HomeMy WebLinkAboutVERIZON WTF AT 1052 W. VINE DR. - PDP - PDP120025 - CORRESPONDENCE - (3)Department: Technical bervices
Contact: Jeff County, 970.221.6588, jcounty(a)fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 10/16/2012
12/27/2012: This sheet was not provided for this review.
10/16/2012: Please change the elevation & datum of the benchmark on sheet A2.1. The City of
Fort Collins requires the 1929 unadjusted datum.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 12/27/2012
12/27/2012: What is the ARCH sheet referenced in the note for the "New Verizon Wireless
Pre -Fab Equipment Shelter'? Will this be included in the plan set being filed?
Topic: Site Plan
Comment Number: 6 Comment Originated: 12/27/2012
12/27/2012: There are 3 line over text issues on sheet A2.0.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/20/2012
12/20/2012: Mechanical/Utility equipment should be painted to match the wall it is attached to.
A note on the Enlarged site plan should be included to state this.
Department: Stormwater Engineering
Contact: Mark Taylor, , mtaylor(a)fcgov.com
Topic: Floodplain
Comment Number: 1 Comment Originated: 10/16/2012
Any and all construction activities in the flood fringe must be preceded by an approved
Floodplain Use Permit, $25 fee, and approved plans (at time of building permit). This can be
found online at: http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents
Please contact Mark Taylor, 970.416.2494, mtaylor@fcgov.com with questions.
Comment Number: 3 Comment Originated: 10/18/2012
10/18/2012: On enlarged site plan sep. sheet, please show (call out) the separation between
flood fringe and monopine base.
Comment Number: 4
Comment Originated: 10/18/2012
10/18/2012: Is the tower (monopine trunk) and the contents of waterproof? If so, please add the
following note on the site plan: "The contents of the tower and the tower itself is waterproof. In
the event of flooding, the City of Fort Collins is not responsible for any damage."
If not, please call Mark Taylor,
Contact: Wes Lamarque, 970.416-2418, wlamargue(a)fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 12/27/2012
12/27/2012: Stormwater is ready for a hearing. Floodplain has not reviewed the plans yet and
will review them soon. All Floodplain comments may be addressed in final compliance.
Department: Technical Services
Contact: Jeff County, 970.221-6588, jcountyPfcgov.com
Topic: Building Elevations
Comment Number: 4
Comment Originated: 10/16/2012
12/27/2012: This has been addressed on the 11 "x17" plan sheets. The full size (24"x36")
sheets were not provided for this review.
10/16/2012: There are line over text issues on all(including color 11 "xl7") sheets A3.0 & A3.1.
Comment Number: 5 Comment Originated: 10/16/2012
12/27/2012: This has been addressed on the 11"xl7" plan sheets. The full size (24"x36")
sheets were not provided for this review.
10/16/2012: Please trim everything shown outside of the border on the color 11"x17 sheets
A3.0 & A3.1.
Comment Number: 8
Comment Originated: 12/27/2012
12127/2012: If the 11 "xl7" sheets are to be filed with this project, they will need to be 24"x36"
plans.
Department: Light And Power
Contact: Doug Martine, 970.224-6152, dmartine(a).fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/01/2012
10/01/2012: Light & Power Engineering will need a Commercial Service Information (C-1) form
completed. Electric development and system modifications will apply. Please coordinate
power requirements with Light & Power Engineering at (970)221-6700.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, elynxwileropoudre-fire.org
Topic: General
Comment Number: 1
10/17/2012: FIRE LANE
Comment Originated: 10/17/2012
Shall be designated on the plat as an Emergency Access Easement.
Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead
clearance.
Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
Be visible by signage and maintained unobstructed at all times.
2006 International Fire Code 503.2.3, 503.3, 503.4 and Appendix D
Comment Number: 2 Comment Originated: 10/17/2012
10/17/2012: TURNING RADII
The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside
and 50 feet outside.
