Loading...
HomeMy WebLinkAboutCARRIAGE HOUSE APARTMENTS - FDP - FDP130024 - CORRESPONDENCE - PROJECT EXTENSIONWe are attempting to finalize our Utility Plans for the Carriage House Apartments, and each of you had a couple of comments on the last submittal, which the attached plans should address. Just so everyone is on the same page, I wanted to quickly highlight the changes. For Engineering's comments, we have labeled the curb at the back of walk on Sheet U1, and referred to the detail on Sheet D2. Also, I have updated the callout for the limits of gutter replacement on Sheet G2. Thanks for catching that one! Forestry also had a couple of comments. To address those, the storm drain alignment out of the existing inlet in Shields St had a bend removed in order to give more clearance between the pipe and the existing pine tree on the corner. We also updated Sheet U1 so that only the water services to Buildings 1, 3, and 5 will be bored under the existing trees. The rest of the services will now be open trenched. Because of this change, we also added some additional notes about tree protection to the notes on U1. In order to address the Water -Wastewater comments, we have updated the note regarding abandonment of utilities to include sewer services. As I mentioned, I believe these changes should get us over the hump for mylars. If each of you can take a look at the plans, and confirm that you are indeed ready for signatures, I would greatly appreciate it. As always, thanks for your time and energy! Andy Reese Project Engineer Northern Engineering Direct: 970.568.5403 Office:970.221.4158 a ndv@ northern en ei nee ri ne.com <Carriage House FINAL DevelopmentAgreement- 12-06-13.pdf> 8 Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Andy Reese f mailto:andy(�bnorthernengineering.coml Sent: Tuesday, September 10, 2013 6:37 AM To: Courtney Levingston Subject: FW: Carriage House Mylar check -set Courtney, I believe that with Roger's response below, we have everyone on -board for mylar on the utility plans, correct? If so, what are our next steps for you? Are we waiting for Tim B to sign off on the landscape plan? Andy Reese Project Engineer Northern Engineering Direct: 970.568.5403 Office: 970.221.4158 andy@northernengineering.com From: Roger Buffington f mailto: RBUFFINGTONCcbfcgov.coml Sent: Monday, September 09, 2013 3:38 PM To: Andy Reese Subject: RE: Carriage House Mylar check -set Andy, I'm ready for mylars. Roger Buffington, P.E. Fort Collins Utilities (970) 221-6854 rb uffi ngto n @fcgov.com From: Andy Reese [ma ilto:andy(a)northernengi neeri ng.com1 Sent: Wednesday, September 04, 2013 4:26 PM To: Tyler Siegmund; Roger Buffington; Tim Buchanan; Wes Lamarque Cc: Courtney Levingston Subject: Carriage House Mylar check -set Hello everyone, 7 looking for a few weeks ago? If so, did you have a chance to look it over and does everything look good? I would like to give the applicant the go ahead to print the planning set of mylars (at least) so they can get those signed and notarized here before things get too hectic with us before the holidays. Thanks Tim! I appreciate your attention to detail and your thoughtful review. Thanks, Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Andy Reese f mailto:andy(5)northernengineering.coml Sent: Wednesday, September 25, 2013 2:08 PM To: Courtney Levingston Cc: Tyler Siegmund Subject: RE: Carriage House Mylar check -set Hi Courtney, I wanted to check in on the Carriage House items, and see where things are. Have we heard anything back from Tim on the Landscape Plan? Also, I know that Tyler sent a draft Development Agreement — has any progress been made on that front? Thanks, Andy From: Courtney Levingston f mailto:CLevingston(dfcoov.com] Sent: Tuesday, September 10, 2013 9:59 AM To: Andy Reese Cc: Tyler Siegmund Subject: RE: Carriage House Mylar check -set yes, once we get the landscape plans and Tim signs off on them, then we can go to mylar. Please have Chuck sign the mylars in a black, fine tip sharpie and make sure it does not smudge. Also, I am not sure where the Development Agreement is at, but that needs to be wrapped up as well. Thanks, L To. _;ourtney Levingston Subject: RE: Carriage House Mylar check -set Bummer. I'd really like to get this wrapped up! I have attached the tree mitigation plan that I just received from the Landscape Architect (Sandi Gibson with Outside L.A., LLC). Let me know if there is anything else you need. Andy From: Courtney Levingston f mailto:CLevingston@fcgov.com] Sent: Wednesday, October 02, 2013 12:49 PM To: Andy Reese Subject: RE: Carriage House Mylar check -set No I have not, I am not sure who on the Applicant end is responsible for the tree mitigation plan, but it should be sent to Tim for a quick pre-mylar review. Thanks, Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevineston@fcgov.com From: Andy Reese f mailto:andyCalnorthernengineerino.coml Sent: Wednesday, October 02, 2013 11:42 AM To: Courtney Levingston Subject: RE: Carriage House Mylar check -set Hey Courtney, Did you ever hear back from Tim? Andy From: Courtney Levingston f ma ilto: CLevi ngstonCa)fcgov.coml Sent: Wednesday, September 25, 2013 3:18 PM To: Tim Buchanan Cc: Andy Reese; Tyler Siegmund Subject: FW: Carriage House Mylar check -set Hi Tim, Did you ever receive the tree mitigation plan check sheet (sheet FP3A) from the Applicant that you were Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Andy Reese f mailto:andv(abnorthernengineering.com1 