Loading...
HomeMy WebLinkAboutVERIZON WTF AT 1052 W. VINE DR. - PDP - PDP120025 - CORRESPONDENCE - (3)Department: Technical bervices Contact: Jeff County, 970.221.6588, jcounty(a)fcgov.com Topic: Construction Drawings Comment Number: 3 Comment Originated: 10/16/2012 12/27/2012: This sheet was not provided for this review. 10/16/2012: Please change the elevation & datum of the benchmark on sheet A2.1. The City of Fort Collins requires the 1929 unadjusted datum. Topic: Landscape Plans Comment Number: 7 Comment Originated: 12/27/2012 12/27/2012: What is the ARCH sheet referenced in the note for the "New Verizon Wireless Pre -Fab Equipment Shelter'? Will this be included in the plan set being filed? Topic: Site Plan Comment Number: 6 Comment Originated: 12/27/2012 12/27/2012: There are 3 line over text issues on sheet A2.0. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/20/2012 12/20/2012: Mechanical/Utility equipment should be painted to match the wall it is attached to. A note on the Enlarged site plan should be included to state this. Department: Stormwater Engineering Contact: Mark Taylor, , mtaylor(a)fcgov.com Topic: Floodplain Comment Number: 1 Comment Originated: 10/16/2012 Any and all construction activities in the flood fringe must be preceded by an approved Floodplain Use Permit, $25 fee, and approved plans (at time of building permit). This can be found online at: http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents Please contact Mark Taylor, 970.416.2494, mtaylor@fcgov.com with questions. Comment Number: 3 Comment Originated: 10/18/2012 10/18/2012: On enlarged site plan sep. sheet, please show (call out) the separation between flood fringe and monopine base. Comment Number: 4 Comment Originated: 10/18/2012 10/18/2012: Is the tower (monopine trunk) and the contents of waterproof? If so, please add the following note on the site plan: "The contents of the tower and the tower itself is waterproof. In the event of flooding, the City of Fort Collins is not responsible for any damage." If not, please call Mark Taylor, Contact: Wes Lamarque, 970.416-2418, wlamargue(a)fcgov.com Topic: General Comment Number: 7 Comment Originated: 12/27/2012 12/27/2012: Stormwater is ready for a hearing. Floodplain has not reviewed the plans yet and will review them soon. All Floodplain comments may be addressed in final compliance. Department: Technical Services Contact: Jeff County, 970.221-6588, jcountyPfcgov.com Topic: Building Elevations Comment Number: 4 Comment Originated: 10/16/2012 12/27/2012: This has been addressed on the 11 "x17" plan sheets. The full size (24"x36") sheets were not provided for this review. 10/16/2012: There are line over text issues on all(including color 11 "xl7") sheets A3.0 & A3.1. Comment Number: 5 Comment Originated: 10/16/2012 12/27/2012: This has been addressed on the 11"xl7" plan sheets. The full size (24"x36") sheets were not provided for this review. 10/16/2012: Please trim everything shown outside of the border on the color 11"x17 sheets A3.0 & A3.1. Comment Number: 8 Comment Originated: 12/27/2012 12127/2012: If the 11 "xl7" sheets are to be filed with this project, they will need to be 24"x36" plans. Department: Light And Power Contact: Doug Martine, 970.224-6152, dmartine(a).fcgov.com Topic: General Comment Number: 1 Comment Originated: 10/01/2012 10/01/2012: Light & Power Engineering will need a Commercial Service Information (C-1) form completed. Electric development and system modifications will apply. Please coordinate power requirements with Light & Power Engineering at (970)221-6700. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, elynxwileropoudre-fire.org Topic: General Comment Number: 1 10/17/2012: FIRE LANE Comment Originated: 10/17/2012 Shall be designated on the plat as an Emergency Access Easement. Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. Be visible by signage and maintained unobstructed at all times. 2006 International Fire Code 503.2.3, 503.3, 503.4 and Appendix D Comment Number: 2 Comment Originated: 10/17/2012 10/17/2012: TURNING RADII The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. International Fire Code 503.2.4 and Local Amendments Comment Number: 3 Comment Originated: 10/17/2012 10/17/2012: PREMISE IDENTIFICATION New and existing buildings shall be plainly identified. Address numbers shall be visible from the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals on a contrasting background. 