International Fire Code 503.2.4 and Local Amendments
Comment Number: 3 Comment Originated: 10/17/2012
10/17/2012: PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from
the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals
on a contrasting background.
2006 International Fire Code 505.1
Comment Number: 4 Comment Originated: 10/17/2012
10/17/2012: BATTERY STORAGE SYSTEMS
Stationary storage battery systems used for standby power and having an electrolyte capacity
in excess of 50 gallons of stationary lead acid or 1,000 Ibs lithium ion shall comply with Section
608 and Table 608.1 of the International Fire Code.
Comment Number: 5 Comment Originated: 10/17/2012
10117/2012: DIESEL GENERATOR
Storage systems for diesel fuel shall provide for spill control and secondary containment when
the storage vessel exceeds 55 gallons. Other conditions apply to combustible liquid storage.
Refer to Sections 2704 and 3404 of the 2006 International Fire Code for more details.
Comment Number: 2
10/19/2012: Planting detail:
Comment Originated: 10/19/2012
Include 8 inch water basin at edge of planting hole
Mulch 4 inches deep within planting basin
No need to wrap tree trunks on conifers
Don't over excavate the depth of the tree planting pit
Remove top half of w1re basket and pull hurlaP back off the top of the hall
Remove all twine and labels
Surface of tree ball to be 1 inch higher that existing grade
Comment Number: 5
01/02/2013:
Comment Originated: 01/02/2013
Forestry staff met with the applicant to review the possible tree removal. The tree is question is
a large Siberian Elm. It appeared that the road could not be relocated to save this tree. Please
confirm if this is the case and why it could not be shifted to save this tree. If it needs to be
removed please add a note that says. "Tree removal and pruning work will be by a City of Fort
Collins licensed arborist".
Comment Number: 6
01/02/2013:
Comment Originated: 01/02/2013
In the planting detail evergreen trees do not need to be wrapped and the depth of the planting
hole should not be deeper than the root ball of the trees. Please review and change as
appropriate.
Comment Number: 7 Comment Originated: 01/02/2013
01/02/2013:
Mature height and spread of Rocky Mountain Juniper in the Fort Collins Nursery Descriptive
Guide is listed at height 16-20 feet and width 12-15 feet. The sizes of this tree in the visual
appear to be larger in some dimensions at planting, at 3 years and 20 years than may actually
occur. Consider adding a couple of more trees that could more closely achieve the information
provided in the visual. Without irrigation after establishment growth rates would generally be
slower and potential size may be less.
Department: Light And Power
Contact: Alan Rutz, 970.224-6153, arutz(ofcgov.com
Topic: General
Comment Number: 2
Comment Originated: 12/26/2012
12/26/2012: Light and Power will require access to the meter through the main gate. Through a
lockbox or a combination lock.
Department: Engineering Development Review
Contact: Marc Virata, 970.221-6567, mvirata(a)fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/16/2012
12/31/2012: Carrying over the comment for future reference. The easement isn't needed at this
time, but the completed easement (and legal description/exhibit) will be required after hearing,
prior to mylar final approval, along with the associated fees referenced previously.
1011512012: The "Nev, 1G-10" Access & Utility Easement" should be revised to 20' in width and
be dedicated as an "Emergency Access & Utility Easement" per discussion with PFA at the
10/17 Staff Review. The dedication of this easement (and any easements) to the City requires
deeds of dedication in an approved City format (the template will be emailed separately) along
with a $250 fee for each easement, and county recordation costs in an amount to be
determined. The required deed(s) of dedication will need to be in place prior to final plan
approval of the project (after public hearing).
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan()fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 10/19/2012
10/19/2012: Watering:
Thoroughly soak the soil ball and surrounding soil at planting.
Following transplanting, and through the first three growing seasons, trees shall receive
supplemental watering at a rate of minimum of 50 gallons of water each week during the
growing season (from April through September); and 50 gallons every four weeks during the
winter (October through March). Water shall be applied over the top of the soils ball. If trees
appear stressed apply additional water at each irrigation cycle. Length of water cycles may be
modified slightly as determined appropriate by a qualified landscape contractor.
