Loading...
HomeMy WebLinkAboutRIGDEN FARM - OVERALL DEVELOPMENT PLAN - 56-98B - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYMultimodal Transportation Level of Service Manual P- 20 LOS Standards for Development Review - Bicycle Figure 7. Bicycle LOS Worksheet level of service - connectivity nwinnan actual proposed base connectivity: C A specific connections�toprio�ritytes: description of applicable destination area within 1,320' including address 5 Fu-ru fza C'mmseuet_ AggA ,JC r* OF 17 a KE' J destination area classification (see teat) CIO& MORatAt ce�,r�te. City of fort Collins Transportation Master Plan Nlultimodal Transportation Level of Service Manual p• 18 LOS Standards for Development Review - Pedestrian Figure 6. Pedestrian LOS Worksheet project location classification: Qc T I V I -r y clmrE z Q P vT 1 U R G (enter as many as apply) description of applicable destination area level of service (Ininintum based on project location classification) destination area within 1,320' classification °e" nlenslh aenury including address (see text) Jirntneu :aainuiry• aosuog> amnuon r^ nl'iimlun IJ 3 1orUR'tz� t�MUGRCIp COMMElZC_I AC- actual A//A IU/A i(l/A N1A NI/Q !Jo to T 4 O proposed � >A(E ❑miirmun S g 2G Fti-rur—c: QFrle(; o (i AA 1"L0VMG'actual NIA A/ A A WbcaT OR LJA)G B 8 �io12Tf1 Or �iRo4t=6 proposed B ❑3 mumrnsn actual proposed 'l❑Ilta 91n1I1i1 Y actnall proposed /% ^� City of Fort Collins Transportation Master Plan Multimodal Transportation Level of Service Manual p. 18 LOS Standards for Development Review - Pedestrian Figure 6. Pedestrian LOS Worksheet project location classification: ACTIVITY eIFA)TC--P— CFU-rUfZE ) (enter as many as apply) description of applicable destination area level of service (minimum based on project location classification) destination area within 1,320' classification w.n.i including address (see text) dnaneu aairnvty bfN m�,� s ..meaty ao.ilngs wautin p ntiimian f� �% P O �ESI�tcA)TIIdC. REStDEurtAL rJ art(,ai q c 8 C e \Rl E5T o F R T PA %dj EQ L, vE proposed 8 15 8 V v rUrojzE =�SiITfJTr C � UKc.tf proposed 4 A A Omcm(nnn C C C C (2 �65 i'DENt t A L. QES t i��TrA SouTf+ OF actual 411A IV/A IJIA 411A VA K(G D Aki FARfA proposed A A A 8 i-- U FV �� m'viunmi 1. C C- c, 7 U 2 G' S l gC�vrr 2e 51 DGw rt rac. octo:d AJ//A A IA A//A A/ A /V A tio2T1+ a� � 6 3 �rz�Kc proposed A B A9SUMG t)If��Y City of fort Collins Transportation Master Plan I I i� n 1, 1 J I 1 1 1 1 1 1 1 1 APPENDIX G 1 1 1 1 1 1 1 1 M = = = M = HCS: Unsignalized Intersections Release 2.1g LT9P4PM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) phase 4 access (E-W) cr9 Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/1 99 Other Information...._._.. am pm 1998 short long bkgrd total Two-way Stop -controlled Inte ection Northbound Southbound Eastbound westbound L T R 11 L T R L T R L T R No. Lanes 1 0 0 1 < 0 0 > 0 < 0 0 0 0 Stop/Yield Volumes PHF Grade MCI (�) SU/RV's 00 CVIs M PCE's______ N N 135 440 350 55 .95 .95 .95 .95 0 0 1.10 ------------------------------ 30 .95 1.10 Adjustment Factors 70 95 1.101 __________________ HCS: Unsignalized Intersections Release 2.19 LT9P4PM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 397 Potential Capacity: (pcph) 871 Movement Capacity: (pcph) 871 Prob. of Queue -Free ------------------------------------------------- State: 0.91 Step 2: LT from Major Street SBNB Conflicting Flows: (vph) --- - 426 Potential Capacity: (pcph) 1074 Movement Capacity: (pcph) 1074 Prob. of Queue -Free ----------------------------------------------- State: 0.85 Step 4: LT from Minor ------------------------------------------------- Street WB EB Conflicting Flows: (vph) 1002 Potential Capacity: (pcph) 278 Major LT, Minor TH Impedance Factor: 0.85 Adjusted Impedance Factor: 0.85 Capacity Adjustment Factor due to Impeding Movements 0.85 Movement Capacity: -------------------------------------------------------- (pcph) 238 Intersection Performance Summary Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) Flow Move ------------ --------------- Rate Cap Left Turn Major Road 5.00 2.10 Movement (pcph) (pcph) Right Turn Minor Road 5.50 2.60 -------- ------ --- Through Traffic Minor Road 6.00 3.30 EB L 35 238 > Left Turn Minor Road 6.50 3.40 EB R 81 871 > NB L 156 1074 Avg. Shared Total Cap Delay (pcph)(sec/veh) 483 9.8 3.9 95%; Queue Approach Length LOS Delay (veh) (sec/veh) 1.0 B 9.8 0.5 A 0.9 Intersection Delay = 1.4 sec/veh i i i i i i i i HCS: Unsignalized Intersections Release 2.lg LT9P4AM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ---------------- Streets: (N-S) phase 4 access (E-W) cr9 Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 19/99 Other Information ....... ..a pm 1998 short long to bkgrd tal Two-way Stop -controlled I ersection __----- - --------- - ---____ LNorthboundd I LSouthboundR I LEastboundR I LWestboundR No. Lanes 1 1 0 0 1 < 0 0 > 0 < 0 0 0 0 Stop/Yield N N Volumes 35 235 420 15 45 120 PHF _95 _95 .95 .95 .95 .95 Grade 0 0 0 MCI M SU/RV's ("s) CV's M) PCE's 1.10 1.10 1.10 ----------------------------------------------------------------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) -------------------------------------------------------- Left Turn Major Road 5.00 2.10 Right Turn Minor Road. 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g LT9P4AM.HCO Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB ES Conflicting Flows: (vph) 450 Potential Capacity: (pcph) 819 Movement Capacity: (pcph) 819 Prob. of Queue -Free State: 0.83 Step 2:LTfromMajorStreet SB NB -----------------_------ - -- _ - Conflicting Flows: (vph) 458 Potential Capacity: (pcph) 1037 Movement Capacity: (pcph) - 1037 Prob. of Queue -Free State: 0.96 -------------------------------------------------------- Step 4: LT from Minor Street WE EB ----------------------------------------------_-------- Conflicting Flows: (vph) 734 Potential Capacity: (pcph) 398 Major LT, Minor TH Impedance Factor: 0.96 Adjusted Impedance Factor: 0.96 Capacity Adjustment Factor - due to Impeding Movements 0.96 Movement Capacity: (pcph) -------------------------------------------------------- 382 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) ________ ______ ______ ______ _______ EB L 52 382 > _______ _____ --------- 624 8.3 1.4 B 8.3 EB R 139 819 > NB L 41 1037 3.6 0.0 A 0.5 Intersection Delay = 1.7 sec/veh Page 2 M = = = M HCS: Unsignalized Intersections Release 2.19 LTDP2PM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S) phase 2 access (E-W) drake and cr9 Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis .......... Other Information......... 1/19 99 am 1998 short long bkgrd total Two-way Stop -controlled Intersection Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ______ 0 1 < 0 0 > 1 0 0 > 0 < 0 0 0 0 Stop/Yield Volumes PEP Grade MCI ($) SU/RV's ("s) CV's ($) PCE's N 400 45 .95 .95 0 .______________ N 10 460 .95 .95 0 1.10 --------------- 25 10 .95 .95 0 1.10 1.10 --------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ---------------------------------------------------- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.ig LTDP2PM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SE Conflicting Flows: (vph) 444 Potential Capacity: (pcph) 825 Movement Capacity: (pcph) 825 Prob. of Queue -Free State: 0.99 -------------------------------------------------------- Step 2: LT from Major Street WE EB ------------------------------------------------- Conflicting Flows: (vph) 468 Potential Capacity: (pcph) 1026 Movement Capacity: (pcph) 1026 Prob. of Queue -Free State: 0.99 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major IT Shared Lane Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 4: LT from Minor Street NB SB ________________________________________________________ Conflicting Flows: (vph) 940 Potential Capacity: (pcph) 302 Major IT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: (pcph) -------------------------------------------------------- 297 Intersection Performance Summary Avg. 95$ Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) - ---- ------ ------- ------ ----- (sec/veh) --------- -------- ------ NB L 29 297 > 365 11.1 0.3 C 11.1 NB R 12 825 > WE L 12 1026 3.6 0.0 A 0.1 Intersection Delay = 0.4 sec/veh HCS: Unsignalized Intersections Release 2.19 LTDP2AM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 _ Streets: (N-S) phase 2 access (E-W) drake and cr9 Major street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis......... 19/99 Other Information .........am m 1998 short long bkgrd total Two-way Stop -controlled I rsection Eastbound I Westbound I Northbound I Southbound L T R L T R L T R L T R No. Lanes 1 0 1 < 0 0 > 1 0 10 > 0 < 0 10 0 0 Stop/Yield Volumes PHF Grade MCI (e) SU/RV'S M CV's M PCE's N N 380 15 5 285 .95 .95 .95 .95 0 0 ------------------------------ 1.10 40 10 .95 .95 0 1.10 1.10 --------------- Adjustment Factors vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) --------------------------------------------------------- _________ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g LTDP2AM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 408 Potential Capacity: (pcph) 860 Movement Capacity: (pcph) 860 Prob. of Queue -Free State: 0.99 ----- Step 2: IT from Major Street--____- WB-___--__-_-EB --------------------------------------------- Conflicting Flows: (vph) 416 Potential Capacity: (pcph) 1086 Movement Capacity: (pcph) 1086 Prob. of Queue -Free State: 0.99 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major IT Shared Lane Prob. of Queue -Free State: 0.99 -------------------------------------------------------- Step 4: IT from Minor Street NB SB ________________________________________________________ Conflicting Flows: (vph) 713 Potential Capacity: (pcph) 409 Major LT, Minor TH Impedance Factor: 0.99 Adjusted Impedance Factor: 0.99 Capacity Adjustment Factor due to Impeding Movements 0.99 Movement Capacity: (pcph) -------------------------------------------------------- 406 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) ------ ---- - ------- ----- (sec/veh) -------- -------- ------ ------ NB L 46 406 > 456 9.0 0.4 B 9.0 NB R 12 860 > WB L 6 1086 3.3 0.0 A 0.1 Intersection Delay = 0.6 sec/veh HCS: Unsignalized Intersections Release 2.19 LTDRPM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S) rigden(E-W) drake=====_________ Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/1 99 Other Information......... am(pM) 1998 short long bkgrd total Two-way Stop -controlled Inte ction Eastbound I Westbound I Northbound I Southbound L T R L T R L T R L T R No. Lanes 1 0 1 1 1 1 1 0 I 1 0 1 I 0 0 0 Stop/yield Volumes PHF Grade MC,s M SU/RV's M CV's M PCE's N 425 140 .95 .95 0 _______________ N 20 475 .95 .95 0 1.10 -------------- 90 10 .95 .95 0 1.10 1.10 --------------- HCS: Unsignalized Intersections Release 2.lg LTDRPM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SR Conflicting Flows: (vph) 447 Potential Capacity: (pcph) 822 Movement Capacity: (pcph) 822 Prob. of Queue -Free State: 0.99 Step 2: LT from Major - ------------- Street ------ WBEB ------------------ ----------------------------- Conflicting Flows: (vph) 594 Potential Capacity: (pcph) 893 Movement Capacity: (pcph) 893 Prob. of Queue -Free -------------------------------------------------------- State: 0.97 Step 4: LT from Minor Street NB SB ________________________________________________________ Conflicting Flows: (vph) 968 Potential Capacity: (pcph) 291 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor due to Impeding Movements 0.97 Movement Capacity_ ----------------- (pcph) 284 Adjustment Factors Intersection Performance Summary Vehicle Critical Follow-up Avg. 95`s Maneuver Gap (tg) Time (tf) Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) Right Turn Minor Road 5.50 2.60 ________ ______ ______ ______ _______ ______ _ _____ _________ Through Traffic Minor Road 6.00 3.30 NB L 105 284 19.9 1.7 C Left Turn Minor Road 6.50 3.40 18.4 NB R 12 822 4.4 0.0 A WB L 23 893 4.1 0.0 A 0.2 Intersection Delay = 1.7 sec/veh M HCS: Unsignalized Intersections Release 2.19 LTDRAM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) rigden (E-W) drake Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/19/99 Other Information.........am pm 1998 short bkgrd long total Two-way Stop -controlled In rsection Eastbound Westbound Northbound Southbound L T R 10 L T R 11 L T R L T R No. Lanes 1 1 1 0 1 0 1 0 0 0 Stop/Yield Volumes 390 PHF .95 Grade 0 MCI M) SU/RV's (%) CV's (%) PCE's --------------------- 40 95 5 325 95 .95 0 160 10 .95 .95 0 11.10 11.10 1.101 ------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) --- ------------------------- Left Turn Major Road ---------- 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.1g LTDRAM.HCO Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 411 Potential Capacity: (pcph) 857 Movement Capacity: (pcph) 857 Prob. of Queue -Free State: 0.99 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 453 Potential Capacity: (pcph) 1043 Movement Capacity: (pcph) 1043 Prob. of Queue -Free State: 0_99 _ Step 4: LT from Minor Street NB SB ----------------------------- Conflicting Flows: (vph) 758 Potential Capacity: (pcph) 385 Major IT, Minor TH Impedance Factor: 0.99 Adjusted Impedance Factor: 0.99 Capacity Adjustment Factor due to Impeding Movements 0.99 Movement Capacity: (pcph) -------------------------------------------------------- 383 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) ________ ___ ____ NB L 185 383 17.9 _______ _____ 2.5 C --------- 17.1 NB R 12 857 4.3 0.0 A WB L 6 1043 3.5 0.0 A 0.1 Intersection Delay = 3.1 sec/veh Page 2 i M = = = M M M M = = = r HCS: Unsignalized Intersections Release 2.19 LTDFPM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S) full access (E-W) drake Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/19/99 Other Information......... am pm 1998 short long bkgrd total Two-way Stop -controlled Inters ction Eastbound I westbound I Northbound I Southbound L T R L T R L T R L T R No. Lanes 1 1 1 < 0 1 1 1 < 0 1 1 < 0 11 1 < 0 Stop/Yield Volumes PHF Grade MCI M SU/RV's M Cv's (�) PCE's 1!75 525 35 .95 .95 .95 0 1.10 --------------- N 60 445 60 25 1 10 .95 .95 .95 .95 .95 .95 0 0 1.10 I1.10 