HomeMy WebLinkAboutCSU ENV. LEARN. CENT. - SITE PLAN ADVISORY REVIEW - 55-98 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWe) Depending on the numbers the transportation impact study shows, you
may be required to provide right turn and left turn lanes and associated
improvements to the Frontage Road and Prospect.
f) You will be required to complete improvements to Prospect along the
property frontage. This will include ROW dedication to the current
standards. Part of Prospect does fall within the State ROW, and those
improvements will be per State Code.
Please contact Tim Blandford at 221-6750 if you have questions about these
comments.
6. Gaylene Rossiter with Transfort stated that there transit service about 1 mile
to the west along East Prospect Road and the intersection with Midpoint
Drive (Route 10). There are no plans at this time to extend transit further to
the east.
7. The Environmental Planner with the Current Planning Department offered the
following comments:
a) We recommend you use design techniques that will maximize
compatibility with the natural environment. This includes avoiding the use
of riprap (or at the minimum buried riprap), and revegetating disturbed
areas as a result of development with native grasses.
b) The proximity of the parking lot to the creek does not comply with the
minimum distance requirements of the Land Use Code. The parking lot
should be located further to the west if possible.
c) We recommend that the ditch/drainageway passing through the parking
lot is an open channel.
Please contact Rob Wilkinson at 221-6750 if you have questions
regarding these comments.
8. The Current Planning Department offered the following comments:
a) At an earlier meeting to discuss the proposed project with City staff, the
recommendation was made that the issue be brought before various City
Boards and Commissions on a "for your information" basis. I've
scheduled dates for the Planning and Zoning Board (worksession), Parks
and Recreation Board, Natural Resources Advisory Board, and Council
Growth Management Committee. The dates are as follows:
Planning and Zoning Board —August 28, 1998
Parks and Recreation Board —September 23, 1998
Natural Resources Advisory Board —September 16, 1998
Council Growth Management Committee —September 14, 1998
Please contact Roger Buffington at 221-6854 if you have questions about
these comments.
3. The Stormwater Utility offered the following comments:
a) This site is located within the Boxelder/Copper Slough basin and is
located on inventory grid #15K.
b) There are no fees required in this basin.
c) The site needs to have some water quality measures prior to the release
of drainage water.
d) There needs to be some coordination between the site developer and
Natural Resources for the use of riprap and its visual impacts on the
creek.
e) Any grading outside of the limits of the site shown would require a grading
easement.
f) The standard drainage and erosion control reports and plans are required
and they must be prepared by a professional engineer registered in
Colorado.
Please contact Glen Schlueter at 221-6589 if you have questions about these
comments.
4. Light and Power offered the following comments:
a) There existing electric system is located south of Prospect Road and the
Frontage Road.
b) There will be development charges, and we will need to review a site plan
and a plat to determine these charges.
c) A commercial C1 form will be required.
d) We will need to discuss transformer locations.
Please contact Alan Rutz at 221-6700 if you have questions about these
comments.
5. The Engineering Department offered the following comments:
a) The Street Oversizing Fee is $552.19/acre, assuming that this is
categorized as a recreational use. Please contact Matt Baker for more
specific information regarding the fee.
b) Please submit a transportation impact study with the utility plans for
review.
c) The Frontage Road is considered to be a state highway and therefore,
you will be required to improve it to Prospect per the State Code
requirements.
d) You will need to apply for a State Highway Access Permit through CDOT.
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: July 20, 1998
ITEM: Visitor's Center at the Environmental Learning Center
APPLICANT: Tom Kehler
Colorado State University
Facilities Management
Fort Collins, Colorado 80523-6030
LAND USE DATA:
This is a request for the proposed Visitor's Center at the Environmental Leaming
Center. It is a joint venture among Colorado State University, the City of Fort
Collin, and Colorado State Parks. The building is located on property owned by
CSU, and the proposed parking is to be located on the Resource Recovery Farm
site, and will be shared parking with the future "Rock Park."
COMMENTS:
1. The Zoning Department offered the following comments:
a) For parking lots with up to 100 spaces, we require 6% of the interior to be
parking lot interior landscaping.
b) Please locate bicycle racks near the main entrance of the building.
c) You will need to provide four (4) handicapped spaces. It may function
better if the two (2) handicapped spaces on the south of the parking lot
are moved to the north half, closer to the building entrance.
Please contact Jenny Nuckols at 221-6760 if you have questions on these
comments.
