Loading...
HomeMy WebLinkAboutRIGDEN FARM, 7TH FILING, THE WILLOWS - PDP - 56-98N - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT-10 DRAKE RD. oG O Li.. > .. .. .... FOOTHILLS REGIONAL CHA NNE < FROjEfT SITE HORSETOOTH RD. AC W x 0) 01, V) . Of %.'5p rl < z c) w z LLJ z :D 0 F- z 0-- L) 0 HARMONY RD, VICINITY MAP APPENDIX A MAPS AND FIGURES 8. REFERENCES 1. City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), May 1984. 2. "Drainage and Erosion Control Report for Rigden Farm Filing One, P.D.P.", JR Engineering, September 1999. 3. "Drainage and Erosion Control Report for Rigden Farm Filing Six", JR Engineering, Revised March 28, 2001 and has yet to be approved by the City of Fort Collins. 4. "Final Report for the Hydrologic Model Update for the Foothills Basin Master Drainage Plan", April 27, 1999, Anderson Consulting Engineers, Inc. 5. "Foothills Basin (Basin G) Drainage Master Plan", February 1981, Resource Consultants, Inc. 6. "Overall Drainage Plan for the Rigden Farm O.D.P.", JR Engineering, November 1999. 7. Soil Survey of Larimer County Area, Colorado. United States Department of Agriculture Soil Conservation Service and Forest Service, 1980. 8. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March 1969, and Volume 3, dated September 1999. Drainage and Erosion Control Report Page 14 The Willows at Rigden Farm June 18, 2001 Plan, with base material consisting of 6" coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. 5.4 Maintenance All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Straw bale dikes or silt fences will require periodic replacement. Sediment traps (behind straw bale barriers) shall be cleaned when accumulated sediments equal approximately one-half of trap storage capacity. Maintenance is the responsibility of the developer. 5.5 Permanent Stabilization A vegetative cover shall be established within one and one-half years on disturbed areas and soil stockpiles not otherwise permanently stabilized. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather conditions. Drainage and Erosion Control Report Page 13 The Willows at Rigden Farm June 18, 2001 The storm pipe design was performed for the ultimate build -out of The Willows at Rigden Farms and is included in Appendix E of this report. Riprap is provided at the outlet of all storm pipes. (See Appendix F for calculations.) 5. EROSION CONTROL 5.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled on -site by use of silt fences, straw bale barriers, gravel construction entrances, and seeding and mulch. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. Straw bale dikes will be placed along proposed swales. Erosion control effectiveness, rainfall performance calculations and a construction schedule are provided in Appendix F. 5.2 Dust Abatement During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. 5.3 Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of - way unless so approved by the Director of Engineering in writing. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required per the detail shown on the Erosion Control Drainage and Erosion Control Report Page 12 The Willows at Rigden Farm June 18, 2001 curb or the street crown for local streets. During the major storm, the depth of water over the crown or curb is limited to six inches. The 2-year storm was used as the minor storm and the 100-year storm was used as the major storm for street capacity calculations. See the street capacity calculations in Appendix C for more detailed information. 4.2 Inlet Sizing Inlets were sized using the computer program UDINLET that was developed by James C. Y. Guo of the University of Colorado at Denver. Computer output files for the inlet sizing are provided in Appendix D of this report. Inlets were designed to receive the 100-year peak flows. All inlet locations and sizes are shown on the Utility Plans for the construction of this project. All trench drains are Neenah Type R4990 — DX, with a type "P" grate, and are sized to carry 1.0 cfs of flow from the private driveways. (See Appendix D for trench drain capacity calculation.) 4.3 Storm Sewer System For the storm pipe design, the computer program StormCAD, developed by Haestad Methods, Inc. was used. StormCAD considers whether a storm pipe is under inlet or outlet control and if the flow is uniform, varied,.or pressurized and applies the appropriate equations (Manning's, Kutter's, Hazen -Williams, etc). StormCAD also takes into account tailwater effects and hydraulic losses that are encountered in the storm structures. It calculates the losses through an inlet or manhole by allowing the user to assign a coefficient for the equation, hL= K*(Vz/2g) Where hL = headloss K = headloss coefficient V = average velocity (ft/s) g = gravitational constant (32.2 ft/s2) Drainage and Erosion Control Report The Willows at Rigden Farm Page 11 June 18,2001 n where Q is the maximum rate of runoff in cfs, A is the total area of the basin in acres, Cf is the storm frequency adjustment factor, C. is the runoff coefficient, and I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration. The frequency adjustment factor, Cf, is 1.0 for the initial 2-year storm and 1.25 for the major 100- year storm. The runoff coefficient is dependent on land use or surface characteristics. The rainfall intensity is selected from Rainfall Intensity Duration Curves for the City of Fort Collins (Figure 3.1 of SDDCCS). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration tC=t;+t, (2) where t. is the time of concentration in minutes, t; is the initial or overland flow time in minutes, and t, is the conveyance travel time in minutes. The initial or overland flow time is calculated with the SDDCCS Manual equation: t; = [1.87(1.1 - CCf)Los[/(S)0.33 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. , All hydrologic calculations associated with the sub -basins shown on the attached drainage plan are included in Appendix 13 of this report. 4. HYDRAULIC ANALYSIS 4.1 Allowable Street Capacity The theoretical street and gutter capacity was calculated using Manning's equation for open channel flow. Allowable gutter flows and maximum street capacities for both the initial and major storms were estimated and evaluated based on the specifications set forth in the SDDCCS Manual. During the initial storm, runoff was not allowed to overtop either the Drainage and Erosion Control Report Page I The Willows at Rigden Farm June 18, 2001 Runoff from Offsite-basin OS-1, under ultimate conditions, will be conveyed via overland and gutter flow to the south gutter of Chase Drive. The developed flow of OS-1 will then be conveyed eastward toward the existing sump inlet at Design Point 4. The existing storm system conveys flows to the south releasing them in Existing Water Quality Pond 1. Runoff from Offsite-basin OS-2, under ultimate conditions, will be conveyed via overland and gutter flow to the west gutter of Kansas Drive. The developed flow of OS-2 will then be conveyed southward toward the proposed sump inlet at Design Point 17. The proposed storm system conveys flows to the south releasing them in existing Water Quality Pond 2. Runoff from Offsite-basin OS-3, under ultimate conditions, will be conveyed via overland and gutter flow to the proposed area inlet at design point 1. The developed flow of OS-3 will then be conveyed southward via pipe flow to existing Water Quality Pond 2. Offsite-basin OS-4 is Basin,108 from "Final Drainage and Erosion Control Report for Rigden Farm Filing One, P.D.P." This basin picks up a carryover of 4.42 cfs from Design Point R8c and 6.60 cfs of carryover from Design Point R7e. The existing sump inlet on Custer Drive captures these flows and routes them to the existing Water Quality Pond 1 via storm pipe. The revised flows to the existing sump inlet were checked and do not show any negative impacts to the inlet or the pipe system installed with Rigden Farm First Filing. (See calculations in Appendix E.) 3.4 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine the 2-year and 100-year peak runoff values for each sub -basin. Runoff coefficients were assigned using Table 3-2 of the SDDCCS Manual. The Rational Method is given by: Q = CrCIA Drainage and Erosion Control Report The Willows at Rigden Farm (1) Page S June 18, 2001 r C n the pipe flow software and the system was still capable of handling the flows comfortably. (See Appendix D for grate calculation) Runoff from Sub -basin 120a, 120b, 120c, and 120d will flow to on -grade trench drains at Design Points 30, 31, 32 and 33 respectively. A concrete chase will carry each of these flows eastward to Kansas Drive. These Sub -basins all contribute to the flow at Design Point 17 which joins the flow of DP 16 before entering the proposed sump inlet. The pipe system will then carry these flows to south releasing them into the existing Water Quality Pond 2. Runoff from Sub -basin 121 will be conveyed via gutter flow to Design Point 16. Flows from Design Point 16 will join that of Design Point 17 before entering a proposed sump inlet and pipe system, which conveys flows to the existing Water Quality Pond 2. Runoff from Sub -basin 122 will be conveyed via gutter flow to a proposed sump inlet at Design Point 10. Flows from Design Point 10 will join that of Design Point 8 before entering a proposed sump inlet and pipe system, which conveys flows to the existing Water Quality Pond 1. Runoff from Sub -basin 123 will be conveyed via gutter flow to a proposed sump inlet at Design Point 8. Flows from Design Point 8 will join that of Design Point 10 before entering a proposed sump inlet and pipe system, which conveys flows to the existing Water QualityPond 1. Runoff from Sub -basin 124 will be conveyed via gutter flow to a proposed on -grade combination inlet at Design Point 22. Flow will then enter a storm sewer system, which conveys flows to the existing Water Quality Pond 1. Runoff from Sub -basin 125 will be conveyed via overland flow, directly into Existing Water Quality Pond 1 designed with Rigden Farm Filing One P.D.P. Runoff