2006 International Fire Code 505.1 Comment Number: 4 Comment Originated: 10/17/2012 10/17/2012: BATTERY STORAGE SYSTEMS Stationary storage battery systems used for standby power and having an electrolyte capacity in excess of 50 gallons of stationary lead acid or 1,000 Ibs lithium ion shall comply with Section 608 and Table 608.1 of the International Fire Code. Comment Number: 5 Comment Originated: 10/17/2012 10117/2012: DIESEL GENERATOR Storage systems for diesel fuel shall provide for spill control and secondary containment when the storage vessel exceeds 55 gallons. Other conditions apply to combustible liquid storage. Refer to Sections 2704 and 3404 of the 2006 International Fire Code for more details. Comment Number: 2 10/19/2012: Planting detail: Comment Originated: 10/19/2012 Include 8 inch water basin at edge of planting hole Mulch 4 inches deep within planting basin No need to wrap tree trunks on conifers Don't over excavate the depth of the tree planting pit Remove top half of w1re basket and pull hurlaP back off the top of the hall Remove all twine and labels Surface of tree ball to be 1 inch higher that existing grade Comment Number: 5 01/02/2013: Comment Originated: 01/02/2013 Forestry staff met with the applicant to review the possible tree removal. The tree is question is a large Siberian Elm. It appeared that the road could not be relocated to save this tree. Please confirm if this is the case and why it could not be shifted to save this tree. If it needs to be removed please add a note that says. "Tree removal and pruning work will be by a City of Fort Collins licensed arborist". Comment Number: 6 01/02/2013: Comment Originated: 01/02/2013 In the planting detail evergreen trees do not need to be wrapped and the depth of the planting hole should not be deeper than the root ball of the trees. Please review and change as appropriate. Comment Number: 7 Comment Originated: 01/02/2013 01/02/2013: Mature height and spread of Rocky Mountain Juniper in the Fort Collins Nursery Descriptive Guide is listed at height 16-20 feet and width 12-15 feet. The sizes of this tree in the visual appear to be larger in some dimensions at planting, at 3 years and 20 years than may actually occur. Consider adding a couple of more trees that could more closely achieve the information provided in the visual. Without irrigation after establishment growth rates would generally be slower and potential size may be less. Department: Light And Power Contact: Alan Rutz, 970.224-6153, arutz(ofcgov.com Topic: General Comment Number: 2 Comment Originated: 12/26/2012 12/26/2012: Light and Power will require access to the meter through the main gate. Through a lockbox or a combination lock. Department: Engineering Development Review Contact: Marc Virata, 970.221-6567, mvirata(a)fcgov.com Topic: General Comment Number: 2 Comment Originated: 10/16/2012 12/31/2012: Carrying over the comment for future reference. The easement isn't needed at this time, but the completed easement (and legal description/exhibit) will be required after hearing, prior to mylar final approval, along with the associated fees referenced previously. 1011512012: The "Nev, 1G-10" Access & Utility Easement" should be revised to 20' in width and be dedicated as an "Emergency Access & Utility Easement" per discussion with PFA at the 10/17 Staff Review. The dedication of this easement (and any easements) to the City requires deeds of dedication in an approved City format (the template will be emailed separately) along with a $250 fee for each easement, and county recordation costs in an amount to be determined. The required deed(s) of dedication will need to be in place prior to final plan approval of the project (after public hearing). Department: Forestry Contact: Tim Buchanan, 970-221-6361, tuchanan()fcgov.com Topic: General Comment Number: 3 Comment Originated: 10/19/2012 10/19/2012: Watering: Thoroughly soak the soil ball and surrounding soil at planting. Following transplanting, and through the first three growing seasons, trees shall receive supplemental watering at a rate of minimum of 50 gallons of water each week during the growing season (from April through September); and 50 gallons every four weeks during the winter (October through March). Water shall be applied over the top of the soils ball. If trees appear stressed apply additional water at each irrigation