2. The Water/Wastewater Utility offered the following comments:
a) This site is served by ELCO and Boxelder Sanitation.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
Commi ty Planning and Environmental rvices
Current Planning
City of Fort Collins
August 11, 1998
Appendix A
Tom Kehler
Colorado State University
Facilities Management
Fort Collins, Colorado 80523-6030
RE: Conceptual Review Comments
Dear Tom:
For your information, attached is a copy of the Staff's comments concerning the
proposed Visitor's Center at the Environmental Learning Center that was
proposed to the conceptual review team on July 20, 1998. In addition, a copy of
a memo forwarded to Frank Bruno prior to conceptual review is attached and
outlines in greater detail staff's concerns.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
gHarter, AICP
City Planner
xc: Eric Bracke
Stormwater Utility/Glen Schlueter
Frank Bruno
Sheri Wamhoff
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
Final Plan Submittal Requirements
The following documents are enclosed under separate cover:
30-copies Diagram 1
30-copies Diagram 2
2-copies Ordinance 98-43 Authorizing City Manager to Enter IGA
2-copies IGA
2-copies Resolution 98-44 (Annexation Finding of Fact)
2-copies Ordinance 44, 1998 (Annexation)
2-copies Ordinance 45, 1998 (Amending City Zoning Map)
2-copies Non -Exclusive Easement Agreement (not signed)
6-copies Traffic Report
2-copies Phase I Environmental Site Assessment
2-copies Geotechnical Engineering Report
Drawing Copies
3 0-A0.01 6-A3.01 12-P2.01
42-C 1 6-A3.02 12-E0.01
46-C2 6-A4.01 12-E2.01
12-C3 12-M 1.0
42-C4 12-P0.01
Bob, please let me know when University representatives may need to meet with City staff again.
If you have questions concerning this submittal, please contact me at 491-0007. Thank you.
Sincerely,
Thomas W. Kehler, Landscape Architect/Planner
enc: Diagram 1
Diagram 2
Appendix A -City Conceptual Review Comments
cc: Ron Baker
Frank Bruno
Nancy Hurt
Mike Lyons
7.
ELC site with its curvilinear drive with pick-up and drop-off near the building
will be able to accommodate the service.
Environmental Planner
7.a. It appears that riprap can be deleted and replaced with native grasses for
revegetating disturbed areas as a result of development.
7.b. The design of the parking lot can be redesigned and moved westerly in order to
comply with the minimum distance of 100 feet from the top of the Boxelder
Creek embankment assuming the City will accept the use of additional land to the
west for parking purposes and include this additional area in the easement. Both
the initial gravel parking lot and the final build -out for the parking lot will be
constructed to comply with this minimum requirement of 100 feet (see Diagrams
1 and 2).
7.c. There is no ditch/drainway passing through the parking lot. We suspect the plans
have not been interpreted correctly. The only feature passing through the parking
lot is the City's existing concrete irrigation ditch which will be removed by
construction of the parking lot.
Current Planning Department
8.a. Since the City is an integral partner in this project, we are requesting that City
staff, without a representative from the University, attend the various city boards
and commissions to provide information about the project. If unusual
circumstances develop where a University representative would be needed, we
would then be happy to send a representative upon request.
8.b. Project plans and other submittal requirements are enclosed.
8.c. The University is requesting that the City handle the building permit review for
approval of the parking lot and purchase the permit since the lot will be built on
City property. The University will provide plans and other documents for this
review. In addition, permit fees and construction costs associated with expanding
the parking lot to accommodate future needs of the "Rock Park" should be
assumed by the City as their responsibility.
Q
Prospect Road and 30 MPH north of Prospect Road. Frontage Road is also two
lanes wide south and north of Prospect Road (2-12 ft. lanes for a total pavement
width of approximately 24 ft.). Our interpretation of the State Highway Access
Code, p. 46, is that no auxiliary lanes will need to be constructed along the
Frontage Road for the access drive to the Environmental Learning Center. Not
only is the posted speed limit of 35 miles per hour (MPH) south of Prospect Road
less than the minimum 40 MPH in the code, but in addition, the projected peak
hour right ingress turning volumes of 28 in the a.m. and 45 in the p.m. are less
than the standard minimum 50 vehicles per hour (VPH).
According to Ms. Tesse Jones, the CDOT will require construction of the turn
lanes south of Prospect Road as proposed in Option B by Mr. Delich in his Traffic
Study. These improvements include construction of two (2) approach lanes for
northbound Frontage Road south of Prospect Road:
Add another lane on the east side of the road for the through traffic
and right turn lane movements. Total width of road to be
approximately 36 feet.
2. Use the existing pavement east of the existing road centerline for
the left turn movement onto westbound Prospect Road. In
addition, the CDOT will probably require some widening of
Frontage Road north of Prospect Road in order to properly align
the traffic lanes here with the new alignment south of Prospect
Road.
5.d. We have confirmed that the access permit will be issued by CDOT.
5.e. Please see our responses 5.b. paragraph 2 and 5.c.
