces are eight feet wide with a five feet wide adjacent access aisle. Slopes for parking and access aisles shall not exceed 1:50 in any direction. Ground and floor surfaces for accessible routes, parking and access aisles shall be stable, firm and slip resistant. Accessible parking spaces shall be located on the shortest possible route from adjacent parking to an accessible building entrance. (b) Buildings larger than 5,000 square feet shall be equipped with an automatic fire - suppression system throughout in accordance with Uniform Building Code Section 904.2.2 as amended by the City of Fort Collins. (c) Buildings (new construction) shall be designed to comply with the Fort Collins Energy Codes. The residential code is an amended version of the 1995 Model Energy Code and the nonresidential code is based on ASHRAE/IES (American Society of Heating, Refrigerating and Air-conditioning Engineers/Illuminating Engineering Society) 90.1-1989. TCI TCI of Fort Collins has no current facilities in this area. For TCI to make plans to service this area we will need a Broadband utility easement completed with our commercial accounts executive Renrta Santoro, who may be reached at 970-493-7400. Poudre Fire Authority (a) Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1,000 gallons of water per minute at a residual pressure of 20 psi. Hydrants must be of an approved type as defined by the water department and the fire department. No commercial building can be greater than 300 feet from a fire hydrant. (b) Fire apparatus access roads must be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured y an approved route around the exterior of the building or facility. This fire lane shall be Street Oversizing Although CSU is exempted from street oversizing capital expansion fees, the City itself is not exempt. The Visitor's Center portion of the project is responsible for 490 daily trips from the TIS. The Visitor's Center portion of the fee is $32,663.40. Additional fees may be required from a future "rock park" facility constructed on an adjacent site. This project should construct the full, ultimate improvements along Prospect Road and the Frontage Road with this development. Since CSU is exempted from the Street Oversizing Program, there will be no Street Oversizing participation in the roadway costs for Prospect or the Frontage Road. Zoning (a) Remove the topography lines from the final site plan submittal. ` (b) Show the elevation height on the building elevations. (c) Please submit a landscape plan for City review. (d) Please submit better detail on the parking spaces showing dimensions and clearly indicating the location of handicap spaces. (e) The plan should show building envelope dimensions and distances to property lines. (f) The City's Land Use Code does not allow gravel as a surface material in parking lots. If you desire to pursue a gravel lot, a variance will be required. This can be granted by the City's Zoning Board of Appeals. However, you should be aware that economic considerations are not a criteria that this Board considers. (g) The property will need to be platted before a building permit can be issued Light and Power (a) The electric service provider will be Fort Collins Light and Power. The nearest source of power is along the south side of Prospect Road, east of the Boxelder ditch. The developer will need to coordinate power requirements with Light and Power Engineering which can be contacted at (970) 221-6700. (b) Normal electric development charges will apply including the cost of a ditch crossing permit and the costs to bore the ditch. (c) The location of the transformer may need to change to meet utility requirements. (d) Short circuit current values will be larger than what is shown on drawing EO.01. culvert can handle only 315 cfs and flood flows would be forced through the parking lot creating unacceptable conditions. This needs to be redesigned incorporating a larger bridge that will not impede the projected flows. Engineering (a) The plans need to be 24 x 36 in size. (b) Please provide a cover sheet with general notes and an index of sheets. (c) Need to provide and show the design and improvements for the Frontage Road. As per the Traffic Impact Study this should be a connector street with a 36 width (2 - 12 foot travel lanes and 2 - 6 foot bike lanes) - widening out to 48 feet at the intersection to accommodate the left turn bay. This needs to be built in accordance with City standards with curb gutter and sidewalk. (d) The state does issue the state highway access permit. This permit is issued from plans approved by the City and can not be issued until said plans are approved for the required improvements. (e) Provide and show the design and improvements for Prospect Road along the frontage of the property. This is construction of the south half of the arterial street with curb, gutter and sidewalk. (f) Provide and show the design of the improvements needed for Prospect Road at the intersection of the frontage road and any work that is needed on the north leg of the frontage road in order for the lanes to line up. (g) Provide a sidewalk connection from the Frontage Road to the Site. (h) Provide a plat of the property showing the dedication of right-of-way for Prospect Road (57.50 feet from Centerline), 15 foot utility easement along the right-of-way and all other easements as necessary. May