1.10 1.10 ----------------------------- Adjustment Factors 60 1 160 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ---------------------------------------------------------- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg LTDFPM.HCO Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 572 500 Potential Capacity: (pcph) 710 773 Movement Capacity: (pcph) 710 773 Prob. of Queue -Free State: 0.98 0.76 ------------- Step 2: LT from Major Street WB----_-_--_-EB -------------------------------------------------------- Conflicting Flows: (vph) 590 531 Potential Capacity: (pcph) 897 957 Movement Capacity: (pcph) 897 957 Prob. of Queue -Free State: 0.92 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB ________________________________________________________ Conflicting Flows: (vph) 1244 1232 Potential Capacity: (pcph) 243 246 Capacity Adjustment Factor due to Impeding Movements 0.84 0.84 Movement Capacity: (pcph) 204 206 Prob. of Queue -Free State: 1.00 1.00 ----- _-------------------------------------------------- Step 4: LT from Minor Street NB SB - ____________________________ Conflicting Flows: (vph) 1298 1219 Potential Capacity: (pcph) 188 208 Major LT, Minor TH Impedance Factor: 0.84 0.84 Adjusted Impedance Factor: 0.87 0.87 Capacity Adjustment Factor due to Impeding Movements 0.66 0.86 Movement Capacity: (pcph) _________________ 125 179 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) ----- --------- ---- --- ------ ------ ------ NB L 29 125 ------- 37.3 ------ 0.8 E NB T 1 204 > 27.8 NB R 12 710 > 596 6.2 0.0 B SB L 69 179 32.2 1.6 E SB T 1 206 > 13.3 SB R 185 773 > 762 6.2 1.1 B EB L 87 957 4.1 0.2 A 0.5 WB L 69 897 4.3 0.2 A 0.5 Intersection Delay = 3.1 sec/veh Page 2 M M � M = M M M = HCS: Unsignalized Intersections Release 2.19 LTDFAM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S) full access (E-W) drake Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 19/99 Other Information.........am pm 1998 short long b k g r d total Two-way Stop -controlled I rsection Eastbound I Westbound I Northbound I Southbound L T R L T R L T R L T R No. Lanes 11 1 < 0 1 1 1 < 0 1 1 < 0 1 1 1 < 0 Stop/Yield Volumes PHF Grade MCI (%) SU/RVIS (%) CVIS (%) PCEIs N 35 390 10 95 .95 .95 0 1.10 .______________. N 30 425 30 50 1 15 .95 .95 .95 .95 .95 .95 0 0 1.10 11.10 1.10 1.10 ----------------------------- Adjustment Factors 30 1 80 .95 .95 .95 0 1.10 1.10 1.10 .______________ Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ---------------------------------------------------------- --- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg LTDFAM.HCO Page 2 ------------------ Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 416 463 Potential Capacity: (pcph) 852 807 Movement Capacity: (pcph) 852 807 Prob. of Queue -Free State: 0.98 0.89 -------------------------------------------------------- Step 2: LT from Major Street ------------------------------------ WB EB ------------- - - Conflicting Flows: (vph) 422 479 Potential Capacity: (pcph) 1079 1014 Movement Capacity: (pcph) 1079 1014 Prob. of Queue -Free State: 0.97 0.96 -------------------------------------------------------- Step 3: TH from Minor Street NB SB ----------------------------------------------- Conflicting Flows: (vph) 964 954 Potential Capacity: (pcph) 340 344 Capacity Adjustment Factor due to Impeding Movements 0.93 0.93 Movement Capacity: (pcph) 316 319 Prob. of Queue -Free State: 1.00 1.00 -------------------------------------------------------- Step 4: LT from Minor Street NB SB __ ___________________________ Conflicting Flows: (vph) 991 957 Potential Capacity: (pcph) 282 296 Major IT, Minor TH Impedance Factor: 0.93 0.93 Adjusted impedance Factor: 0.94 0.94 Capacity Adjustment Factor due to Impeding Movements 0.84 0.92 Movement Capacity: (pcph) -------------------------------------------------------- 236 273 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) ________ ______ ______ ______ NB L 58 236 _______ 20.2 _______ 0.9 _____ --------- D NB T 1 316 > 16.4 NB R 18 852 > 782 4.7 0.0 A SB L 35 273 15.1 0.4 C SB T 1 319 > 7.8 SB R 92 807 > 794 5.1 0.4 B EB L 41 1014 3.7 0.0 A 0.3 WE L 35 1079 3.4 0.0 A 0.2 Intersection Delay = 2.0 sec/veh M = = i = M M M = M = = M HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation ______________ Streets: (E-W) horsetooth (N-S) cr9 Analyst: Matt File Name: LTH9AM.HC9 Area Type: Other 1-19-99 am pm Comment: 1998 short long kgrd total -- ----------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 1 1 1 1 1 < 0 1 1 < 0 1 1 < 0 Volumes 35 15 415 10 15 15 200 220 5 5 490 45 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3,00 3.00 _________________________________-_-_____________-__-______________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WE Right Green 19.OA Green 20.OA 46.OP Yellow/AR 5.0 Yellow/AR 5.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 -____---______ ______ __ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 366 1592 0.101 0.230 19.6 C 14.6 B T 391 1863 0.041 0.210 20.3 C R 728 1583 0.600 0.460 14.0 B WE L 386 1678 0.028 0.230 19.3 C 20.2 C TR 362 1723 0.088 0.210 20.5 C NB L 499 1770 0.423 0.750 10.9 B 6.6 B TR 1356 1857 0.175 0.730 2.7 A SB L 448 897 0.011 0.500 8.1 B 13.6 B TR 883 1839 0.638 0.480 13.7 B Intersection Delay = 12.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.619 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) horsetooth (N-S) cr9 Analyst: Matt File Name: LPM.HC9 Area Type: Other 1-19-99 am p Comment: 1998 short long bkgrd rota --------------------- Eastbound westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 1 1 1 1 1 < 0 1 1 < 0 1 1 < 0 Volumes 55 25 245 5 10 15 385 505 10 10 370 40 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ______________________________________________ ______________--_ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right g + Peds Peds * WB Left * SB Left Thru + Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green L9.OA Green 20.OA 46.OP Yellow/AR 5.0 Yellow/AR 5.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ________________________________________________________ --__ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- ES L 372 1618 0.156 0.230 19.9 C 13.5 B T 391 1863 0.066 0.210 20.4 C R 728 1583 0.354 0.460 11.4 B WB L 373 1623 0.013 0.230 19.2 C 20.3 C TR 356 1697 0.076 0.210 20.5 C NB L 584 1770 0.693 0.750 11.7 B 7.0 B TR 1356 1857 0.401 0.730 3.4 A SB L 137 274 0.080 0.500 8.4 B 11.7 B TR 881 1836 0.489 0.480 11.8 B Intersection Delay = 9.7 sec/veh Intersection LOS = B Lost Time/Cycle, L = 5.0 sec Critical v/c(x) = 0.526 _______________________________________________________________________ i == M M M M M= M M= HCS: Unsignalized Intersections Release 2.1g AX1122Nzam Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) cr9(E-W) horsetooth=====____ Analyst ................... mjd Date of Analysis.......... 1/19/99 Other Information........ ramp pm 1998 short long bkgrd total All -way Stop -controlled InEersection Northbound Southbound Eastbound J westbound L T R L T R L T R L T R No. Lanes 1 1< 0 1 1 c 0 Volumes 200 220 5 5 490 45 1 1 35 15 1 415 0> 1 10 15 < 0 15 PHF .95 .95 .95 .95 .95 .95 .95 _95 .95 .95 .95 .95 ________________________________________________________________ Volume Summary and Capacity Analysis WorkSheet ------------------------------------------------------------------ NB SB EB WB _______________________________________________________________________ LT Flow Rate 211 5 5 47 37 437 11 16 RT Flow Rate Approach Flow Rate 448 568 490 43 Proportion LT 0.47 0.01 0.08 0.26 Proportion RT 0.01 0.08 0.89 0.37 Opposing Approach Flow Rate 568 448 43 490 Conflicting Approaches Flow Rate 533 533 1016 1016 Proportion, Subject Approach Flow Rate 0.29 0.37 0.32 0.03 Proportion, Opposing Approach Flow Rate 0.37 0.29 0.03 0.32 Lanes on Subject Approach 2 2 3 1 3 Lanes on opposing Approach 2 5 2 211 1 11 37 LT, Opposing Approach 5 16 437 RT, Opposing Approach 47 48 48 216 216 IT, Conflicting Approaches 52 52 RT, Conflicting Approaches 453 453 Proportion LT, Opposing Approach 0.01 0.47 0.26 0.08 Proportion RT, Opposing Approach 0.08 0.01 0.37 0.89 Proportion LT, Conflicting Approaches 0.09 0.09 0.21 0.21 Proportion RT, Conflicting Approaches 0.85 0.85 0.05 0.05 *Range limit(s) exceeded (see below) ----------------------------------------------------------------------- HCS: Unsignalized Intersections Release 2.19 M_ffn Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0376 Streets: (N-S) cr9 (E-W) horsetooth Analyst ................... mjd Date of Analysis.......... 1/ /99 Other Information......... am }m 1998 short long bkgrd total All -way Stop -controlled Intersection ------------------------------------------------------ Northbound Southbound Eastbound westbound L T R L T R L T R L T R No. Lanes ____ 1 1 < 0 1 1 < 0 1 1 1 0 > 1 c 0 Volumes 385 505 10 10 370 40 55 25 245 5 10 15 PHP .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 ------------------------------------- __________________________________ volume Summary and Capacity Analysis WorkSheet ---------------------------------------------------------------- NB SB EB WB ------------------------------------- __________________________________ LT Flow Rate 405 11 58 5 RT Flow Rate 11 42 258 16 Approach Flow Rate 948 442 342 32 Proportion LT 0.43 0.02 0.17 0.16 Proportion RT 0.01 0.10 0.75 0.50 Opposing Approach Flow Rate 442 948 32 342 Conflicting Approaches Flow Rate 374 374 1390 1390 Proportion, Subject Approach Flow Rate 0.54 0.25 0.19 0.02 Proportion, Opposing Approach Flow Rate 0.25 0.54 0.02 0.19 Lanes on Subject Approach 2 2 3 1 Lanes on Opposing Approach 2 2 1 3 LT, Opposing Approach 11 405 5 58 RT, opposing Approach 42 11 16 258 LT, Conflicting Approaches 63 63 416 416 RT, Conflicting Approaches 274 274 53 53 Proportion LT, Opposing Approach 0.02 0.43 0.16 0.17 Proportion RT, Opposing Approach 0.10 0.01 0.50 0.75 Proportion LT, Conflicting Approaches 0.17 0.17 0.30 0.30 Proportion RT, Conflicting Approaches 0.73 0.73 0.04 0.04 *Range limit(s) exceeded (see below) ------------------------------------------------------------------ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets (E-W) caster (N-S) timberline Analyst: Matt - File Name: LTTCAM.HC9 Area Type: Other 1-19-99 a pm Comment: 1998 short lon bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 0 > 1 < 0 1 1 < 0 1 2 1 1 2 < 0 Volumes 5 15 15 155 10 235 10 1460 155 120 1365 5 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right - WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ------------------------ Intersection Performance Summary Lane Group: Adj Sat We g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB LTR 392 1453 0.094 0.270 20.8 C 20.8 C WB L 452 1557 0.361 0.290 21.6 C 24.2 C TR 431 1595 0.599 0.270 25.8 D NB L 255 1770 0.043 0.690 6.0 B 9.4 B T 2086 3725 0.774 0.560 9.6 B R 887 1583 0.184 0.560 8,2 B SB L 251 1770 0.502 0.690 11.6 B 9.1 B TR 2085 3724 0.726 0.560 8.9 B Intersection Delay = 11.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.716 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets (E-W) custer (N-S) timberline Analyst: Matt File Name: L�TT�CPM.HC9 Area Type: Other 1-19-99 am O' Comment: 1998 short long bkgrd Iota ______________ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ No. Lanes 0> 1 < 0 1 1< 0 1 2 1 1 2< 0 Volumes 5 20 15 260 25 360 15 1300 245 265 1550 10 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _____________ -_____----______----------______-__-__--- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WE Right Green 28.OA Green 12.OA 46.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ------------------------------------------------------------ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- --__ ----- ----- ----- --- ----- --- EB LTR 424 1413 0.099 0.300 19.2 C 19.2 C WB L 489 1527 0.561 0.320 22.5 C 29.3 D TR 480 1601 0.843 0.300 33.9 D NB L 340 1770 0.047 0.660 12.9 B 14.4 B T 1788 3725 0.803 0.480 14.8 B R 760 1583 0.339 0.480 12.4 B SB L 340 1770 0.821 0.660 31.0 D 24.8 C TR 1786 3722 0.966 0.480 23.8 C Intersection Delay = 21.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.932 _______________________________________________________________________ M M M M M = = M s M HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: LTTVAM.HC9 Area Type: Other Gng bkgrd total 11-16-98 am pm Comment: 1998 short Eastbound Westbound Northbound Southbound L T R L T R L T R L T ---- R No. Lanes ____ ____ ____ 1 1< 0 ____ ____ 1 1< ____ 0 ____ ____ ____ 1 2< 0 ____ ____ 1 2< 0 Volumes 25 10 25 150 10 ISO 25 1415 115 215 1290 30 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _-__________-----_-____ 1.00 3.00 3.00 _______________ -_________�____ Signal erations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 25.OA Green 8.OA 53.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 --------------- ------------ - ----------- - - ------------------------- Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay ___ _____ LOS --- _____ EB L ____ _______ _____ 216 745 0.120 _____ _____ 0.290 19.9 C 20.4 C TR 450 1666 0,082 0.270 20.7 C WB L 454 1567 0.348 0.290 21.5 C 22.7 C TR 432 1599 0.463 0.270 23.7 C NB L 273 1770 0.095 0.690 6.1 B 11.3 B TR 2026 3683 0.834 0.550 11.4 B SB L 269 1770 0.840 0.690 35.1 D 12.7 B TR 2042 3713 0.715 0.550 9.3 B Intersection Delay = 13.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical _______________________________________________________________________ v/c(x) = 0.746 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: LTTVPM.HC9 Area Type: Other 11-16-98 am p� Comment: 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 1 1 < 0 1 1 < 0 1 2 < 0 1 2 < 0 Volumes 45 15 25 70 5 70 20 1450 95 140 1670 20 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 --------------------- __________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 * NB Left EB Left + Thru + Thru Right * Right Peds + Peds WB Left * SB Left Thru * Thru Right * Right g + Peds Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 369 1271 0.127 0.290 19.9 C 20.3 C TR 456 1690 0.092 0.270 20.8 C WB L 447 1543 0.165 0.290 20.1 C 20.8 C TR 432 1601 0.183 0.270 21.3 C NB L 251 1770 0.084 0.690 11.0 B 10.6 B TR 2067 3691 0.826 0.560 10.6 B SB L 251 1770 0.586 0.690 16.9 C 13.2 B TR 2083 3719 0.897 0.560 12.9 B Intersection Delay = 12.