HomeMy WebLinkAboutRIGDEN FARM - OVERALL DEVELOPMENT PLAN - 56-98B - CORRESPONDENCE - REVISIONSItem 18: As discussed at the meeting, it was not our intent to construct a "levee" along the FCRID as implied. County Road 9 shall be raised as part. of it's re -alignment and shall prevent the floodplain from encroaching on the developed portions of the Rigden Farm development. This section shall be modified to clarify this concept. Items 29 and 30: You were to provide Jennifer Zung with additional information regarding offsite flows that may affect our site. These shall be incorporated into the report. Item 33: It was acknowledged that the new Master Plan SWMM run being updated by Anderson Consulting Engineers must be reviewed and accepted by the City. This model will be forwarded to JR to be used in our updated models for the ODP as well as the PDP. However, it was agreed that the ODP would not be held up due to the timing of the anticipated changes to the Master Plan. The remaining items shall also be incorporated into the report or clarified prior to being resubmitted. Pursuant to our discussion, it is our understanding that the concepts presented in the Drainage Study and clarified in our meeting are acceptable to the City at this time. This will allow the ODP Study to. move forward to the Planning 4 ZON1NCr with the agreement that the comments presented will in fact be addressed in the near future. If you should have any additional questions or comments regarding this summary, please contact Jennifer Zung or me at your earliest convenience. Otherwise, would you please initial your acceptance of this letter. Thank you again for your time and consideration of these issues. Sincerely, JR Enggiineeering ,ate/ Robert Almirall, P.E. Project Manager ra cc: Mr. Dave Pietenpol — Wheeler Commercial Mr. Scott Griffin — Wheeler Construction Mr. Vaughn Furness — Jim Sell Design XA91 G4.03\031999SuePaquette Engineering, Mo.- 2620 East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 • FAX (970) 491-9984 www.jreng.com March 19, 1999 Mr. Glen D. Schlueter City of Fort Collins Stormwater Utility P.O. Box580 Fort Collins, CO 80522 RE: Rigden Farm ODP Drainage Study Review Comments JR Project 9164.03 Dear Glen: V On behalf of my client, Wheeler Commercial, I would like to thank you again for meeting with us on March 9, 1999 to discuss the review comments on the ODP Drainage Study. As Scott Griffin mentioned, we really do appreciate the level of detail that was provided and your willingness to discuss the issues and entertain options. . I have listed below our understanding of several of the key issues as referenced in the Project Comment Sheet dated March 3, 1999. The majority of the comments were either editorial in nature or self-explanatory and therefore are not covered in this summary. Item 6: We are aware that there are Master Plan changes forthcoming due to the recently adopted rainfall changes. We have also met with Donnie Dustin and discussed options in regard to redirecting the NTSS to ultimately reduce the runoff directed to the FCRID. V Item 8: The impacts of the re -alignment of County Road 9 to the drainage facilities shall be outlined in the text. Item 9: Additional information regarding the diversion concept and the anticipated quantity of runoff to be diverted shall be provided in the ODP Study. It was agreed at the meeting that the concept of a diversion is acceptable at this level, although adequate supporting documentation and details will be required with the appropriate PDP Drainage Study. Item 10: The percent imperviousness used in the ODP Study are acceptable to the City, although in some cases they are actually higher than the recommended values. Item 17: Jennifer Zung in our office has discussed the new guidelines for floodplains with Marsha Hilmes and portions of these shall be incorporated into the study. A more detailed explanation shall be provided regarding the impacts to the volume and storage of the existing floodplain. X:\9164.03\031999SuePaquette 4935 North 30th Street 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West Colorado Springs, Colorado 80919 Englewood, Colorado 80111 Pueblo, Colorado 81008 (719) 593-2593 • FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119