5.f. The project does not include the construction of improvements for the widening
of Prospect Road (please see response 5.a.).
Regarding dedication of University land for additional Prospect Road right-of-
way, the University is willing to dedicate the additional land. With such
dedication, it is the University's understanding that we will be reimbursed for the
land at its appraised value.
Transfort
6. If and when Transfort extends transit service further east along Prospect Road
where the Environmental Learning Center will be included in its service area, the
5.
expressly extend to the application of the City of Fort Collin's Sales and Use Tax
Ordinance on the property annexed pursuant to this ordinance provided, however,
that all sales to the State of Colorado, its departments or institutions and the
subdivisions thereof, in particular the State Board of Agriculture, in their
governmental capacities only, and all sales, the taxation of which is prohibited by
the Constitution and the laws of the State of Colorado, shall be exempt from the
payment of such sales and use tax.
5.b. Enclosed is a copy of the Traffic Study prepared by Mr. Matt Delich dated March
5, 1997. This study evaluated the access options related to the creation of the
Environmental Learning Center for housing three agencies: Colorado State
University Environmental Learning Center, City of Fort Collins Visitor Center,
and Colorado State Parks. This study was done prior to any discussions about
locating a "Rock Park" adjacent and south of the Environmental Learning Center.
Therefore, there is no traffic or parking data for the "Rock Park". Since the "Rock
Park" is a project that will be located on City property and coordinated by the
City, we feel it would be appropriate for the City to provide the traffic analysis
information and handle the planning for this phase of the project.
The report by Mr. Delich proposed two options for accessing the property.
Option A proposed access from Prospect Road and Option B proposed access
from Frontage Road. The University, after further input from Mr. Delich and our
review of the project with Mr. Eric Bracke on March 14, 1997, selected Option B
with access from Frontage Road. It was Mr. Bracke's conclusion that either
option was acceptable with the City. The selection by the University was based
on operational efficiency and cost. Also, during a later review with Mr. Matt
Baker on March 24, 1997, Mr Baker said that CSU access from Frontage Road
would be their preference.
5.c. Frontage Road, which is a State highway, is generally regulated by the Colorado
Department of Transportation (CDOT). An exception is Frontage Road, south of
Prospect Road, which is located within an easement granted by the City. This
easement, which is basically 80 feet wide, is regulated by the City. Our
assumption is that development in this area will need to be designed and
constructed in accordance with the State Highway Access Code effective August
31, 1998 and with approval from the City. Development of Frontage Road north
of Prospect Road, which is located on CDOT right-of-way, will need a permit
from the highway department and also constructed in accordance with the State
Highway Access Code. It is our understanding that City approval is not required
for this latter permit.
According to the State Highway Access Code, Frontage Road falls under
Category F-R (Frontage Road). Frontage Road speed limits are 35 MPH south of
4.
saddle and inspection of the University's trenching and piping for $400 (1997 estimate). The
estimated cost for construction of the sewer by the University's contractor is approximately
$10,000.
Stormwater Utility
3.a. & 3.b. No response requested.
3.c. According to the revised site plan (see Diagram 2), a new water quality basin will
be provided southeast of the parking lot to filter -out oils and other debris from the
parking lot runoff. Details of the design will be provided by The Sear -Brown
Group.
3.d. It appears that most if not all of the proposed riprap for bank stabilization can be
replaced with vegetation such as native grasses. Selection of specific plant
species will be determined after further review and input from Mr. Wilkinson.
3.e. All grading will take place either within the site limits of the property, or within
the boundary of the easement from the City for construction of the parking lot, or
within the State's Frontage Road easement.
31The grading, drainage and erosion control plans and reports have been done by the
Sear -Brown Group (see sheet C2). A revised C1 Plan, showing the parking lot in
its more westerly location, will be submitted later.
Light and Power
4.a. No response requested.
4.b. Light and Power has reviewed the plans. The estimated development fee by Light
and Power is $13,420 with an estimated installation cost of $13,231 (1997 prices).
4.c. The commercial C 1 form will be provided by the electrician prior to construction.
The electrical diagram and electrical panel layout are shown on drawing E0.01.
4.d. The transformer location will be verified with Light & Power. The location is
approximately 30 feet north of the building as shown on drawing sheet C-1.
Engineering Department
5.a. The University, as a public State institution, is exempt from paying City street
oversizing costs.. Furthermore, in the annexation of the property by the City,
Ordinance No. 44 (Annexation Agreement) states in Section 5. "Not withstanding
the provisions of Section 4 of the Ordinance, the jurisdiction of the City shall
3.