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.682 _______________________________________________________________________ I I Ir� u I n I n PI I 11 i I I I APPENDIX F I HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) horsetooth (N-S) cr9 Analyst: Matt File Name: LBH9AM.HC9 Area Type: Other 1-19-99 am m P Comment: 1998 short long bkgrd total ------------------------- Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 1 1 1 1 1 < 0 1 1 < 0 1 1 < 0 Volumes 20 15 320 10 15 15 125 165 5 5 335 20 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds * WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 19.OA Green 20.OA 46.OP Yellow/AR 5.0 Yellow/AR 5.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ______ _________________________ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ---- --- ------- ----- ----- ---- --- ----- -- EB L 366 1592 0.057 0.230 19.4 C 13.1 B T 391 1863 0.041 0.210 20.3 C R 728 1583 0.463 0.460 12.3 B WB L 386 1678 0.029 0.230. 19.3 C 20.2 C TR 362 1723 0.088 0.210 20.5 C NB L 649 1770 0.203 0.750 3.0 A 2.8 A TR 1354 1855 0.132 0.730 2.6 A SB L 541 1082 0.009 0.500 8.1 B 11.1 B TR 887 1847 0.422 0.480 11.2 B Intersection Delay = 9.8 sec/veh Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.442 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) horsetooth (N-S) cr9 Analyst: Matt File Name: LBH9PM.HC9 Area Type: Other _ 1-19-99 am Comment: 1998 short ong kgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- NO. Lanes 1 1 1 1 1 < 0 1 1 < 0 1 1 < 0 Volumes 20 25 115 5 10 15 260 320 10 10 110 20 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 -___----_------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 19.OA Green 20.OA 46.OP Yellow/AR 5.0 Yellow/AR 5.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------- -------------__--__-__--- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 372 1618 0.056 0.230 19.4 C 12.9 B T 391 1863 0.066 0.210 20.4 C R 728 1583 0.166 0.460 10.2 B WB L 373 1623 0.013 0.230 19.2 C 20.3 C TR 356 1697 0.076 0.210 20.5 C NB L 981 1770 0.279 0.750 2.5 A 2.7 A TR 1353 1854 0.257 0.730 2.9 A SB L 320 640 0.034 0.500 8.2 B 9.4 B TR 874 1820 0,157 0.480 9.5 B Intersection Delay = 6.1 sec/veh Intersection LOS = B Lost Time/Cycle, L.= 7.0 sec Critical v/c(x) = 0.265 M M M= M M M M r we i! M W! m" M m HCS- Unsignalized Intersections Release 2.19 LBH9AM.HCO Page 1 HCS: Unsignalized Intersections Release 2.lg LBH9PM.HCO Page 1 Center For Microcomputers In Transportation ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida University of Florida 512 Weil Hall 512 Weil Hall Gainesville, FL 32611-2083 Gainesville, FL 32611-2083 Ph: (904) 392-0378 -------- Ph: (904) 392-0378 streets (N-S) cr9(E-W) horsetooth Streets:(N-S)-cr9--------__-------_---_--__--(E-W) horsetooth Analyst................... mjd Analyst... ................ mjd Date of Analysis.......... 19/99 Other Information........ am pm 1998 short long bkgr ('section total Date of Analysis.......... 1/ /99 Other Information......... am pm 1998 short long bkgrd ,. total All -way Stop -controlled 1' ------------- All -way Stop -controlled Inter ction Northbound Southbound I Eastbound westbound Northbound Southbound Eastbound westbound L T R L T R L T R ____ ____ L T ____ R ____ L T R L T R L T R ___ ____ L T ____ ____ R ____ No. Lanes ____ ____ ____ 1 1 < 0 ____ ____ ____ 1 1 < 0 ____ ____ 1 1 1 0 > 1 < 0 No. Lanes _ __ 1 1 < 0 1 1 < 0 1 1 1 0 > 1 < 0 Volumes 125 165 5 5 335 20 20 15 320 10 15 15 Volumes 260 320 10 10 110 20 20 25 115 5 10 15 PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 PHF ------------------------------------------------------------- .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 -------------------------------------------------------------- Volume Summary and Capacity Analysis WorkSheet ------- - - - - --------- Volume Summary and Capacity Analysis WorkSheet ------------------------------------------ - - ------ ________________________________'------------- NB SB EB WB ---- NB SB EB WB _______________________________________________________________________ LT Flow Rate 132 5 21 11 ________________________________ LT Flow Rate 274 it 21 5 RT Flow Rate 5 21 337 16 RT Flow Rate 11 21 121 16 Approach Flow Rate 311 379 374 43 Approach Flow Rate 622 148 168 32 Proportion LT 0.42 0.01 0.06 0.26 Proportion LT 0.44 0.07 0.13 0.16 Proportion RT 0.02 0.06 0.90 0.37 Proportion RT 0.02 0.14 0.72 0.50 Opposing Approach Flow Rate 379 311 43 374 Opposing Approach Flow Rate 148 622 32 168 Conflicting Approaches Flow Rate 417 417 690 690 Conflicting Approaches Flow Rate 200 200 770 770 Proportion, Subject Approach Flow Rate 0.28 0.34 0.34 0.04 Proportion, Subject Approach Flow Rate 0.64 0.15 0.17 0.03 Proportion, opposing Approach Flow Rate 0.34 0.28 0.04 0.34 Proportion, Opposing Approach Flow Rate 0.15 0.64 0.03 0.17 Lanes on Subject Approach 2 2 3 1 Lanes on Subject Approach 2 2 3 1 Lanes on Opposing Approach 2 2 1 3 Lanes on Opposing Approach 2 2 1 3 IT, Opposing Approach 5 132 11 21 LT, Opposing Approach 11 274 5 21 RT, Opposing Approach 21 5 16 337 RT, Opposing Approach 21 11 16 121 IT, Conflicting Approaches 32 32 137 137 IT, Conflicting Approaches 26 26 285 285 RT, Conflicting Approaches 353 353 26 26 RT, Conflicting Approaches 137 137 32 32 Proportion LT, Opposing Approach 0.01 0.42 0.26 0.06 Proportion IT, Opposing Approach 0.07 0.44 0.16 0.13 Proportion RT, opposing Approach 0.06 0.02 0.37 0.90 Proportion RT, Opposing Approach 0.14 0.02 0.50 0.72 Proportion LT, Conflicting Approaches 0.08 0.08 0.20 0.20 Proportion LT, Conflicting Approaches 0.13 0.13 0.37 0.37 Proportion RT, Conflicting Approaches 0.85 0.85 0.04 0.04 Proportion RT, Conflicting Approaches 0.69 0.69 0.04 0.04 Approach Capacity ----------- - --- - -------------------------------------- 959 846 814 -------- 290 Approach Capacity ----- ------------------------------ 1121 839 -------------- ----------------- 651 62 Intersection Performance Summary Intersection Performance Summary Approach Approach V/C Average Approach Approach V/C Average Movement Flow Rate Capacity Ratio Total Delay _______ ___________ LOS ____ Movement Flow Rate Capacity __________ __________ _________ Ratio Total Delay _______ ___________ LOS ---- __________ __________ _________ NB 311 959 0.32 3.4 A NB 622 1121 0.55 8.2 B SB 379 846 0.45 5.5 B SB 148 839 0.18 2.O A EB 374 814 0.46 5.7 B EB 168 651 0.26 2.7 A WB 43 290 0.15 1.8 A WB 32 62 0.52 7.1 B Intersection Delay = 4.8 Intersection Delay = 6.3 Level of Service (Intersection) = A Level of Service (Intersection) = B M" W W M M`" r001 i W im M M on" M HCS: Unsignalized Intersections Release 2.1g LBTCPM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) timberline (E-W) custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/ /99 Other Information......... am pm 1998 short long bkgrd total Two-way Stop -controlled Inter ction Northbound Southbound Eastbound westbound L T R L T R L T R L T R No. Lanes 1-1 2 0 0 2 < 0 0 > 0 c 0 0 0 0 Stop/Yield Volumes PHF Grade MCI (%) SU/RV's M CV's (�) PCE's N 15 774 .95 .95 0 1.10 -------------- 882 10 5 15 .95 .95 .95 .95 0 0 1.10 1.10 ______________ HCS: Unsignalized Intersections Release 2.1g LBTCPM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 470 Potential Capacity: (pcph) 800 Movement Capacity: (pcph) 800 Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 2: LT from Major Street SB---------- NB ---------------------------------------------- Conflicting Flows: (vph) 939 Potential Capacity: (pcph) 537 Movement Capacity: (pcph) 537 Prob. of Queue -Free State: 0.97 -------------------------------------------------------- Step 4: IT from Minor Street WB EB __________________.______________________________________ Conflicting Flows: (vph) 1764 Potential Capacity: (pcph) 79 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor due to Impeding Movements 0.97 Movement Capacity: (pcph) -------------------------------------------------------- 76 Adjustment Factors Intersection Performance Summary Vehicle Critical Follow-up Avg. 95% Maneuver Gap (tg) Time (tf) Flow Move Shared Total Queue Approach ____J--------------------------------------------------- - Rate Cap Cap Delay Length LOS Delay Left Turn Major Road 5.50 2.10 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) Right Turn Minor Road 5.50 2.60 ________ ______ ______ ______ _______ _______ _____ _________ Through Traffic Minor Road 6.50 7.00 3.30 3.40 EB L 6 76 > 237 16.9 0.3 C 16.9 Left Turn Minor Road EB R 18 800 > NB L 18 537 6.9 0.0 B 0.1 Intersection Delay = 0.3 sec/veh m r� ,w m U040 MAN " HCS: Unsignalized Intersections Release 2.lg LBTCAM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) timberline (E-W) Custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 19/99 Other Information........ am pm 1998 short long bkrd gtotal Two-way Stop -controlled In rsection Northbound Southbound Eastbound Westbound L T R ( L T R I L T R L T R No. Lanes 1 2 0 O 2 < 0 0 > 0 < 0 0 0 0 Stop/Yield volumes PHP Grade MCI (�) SU/RV's (%) CVIs (%) PCE's N 10 876 .95 .95 0 1.10 ------------- 'N 774 5 .95 .95 0 ------------- 5 15 .95 .95 0 1.10 1.10 -------------- Adjustment Factors HCS: Unsignalized Intersections Release 2.19 LBTCAM.HCO Worksheet for TWSC intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 410 Potential Capacity: (pcph) 858 Movement Capacity: (pcph) 858 Prob. of Queue -Free State: 0.98 Step 2:LT ---------------___-_-__- SBNB -from -major - _ Conflicting Flows: -Street (vph) 820 Potential Capacity: (pcph) 622 Movement Capacity: (pcph) 622 Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 4: IT from Minor Street ---------------------- WB EB ------------------- Conflicting Flows: ----------- (vph) 1750 Potential Capacity: (pcph) 81 Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: -------------------------------------------------------- (pcph) 79 Vehicle Critical Follow-up Maneuver Gap (tg) .Time (tf) ---------------------- ------------------------------- Left Turn Major Road 5.50 2.10 Movement Right Turn Minor Road 5.50 2.60 -------- Through Traffic Minor Road 6.50 3.30 EB L Left Turn Minor Road 7.00 3.40 EB R NB L Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) ______ ______ ______ _______ ___ 6 79 > 248 16.1 0.2 C 16.1 18 858 > 12 622 5.9 0.0 B 0.1 Intersection Delay = 0.2 sec/veh Page 2 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: LBTVAM.HC9 Area Type: Other 11-16-98� pm Comment: 1998 short long kgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 1 1< 0 1 1< 0 1 2< 0 1 2< 0 Volumes 25 10 25 150 10 180 25 1265 115 215 1085 30 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1,00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right g * Peds Peds WB Left * SB Left Thru * Thru Right * Right g * Peds Peds NB Right HB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ------------------------ -------- ---------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 216 745 0.120 0.290 19.9 C 20.4 C TR 450 1666 0.082 0.270 20.7 C WB L 454 1567 0.348 0.290 21.5 C 22.7 C TR 432 1599 0.463 0.270 23.7 C NB L 274 1770 0.095 0.690 4.8 A 9.0 B TR 2060 3679 0.741 0.560 9.1 B SB L 255 1770 0.886 0.690 40.0 D 12.6 B TR 2078 3710 0.593 0.560 7.6 B Intersection Delay = 12.2 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.688 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: LBTVPM.HC9 Area Type: Other 11-16-98 am pm Comment: 1998 short long kgrd total ______�_____-__-_______________________________ Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 1 1 < 0 1 1 < 0 1 2 < 0 1 2 < 0 Volumes 45 15 25 70 5 70 20 1195 95 140 1305 20 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 -------------------- _-----_-----------------_--__----____--- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ---- ---- ------ ----- ----- ----- --- ----- --- EB L 369 1271 0.127 0.290 19.9 C 20.3 C TR 456 1690 0.092 0.270 20.8 C WB L 447 1543 0.165 0.290 20.1 C 20.8 C TR 432 1601 0.183 0.270 21.3 C NB L 260 1770 0.081 0.690 5.8 B 8.4 B TR 2063 3684 0.691 0.560 8.5 B SB L 263 1770 0.559 0.690 11.1 B 8.8 B TR 2082 3717 0.704 0.560 8.6 B Intersection Delay = 9.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.566 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: LBTDAM.HC9 Area e: Other 1-19-99 P am m Comment: short long mid bkgrd otal Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 2 2 < 0 1 2 < 0 2 2 1 1 2 1 Volumes 405 175 410 60 120 110 305 1090 70 100 825 205 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right * WE Right Green 17.OA 23.OA Green 10.OA 7.OA 25.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _____________________________________________________ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 715 3574 0.614 0.200 28.9 D 29.2 D TR 842 3367 0.769 0.250 29.5 D WE L 357 1787 0.176 0.200 25.2 D 23.5 C TR 873 3492 0.291 0.250 23.1 C NB L 715 3574 0.463 0.200 27.2 D 22.9 C T 1266 3725 0.951 0.340 22.7 C R 879 1599 0.084 0.550 8.1 B SB L 232 1787 0.452 0.130 31.5 D 23.1 C T 1006 3725 0.906 0.270 24.8 C R 768 1599 0.281 0.480 11.9 B Intersection Delay = 24.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.758 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: LBTDPM.HC9 Area Type: Other 1-19-99 am 0 Comment: short mid (on grd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ _ -- No. Lanes 2 2 < 0 1 2 < 0 2 2 1 1 2 1 Volumes 245 145 295 115 210 160 330 875 90 80 1070 320 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WE Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right * WE Right Green 12.0A 23.OA Green 13.OA 3.OA 31.