Comment Number: 4 Comment Originated: 10/19/2012
10/19/2012: Landscape contractor to contact the City Forester at the end of three seasons of
tank irrigation to determine if trees can survive without additional irrigation or if addition irrigation
will be required.
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 10/16/2012
10/16/2012: Adding a few additional trees is possible with the spacing shown on the landscape
plan. This could provide better initial screening of the base per LUC 3.2.1(E).
Comment Number: 8 C� lent Originated: 10/15/2012
12/11/2012: Comment repeated. Please provide non colored elevations showing this.
10/15/2012: On the elevations, there is reference to a lighting cut sheet please remove and
provide light fixture detail on elevations. Per LUC 3.2.4, must be fully shielded and down
directional. Illustration on elevations should graphically reflect the code requirement.
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston(a)fcgov.com
Topic: General
Comment Number: 9
Comment Originated: 10/15/2012
10/15/2012: On title sheet (T1.0) please change note regarding co -location as follows -
Note: "Per LUC 3.8.13(B), no wireless telecommunication facility of equipment owner or lessee
or employee there of shall act to exclude or attempt to exclude any other wireless provider
from using the same building, structure or location."
Comment Number: 10
Comment Originated: 10/15/2012
12/11/2012: On title Sheet ( T1.0) please add the height in feet to the no. of stories so it reads "3 — 75
feet."
10/15/2012: On title sheet (T1.0) please change stories from 1 to "3 - 75 feet'
Comment Number: 12 Comment Originated: 10/16/2012
12/11/2012: The abbreviation for Limited Commercial is "CL" not LC" Please update on sheet
T1.
10/16/2012: The zoning on the title sheet IT 1) is incorrect. It says neighborhood commercial
and it should be limited commercial. Please revise.
Comment Number: 13
Comment Originated: 10/19/2012
12/11/2012: We did not receive the non -colored elevations to verify that this comment was
addressed. The GPS antenna depicted on the elevation is shown to protrude above the
building which does not meet Section 3.8.13(C)(3) of the Land Use Code. Please lower the
GPS antenna so it does not rise above the top of the pre-fab equipment shelter.
10/19/2012: The GPS antenna depicted on the elevation is shown to protrude above the
building which does not meet Section 3.8.13(C)(3) of the Land Use Code. Please lower the
GPS antenna so it does not rise above the top of the pre-fab equipment shelter.
Comment Number: 15 Comment Originated: 12/11/2012
12/11/2012: On Sheet T1.0, please note that Fort Collins should never be abbreviated to Ft.
per our City standards. Please update and spell out "Fort' on sheet T1.0 where the abbreviation
is used. This can be addressed at time of Final submittal after hearing, prior to
mylars/recording.
City of �' ,
F art Callins�
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview .
January 04, 2013
Irene Cooke
Closser Consulting for Verizon Wireless
P.O. Box 423
Tabernash, CO 80478
RE: Verizon Wireless at 1052 W. Vine Dr., PDP120025, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston, at
970-416-2283 or clevingston@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston cDfcgov.com
Topic: General
Comment Number: 3 Comment Originated: 10/15/2012
12/11/2012: Note 5 on the Landscape Plan (L1.0) should not say "of this section" at the end,
but the Land Use Code.
10/15/2012: Remove the last note under the Plant Liston the landscape plan concerning
replacement conformance.
Comment Number: 6 Comment Originated: 10/15/2012
12/11/2012: At time of final, the non -colored elevations are required with the heights called out. These
elevations should be full sized -- they will be recorded with the city on mylar. The elevations should include
the comment below:
10/15/2012: On all elevations, please call out that the utility boxes will be painted to match the
building per LUC 3.5.1(I)(3).
Comment Number: 7
Comment Originated: 10/15/2012
12/11/2012: At time of final, the non -colored elevations are required please call out the color
and material of the pole "trunk".
10/15/2012: On all elevations, please call out the color and material of the pole "trunk".