RESPONSE TO CONCEPTUAL REVIEW COMMENTS
Zoning Department
La. Due to budget constraints, the parking lot for the facility will be constructed
initially of gravel with a capacity of 62 spaces (see Diagram 1). The types of
parking include 3-handicapper spaces, 51-standard vehicle spaces, and 8 spaces
for recreational vehicles and temporary bus parking. The capacity of the lot is
based on the projected need for the three occupants (Colorado State University,
City of Fort Collins Visitor Center and Colorado State Parks) in accordance with
the Program Plan dated August 1996. Construction of curb and gutter and asphalt
paving of the lot will be accomplished in the future when funding becomes
available. We believe the parking for a future "Rock Park" by the Geological
Society of America should be planned and built by the City once this portion of
the project is finalized. If built, we anticipate this additional parking for the
"Rock Park" will be constructed as an addition to the existing parking lot with a
build -out similar to the configuration shown in Diagram 2.
Of the proposed interim interior gravel parking lot area (34,000 sf), there will be
approximately 12.5 % or 4,270 sf of interior landscape area.
Of the proposed ultimate interior parking lot area (67,100 sf), there will be
approximately 18.8% or 12,636 sf of interior landscape area.
1.b. The location for bike rakes is shown on Diagram 1.
I.c. According to the City's Land Use Code, p. 34, a parking lot with 62 spaces
requires 3-handicapper accessible spaces. The revised site plan will therefore
provide 3-H.C. parking spaces on the north side of the lot near the walkway
leading to the building.
Water/Wastewater Utility
2.a. We are aware that the site is served by ELCO and Boxelder Sanitation. Both
agencies have been contacted for coordination of their work.
ELCO will furnish and install a 5/8 inch water meter for an estimated cost of
$6,200 and install the fire line for serving the sprinkler suppression system in the
building for $750 (both estimates based on 1997 prices). Also, Mr. Kevin Wilson,
Fire Marshall, has been contacted about the fire hydrant. Estimated cost for
installation of the hydrant, based on 1997 prices, is $8,000.
Sanitary Sewer: Boxelder Sanitation will furnish and install the sewer main cut
0
October 7, 1998
City of Fort Collins
Current Planning
Attention: Mr. Robert Blanchard, Director
281 North College Ave.
P.O. Box 580
Fort Collins, Colorado 80522-0580
Re: CSU Environmental Learning Center
Dear Mr. Blanchard:
Facilities Management
Fort Collins, Colorado 80523-6030
Below is our response to the Conceptual Review Comments from City staff dated July 20, 1998
(see attached Appendix A for copy of review staff comments).
With regard to the submittal requirements, several things need mentioning:
a. The landscape plan for the project has not been executed to date. This plan will
be submitted at a future time.
b. No specific subsurface hydrologic study was done for the project (see enclosed
Phase I Environmental Site Assessment and Geotechnical Engineering Report).
C. Civil drawings C1, C2, and C3 (site plans) show the parking lot as designed
currently. Enclosed are Diagrams 1 and 2 that depict the interim gravel parking
lot and the final build -out for the parking lot in its revised location further west in
order to provide the minimum 100 foot natural area buffer between the Boxelder
Creek (top of bank) and the parking lot. When there is consensus on this latter
location, the University will have the civil drawings revised accordingly.
d. An easement agreement for construction of the parking lot on City property is in
process, but needs to be revised to incorporate the additional area to the east for
construction of the access road and to include the additional land to the west for
the revised location of the parking lot.
e. The executed deed for dedication of University land for additional right-of-way
for Prospect Road will be executed at a later date.
f. Since the University is exempt from normal project review by the City, drawings
are not stamped with a notarized signature block of Owner's certification of
acceptance.
g. Enclosed, with other conceptual review documents, are two copies each of City
Ordinance No. 44 Annexing the ELC property to the City and the signed IGA
between the City and the University.
1.
thi(Green
Division of Administrative Services Llg its
P A R i\ R R
T
For these meetings, I think it would be appropriate to have you attend
to give a summary of the project and the time frame. If possible, it
would be beneficial to have reduced copies of the plans that could be
sent to the board members in their packets.
b) We've discussed that the project will go through a hybrid development
review process to facilitate the review and comments from various City
staff and outside reviewing agencies. Attached is a set of submittal
requirements, and not all of these will be necessary to be submitted, but it
will give you a general idea of the level of detail we would like to review.
When you have all the plans ready (and the transportation impact study),
please call Ginger Dodge at 221-6750 to schedule a time to bring in the
submittal. The review process should take around four (4) weeks, and at
the end of that time, comments will again be forwarded to you.
c) The parking lot portion of the proposal will be required to receive approval
as a building permit review. This review will be done as part of the hybrid
review process for the entire site so as to not delay the process. The
building permit review is required as the parking lot is not located on the
same lot as the Visitor's Center.
Please contact Leanne Harter at 221-6750 if you have questions about these
comments.