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ ___ EB L 536 3574 0.496 0.150 30.3 D 27.3 D TR 846 3384 0.576 0.250 25.7 D WB L 268 1787 0.451 0.150 30.3 D 25.8 D TR 880 3519 0.464 0.250 24.5 C NB L 679 3574 0.526 0.190 28.3 D 17.2 C T 1341 3725 0.721 0.360 13.8 B R 831 1599 0.114 0.520 9.3 B SB L 286 1787 0.294 0.160 28.3 D 22.4 C T 1229 3725 0.961 0.330 24.7 C R 784 1599 0.430 0.490 12.8 B Intersection Delay = 21.9 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/e(x) = 0.691 I 11 I i APPENDIX E M m a lw' " r " !' m"" W om " ON.MOV M ` m HCS: Unsignalized Intersections Release 2.1g STH9AM.HCO Page 1 HCS: Unsignalized Intersections Release 2.lg STH9PM.HCO Page 1 Center For Microcomputers In Transportation Center For Microcomputers In Transportation University of Florida University of Florida 512 Weil Hall 512 Weil Hall Gainesville, FL 32611-2083 Gainesville, FL 32611-2083 Ph: (904) 392-0378 Ph: (904) 392-0378 Streets: (N-S) cr9 (E-W) horsetooth Streets: (N-S) cr9 (E-W) horsetooth Analyst ................... mjd Analyst................... mjd Date of Analysis.......... 1/19/99 Other Information......... am pm 1998 short long bkgrd total Date of Analysis.......... 1/19/99 Other Information......... am PM 1998 short long bkgrd total All -way Stop -Controlled I rsection ---'-------------'------------------- -------------------___�________ All -way Stop -controlled Inter Ction -'--- -----------------"----------------------------- ----------------- ---------'------------------------------------------'------ Northbound Southbound Eastbound westbound '----------'------------'----'-----'------------------'----'----------- Northbound Southbound Eastbound Westbound L T R L T R L T R L T R L T R L T R L T R L T R No. Lanes ____ ____ 1 1 < 0 0 > 1 < __ 0 ____ ____ 1 1 ____ 1 _ 0 > 1 < 0 No. Lanes 1 1 < 0 0 > 1 < 0 1 1 1 0 > 1 < 0 Volumes 215 75 5 5 110 15 15 15 550 5 10 5 Volumes 455 135 5 5 30 15 5 15 215 5 10 10 PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 ---------------------------- -- ---------------------------- Volume Summary and Capacity Analysis WorkSheet ------- --- ----- -----------------------------P---------------------------------------- Volume Summary and Capacity Analysis WorkSheet ------ --------------------- -- ----'- NB SB EB WB ------------------------------------------------- NB ------------------ SB EB WB _______________________________________________________________________ LT Flow Rate 226 5 16 5 _______________________________________________________________________ LT Flow Rate 479 5 5 5 RT Flow Rate 5 16 579 5 RT Flow Rate 5 16 226 11 Approach Flow Rate 310 137 611 21 Approach Flow Rate 626 53 247 27 Proportion LT 0.73 0.04 0.03 0.24 Proportion IT 0.77 0.09 0.02 0.19 Proportion RT 0.02 0.12 0.95 0.24 Proportion RT 0.01 0.30 0.91 0.41 Opposing Approach Flow Rate 137 310 21 611 Opposing Approach Flow Rate 53 626 27 247 Conflicting Approaches Flow Rate 632 632 447 447 Conflicting Approaches Flow Rate 274 274 679 679 Proportion, Subject Approach Flow Rate 0.29 0.13 0.57 0.02 Proportion, Subject Approach Flow Rate 0.66 0.06 0.26 0.03 Proportion, Opposing Approach Flow Rate 0.13 0.29 0.02 0.57 Proportion, Opposing Approach Flow Rate 0.06 0.66 0.03 0.26 Lanes on Subject Approach 2 1 3 1 Lanes on Subject Approach 2 1 3 1 Lanes on Opposing Approach 1 2 1 3 Lanes on Opposing Approach 1 2 1 3 LT, Opposing Approach 5 226 5 16 LT, Opposing Approach 5 479 5 5 RT, Opposing Approach 16 5 5 579 RT, Opposing Approach 16 5 11 226 IT, Conflicting Approaches 21 21 231 231 IT, Conflicting Approaches 10 10 484 484 RT, Conflicting Approaches 584 584 21 21 RT, Conflicting Approaches 237 237 21 21 Proportion LT, Opposing Approach 0.04 0.73 0.24 0.03 Proportion IT, Opposing Approach 0.09 0.77 0.19 0.02 Proportion RT, Opposing Approach 0.12 0.02 0.24 0.95 Proportion RT, Opposing Approach 0.30 0.01 0.41 0.91 Proportion LT, Conflicting Approaches 0.03 0.03 0.52 0.52 Proportion IT, Conflicting Approaches 0.04 0.04 0.71 0.71 Proportion RT, Conflicting Approaches 0.92 0.92 0.05 0.05 Proportion RT, Conflicting Approaches 0.86 0.86 0.03 0.03 Approach Capacity 956 380 915 357 Approach Capacity 1276 536 600 82 Intersection Performance Summary Intersection Performance Summary Approach Approach V/C Average Approach Approach V/C Average Movement Flow Rate Capacity _________ Ratio Total Delay ----------- LOS __-_ Movement Flow Rate Capacity Ratio Total Delay LOS _ __________ NB 310 956 _______ 0.32 3.4 A __________ __ _________ NB 626 1276 _______ 0.49 ___________ 6.5 ---- B SB 137 380 0.36 3.9 A SB 53 536 0.10 1.5 A EB 611 915 0.67 12.6 C EB 247 600 0.41 4.8 A WB 21 357 0.06 1.3 A WB 27 82 0.33 3.5 A Intersection Delay = 8.7 Intersection Delay = 5.7 Level of Service (Intersection) = B Level of Service (Intersection) = B M M& m o 4. uW am M 6 10am m m1 M 4W am no M go HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) custer (N-S) timberline Analyst: Matt File Name: STTCAM.HC9 Area Type: Oth 1-19-99 am pm Comment: 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 0> 1 < 0 1 1< 0 1 2 1 1 2 < 0 Volumes 5 1 15 140 1 170 10 1085 55 65 975 5 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left + NB Left Thru * Thru Right * Right g + Peds Peds WB Left * SB Left Thru * Thru Right * Right g Peds + Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ---------- - - --- ------------- ------ -------------------------- ---- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- -- - ------- ----- ----- ----- --- -- - --- EB LTR 374 1387 0.059 0.270 17.5 C 17.5 C WB L 477 1645 0.308 0.290 18.0 C 19.0 C TR 428 1585 0.421 0.270 19.8 C NB L 268 1770 0.041 0.690 4.3 A 9.3 B T 2086 3725 0.575 0.560 9.5 B R 887 1583 0.065 0.560 6.5 B SB L 261 1770 0.261 0.690 5.6 B 8.8 B TR 2085 3723 0.519 0.560 9.0 B Intersection Delay = 10.3 sec/veh Intersection LOS = S Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.509 ------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) custer (N-S) timberline Analyst: Matt File Name: STTCPM.HC9 Area Type: Oth Comment: 1998 short long bkgrd total ________________________________=_______=________________ 1-19-99 am Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ____ ____ ____ 0> 1 < 0 ____ ____ ____ 1 1< 0 ____ ____ ____ 1 2 1 ____ ____ ____ 1 2< 0 Volumes 5 1 15 95 1 115 15 855 145 180 990 10 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ________________________________----------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ---- ---- ------- EB LTR 382 1415 ----- 0.058 ---- ----- --- 0.270 17.5 C ---- 17.5 --- C WB L 477 1645 0.210 0.290 17.4 C 18.1 C TR 428 1586 0.285 0.270 18.8 C NB L 267 1770 0.060 0.690 4.5 A 8.2 B T 2086 3725 0.453 0.560 8.5 B R 887 1583 0.173 0.560 6.9 B SB L 284 1770 0.665 0.690 11.4 B 9.4 B TR 2083 3720 0.531 0.560 9.1 B Intersection Delay = 9.7 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 ------------------------------------------------ sec Critical v/c(x) = 0.510 --------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: STTVAM.HC9 Area Type: Oth 11-16-98 am pm Comment: 1998 short long bkgr total Eastbound westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 1 1 < 0 1 1 < 0 1 2 < 0 1 2 < 0 Volumes 20 10 20 135 10 165 20 965 105 195 930 25 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 --------------------------------------------------------- ---_-_ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right + Peds * Peds WE Left * SB Left Thru * Thru Right * Right Peds + Peds NB Right EB Right SB Right WE Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- ----- --- ----- --- EB L 231 797 0.091 0.290 16.7 C 17.2 C TR 453 1679 0.071 0.270 17.5 C WB L 462 1592 0.308 0.290 18.0 C 19.1 C TR 432 1600 0.428 0.270 19.9 C NB L 270 1770 0.078 0.690 4.3 A 9.4 B TR 2055 3670 0.576 0.560 9.5 B SB L 262 1770 0.782 0.690 23.5 C 11.3 B TR 2078 3711 0.508 0.560 8.9 B Intersection Delay = 11.5 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.578 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation ________________ Streets: (E-W) vermont (N-S) timberline _ Analyst: Matt File Name: STTVPM.HC9 Area Type: Oth Comment: 1998 short long bkgrd tota 11-16-98 am pm Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ____ ____ ____ 1 1 < 0 ____ ____ 1 1 < ____ 0 ____ ____ ____ 1 2 < 0 ____ ____ ____ 1 2 < 0 Volumes 25 5 20 65 5 65 15 930 85 125 935 15 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ______________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------- Intersection Performance _----_----__ Summary ____---_ Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- EB L 379 1306 ---- 0.069 ----- ----- --- 0.290 16.6 C ---- 17.1 -- C TR 442 1637 0.059 0.270 17.5 C WE L 471 1623 0.144 0.290 17.0 C 17.5 C TR 433 1602 0.169 0.270 18.1 C NB L 270 1770 0.059 0.690 4.3 A 9.2 B TR" 2060 3679 0.544 0.560 9.2 B SB L 266 1770 0.496 0.690 7.6 B 8.7 B TR 2081 3717 0.505 0.560 8.9 B Intersection Delay = 9.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 -----------------------------------------------------------------------. sec Critical v/c(x) = 0.457 sW .6 " aw 49 al- = W HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets (E-W) drake (N-S) timberline Analyst: Matt File Name: STTDAM.HC9 Area e• er. 1-19-99� m Comment: shor mid long bkgrd total TYP P ---------- _____--------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 2 2 < 0 1 2 < 0 2 2 1 1 2 < 0 Volumes 305 85 410 5 45 55 335 925 5 60 630 155 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right WE Right Green 15.OA 22.OA Green 7.OA 9.OA 29.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 -------------------------------------- _----__--___-- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- ------- ----- ----- ----- --- ----- --- ES L 643 3574 0.514 0.180 24.5 C 24.3 C TR 791 3294 0.692 0.240 24.2 C WB L 322 1787 0.016 0.180 21.8 C 19.4 C TR 828 3451 0.133 0.240 19.3 C NB L 679 3574 0.536 0.190 24.3 C 18.8 C T 1490 3725 0.686 0.400 17.0 C R 943 1599 0.005 0.590 5.4 B SB L 179 1787 0.353 0.100 27.6 D 23.0 C TR 1121 3615 0.774 0.310 22.6 C Intersection Delay = 21.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.653 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: STTDPM.HC9 Area Type er 1-19-99 am Comment: shor mid long bkgrd tota Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 2 2 < 0 1 2 < 0 2 2 1 1 2 < 0 Volumes 130 35 370 5 120 110 335 635 5 25 805 230 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 --------- ------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WE Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right WE Right Green 16.OA 20.OA Green 4.OA 9.OA 33.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _---__-____ -------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ---- ---- ------ ----- ----- ----- -- ---- --- EB L 679 3574 0.208 0.190 22.1 C 23.6 C TR 714 3247 0.626 0.220 24.0 C WB L 340 1787 0.015 0.190 21.3 C 21.3 C TR 768 3492 0.331 0.220 21.3 C NB L 572 3574 0.636 0.160 27.0 D 17.5 C T 1639 3725 0.428 0.440 12.6 B R 1023 1599 0.005 0.640 4.2 A SB L 125 1787 0.208 0.070 28.5 D 27.0 D TR 1260 3601 0.907 0.350 27.0 D Intersection Delay = 22.6 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 Sec Critical v/c(x) = 0.648 ----------------------------------------------------------------------- HCS: Unsignalized Intersections Release 2.1g SBH9AM.HCO Page 1 ----------- -- HCS: Unsignalized Intersections Release 2.1g ------ SBH9PM.HCO Page 1 - ------------------------------------------------ --------------------------------------- Center For Microcomputers In Transportation --------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida University of Florida 512 Weil Hall 512 Weil Hall Gainesville, FL 32611-2083 Gainesville, FL 32611-2083 Ph: (904) 392-0378 Ph: (904) 392-0378 Streets: (N-S) cr9 (E-W) horsetooth Streets: (N-S) cr9 (E-W) horsetooth Analyst ................... mjd Analyst................... mjd Date of Analysis.......... /19/99 Other Information........ am pm 1998 short long bkgrd total Date of Analysis.......... 1/ 99 Other Information.........am pm -1 short long bkgrd total All -way Stop -controlled In rsection All -way Stop -controlled Inte ction Northbound Southbound Hastbound Westbound Northbound Southbound Eastbound Westbound L T R L T R L T R L T R L T R L T R L T R L T R No. Lanes 1 1 < 0 0 > 1 < 0 1 1 1 0 > 1 < 0 No. Lanes 1 1 < 0 0 > 1 < 0 1 1 1 0 > 1 < 0 Volumes 190 75 5 5 110 15 15 15 485 5 10 5 Volumes 390 135 5 5 30 15 5 15 175 5 10 10 PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 PHF .95 .95 .95 ____ .95 .95 .95 ___ ___ .95 .95 .95 .95 .95 .95 __________________ _____________________________________________________ Volume Summary and Capacity Analysis WorkSheet ________ Volume Summary and Capacity Analysis WorkSheet --- ----- --------- --------------------------------------------------------------- NB SB EB WB -------------- NB SB EB WB _______________________________________________________________________ LT Flow Rate 200 5 16 5 ___________________ ____ ___ LT Plow Rate 411 5 5 5 RT Flow Rate 5 16 511 5 RT Flow Rate 5 16 184 11 Approach Flow Rate 284 137 543 21 Approach Flow Rate 558 53 205 27 Proportion IT 0.70 0.04 0.03 0.24 Proportion LT 0.74 0.09 0.02 0.19 Proportion RT 0.02 0.12 0.94 0.24 Proportion RT 0.01 0.30 0.90 0.41 Opposing Approach Flow Rate 137 284 21 543 Opposing Approach Flow Rate 53 558 27 205 Conflicting Approaches Flow Rate 564 564 421 421 Conflicting Approaches Flow Rate 232 232 611 611 Proportion, Subject Approach Flow Rate 0.29 0.14 0.55 0.02 Proportion, Subject Approach Flow Rate 0.66 0.06 0.24 0.03 Proportion, Opposing Approach Flow Rate 0.14 0.29 0.02 0.55 Proportion, Opposing Approach Flow Rate 0.06 0.66 0.03 0.24 Lanes on Subject Approach 2 1 3 1 Lanes on Subject Approach 2 1 3 1 Lanes on Opposing Approach 1 2 1 3 Lanes on Opposing Approach 1 2 1 3 LT, opposing Approach 5 200 5 16 LT, Opposing Approach 5 411 5 5 RT, Opposing Approach 16 5 5 511 RT, Opposing Approach 16 5 11 184 LT, Conflicting Approaches 21 21 205 205 LT, Conflicting Approaches 10 10 416 416 RT, Conflicting Approaches 516 516 21 21 RT, Conflicting Approaches 195 195 21 21 Proportion LT, Opposing Approach 0.04 0.70 0.24 0.03 Proportion LT, Opposing Approach 0.09 0.74 0.19 0.02 Proportion RT, Opposing Approach 0.12 0.02 0.24 0.94 Proportion RT, Opposing Approach 0.30 0.01 0.41 0.90 Proportion LT, Conflicting Approaches 0.04 0.04 0.49 0.49 Proportion IT, Conflicting Approaches 0,04 0.04 0.68 0.68 Proportion RT, Conflicting Approaches 0.91 0.91 0.05 0.05 Proportion RT, Conflicting Approaches 0.84 0.84 0.03 0.03 Approach Capacity ----------------------------------------------------------------------- 