wish to provide easements through the site for future connections to the water and sewer lines for any construction to the south of this site as it appears that those connections will need to go through this site. (i) If the temporary parking lot is allowed - this design needs to be a part of the utility plan set and site plan set. 0) See additional comments on the utility plans. Transportation Board...........................................December 16, 1998 Parks and Recreation Board..................................To Be Determined Natural Resources (a) The parking lot must be moved to west to be out of the 100 foot buffer. This is shown to be the case on the drawing labeled "ultimate build -out for parking lot." However, it is not shown on the drawing labeled "interim gravel parking lot layout." (b) Boxelder Creek must be crossed using a bridge (70 foot minimum), rather than the box culvert as shown, to prevent the stream corridor from restriction and to preserve wildlife movement. (c) Any rip -rap must be naturalized and buried. (d) Parking lot drainage must not drain directly into Boxelder Creek. Instead, some pretreatment and filtration must be employed. (e) All disturbed areas must be revegetated with native species. (f) Please remove all Russian Olive trees on the site. (g) Screening material required by the zoning district standards may be placed in the buffer zone. Transportation Planning (a) The roadway widening for the Frontage Road south of Prospect Road needs to include an additional 12 feet to allow for two 6 foot bikelanes. (b) Please provide enhanced crosswalks across drive aisles within the parking lot and at the main entrance (see attached site plan labeled "Transportation Planning." Stormwater Stormwater comments are attached as are their redlined plans. Three important comments need to be highlighted: (a) A drainage report was not provided with this submittal as requested in previous correspondence and during the conceptual review. Without this, it is not possible to do an adequate review of the project to offer substantive comments. Without this review and approval from the City, City funds cannot be used to develop this project. (b) The bridge that crosses Boxelder Creek is a major concern. The 100 year flows in Boxelder Creek at this location are over 4,000 cfs. As designed, the proposed box Community Planning and Environmental S%-,vices Current Planning City of Fort Collins November 10, 1998 Thomas W. Kehler Colorado State University Facilities Management Fort Collins, CO 80523-6030 RE: CSU Environmental Learning Center Dear Tom: City staff has reviewed the submittal for the CSU Environmental Learning Center, #55- 98, dated October 7, 1998 and would like to offer the following comments. Significant issues remain with this project that warrant additional review and coordination including design issues inconsistent with the City's Land Use Code, lack of sufficient information with the submittal documents, incomplete plans and lack of street improvement plans. I suggest that staff from the University and the City meet to review these issues and reach agreement about how this project can proceed with City support. Responses to October 7 1998 letter Response 5a: The City does not interpret the section of the annexation agreement cited in your response 5a as precluding CSU from providing the needed improvements for the widening of Prospect Road. Response 5f. Response 5f, second paragraph, states the University's willingness to dedicate additional land for the widening of Prospect Road. However, it then states that you expect to be reimbursed for its appraised value. If the City is purchasing the property, this is not considered a dedication — rather it is a fee simple purchase. Because of the impacts of this development, CSU should dedicate the necessary right- of-way. Response 8a: It is our understanding that as the primary developer of this project, you have previously agreed to attend any scheduled meetings with Boards and Commissions and make the presentation regarding the proposed project. The schedule for the meetings with Boards and Commissions is: Natural Resources Advisory Board.........................December 2, 1998 Planning and Zoning Board...................................December 11, 1998 Council Growth Management Committee .................December 14, 1998 281 North College Avenue • P.O. Box 580 0 Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 visible by painting and signage and maintained unobstructed. A fire lane plan shall be submitted for approval prior to installation. Any building not meeting this criteria shall be sprinklered. NOTE: This building is out of access and required to be fire sprinklered. A fire lane is required for this building. (c) Address numerals shall be visible from the street fronting the property and posted with a minimum of 6 inch numerals on a contrasting background. Bronze numerals on brown brick is not acceptable. This concludes our comments at this time. As noted earlier, there=are significant issues to be resolved before the City supports this project proceeding. I would be happy to coordinate the scheduling of a meeting between University staff and City staff. Please contact me if you have any questions regarding these comments or would like to schedule a meeting. Sincerely, / el C Robert E. Blanchard, AICP Current Planning Director