Loading...
HomeMy WebLinkAboutRIGDEN FARM, PHASE 1 - PDP - 56-98C - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: aden F'7AF.rns ►'AP Planner: TCoy SOW ES Engineer: WAM140Fr— 1 si Tralic Operations: Date: q1,5199 Items Requested Site I land Plat I Utility I Drainage Rpt Other Items Required Engineering X x x :2 Tro. Mc. c.4vA\.l qJctt Site X ROW Items Being Returned land I Plat Utility Drainage Rpt Other Items Being Returned . — Stormwater x X X x --- x Water/Wastewate X x x Traffic Operations S4„d 4--t Trans. Planning Transfort Natural Resources Park Planning Other: Note: All redlined items should be returned with the resubmittal/ revisions. i Revisions Routing Sheet fuj z all i mom ' Nommom BUELDING INSPECTION LIGHT& POWER MAPPING/ DRAFTING ADVANCE PLANNING R.O.W. PLANNING IN IMMINIM WATER CONSERVATION mOmm POST OFFICE IN m mmomm �©mImm PUBLIC SERVICE NO m m MINI STATE HIGHWAY DEPARTMENT —1 DITCH COMPANY NNW MMIN RAILROAD: UP or BN/CS WON mmmmmm == m mmmmmm mmmmom womommom �No No amommmmmmm