961 396 911 355 A p Approach Capacity 1277 ----------------------------------------------------------------------- 546 598 81 Intersection Performance Summary Intersection Performance Summary Approach Approach V/C Average Approach Approach V/C Average Movement Flow Rate Capacity Ratio Total Delay ___________ LOS ____ Movement Flow Rate Capacity Ratio __________ _________ ------- Total Delay ----------- LOS ---- __________ __________ _________ NB 284 961 _______ 0.30 3.1 A __________ NB 558 1277 0.44 5.3 B SB 137 396 0.35 3.7 A SB 53 546 0.10 1.4 A EB 543 911 0.60 9.6 B EB 205 598 0.34 3.7 A WB 21 355 0.06 1.3 A WB 27 81 0.33 3.5 A Intersection Delay = 6.7 Intersection Delay = 4.6 Level of Service (Intersection) = B Level of Service (Intersection) = A HCS: Unsignalized Intersections Release 2.1g SBTCPM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) timberline===== =(E-W) custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/ 9/99 Other Information......... am pm 1998 short long bkgrd total Two-way Stop -controlled Inter ction Northbound I Southbound I Eastbound I westbound L T R L T R L T R L T R No. Lanes 11 2 0 1 0 2< 0 0> 0 < 0 1 0 0 0 Stop/Yield volumes PHF Grade MCI (%) SU/RV's (%) CvIa (%) PCE's N 15 513 .95 .95 0 1.10 --------------- N 594 10 5 15 .95 .95 .95 .95 0 1 0 1.10 1.10 -------------- Adjustment Factors vehicle Critical Follow-up Maneuver Gap (tg) ------------------ Time (tf) --- ------------ - --------------- Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 HCS: Unsignalized Intersections Release 2.1g SBTCPM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 318 Potential Capacity: (pcph) 955 Movement Capacity: (pcph) 955 Prob. of Queue -Free State: 0.98 Step 2:LTStreet -----------------------_ SB NB -from - - -major - - Conflicting Flows: (vph) 636 Potential Capacity: (pcph) 781 Movement Capacity: (pcph) 781 Prob. of Queue -Free State: _-----_--_- 0.98 ---------------------___-----_ Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 1186 Potential Capacity: (pcph) 185 Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: - 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: (pcph) -------------------------------------------------------- 181 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) ------------- (veh) ------- - (sec/veh) -------- ------ ------ EB L 6 181 > 462 8.2 0.0 B 8.2 EB R is 955 > NB L 18 781 4.7 0.0 A 0.1 Intersection Delay = 0.2 sec/veh Wk aW-' 4M �W- UN-; W* WD 41ft' OR 4- om HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File NameSBTVAM.HC9 Area Type: Ot 11-16-9 am pm Comment: 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ---- No. Lanes 1 1 < 0 1 1 < 0 1 2 < 0 1 2 < 0 Volumes 20 10 20 135 10 165 20 910 105 195 790 25 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds * Peds WE Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WE Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ________________________ ___--______ ____ _____-__ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 231 797 0.091 0.2.90 16.7 C 17.2 C TR 453 1679 0.071 0.270 17.5 C WB L 462 1592 0.308 0.290 18.0 C 19.1 C TR 432 1600 0.428 0.270 19.9 C NB L 294 1770 0.071 0.690 3.9 A 9.2 B TR 2054 3667 0.546 0.560 9.3 B SB L 265 1770 0.774 0.690 22.0 C 10.9 B TR 2077 3709 0.434 0.560 8.4 B Intersection Delay = 11.3 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.561 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) vermont (N-S) timberline Analyst: Matt File Name: SBTVPM.HC9 Area Type: Comment: 1998 Oth short long bkgr total 11-16-98 am pm Eastbound Westbound Northbound Southbound L T R L T R L T R L T ____ ____ ---- R No. Lanes ____ ____ ____ 1 1< 0 ____ ____ ____ 1 1< 0 ____ ____ ____ 1 2< 0 1 2< 0 Volumes 25 5 20 65 5 65 15 785 85 125 845 15 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ____-______ ________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru + Thru * Right * Right Peds * Peds wB Left * SB Left Thru * Thru Right 9 * Right Peds + Peds NB Right EB Right SB Right WE Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 _____-________________ ________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay ___ _____ LOS --- _____ EB L ____ _______ _____ 379 1306 0.069 _____ _____ 0.290 16.6 C 17.1 C TR 442 1637 0.059 0.270 17.5 C WE L 471 1623 0.144 0.290 17.0 C 17.5 C TR 433 1602 0.169 0.270 18.1 C NB L 283 1770 0.057 0.690 4.0 A 8.5 B TR 2056 3671 0.467 0.560 8.6 B SB L 280 1770 0.471 0.690 6.2 B 6.2 B TR 2081 3716 0.457 0.560 8.5 B Intersection Delay = 9.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.411 _______________________________________________________________________ " w1AW 00 o 10 w aw: ow an HCM: SIGNALIZED INTERSECTION SUMMARY version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: SBTDAM.HC9 Area Typ er 1-19-99(am) am pm Comment: short mid long bkgr total Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 2 2< 0 1 2< 0 1 2 1 1 2< 0 Volumes 305 85 375 5 45. 55 240 845 5 60 600 155 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _________________________________________________________________,---_-- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right g * Peds Peds WB Left * SB Left Thru * Thru Right * Right g * Peds Peds NB Right * EB Right SB Right WB Right Green 16.OA 21.OA Green 4.OA 7.OA 34.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ____ ____ _______ _____ _____ _____ ___ _____ --- EB L 679 3574 0.487 0.190 23.8 C 24.1 C TR 759 3302 0.669 0.230 24.2 C WB L 340 1787 0.015 0.190 21.3 C 19.9 C TR 794 3451 0.139 0.230 19.8 C NB L 325 1787 0.778 0.530 22.4 C 16.1 C T 1602 3725 0.582 0.430 14.4 B R 1007 1599 0.005 0.630 4.4 A SB L 202 1787 0.312 0.460 11.0 B 17.5 C TR 1300 3611 0.642 0.360 18.0 C Intersection Delay = 18.8 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.671 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: SBTDPM.HC9 Area Type- er 1-19-99 am pm Comment: shor mid long bkgrd total Eastbound westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ No. Lanes 2 2 < 0 1 2 < 0 1 2 1 1 2 < 0 Volumes 130 35 270 5 120 110 270 585 5 25 725 230 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left * Thru Thru * + Right * Right Peds * Peds WB Left * SB Left * Thru Thru * Right * Right Peds * Peds NB Right * EB Right SB Right WE Right Green 16.OA 20.OA Green 4.OA 9.OA 33.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ---- ---- ------- ----- ----- ----- --- ----- --- EB L 679 3574 0.208 0.190 22.1 C 22.2 C TR 718 3263 0.469 0.220 22.3 C WB L 340 1787 0.015 0.190 21.3 C 21.3 C TR 768 3492 0.331 0.220 21.3 C NB L 361 1787 0.787 0.540 23.5 C 15.7 C T 1639 3725 0.395 0.440 12.3 S R 1023 1599 0.005 0.640 4.2 A SB L 287 1787 0.091 0.450 10.3 B 22.7 C TR 1257 3591 0.839 0.350 23.0 C Intersection Delay = 20.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 8.0 sec Critical v/c(x) = 0.647 _______________________________________________________________________ 11 i1 I ) Ll i, I APPENDIX C t> am ift � M M 49-0 Aw qM M? " No ift- � t► � ! M HCS: Unsignalized Intersections Release 2.1g 98H9AM.HCO Page 1 HCS: Unsignalized Intersections Release 2.19 98H9PM.HCO Page 1 Center For Microcomputers In Transportation Center For Microcomputers In Transportation University of Florida University of Florida 512 Weil Hall 512 Weil Hall Gainesville, FL 32611-2083 Gainesville, FL 32611-2083 Ph: (904) 392-0378 Ph: (904) 392-0378 Streets: (N-S) cr9 (E-W) horsetooth Streets: (N-S) cr9 (E-W) horsetooth Analyst ................... mjd Analyst................... mjd Date of Analysis.......... 19/9 Other informationpm 1998 short long bkgrd total Date of Analysis.......... 1/1 9 Other Information......... am pm 1998 short long bkgrd total ........!am, All -way Stop -controlled I ersect All -way Stop -controlled Inte ct' Northbound SOUthbound Eastbound westbound Northbound Southbound Eastbound Westbound L T R L T R L T R L T R L T R L T R L T ____ ____ R ____ ____ L T ____ R ____ No. Lanes 1 1 < 0 0 > 1 <_0 1 1 ____ 1 ____ 0 > 1 ____ < 0 No. Lanes _ _ 1 1 '_0 ___ ____ ____ 0 > 1 < 0 1 1 1 0 > 1 < 0 Volumes 181 69 1 4 106 13 16 14 468 3 11 3 Volumes 374 128 2 5 27 15 4 12 168 1 11 9 PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 PHF .95 .95 .95 ------------------------------------------------- .95 .95 .95 .95 .95 .95 .95 .95 .95 ----------------------------------------------------------- Volume Summary and Capacity Analysis WorkSheet --------------------- Volume Summary and Capacity Analysis WorkSheet ------------ -------------------------------- --------------- NB SB EB ------- WB ---- ------------ -- - ------------------------------------------------ 'NB SB EB WB _______________________________________________________________________ LT Flow Rate 191 4 17 3 _______________________________________________________________________ LT Flow Rate 394 5 4 1 RT Flow Rate 1 14 493 3 RT Flow Rate 2 16 177 9 Approach Flow Rate 265 130 525 18 Approach Flow Rate 531 49 194 22 Proportion LT 0.72 0.03 0.03 0.17 Proportion LT 0.74 0.10 0.02 0.05 Proportion RT 0.00 0.11 0.94 0.17 Proportion RT 0.00 0.33 0.91 0.41 Opposing Approach Flow Rate 130 265 18 525 Opposing Approach Flow Rate 49 531 22 194 Conflicting Approaches Flow Rate 543 543 395 395 Conflicting Approaches Flow Rate 216 216 580 580 Proportion, Subject Approach Flow Rate 0.28 0.14 0.56 0.02 Proportion, Subject Approach Flow Rate 0.67 0.06 0.24 0.03 Proportion, Opposing Approach Flow Rate 0.14 0.28 0.02 0.56 Proportion, Opposing Approach Flow Rate 0.06 0.67 0.03 0.24 Lanes on Subject Approach 2 1 3 1 Lanes on Subject Approach 2 1 3 1 Lanes on Opposing Approach 1 2 1 3 Lanes on Opposing Approach 1 2 1 3 IT, Opposing Approach 4 191 3 17 LT, Opposing Approach 5 394 1 4 RT, Opposing Approach 14 1 3 493 RT, Opposing Approach 16 2 9 177 IT, Conflicting Approaches 20 20 195 195 IT, Conflicting Approaches 5 5 399 399 RT, Conflicting Approaches 496 496 15 15 RT, Conflicting Approaches 186 186 18 18 Proportion LT, Opposing Approach 0.03 0.72 0.17 0.03 Proportion LT, Opposing Approach 0.10 0.74 0.05 0.02 Proportion RT, Opposing Approach 0.11 0.00 0.17 0.94 Proportion RT, Opposing Approach 0.33 0.00 0.41 0.91 Proportion LT, Conflicting Approaches 0.04 0.04 0.49 0.49 Proportion LT, Conflicting Approaches 0.02 0.02 0.69 0.69 Proportion RT, Conflicting Approaches 0.91 0.91 0.04 0.04 Proportion RT, Conflicting Approaches 0.86 0.86 0.03 0.03 Approach Capacity ---------------------- ------------------------------ 955 384 - 920 -------------- 352 Approach Capacity ------------------------------------------------------ 1296 558 634 ----------- 77 Intersection Performance Summary Intersection Performance Summary Approach Approach V/C Average Approach Approach V/C Average Movement Flow Rate Capacity Ratio Total Delay LOS Movement Flow Rate Capacity Ratio _______ Total Delay. ___________ LOS ---- __________ __________ _________ _______ NB 265 955 0.28 ___________ 2.9 ____ A __________ __________ _________ NB 531 1296 0.41 4.7 A SB 130 384 0.34 3.6 A SB 49 558 0.09 1.4 A EB 525 920 0.57 8.7 B EB 194 634 0.31 3.2 A WB 18 352 0.05 1.2 A WB 22 77 0.29 3.0 A Intersection Delay = 6.2 Intersection Delay = 4.1 Level of Service (Intersection) = B Level of Service (Intersection) = A HCS: Unsignalized Intersections Release 2.lg 98TCPM.HCO Page_I Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ---------------------------------------------------------------- ------------------------------ Streets: (N-S) timberline (E-W) custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 1/ 9 Other Information......... am pm 998 short long bkgrd total Two-way Stop -controlled Inter cti Northbound I Southbound I Eastbound I Westbound L T R L T R L T R L T R No. Lanes I 1 1 0 1 0 1 < 0 0 > 0 < 0 10 0 0 Stop/Yield volumes PHF Grade MC,s (t) SU/RV's M CV's 00 PCE's N 14 733 .95 .95 0 1.10 --------------- N 953 8 2 13 .95 .95 .95 .95 0 0 1.10 1.10 ______________ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) --------------------------------------------- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg 98TCPM.HCO Page 2 Worksheet for TWSC Intersection --------------------------------------- _________________ Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 1007 Potential Capacity: (pcph) 428 Movement Capacity: (pcph) 428 Prob. of Queue -Free State: 0.96 -------------------------------------------------------- Step 2: LT from Major Street SBNB -------------------------------------------------------- Conflicting Flows: (vph) 1011 Potential Capacity: (pcph) 565 Movement Capacity: (pcph) 565 Prob. of Queue -Free State: 0.97 ------ __________________________________________________ Step 4: LT from Minor Street WB EB ________________________________________________________ Conflicting Flows: (vph) 1794 Potential Capacity: (pcph) 97 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor due to Impeding Movements 0.97 Movement Capacity: (pcph) ________________________________________________________ 94 Intersection Performance Summary Avg. Flow Move Shared Total Rate Cap Cap Delay Movement (pcph) (pcph) (pcph)(sec/veh) -------- ------ ------ ------ ------- EB L 2 94 > 302 12.6 EB R 15 428 > 95% Queue Approach Length LOS Delay (veh) (sec/veh) 0.0 C 12.6 NB L 17 565 6.6 0.0 B 0.1 Intersection Delay = 0.2 sec/veh no mw% an_*=__ W an, � a W .s HCS: Unsignalized Intersections Release 2.lg 98TCAM.HCO Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets (N-S) timberline (E-W) custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ................... mjd Date of Analysis.......... 19/9 Other Information ........ !a, pm 1998 short long bkgrd total Two-way Stop -controlled In rsect Northbound Southbound Eastbound Westbound L T R I L T R I L T R I L T R No. Lanes 11 1 0 1 0 1 < 0 1 0 > 0 < 0 1 0 0 0 stop/Yield Volumes PHF Grade MCI (%) SU/RV's M Cv's M PCE's ---- -- N 7 1027 .95 .95 0 1.10 --------------- 884 3 .95 .95 0 ----- 2 15 .95 .95 0 1.10 1_10 NMI err �■�► NMI MIR ow'__ r M �■■ HCS: Unsignalized Intersections Release 2.19 98TCAM.HCO Page 2 Worksheet for TWSC Intersection --------------------------------------- ---------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 932 Potential Capacity: (pcph) 467 Movement Capacity: (pcph) 467 Prob. of Queue -Free State: 0.96 -------------------------------------------------------- Step 2: LT from Major Street ----------------------- SBNB Conflicting Flows: (vph) 934 Potential Capacity: (pcph) 615 Movement Capacity: (pcph) 615 Prob. of Queue -Free State: 0.99 ---------------------------------------------- Step 4: LT from Minor Street WB EB ________________________________________________________ Conflicting Flows: (vph) 2020 Potential Capacity: (pcph) 72 Major LT, Minor TH Impedance Factor: 0.99 Adjusted Impedance Factor: 0.99 Capacity Adjustment Factor due to Impeding Movements 0.99 Movement Capacity: -------------------------------------------------- (pcph) 71 Adjustment Factors Intersection Performance Summary Vehicle Critical Follow-up Avg. 95% Maneuver Gap (tg) Time (tf) Flow Move Shared Total Queue Approach - Rate Cap Cap Delay Length LOS Delay Left Turn Major Road 5.00 2.10 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) Right Turn Minor Road 5.50 2.60 -------- ------ ------ ------ --- --- ------- ----- --------- Through Traffic Minor Road 6,00 3.30 EB L 2 71 > Left Turn Minor Road 6.50 3.40 300 12.9 0.1 C 12.9 EB R 18 467 > NB L 8 615 5.9 0.0 B 0.0 Intersection Delay = 0.1 sec/veh .W as " M NOW M HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) Vermont (N-S) timberline Analyst: Matt File Name: 98TVAM.HC9 Area Type• her 11-16-98 am pm Comment: 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R ____ L T ____ ____ R ---- No. Lanes ____ ____ ____ 1 1 < 0 ____ ____ 1 1 < ____ 0 ____ ____ 1 2 < 0 1 2 < 0 Volumes 19 7 16 132 8 164 16 777 102 192 739 21 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ___________________ ___________________________-__-_________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peas * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ___________________________________ ____________________ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- EB L ___________ 235 811 _____ 0.085 _____ _____ ___ _____ 0.290 16.7 C 17.1 C TR 450 1665 0.053 0.270 17.5 C WB L 474 1634 0.293 0.290 17.9 C 19.0 C TR 431 1596 0.420 0.270 19.8 C NB L 310 1770 0.061 0.690 3.8 A 8.6 B TR 2050 3661 0.474 0.560 8.6 B SB L 278 1770 0.727 0.690 16.O C 9.7 B TR 2078 3710 0.404 0.560 8.2 B Intersection Delay = 10.6 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 ----------------------------------------------------------------------- sec Critical v/c(x) = 0.515 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) Vermont (N-S) timberline Analyst: Matt File Name: 98TVPM.HC9 Area Type- her 11-16-98 am pm Comment 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ No. Lanes 1 1< 0 1 1< 0 1 2< 0 1 2< 0 Volumes 23 5 20 65 1 63 15 691 83 123 809 10 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ------ _________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru + Thru Right * Right g * Peas Peds + WB Left * SB Left Thru * Thru Right * Right g + Peds Peas NB Right EB Right SB Right WB Right Green 25.OA Green 7.OA 54.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----- __________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 415 1432 0.058 0.290 16.6 C 17.0 C TR 442 1637 0.059 0.270 17.5 C WB L 471 1623 0.144 0.290 17.0 C 17.5 C TR 429 1588 0.156 0.270 18.0 C NB L 293 1770 0.055 0.690 3.9 A 8.2 B TR 2053 3666 0.416 0.560 8.2 B SB L 306 1770 0.422 0.690 5.0 A 7.9 B TR 2082 3718 0.435 0.560 8.4 B Intersection Delay = 8.9 sec/veh Intersection LOS = B Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.386 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) 7ia eeeciu 6� Analyst: Matt File Name: 98TDAM.HC9 Area Type- er 11-16-98 am pm Comment: 1998 short long bkgrd total Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 0> 1 1 0> 1 < 0 1 1< 0 1 1< 0 Volumes 296 78 365 1 40 47 235 831 3 58 251 74 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 --------------------------------- --------------------- ----------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 * NB Left EB Left * + Thru * Thru Right * Right g + Peds Peds * WE Left * SB Left Thru * Thru Right * Right g + Peds Peds NB Right EB Right SB Right WB Right Green 40.OA Green 12.OA 34.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB LT 502 1196 0.784 0.420 21.7 C 14.8 B R 918 1583 0.418 0.580 1.7 B WE LTR 643 1531 0.143 0.420 11.6 B 11.6 B NB L 422 1770 0.585 0.540 10.7 B 20.1 C TR 968 1862 0.907 0.520 22.7 C SB L 75 196 0.819 0.380 50.0 E 22.0 C TR 648 1799 0.528 0.360 17.0 C Intersection Delay = 18.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.852 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation ----------- _------ Streets: (E-W) drake (N-S) t �� BQQClv� Analyst: Matt File Name: 98TDPM.HC9 Area - her 11-16-98 am pm Comment: 1998-short long bkgrd total ------------- --------------------------------------------------------- ----------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 0 > 1 1 0 > 1 < 0 1 1 < 0 1 1 < 0 Volumes 117 28 266 1 114 102 264 563 2 18 707 212 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 --------------- -------- ----------- ----------------------- --------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru + Right * Right Peds * Peds WE Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right EB Right SB Right WE Right Green 27.OA Green 9.OA 50.OP Yellow/AR 5.0 Yellow/AR 4.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB LT 154 531 0.987 0.290 74.7 F 35.0 D R 665 1583 0.421 0.420 13.5 B WE LTR 451 1557 0.505 0.290 19.9 C 19.9 C NB L 287 1770 0.969 0.670 54.2 E 21.4 C TR 1210 1862 0.492 0.650 6.1 B SB L 117 217 0.162 0.540 7.6 B 46.4 E TR 935 1798 1.034 0.520 47.2 E Intersection Delay = 33.4 sec/veh Intersection LOS = D Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 1.015 ----------------------------------------------------------------------- i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 APPENDIX B 1 = = M = = M = M = M = M = = M M = = = MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 11-25-98 Observer: Michael Day: Wednesday City: Ft. Collins R = right turn Intersection: County Road 9/Horsetooth S = straight L = ien turn Time Northbound: CR 9 Southbound: CR9 Total Eastbound: Horsetooth Westbound: Horsetooth Total Total R [--F S L Total R S L Total R S L Total R S L Total Begins B n orth/south easVwest All 17 1 104 113 2 6 11 1 4 2 128 232 7:30 0 19 66 i i : 1! l I IT :' 24 48 3 28 2 105 123 4 4 1 2 3 1 137 7:45 0 172 q Ill 4 28 1 86 125 1 2 0 4 0 132 1 14 38 Mi a I! 1 5 33 0 79 107 7 4 0 0 0 118 Ott 0 7:30-8:30 JIMIt - ii 251 jl:43]-1 123 374 K 498 17 515 889,I PHF 0.74 0.81 0.95 0.61 4 13 1 151 41 2 1.1-11 - III 3 1 0 . 11: :4, 48 . t NN 4:30 0 27 106 1! 1 1 lill i Ml 1 142 39 2 1 2 3 0 47v' - 4:45 2 41 87 RN IN 5 6 , ... .. . Q `1138 0 'i:l yj� 3 3 0 56 5:00 0 33 5 Ri! 2 7 1 !1�111!111i i iF t 2 120 2 4 0 53 173 5:15 0 27 86 AN 1 4:30-5:30 504 1,!6j 47 551 IN, Milt, 1I4 184 i 20 204 PHF 0.95 0.65 0.92 0.83 M M M M M M M M M M M M M M M M = M = MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 11-24-98 Observer: Michael Day: Tuesday City: Ft. Collins R = right turn Intersection: Timberline/Vermont S = straight L = Ian IUM Time Begins Northbound: Timberline Southbound: Timberline Total north/south Eastbound: Vermont Westbound: Vermont Total east/west Total All R S I L Total R S S L Total R S I L Total R S L Total 7:30 56 189 5 50; RR 4 188 110 552 9 4 7 .2011� 52 2 71 145 7:45 13 240 6 I I Orivo:: 'p 10 186 1 86 25 r 480 1 0 7 P p 49 3 21 7311 81 561 10 177 3 h" 4 2 4 204 0 25 423 3 2 4 30 2 18 59 4i :i 23 171 4 3 161 32 1 i"N ii:' 394 3 1 1 33 1 22 61 7:30-830 897 952 1849 IN 42 304 346 2195 PHIF 0.87 0.79 0.53 0.61 4:30 18 188 3 i P rilri;- I :,iil Ill�i"l 2 182 30 i $1 1�1' 1 423 5 4 10 1,1 1, :!t, 16 1 16 64, 51 1 ij 4:45 22 163 4 . ........ . 1 183 19 1 II 39 2 6 0 3 9 15 0 26 50 0 1,14, Ito l� 5:00 22 191 4 3 225 34 479 8 0 5 12 0 10 35 Li '41 4': PL�'..?:15 5:15 21 149 4 4 219 40 l�i 263 437 1 1 5 21 0 13 41 Oil, 1 4:30-5:30 789 942 1731 1111 '! !Y"' i 1 1;11 ij�11111:11 48 129 177 PHIF 0.91 0.9 0.63 0.79 = m M M = M m M M m M = M = = = = = = MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 11-30.98 Observer: Michael Day: Monday City: Ft. Collins R = right turn Intersection: Timberline/Custer S = straight L = ieTt turn Time Northbound: Timberline Southbound: Timberline Total Eastbound: Custer Westbound: Total Total R S I L Total R S L Total R S L Total R S L Total Begins north/south east/west All 0 261 574 7 0 7 7:30 311 2 h! 314 1 0 194 509 5 1 6 7:45 NY I 2 214 . r 2 0 r 2 443, 22 k 215 397 2 399 2T; i 1034 887 1921 17 1-11 1 h 0 177:30-830 : ,i —:, - — - PHIF 0.82 0.85 0.61 We 4:30 4:45 182 187 1 3 1209 6 6 234 !!Ili'! 'r 393 430 2 3 0 0 1 . I � , . Wi. P, 2 3 41 395 7.i 433 5:00 177 7 1:11�i�!�:!'!:ill!;184�lil�li�il!�li��!I 444 5 0 IR 1, �,; 1 1 : 5 I 5:15 187 3 0 UIUP.1.1 441 3 2 IN 4:30 5:30 747 1708 15 ij . `11I,141-'rl !: , Ill 2 1 0 15 1 PHIF 0.98 0.92 0.75 n1a = = = = = = = M M = = M = = M = = = = MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 TABULAR SUMMARY OF VEHICLE COUNTS Date: 11.12-98 Observer: Michael Day: Thursday City: Ft. Collins R = right turn Intersection: Tlmberlin,e/Drake S = straight L = 110TIT IUM Time Northbound: Timberline Southbound: Timberline Total Eastbound: Drake Westbound: Drake Total Total R S L Total R S L Total R S L Total R S L Total Begins north/south east1west All 7:30 0 197 74 N;2il 2 33 146 10 460 133 18 58 10 13 3 0 1 it it I 232 t!, if 01 it 7:45 0 263 54 30 141 11 499 70 16 101 20 14 0 720! ii � If if iN ,17 it221 lA17 t, 2 206 61 if 1111 'Itfil: !;I ll: :11l[i 40 151 17 "iij tf 477 74 17 89 7 0 198 1 165 4( 36 129 15 ':lt;lt:ji� I 392 . fill 6 6 6 0567 :i l i'!, 175 It 7:30-8:30 1069 759 828 �i:ii 2Kif 739 87 826 PHF 0.84 0.91 0.88 0.64 0 1108 60 1 46 155 1 20Z!1'1ijlJ]'] 1� 370 38 7 31 27 28 0 131 4:30 1.1 III 14 111.777i; i i4i P., q i P I :illi.W V. i i�' W 4"A; 50 213 3 499 69 4 25 20 21 140 4:45 0 167 66 M.' N .1, , ,, .' 1.ii 11 !.:I Ili it j 1111 1, If :11�! :1 1 �ilrq,, 11� "I I t f 1 127 71 110.IIIf'. -11 1:12111IN" :iiiii!!!lI1:j 66 160 3 22911i,1111�;1!i! 1 428 70 6 27 29 36 0 III5:00 168 519 lill ilil't 1 l� �lii�l Millf 1: it I'; t;'i "It 5:15 1 161 67 :1 fi 114 11 1111, i 5 0 179 11 469 89 11 34 26 29 0 189 j 8.9 ii14J:i 17,11INiRPI; R 1 "t; . I U, i 4:30-1766 530 l' 2 11411 �p 829 jil I R It I I I2394 217 1 628 11; it ,563, ... 'I ,.11.1t.i I 1 i " �2 Z" PHF 0.89 0.88 0.77 0.83 APPENDIX A i 1 i ' VII. CONCLUSIONS This study assessed the potential impacts of implementing the Rigden Farms mixed -use development located south of Drake Road and east of Timberline Road in Fort Collins, Colorado.. As a result of the analysis, the following conclusions were drawn: - The potential impacts of the proposed project were evaluated at the following intersections: Timberline/Drake, Timberline/Custer, ' Timberline/Vermont, Horsetooth/CR9, and the various accesses. Currently, all analyzed intersections operated acceptably, except for selective movements at the. Timberline/Drake intersection. This intersection requires some selective geometric improvements with the existing traffic volumes. - The traffic impact analyses were performed for future Years 2003, ' and 2020. Future background traffic conditions without the project and total traffic conditions with completion of the proposed project were evaluated. - For Year 2003 background and total traffic conditions, the study intersections are projected to operate at acceptable levels of service.with the geometric improvements recommended in Figure 13. ' - For Year 2020 future background and total traffic conditions, the study. intersections are projected to operate at acceptable. levels of ' service with the recommended improvements. The long range geometry is shown in Figure 14. - Acceptable level of service is achieved for pedestrian, bicycle, ' and transit modes based upon Fort Collins measures in the multi -modal transportation guidelines. L 32 1 Bicycle Level of Service There will be one "Priority Destination" within a quarter mile of Rigden Farms. This will be the future commercial area in the northwest quadrant of the Timberline/Drake intersection. The cross section of Timberline Road has bike lanes. These will be enhanced as Timberline Road ' is improved in the future. Bike lanes on Drake Road will also be enhanced as it is improved in the future. Appendix G contains the Bicycle LOS Worksheet. ' Transit Level of Service ' Currently, this area is served by Route 10. The Fort Collins 2015. Transit System shows that Timberline Road will be a high frequency transit corridor with 20 minute service. Drake Road will be served by feeder route ' service at 30 minute headways. Transit level of service will be at D or better. Most of Rigden Farms will be within 1320 feet of a high frequency or feeder transit route in the future. I 7 U [-1 J I� J 1 ,I 7 31 Pedestrian Level of Service Appendix G contains a map that shows the area within 1320 feet of this site. A portion of the Rigden Farms is shown as a future activity center on the City Structure Plan.