Items Requested
Utill Drainage R t Omulred
Redlined Items Being Returned
bite land I Plat Utility Drainage R t Other Items Being Returned
itormwater
y
i
Water/Wastewate
Traffic Operatfom
x
k-._
Trans. Planning
Transfort
Natural Resources
Park Planning
Other:
Hate: All redllned items should be returned with the resubmittal/ rehsions.
Revisions R1 ..
Oil Moro.
.,
. ,
UFAMrA
mm
BUILDING INSPECTION
MAPPING / DRAFTING
1.00
ADVANCE PLANNING
W al
R.O.W. PLANNING
WATER CONSERVATION
STATE HIGHWAY DEPARTMENT
mmmm
mmmmmms
mmmmmmm�
rill
, .
®mom®®awommom�
wommmm�
zmommmoiiiiiim
cepIR
18
Issue, Contact. Peter Barnes
Repeat Comment - Remove contours and utility lines from final site plan. If this
is supposed to be the final compliance plan, they shouldn't be on this plan.
19 Issue Contact. Peter Barnes
Repeat Comment - Show and label all handicap parking ramps on the site plan.
No ramps are indicated.
20 Issue Contact. Peter Barnes
The names of the plat and the development plan should be the same. It's too
confusing to have the plat named Rigden Farms 3rd, and the rest of the plan
named Pardside West at Rigden Farm. The legal description will be whatever
the plat title is.
21 Issue Contact. Peter Barnes
Since this is a final compliance review, building permits won't be issued if the
above -requested changes aren't shown on the recorded plans.
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
pleas feel free to c II me at (970) 221-6750.
Yo �rs Trully,
T Y JCyNE`SJ
City I ner
4 of 4
Transportation Planning
6 Issue Contact: Tom Reiff
No additional comments other than to agree with engineering's comments
regarding the sidewalk issues
Water Wastewater
11
12
13
14
Zoning
15
16
17
Issue Contact. Jeff Hill
Provide required landscape/utility separation distances on the landscape plans.
Issue Contact: Jeff Hill
Please provide a copy of the Rockford drive plans with this submittal. This
project is dependant on the approval of the Rockford drive plans.
Issue Contact. Jeff Hill
As previously indicated, draw meter pits to scale and maintain a 4' minimum
separation between building envelop and outside wall of meter pit.
Issue Contact: Jeff Hill
As previously indicated, curb stops, meter pits and valve boxes may not be
placed in drainage pans.
Issue Contact. Jeff Hill
As previously inidcated coordinated civil plans with those of the Rockford Dr.
plans.
Issue Contact: Peter Barnes
Comments 1,2,3, &5 of zoning's 3/22/01 comments still haven't been
addressed (see comments below). They'll need to address the comments
before permits can be issued.
Issue Contact: Peter Barnes
Repeat Comment - Plant not 16 mentions phases, but there are no phase lines
discernable on the site or landscape plan. Shouldn't have more than 2 phases,
and each phase should include the street trees adjacent to the phase.
Issue Contact: Peter Barnes
Repeat Comment - Show building envelope dimensions for garages.
3of4
3
4
5
Issue Contact: Marc Virata
Comments from last round were not addressed regarding Drake Road and
Rockford Drive.
-Again, one utility plan set needs to be submitted for the development, not
separate plan for onsites and Rockford Drive.
-Again, the sidewalk along Drake Road is not to standard and appears to be too
far detached from Drake compared to the rest of the sidewalk along Drake.
-Again, a typical cross-section of Drake Road should be provided to see how
sidewalk improvements and grading is done and how they tie into the property.
-See previous comments from the last submittal for more explanation on these
comments.
Issue Contact: Marc Virata
A meeting with the two design engineers, Engineering, Stormwater, and
Transportation Planning might be beneficial to discuss the status of the plans
and the concerns with the design proposals along Rockford Drive and Drake
Road.
Issue Contact. Marc Virata
The sidewalk along Rockford Drive appears to stop short of Limon. As
previously noted, indicate on the site plan that Rockford Drive is to be
constructed with this project and that the sidewalk along Limon Drive is to be
constructed with this project.
Stormwater Utility
7
0
0
10
Issue Contact: Wes Lamarque
1. Please provide calculations and details from each size of sidewalk culvert or
curb cut used.
Issue Contact. Wes Lamarque
2. Please provide swale cross-section for swale referenced in report. Also,
please call out the longitudinal slopes of swale.
3. Please provide a detail of retaining wall.
Issue Contact: Wes Lamarque
Issue Contact. Wes Lamarque
4. Please provide a stub of the 54" pipe across Rockford so the road will not
have to be removed when the pipe is extended.
2of4
STAFF PROJECT REVIEW
PARKSIDE HOMES
DESIGN DEVELOPMENT CONSULTANTS
2627 REDWING RD. #350
FT. COLLINS. CO 80526
Date: 07/06/2001
Staff has reviewed your submittal for RIGDEN FARM,fARKSIDE WEST, PDP/FC, #56-
98G, and we offer the following comments:
ISSUES:
Current Planning
22 . Issue Contact: Troy Jones
Lack of Engineering Firm Coordination: Having Loonan Associates do part of
the engineering work and JR Engineering do the other part of the engineering
work seems to be causing a coordination problem. We need to set up a
meeting with Marc Virata (of the Engineering Department), Basil Hamdan (of
the Stormwater Department), Tom Reiff (of the Transportation Planning
Deparmtent), Troy Jones (of the Current Planning Department), and
representatives from the developer, and both JR Eng. And Loonan. Please call
me and I will coordinate city staff's schedules to assist in setting up this
meeting.
23 Issue Contact: Troy Jones
Get in touch directly with Jeff Hill (of the Water/Wastewater Department) at
221-6764 if you need any clarification on the issues from the Water/Wastewater
Department.
24 Issue Contact. Troy Jones
If any of the zoning comments are not clear or you feel they need further
discussion, I recommend we set up a meeting with Peter Barnes (of the Zoning
Department), and myself (Troy Jones of the Current Planning Department) to
discuss. Let me know if you would like me to set this meeting up.
25 Issue Contact. Troy Jones
Please see the redlined plans from the Stormwater, Water/Wastewater, and
Engineering Departments. Note that the Engineering redlines are the same
copies of redlines from the last round of review because they were not
responded to.
Engineering
2
Issue Contact. Marc Virata
Does Natural Resources desire to maintain the private drives?
Revise the plat note as shown on the attachment.
1 of 4