HomeMy WebLinkAboutHACIENDA HIGGINS-MARQUEZ - PDP/FDP - FDP120022 - CORRESPONDENCE -Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffingtonna.fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/26/2012
12/26/2012: On the site plan, show the proposed locations for the water and sewer services for
the new single family residence.
Comment Number: 1 Comment Originated: 12/26/2012
12/26/2012: On the site plan, show the proposed locations for the water and sewer services for
the new single family residence.
Department: Zoning
Contact: Peter Barnes, 970-416.2355, pbarnes(o)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/18/2012
12/18/2012: The applicant is requesting a modification to the front setback requirement and the
building height requirement. In order to review the modification request, a site plan showing
the actual building footprint and the building elevation drawings need to be submitted. The 'site
plan' the applicant submitted shows only a building envelope, which isn't adequate to
determine the merits of a setback modification. Also, the site plan envelope submitted shows
a 20' setback from Mulberry. If the address and/or front door is on Mulberry, then the Mulberry
lot line is the front lot line, and the 20' setback shown complies with the code and a setback
modification isn't needed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 2 Comment Originated: 12/31/2012
12/31/2012: The boundary and legal description close.
Comment Number: 3 Comment Originated: 01/02/2013
01/02/2013: Please show a detail of the monuments shown on sheet 1. What is the significance
of the other two monument symbols?
Comment Number: 4 Comment Originated: 01/02/2013
01/02/2013: Are there two monuments found for note FD 1? Please clarify this.
Comment Number: 5 Comment Originated: 01/02/2013
01/02/2013: Please revise the notes on sheet 1.
Comment Number: 6 Comment Originated: 01/02/2013
01/02/2013: Please label all surrounding properties as unplatted or the subdivision they are a
part of.
Comment Number: 7 Comment Originated: 01/02/2013
01/02/2013: There is an existing witness corner to the N 1/4 corner of Section 15, that lies
143.7' west of the split. It is your choice whether to show it or not.
Comment Number: 8 Comment Originated: 01/02/2013
01/02/2013: Please provide current monument records for the public land corners shown.
Comment Number: 9 Comment Originated: 01/02/2013
01/02/2013: Please show any corners found for rec. 2002037189 & 20020108569.
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/31/2012
12/31/2012: No comments.
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanford(a)_fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/23/2012
12/23/2012: No Landscape Plans received. No Issues with this proposal other than very good
sight distance along Mulberry from/to Cook St needs to be maintained.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(a)fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/02/2013
01/02/2013:
Contact the City Forester for an on -site meeting to review existing trees on the site.
Tim Buchanan 2216361
Comment Number: 2 Comment Originated: 01/02/2013
01/02/2013:
Significant trees should be preserved, transplanted or mitigated (LUC 3.2.1 F and G)
Significant trees should be shown on the plan by species size and condition with intent stated
to protect, transplant or remove. Removed significant trees need to be mitigated with new
upsized tree. The plan should include mitigation for removed significant trees.
Department: Light And Power
Contact: Rob Irish,. 970.224-6167, rirish fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/28/2012
12/28/2012: Owner will be responsible for the cost of the new secondary service to the house.
No square footage or front footage charges will apply. Electric meter will need to be installed
on the West side of the house along Cook St.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 12/27/2012
12/27/2012: The site disturbs.more than 10,000 sq-ft therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria Under the Amendments of Volume 3 Chapter 7 Section 1.3.3. If you
need clarification concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 12/27/2012
12/27/2012: No comments besides the erosion control comment.
When showing the height on the building elevations, building height must be measured from
the average of the finished ground level at the center of all walls of a building or structure to the
highest point of the roof surface or structure. This is outlined in Section 3.8.17 of the Land Use
Code.
Comment Number: 4
Comment Originated: 12/31/2012
12/31/2012: Please remove the reception numbers on nearby parcels on the site plan, but
keep the address for the lot immediately south (512 Cook Street).
Comment Number: 5 Comment Originated: 12/31/2012
12/31/2012: The last paragraph under the statement of ownership and subdivision on sheet 1 of
the subdivision plat lists "Richard's Lake PUD, Filing One, Second Replat." I think this is a typo,
please revise.
Comment Number: 6
Comment Originated: 12/31/2012
12/31/2012: Please resubmit the plans making the changes noted, providing building
elevations and the erosion control information.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmundPfcgov.com
Topic: Plat
Comment Number: 1
Comment Originated: 01/04/2013
01/04/2013: Update the statement of ownership and subdivision note to reference Hacienda
Higgins -Marquez Subdivision and not Richards Lake PUD filing One, Second Replat.
Topic: Site Plan
Comment Number: 2 Comment Originated: 01/04/2013
01/04/2013: Add our standard note to the site plan: Any damaged curb, gutter and sidewalk
existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed,
damaged or removed due to construction of this project, shall be replaced or restored to City
of Fort Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
Comment Number: 3 Comment Originated: 01/04/2013
01/04/2013: If known, show the existing locations for the water and sewer services on the site
plan.
Comment Number: 4 Comment Originated: 01/04/2013
01/04/2013: Show the building footprint and driveway with measurements on the site plan.
City of
F6rt Coltins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/deveiopmentreview
January 04, 2013
William Higgins
8571 Secretariat Dr.
Wellington, CO 80549
RE: Hacienda Higgins -Marquez (1717 W. Mulberry St.), FDP120022, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ryan Mounce, at 970-224-6186 or
rmounce@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ryan Mounce, 970.224.6186, rmounce aofcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/31/2012
12/31/2012: Please show the building footprint and driveway with measurements on the site
plan. This will help illustrate the front entrance along Mulberry Street and that access is being
taken off Cook Street.
Comment Number: 2
Comment Originated: 12/31/2012
12/31/2012: The site plan shows a 20' setback along Mulberry Street that meets the land use
standards of the R-L district, and no modification is required. If a 15' front yard setback is still
being requested, please show the setback at 15' when you add the building footprint to the site
plan.
Comment Number: 3
Comment Originated: 12/31/2012
12/31/2012: A request for modification has been submitted for building height but the response
letter to the conceptual review comments mentions the building roof pitch will be changing to
meet the 28' height requirement of LUC Section 4.4(D)(2)(e) -- if the top of the roof is now 28',
no modification will be needed. Please submit building elevations that identifies the final height
of the building.