- There are/will be a number of pedestrian destinations within 1320 feet of Rigden Farms. As the City continues to expand Timberline Road, improvements will be made to the sidewalks along this arterial street. Rigden Farms will build sidewalks adjacent to Timberline Road and adjacent to Drake Road as various parcels within Rigden Farms are developed. The level of service determination assumes that other future developments and the City of Fort Collins will build their facilities in accordance with Fort Collins standards. This being the case, pedestrian facilities will exist where they currently do not. This is a reasonable assumption. The Pedestrian LOS Worksheet is provided in Appendix G. The minimum level of service for the activity center is B for all measured categories and, for the remainder of Rigden Farms, the minimum level of service is C for all measured categories. The existing residential area to the west of Timberline Road will have easy access to the commercial center within Rigden Farms. The future signal at the Timberline/Custer intersection will provide a safe crossing environment. It is recommended that pedestrian refuge areas be provided on Timberline Road. There is a future church shown on the east side of Timberline Road just south of Rigden Farms. This church will be accessible to/from most of Rigden Farms without.a significant street crossing. It is expected that the church will build sidewalks along their Timberline frontage and provide sidewalk connections along the north/south street, approximately 500 feet east of Timberline Road. Rigden Farm is bordered by residential land uses to the south. There are. no. street connections shown. It is recommended that some pedestrian (and bike) connections be made internally between these neighborhoods. Land to the north of Rigden Farms is expected to be developed with residential uses and a commercial center near the Timberline/Drake intersection. Since the future westbound left -turn on Drake Road will face dual left -turn lanes, there will be a pedestrian refuge area created. Crosswalks at unsignalized intersections will traverse no more than three lanes on Drake Road. Access to the future employment area in the northwest quadrant of the Timberline/Drake intersection will require two street crossings from Rigden Farms. It is recommended that Timberline Road have pedestrian refuge areas both north and south of Drake Road. The east leg of Drake Road will have a refuge area (previous paragraph). With the. recommended refuge areas, the number of lanes crossed by a pedestrian will be no more than 5 at a time. UN Table 6 Year 2020 Peak Hour Total Traffic Operation Level of Service Intersection a1 EM Timberline/Drake (signal) D C Timberline/Vermont (signal) B B Timberline/Custer (signal) B C Horsetooth/CR9 (all -way stop) Horsetooth/CR9 (signal) B B Drake/Full Access (stop sign) NB LT D E NB T/RT A B SB LT C E SB T/RT B B EB LT A A WB LT A A OVERALL A A Drake/ Rigden (stop sign) NB LT C C NB RT A A WB LT A A OVERALL A A Drake/Phase 2 Access (stop sign) NB LT/RT B C WB LT A A OVERALL A A CR9/Phase 4 Access (stop sign) EB LT/RT B B NB LT A A OVERALL A A * Range limit exceeded. Considered to be LOS E/F. m 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Table 5 Year 2020 Peak Hour Background Traffic Operation Level of Service Intersection AN PM Timberline/Drake (signal) C C Timberline/Vermont (signal) B B Timberline/Custer (stop sign) EB LT/RT C C NB LT B B OVERALL A A Horsetooth/ CR9 (all -way stop) A B 27 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CUE VERN kk ,LE YEAR 2003 GEOMETRY I Figure 13 1 1 1 1 1 1 1 Table 3 Year 2003 Peak Hour Background Traffic Operation Intersection Timberline/Drake (signal) Timberline/Vermont (signal) Timberline/Custer (stop sign) EB LT/RT NB LT OVERALL Horsetooth/ CR9 (all -way stop) Level of service C C B B B B A A A A B A Table 4 Year 2003 Peak Hour Total Traffic Operation Intersection Timberline/Drake (signal) Timberline/Vermont (signal) Timberline/Custer (signal) Horsetooth/CR9 (all -way stop) 25 Level of Service Ai FM C C B B B B B B I tV T m 0 c V.5 VERh YEAR 2020 TOTAL PEAK HOUR TRAFFIC N SCALE Figure 12 23 N mu1 55/110 f 45/120 5/5 305/130 ` 1 T f 85 35— nnn 410 370� 2� M N M O 0 �- 170/115 NOM. CUSTER i /-140/95 5/5 -/ } I NOM. n n 15/15 --)� o �� 0 n 2 \\ �o -165/65 �-1D 5 VERMONT ) i 135/65 20/25 } 10/5 20/20--%,�, N in a m DRAKE RD. HORSETOOTH RD. YEAR 2003 TOTAL PEAK HOUR TRAFFIC N NO SCALE AM/PM Rounded to the Nearest 5 Vehicles. 1s 5 15 15 550 215 5/10 - 10/10 5/5 Figure 11 22 tV. FUTURE TOTAL TRAFFIC PROJECTIONS ' The future total traffic projections reflect future traffic conditions with the traffic from the proposed Rigden Farms project. The future total traffic projections were developed for Years 2003 and 2020. Total Traffic Year 2003 The total traffic for Year 2003 was developed by adding traffic from the proposed project to the background traffic for Year 2003. The resulting peak hour total traffic projections for Year 2003 are shown on ' Figure 11. Total Traffic Year 2020 ' The total traffic for Year 2020 was developed by adding traffic from the proposed project to the background traffic for Year 2020. The ' resulting peak hour total traffic projections for Year 2020 are shown on Figure 12. n L L II 21 o� — 110/160 ONO m � 120/210 I� J 1 1 j- 60/115 405/245 -J 1 T f 175/145 — 410/295 n n � . o\^ o rn M O 0 CUSTER �i OR O .7 O O 160/70 7 N f 10/5 VERMONT i 150/70 25/45 f 10/15 —� o 25/25 N DRAKE RD. HORSETOOTH RD. YEAR 2020 BACKGROUND PEAK HOUR TRAFFIC A& N NO SCALE AM/PM Rounded to the Nearest 5 Vehicles. O 15/15 —15/10 /-10/5 20/20 —/ } 15/25 320/115 u, N .O Figure 10 20 m O N o N ^ N 55/110 — 45/120 r— 5/5 } 305/130 85 35 375 270 o� N co CUSTER 5/5 15/15 �1665 c� r f-10 5 VERMONT ) 135/65 20/25 f 10/5 20/20—" N O O DRAKE RD. YEAR 2003 BACKGROUND PEAK HOUR TRAFFIC A& N NO SCALE AM/PM Rounded to the Nearest 5 Vehicles. as U o � *— 5/10 In �- 5/1 0 5/5 1515 —' 15 15—i o n n 485 175 o tn m� Figure 9 19 IV. FUTURE BACKGROUND TRAFFIC PROJECTIONS In order to properly evaluate the potential impact of the proposed Rigden Farms project on the local traffic conditions, future traffic volumes were first estimated for the study area without the project. These future forecasts reflect the growth that is expected from overall development in and around the City of Fort Collins and traffic from other known future projects in the vicinity of the site. Background Traffic Year 2003 The growth reflected in Year 2003 Background Traffic is based on two factors: area wide growth and development, and traffic generated by specific projects located near the study intersections. The overall growth in the study area and the redistribution of traffic was based upon traffic projections provided in the "North Front Range 2020 Regional Transportation Plan," (NFR2020RTP) draft (8/98), and traffic from cited studies. Appropriate portions of these developments were included in the Year 2003 analysis. The peak hour background traffic for Year 2003 is depicted on Figure 9. Background Traffic Year 2020 Future projections of background traffic for Year 2020 were developed utilizing future traffic projections previously developed for the Timberline Road Extension, the NFR2020RTP, and adding traffic from assumed future developments. The peak hour background traffic for Year 2020 is depicted on Figure 10. E. cus 0 r VL.L. VG V GGVV IVIGIY 1 VI I G ViG1YGflA 1 GV PEAK HOUR TRAFFIC A& N SCALE Figure 8 17 cus PHASE 1 SITE GENERATED PEAK HOUR TRAFFIC Figure 7 _E 16 0 0 0 M co Residential Commercial LONG RANGE TRIP DISTRIBUTION 15 A& N NO SCALE Figure 6 1 1 1 i i 1 1 1 1 i 1 1 1 1 1 1 a 0 m 0 A SHORT RANGE (PHASE 1) TRIP DISTRIBUTION 14 N NO SCALE Figure 5 Land Use apartment - 67 DU (Rate) apartment - 8.8 DU (Rate) apartment - 46 DU (Rate) Table 2 (cont.) Trip Generation (Phase A) Daily A.M. Peak Trips Trips Trips in out 444 5 29 (6.63) (0.08) (0.43) 583 7. 38 (6.63) (0.08) (0.43) 305 4 20 (6.63) (0.08) (0.43) TOTAL 14269 TOTAL OF ALL PHASES 24176 13 P.M. Peak Trips Trips in out 28 13 (0.42) (0.20) 37 18. (0.42) (0.20) 19 9 (0.42) (0.20) 336 321 653 658 551 903 1287 1038 Table 2 (cont.) Trip Generation (Phase A) Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out neighborhood com/retail - 160,000 SF 6867 101 64 288 310 (Rate) (42.92) (0.63) (0.40) (1.80) (1.94) retail - 34,000 SF 1459 2.1 14 61 66 (Rate) (42.92) (0.63) (0.40) (1.80) (1.94) restaurant - 6,000 SF 782 29 27 39 26 (Rate) (130.34) (4.82) (4.45) (6.52) (4.34) day care - 100 students 452 43 38 40 46 (Rate) (4.52) (0.43) (0.38) (0.40) (0.46) restaurant - 6,000 SF 782 29 27 39 26 (Rate) (130.34) (4.82) (4.45) (6.52) (4.34) office - 14,5:00 SF 160 20 3 4 18 (Rate) (11.01) (1.37) (0.19) (0.25) (1.24) retail - 14,500 SF 622 9 6 26 28 (Rate) (42.92) (0.63) (0.40) (1.80) (1.94) medical office - 28.,000 SF 1012 54 14 2.8 75 (Rate) (36.13) (1.94) (0.49) (0.99) (2.67) apartment - 40 DU 265 3 17 17 8 (Rate) (6.63) (0.08) (0.43) (0.42) (0.20) senior apartment - 8.0. DU 153 3 2 5 3 (Rate) (1.86) (0.04) (0.03) (0.06) (0.04) apartment - 44 DU 292 4 19 18 9 (Rate) (6.63) (0.08) (0.43) (0.42) (0.20) 12 Table 2 (cont.) Trip Generation (Phase 2) Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out single family - 137 DU 1311 26 77 89 49. (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) multi family - 8 DU 77 2. 5 5 3 (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) TOTAL 1388 28 82 94 52 Trip Generation (Phase 3) Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out single family - 98 DU 938 19 55 64 35 (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) multi family - 24 DU 230 5 13 16 9. (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) TOTAL 1168 24 68 80 44 Trip Generation (Phase 4) Daily A.M. Peak P.M. Peak Land Use Trips Trips Trips Trips Trips in out in out single family - 170 DU 1627 32 95 ill 61 (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) multi family - 40 DU 383 8 22 26 14 (Rate) (9.57) (0.19) (0.56) (0.65) (0.36) TOTAL 2010 40 117 137 75 11 Table 2 Trip Generation (Phase 1) Daily A.M. Peak Land Use Trips Trips Trips in out single family - 120 DU 1148 23 67 (Rate) (9.57) (0.19) (0.56) multi family - 16 DU. 153 3 9 (Rate) (9.57) (0.19) (0.56) apartment - 79 DU 523 6 34 (Rate) (6.63) (0.08) (0.43) apartment - 80.DU 530 6 34 (Rate) (6.63) (0.08) (0.43) townhome - 119 DU 697 8 44 (Rate) (5.86) (0.07) (0.37) townhome - 17.2 DU. 1008 12 64 (Rate) (5.86) (0.07) (0.37) apartment - 38 DU 252 3 16 (Rate) (6.63) (0.08) (0.43) apartment - 48 DU. 318 4 21 (Rate) (6.63) (0.08) (0.43) apartment - 41 DU 272 3 18 (Rate) (6.63) (0.08) (0.43) office - 40,000 SF 440 55 8 (Rate) (11.01) (1.37) (0.19) community center - no external trips TOTAL 5341 123 315 10 P.M. Peak Trips Trips in out 78 43 (0.65) (0.36) 10 6 (0.65) (0.36) 33 16 (0.42) (0.20) 34 16 (0.42) (0.20) 43 21 (0.36) (0.18) 62 31 (0.36) (0.18) 16 8 (0.42) (0.20) 20 10. (0.42) (0.20) 17 8 (0.42) (0.20) 10 50. (0.25) (1.24) 323 209 a m a o W W DRAKE -D r• , logo e, I I� I ' I I \ \ IIIIIIIIIIIIIIIIIIIIIIIii11111111111111111 IIIIIIIIIIIIIIIIY��,, ��_ r I /� ,��IIIIi111111111111111111 � N NO SCALE L— SITE PLAN (PHASE 1) Figure 4 3 0 0 m 0 P 1 SITE PLAN A& N NO SCALE s Figure 3 III. PROPOSED DEVELOPMENT Rigden Farms is a proposed residential/commercial development located in Fort Collins, Colorado. The project site, depicted on Figure 3, is located on the west side of Timberline Road and to the south of Drake Road. The site will have one access to Timberline Road and multiple accesses to Drake Road and CR9. Figure 4 shows the site plan for Phase 1 of Rigden Farms. This will be the area that will be submitted as a PDP in the near future. Primary access to Phase 1 will be from Timberline Road via Custer Drive. While there will be public access to Phase 1 from Drake Road via Rigden Parkway, this will not be the route of choice. In the course of development of Phase 1, Drake Road to the east of Timberline Road will be under construction. Traffic will be strongly encouraged to utilize Custer Drive. The short range analysis assumes that all site generated traffic will utilize Custer Drive. This assumption presents a conservative analysis. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and future street system. A compilation of trip generation information, prepared by the Institute of Transportation Engineers (Trip Generation 6th Edition) was used to project trips that would be generated by the proposed uses at this site. Table 2 shows the trip generation of Rigden Farms. As indicated in Table 2, it is anticipated that Phase 1 would generate approximately 5341 average daily trip ends, 438 morning peak hour trip ends, and 532 afternoon peak hour trip ends. Full development of Rigden Farms will generate approximately 24,176 average daily trip ends, 1454 morning peak hour trip ends, and 2325 afternoon peak hour trip ends. Based upon research contained in the reference document, it was assumed that some (5-10%) of the site generated traffic for the commercial land uses would be internal to all of Rigden Farm or shared trips between land uses within multi -use commercial developments. Trip Distribution The directional distribution of the generated trips was determined for the proposed Rigden Farms. The distribution was determined based upon a gravity model process, future traffic projections from the Timberline Extension study, and engineering judgment. The trip distribution is provided on Figure 5 for Phase 1. The trip distribution for full development is provided in Figure 6. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figures 7 and 8 show the peak hour site generated traffic for Phase 1 and full build out of the proposed project, respectively. 