cycle. Length of water cycles may be modified slightly as determined appropriate by a qualified landscape contractor. Comment Number: 4 Comment Originated: 10/19/2012 10/19/2012: Landscape contractor to contact the City Forester at the end of three seasons of tank irrigation to determine if trees can survive without additional irrigation or if addition irrigation will be required. Topic: Landscape Plans Comment Number: 1 Comment Originated: 10/16/2012 10/16/2012: Adding a few additional trees is possible with the spacing shown on the landscape plan. This could provide better initial screening of the base per LUC 3.2.1(E). Comment Number: 8 C� lent Originated: 10/15/2012 12/11/2012: Comment repeated. Please provide non colored elevations showing this. 10/15/2012: On the elevations, there is reference to a lighting cut sheet please remove and provide light fixture detail on elevations. Per LUC 3.2.4, must be fully shielded and down directional. Illustration on elevations should graphically reflect the code requirement. Department: Current Planning Contact: Courtney Levingston, 970-416-2283, clevingston(a)fcgov.com Topic: General Comment Number: 9 Comment Originated: 10/15/2012 10/15/2012: On title sheet (T1.0) please change note regarding co -location as follows - Note: "Per LUC 3.8.13(B), no wireless telecommunication facility of equipment owner or lessee or employee there of shall act to exclude or attempt to exclude any other wireless provider from using the same building, structure or location." Comment Number: 10 Comment Originated: 10/15/2012 12/11/2012: On title Sheet ( T1.0) please add the height in feet to the no. of stories so it reads "3 — 75 feet." 10/15/2012: On title sheet (T1.0) please change stories from 1 to "3 - 75 feet' Comment Number: 12 Comment Originated: 10/16/2012 12/11/2012: The abbreviation for Limited Commercial is "CL" not LC" Please update on sheet T1. 10/16/2012: The zoning on the title sheet IT 1) is incorrect. It says neighborhood commercial and it should be limited commercial. Please revise. Comment Number: 13 Comment Originated: 10/19/2012 12/11/2012: We did not receive the non -colored elevations to verify that this comment was addressed. The GPS antenna depicted on the elevation is shown to protrude above the building which does not meet Section 3.8.13(C)(3) of the Land Use Code. Please lower the GPS antenna so it does not rise above the top of the pre-fab equipment shelter. 10/19/2012: The GPS antenna depicted on the elevation is shown to protrude above the building which does not meet Section 3.8.13(C)(3) of the Land Use Code. Please lower the GPS antenna so it does not rise above the top of the pre-fab equipment shelter. Comment Number: 15 Comment Originated: 12/11/2012 12/11/2012: On Sheet T1.0, please note that Fort Collins should never be abbreviated to Ft. per our City standards. Please update and spell out "Fort' on sheet T1.0 where the abbreviation is used. This can be addressed at time of Final submittal after hearing, prior to mylars/recording. City of �' , F art Callins� Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview . January 04, 2013 Irene Cooke Closser Consulting for Verizon Wireless P.O. Box 423 Tabernash, CO 80478 RE: Verizon Wireless at 1052 W. Vine Dr., PDP120025, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or clevingston@fcgov.com. Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970-416-2283, clevingston cDfcgov.com Topic: General Comment Number: 3 Comment Originated: 10/15/2012 12/11/2012: Note 5 on the Landscape Plan (L1.0) should not say "of this section" at the end, but the Land Use Code. 10/15/2012: Remove the last note under the Plant Liston the landscape plan concerning replacement conformance. Comment Number: 6 Comment Originated: 10/15/2012 12/11/2012: At time of final, the non -colored elevations are required with the heights called out. These elevations should be full sized -- they will be recorded with the city on mylar. The elevations should include the comment below: 10/15/2012: On all elevations, please call out that the utility boxes will be painted to match the building per LUC 3.5.1(I)(3). Comment Number: 7 Comment Originated: 10/15/2012 12/11/2012: At time of final, the non -colored elevations are required please call out the color and material of the pole "trunk". 10/15/2012: On all elevations, please call out the color and material of the pole "trunk".