Sent: Thursday, October 03, 2013 4:40 PM To: Courtney Levingston Subject: RE: Carriage House Mylar check -set That is great news! We'll make the change and get you those documents. Any word on mylar for the utility plans? I know we have a final mylar plat circulating, and I believe the DA was getting close... Andy From: Courtney Levingston Finai Ito: CLevingston(0cgov.coml Sent: Thursday, October 03, 2013 4:37 PM To: Andy Reese Subject: RE: Carriage House Mylar check -set Hi Andy, Tim Buchanan reviewed the tree mitigation plan and requested a note on the tree mitigation plan by tree number 37: "Tree number 37 to be evaluated by a private Certified Arborist for possible retention for improved perimeter screening and to protect of the plum thicket. Recommendation to prune/protect or remove to be provided to the City Forester." Once that is added, the planning set is ok to go to mylar. Thanks! Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Andy Reese f mailto:andv(�O northernengi neering.coml Sent: Wednesday, October 02, 2013 1:39 PM 4 We don't have the DDA finalized yet so I haven't submitted -.,e plat. What is the timetable deadline date for recording the plat? Sent from my iPhone On Dec 6, 2013, at 9:12 AM, Courtney Levingston <CLevingston@fcgov.com> wrote: Andy and Chuck, I also have not received signed mylars of the site plan set (site, landscape, tree mitigation, elevations, lighting). Thanks! Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Andy Reese [ma ilto:andy@ northerneng i neering.com] Sent: Friday, December 06, 2013 9:05 AM To: Courtney Levingston Cc: Tyler Siegmund; Nick Haws Subject: RE: Carriage House Mylar check -set Hi Courtney, The final plat is attached, without signatures of course. I am surprised to hear that you haven't received the plat yet. We'll check on it to see if we can't track it down. Let me know if you need anything else. Andy From: Courtney Levingston rmailto:CLevinqston(@fcqov.com Sent: Friday, December 06, 2013 8:57 AM To: Andy Reese Cc: Tyler Siegmund; Nick Haws Subject: RE: Carriage House Mylar check -set Hi Andy, Can you e-mail Tyler and myself a PDF of the Carriage House plat please? As a heads up, we still do not have a signed mylar of this plat. Thanks 3 To: Courtney Levingston Subject: Re: Carriage House Mylar check -set Thx but my question is what is the City's deadline for recording the plat? I don't need to commence construction until next Spring. Sent from my iPhone On Dec 6, 2013, at 12:20 PM, Courtney Levingston <CLevineston@fcgov.com> wrote: Typically, we record the Development Agreement and the Plat at the same time. We need the signed planning site plan set mylars as well at that time. Thanks, Courtney Levingston On Dec 6, 2013, at 11:56 AM, "Tyler Siegmund" <TSiegmund@fcgov.com> wrote: Hi Chuck, The Development Agreement is ready for final signatures. See attached. Let me know if you have any questions. I will need a check for the recording fees made out to the "Larimer County Clerk and Recorder" for $96.00. Thanks, Tyler Siegmund City of Fort Collins Engineering Department 970.221.6501 TSiegmand@fe ov.com From: Courtney Levingston Sent: Friday, December 06, 2013 9:45 AM To: Tyler Siegmund Subject: FW: Carriage House Mylar check -set Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevineston @fcsov.com From: Charles Bailey fmailto:charies.baileylC comcast.netl Sent: Friday, December 06, 2013 9:22 AM To: Courtney Levingston Subject: Re: Carriage House Mylar check -set Hi Courtney 2 Courtney Levingston From: Charles Bailey <charles.baileyl@comcast.net> Sent: Friday, December 06, 2013 7:40 PM To: Courtney Levingston Subject: Re: Carriage House Mylar check -set Follow Up Flag: Flag for follow up Flag Status: Flagged Sent from my Whone On Dec 6, 2013, at 3:24 PM, Courtney Levingston <CLevineston@fcsov.com> wrote: Chuck, The code says the following: An application submitted to the City for the review and approval of a development plan must be diligently pursued and processed by the applicant. Accordingly, the applicant, within one hundred eighty (180) days of receipt of written comments and notice to respond from the City on any submittal (or subsequent revision to a submittal) of an application for approval of a development plan, shall file such additional or revised submittal documents as are necessary to address such comments from the City. If the additional submittal information or revised submittal is not filed within said period of time, the development application shall automatically lapse and become null and void. The Director may grant one (1) extension of the foregoing one -hundred -eighty -day requirement, which extension may not exceed one hundred twenty (120) days in length, and one (1) additional extension which may not exceed sixty (60) days in length. This subsection (A) shall apply to applications which are, or have been, filed pursuant to this Code and to applications which are, or have been, filed pursuant to the laws of the City for the development of land prior to the adoption of this Code. There is nothing that specifically separates out the plat — it is part of your Final Plan submittal documents. Could you help me understand a bit more about what your concerns are with recording everything now? Thanks, Courtney Levingston, AICP, LEED AP ND City Planner I City of Fort Collins 970.416.2283 clevingston@fcgov.com From: Charles Bailey fmailto:charles.bailey 1C&comcast.net l Sent: Friday, December 06, 2013 3:02 PM 1