7 Pedestrian Facilities According to City criteria, the limit of the pedestrian analysis is 1320 feet from the site. This site is within 1320 feet of other residential uses: The sidewalk system in the area is sporadic, due to gaps in development activity. These gaps will be closed as development continues. Bicycle Facilities The only defined bicycle facilities on any of the area streets within 1320 feet of the site are along Timberline Road, along Drake Road (west of Timberline Road), and along CR9 (south of Horsetooth Road). Transit Facilities Transfort currently serves this area of Fort Collins with Route 10. Route 10 provides 60 minute service with a stop near the Drake/Timberline intersection. E Table 1 1998 Peak Hour Traffic Operation Level of Service Intersection &1 M Timberline/Drake (signal) C D Timberline/Vermont (signal) B B Timberline/Custer (stop sign) EB LT/RT C C NB LT B B OVERALL A A Horsetooth/ CR9 (all -way stop) B A 5 I I I r I cus VERN RECENT PEAK HOUR TRAFFIC 4 Figure 2 E I 0 II. EXISTING CONDITIONS The location of the proposed Rigden Farms is shown on Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are predominantly residential or vacant. North of the site is undeveloped land. South and west of the site are primarily residential uses. East of the site are open space and gravel extraction uses. The topography near the Timberline/Drake intersection is flat. Terrain decreases in elevation to the east. The center of the City of Fort Collins is located northwest of the site. ' Roads The primary streets which will serve the proposed project within the study area are: Timberline Road, Drake Road, and CR9. Timberline Road is classified as a six lane arterial. Currently, it has a two lane cross section near Rigden Farms. At Horsetooth Road, Timberline Road has four travel lanes, right -turn lanes, left -turn lanes, and bike facilities. At Drake Road, Timberline Road has two travel lanes, left -turn lanes, no right -turn lanes, and limited bike facilities. The speed limit in the study area is 40 mph. Drake Road has a two lane cross section near the Timberline Road ' intersection. The Timberline/Drake intersection is signalized. CR9 has a narrow, two lane cross section north of Horsetooth Road. The Horsetooth/CR9 intersection has all -way stop control. There is a one lane bridge approximately 1000 feet north of Horsetooth Road. CR9 has an improved two lane cross section south of Horsetooth Road. ' Existing Motor Vehicle Traffic Existing traffic flow data was collected in order to form a basis for the traffic study. Traffic counts were performed at the key intersections in November 1998. The volumes are shown in Figure 2. Count data is provided in Appendix A. Table 1 shows the current operation at the key intersections. Calculation forms are provided in Appendix B. Operation is acceptable at the key intersections, except at the Timberline/Drake intersection. At Timberline/Drake in the afternoon peak hour, the eastbound left turning and through vehicles operate at level of service F, ' the southbound right turning and through vehicles operate at level of service E, and the northbound left turning vehicles operate at level of service E. Although the intersection operates at level of service D, these particular movements need to be addressed. Provision of additional travel lanes will improve the operation of this intersection. i I iI. INTRODUCTION This transportation impact study addresses the capacity, geometric, and control requirements at and near the proposed Rigden Farms, located south of Drake Road and east of Timberline Road in Fort Collins, Colorado. The transportation analysis will address potential vehicular impacts upon the roadway system. Traffic projections will be prepared for future Years 2003 and 2020. The year 2003 future includes Phase 1 of the Rigden Farms development. This portion of the analysis is intended to meet the requirements of the Project Development Plan (PDP) transportation study. The long range (2020) analysis is for full development of Rigden Farms. When other phases are proposed for development, a transportation study must be included with that PDP submittal. �I During the course of the analysis, numerous contacts were made with the project landscape architect/planner, project engineering consultant, and City of Fort Collins Traffic Operations Department. The study involved the following steps: - Collect physical, traffic, and development data; Perform trip generation, trip distribution, and trip assignment; Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses. This report is prepared for the following purposes: =Describe existing conditions; Estimate the trip generation by the proposed/assumed developments; Determine the trip distribution of site generated traffic; Evaluate level of service for future Years 2003 and 2020; =Determine the geometrics at key intersections; Determine the impacts of site generated traffic at key intersections. Information used in this report was obtained from the City of Fort Collins Traffic Operations Department, the planning and engineering consultants, the developers, research sources (ITE, TRB, etc.), and field reconnaissance. The following traffic studies were reviewed and considered in preparing this study: ' - Timber Lakes Business Park - Pinecone (New Fort Collins High School). �I 1 11 11 LIST OF FIGURES Figure 1. Site Location ........................................ Page 3 2. Recent Peak Hour Traffic ............................. 4 3. Site Plan ............................................ 8 4. Site Plan (Phase 1).................................. 9 5. Short Range (Phase 1) Trip Distribution .............. 14 6. Long Range Trip Distribution ......................... 15 7. Phase 1 Site Generated Peak Hour Traffic ............. 16 8. Full Development Site Generated Peak Hour Traffic .... 17 9. Year 2003 Background Peak Hour Traffic ............... 19 10. Year 2020 Background Peak Hour Traffic ............... 20 11. Year 2003 Total Peak Hour Traffic .................... 22 12. Year 2020 Total Peak Hour Traffic .................... 23 13. Year 2003 Geometry ................................... 26 14. Year 2020 Geometry ................................... 29 APPENDIX A Traffic Count Data B 1998 Traffic Analyses C Year 2003 Background Traffic Analyses D Year 2003 Total Traffic Analyses E Year 2020 Background Traffic Analyses F Year 2020 Total Traffic Analyses G Pedestrian/Bicycle Level of Service t TABLE OF CONTENTS Paae ' I. II. Introduction ......................................... Existing Conditions LandUse ............................................. 1 2 2 Roads....................................... Existing Motor Vehicle Traffic ....................... Pedestrian Facilities 2 2 6 Bicycle Facilities ................................... Transit Facilities ................................... 6 6 III. Proposed Development ................................. TripGeneration ...................................... Trip Distribution Trip Assignment ..••.••.•.......•...•..... .•.••.•... 7 7. 7 7 IV. Future Background Traffic Projections ................ Background Traffic Year 2003 Background Traffic year 2020 ........................ 18 18 18 V. Future Total Traffic Projections ..................... Total Traffic Year 2003. 21 21 Total Traffic year 2020 .............................. 21 VI. Traffic Impact Analysis .............................. Traffic Analysis Year 2003. 24 24 Traffic Analysis year 2020 ........................... Pedestrian Level of Service .......................... Bicycle Level of Service Transit Level of Service ............................. 24 30 31 31 VII. Conclusions .......................................... 32 LIST OF TABLES M Table 1. 2. 3. 4. 5, 6. 1998 Peak Hour Traffic Operation ..................... Trip Generation ...................................... Year 2003 Peak Hour Background Traffic Operation ..... Year 2003 Peak Hour Total Traffic Operation Year 2020.Peak Hour Background Traffic Operation Year 2020 Peak Hour Total Traffic Operation .......... Page 5 10. 25 25 27, 28 It RIGDEN FARMS TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 1998 Prepared for: Wheeler Commercial Property Services 1027 West Horsetooth Road, Suite 200 Fort Collins, CO. 80526 Prepared by: MATTHEW J. DELICH, P.E. 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 I I I I 1 I I 1 VI. TRAFFIC IMPACT ANALYSIS The previous chapter described the development of future traffic forecasts both with and without the proposed project. Intersection capacity analyses are conducted in this chapter for all scenarios to assess the potential impact of the proposed project -generated traffic on the local street system. Traffic Analysis - Year 2003 The peak hour background and total traffic volumes for Year 2003, illustrated on Figures 9 and 11, respectively, were analyzed to determine the intersection delay and corresponding level of'service. Tables 3 and 4 summarize the results for the respective Year 2003 background and total traffic conditions. The level of service worksheets for Year 2003 background and total traffic conditions are provided in Appendix C and D, respectively. As indicated in Tables 3 and 4, the traffic movements at each of the study intersections are expected to operate at an acceptable level of service under future traffic conditions for Year 2003. Intersections within the site (i.e. along Custer Drive, east of Timberline Road) were not rigorously analyzed. Given the expected volumes, all of the interior intersections will operate acceptably. The Year 2003 intersection geometry is depicted on Figure 13. There are geometric improvements recommended at the Timberline/Drake and Timberline/Custer intersections. The geometry shown in Figure 13 is necessary to achieve acceptable operation at each analyzed intersection. Traffic Analysis - Year 2020 The Year 2020 peak hour traffic volumes for background and total traffic conditions, illustrated on Figures 10 and 12, respectively, were analyzed to determine the intersection delay and corresponding level of service. Tables 5 and 6 summarize the results. Appendix E contains worksheets for Year 2020 background conditions and Appendix F for total traffic conditions. The level of service analyses shown in Table 5 indicate that the study intersections will continue to operate at acceptable levels of service with the Year 2020 background traffic. Table 6 shows that overall acceptable operation will occur, except at the. Horsetooth/CR9 intersection with the all -way stop sign control. The entering volumes exceed the range limits for the analysis procedure. This is considered tobe level of service E/F. With signalization, the Horsetooth/CR9 intersection will operate acceptably. Intersections within the site (i.e. along Custer Drive, east of Timberline Road) were not rigorously analyzed. Given the expected volumes, all of the interior intersections will operate acceptably. There are four right-in/right-out accesses along Drake Road. Right turn exits at these intersections will operate. acceptably. The Year 2020 intersection geometry is depicted on Figure 14. The geometry shown in Figure 14 is necessary to achieve acceptable operation at each analyzed intersection. 24 I rr rs 01 4- 'to, 04 it im *a, WK, ", as) sm do* 4W. do "a, ri HCS: Unsignalized Intersections Release 2.19 SBTCAM.HCO _Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 Streets: (N-S) timberline ( E- W) Custer Major Street Direction.... NS Length of Time Analyzed... 15 (min) Analyst ...................' mjd Date of Analysis.......... 19/99 Other Information........ am bkg pm 1998 short long rd total Two-way Stop -controlled I rsection Northbound I Southbound I Eastbound I Westbound L T R L T R L T R L T R No. Lanes 1 1 2 0 1 0 2 < 0 0 > 0 < 0 10 0 0 Stop/Yield Volumes PHF Grade MC,s (%) SU/RV's (%) CV's (%) PCE's N 10 651 .95 _95 0 1.10 -------------- N 585 5 5 15 .95 .95 .95 .95 0 1 0 1.10 1.10 ------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) --------- -------------------------------------------------------- Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 HCS: Unsignalized Intersections Release 2.lg SBTCAM.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 310 Potential Capacity: (pcph) 964 Movement Capacity: (pcph) 964 Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 621 Potential Capacity: (pcph) 796 Movement Capacity: (pcph) 796 Prob. of Queue -Free State: 0.98 -------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 1314 Potential Capacity: (pcph) 153 Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: (pcph) -------------------------------------------------------- 151 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) ______ ______ _______ (veh) _______ (sec/veh) _ ________ ______ EB L 6 151 > 411 9.3 0.0 B 9.3 EB R 18 964 > NB L 12 796 4.6 0.0 A 0.1 Intersection Delay = 0.2 sec/veh SITE LOCATION 1" = ZUUU 3 N Figure 1 rr ro r r r �s �r ■r rr �r r� +r r r� r �i rr �r r HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.49 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: LTTDAM.HC9 Area Type: Other 1-19-99 0)pm Comment: short mid long bkgrd total Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 2 2 1 1 2 c 0 2 2 1 1 2 1 Volumes 405 250 505 110 225 220 435 1195 70 155 875 205 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 * NB Left EB Left * * Thru * Thru Right * Right g Peds eds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right * WB Right Green 13.OA 20.OA Green 16.OA 7.OA 26.OP Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 -- - ---- - --------------- - -------------------------- --------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 572 3574 0.768 0.160 34.9 D 24.9 C T 828 3762 0.333 0.220 25.0 C R 784 1599 0.679 0.490 16.5 C WB L 286 1787 0.406 0.160 29.2 D 28.4 D TR 766 3483 0.642 0.220 28.2 D NB L 929 3574 0.508 0.260 24.4 C 29.4 D T 1304 3725 1.013 0.350 32.3 D R 831 1599 0.089 0.520 9.2 B SB L 340 1787 0.480 0.190 28.3 D 23.8 C T 1043 3725 0.927 0.280 25.4 D R 720 1599 0.300 0.450 13.4 B Intersection Delay = 26.7 sec/veh Intersection LOS = D Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.769 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 01-19-1999 Center For Microcomputers In Transportation Streets: (E-W) drake (N-S) timberline Analyst: Matt File Name: LTTDPM.HC9 Area e: Other 1-19-99 am P Comment: short mid ong bkgrd ttalo Eastbound westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- No. Lanes 2 2 1 1 2 c 0 2 2 1 1 2 1 Volumes 245 355 495 125 280 225 535 1030 100 245 1185 320 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 0 0 0 Lost Time 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 1.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 ES Left * NB Left Thru * Thru Right * Right Peds * Peds WB Left * SB Left Thru * Thru Right * Right Peds * Peds NB Right * EB Right SB Right * WB Right Green 11.5A 20.OA Green 16.OA 1.OA 33.5P Yellow/AR 4.0 5.0 Yellow/AR 4.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 ------------------------------- -- -------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ----------- ----- ----- ----- --- ----- --- EB L 518 3574 0.513 0.145 30.7 D 25.2 D T 828 3762 0.475 0.220 26.2 D R 688 1599 0.758 0.430 21.7 C WB L 259 1787 0.509 0.145 31.4 D 30.1 D TR 772 3511 0.724 0.220 29.8 D NB L 715 3574 0.811 0.200 33.9 D 20.9 C T 1360 3725 0.837 0.365 15.4 C R 831 1599 0.126 0.520 9.4 B SB L 340 1787 0.760 0.190 35.7 D 25.4 D T 1323 3725 0.990 0.355 26.9 D R 815 1599 0.413 0.510 11.8 B Intersection Delay = 24.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 7.0 sec Critical v/c(x) = 0.808 i APPENDIX D m 0 CiUs VER! YEAR 2020 GEOMETRY N SCALE Figure 14 29