from Sub -basin 126 will be conveyed via overland flow, directly into Existing Water Quality Pond 2 designed with Rigden Farm Filing One P.D.P. Drainage and Erosion Control Report The Willows at Rigden Farm Page 8 June 18, 2001 n 18 before entering the proposed sump inlet. These flows are then conveyed via pipe flow to the existing Water Quality Pond 2. Runoff from Sub -basin 115b flow southeastward to Design Point 27. Flow is released onto proposed Parkside Drive and conveyed to the proposed sump inlet at Design Point 18. The flows will then be conveyed to the south via pipe flow to the existing Water Quality Pond 2. Runoff from Sub -basins 115c & 115d flows westward to Design Points 28 and 29, respectively and into proposed trench drains. These trench drains release into concrete chases which in turn release on to Kansas Drive. The flow from each of these Sub - basins is conveyed along the easterly gutter of Kansas Drive to the proposed sump inlet at DP 18 & DP 15. After entering the sump inlet, flows are then conveyed via pipe flow to the existing Water Quality Pond 2. Runoff from Sub -basin 116 is conveyed via overland and gutter flow to Design Point 15, a proposed sump inlet. The flow joins that of DP 18 and the other Sub -basins contributing to DP 15 before entering the sump inlet. The flow is then conveyed via storm pipe to the existing Water Quality Pond 2. Runoff from Sub -basin 117 will be conveyed via overland and swale flow to a curb cut at Design Point 19. Flow will then be conveyed along the northern gutter of Parkside Drive eventually joining the remaining flows contributing to DP 18 & 15 before entering the proposed storm sewer. Runoff from Sub -basin 118 ultimately will be conveyed via overland flow eastward toward Kansas Drive. Flow will then be conveyed via gutter flow toward design point 17 where it will join the remaining flows contributing to DP 17 and also join those of DP 16 before entering the proposed sump inlet on Parkside Drive. The storm system releases into the Water Quality Pond 2. Runoff from Sub -basin 119 will be conveyed via swale flow to design point 20 where an existing manhole lid will be replaced by an open grate. The revised flows to this manhole and pipe pose no negative impacts. The inlet capacity check was re -run with Drainage and Erosion Control Report The Willows at Rigden Farm Page 7 June 18,2001 turn releases on to Parkside Drive where it joins the flows from DP 9 & DP 7 and enters the proposed sump inlet. These flows are then conveyed via pipe flow to the existing Water Quality Pond 1. Runoff from Sub -basin 111 is conveyed via overland and gutter flow to Design Point 11, an on -grade trench drain. The trench drain releases into a concrete chase which in turn releases on to Parkside Drive where it joins the flows from DP 9 & DP 7 and enters the proposed sump inlet. These flows are then conveyed via pipe flow to the existing Water Quality Pond 1. Runoff from Sub -basin 112 will be conveyed via overland and gutter flow southward to Design Point 13 and then flow easterly to the proposed sump inlet eventually joining with the remaining flows at DP 7 & DP 9. The pipe system will carry the flows to the existing water quality ponds to the south. Runoff from Sub -basin 113 will be conveyed southward to Design Point 14 via overland and gutter. From here, the flows will follow the north flowline of Parkside Drive to Design Point 15. The flow at Design Point 15 will join that of Design Point 18 and enter the proposed sump inlet. The flow will then be conveyed via storm pipe southward to the existing Water Quality Pond 2. Runoff from Sub -basin 114 will be conveyed via overland and Swale flow to a curb cut at Design Point 12. Flow will then be conveyed along the western side of Parkfront Drive, eventually joining the remaining flows from DP 15 & DP 18, before entering the proposed storm sewer. Runoff from Sub -basin 115 is conveyed via overland and gutter flow to Design Point 18, a proposed sump inlet. The flow joins that of DP 15 and the other Sub -basins contributing to DP 18 before entering the sump inlet. The flow is then conveyed via storm pipe to the existing Water Quality Pond 2 Runoff from Sub -basin 115a is conveyed via overland and gutter flow to Design Point 26, an on -grade trench drain. The trench drain releases into a concrete chase which in turn releases on to Parkside Drive where it joins the remaining flows from DP 15 & DP Drainage and Erosion Control Report Page 6 The Willows at Rigden Farm June 18, 2001 Inlet (DP 18) designed with the `Final Drainage and Erosion Control Report for Rigden Farm Filing Six", which is still awaiting city approval. The revised flows to the proposed sump inlet were checked and do not show any negative impacts to the inlet or the pipe system installed with Rigden Farm First Filing. (See Appendix D for the revised inlet capacity calculation.) Runoff from Sub -basin 106a will be conveyed via overland flow directly on to Rigden Parkway. A flow of 1.6 cfs will be released onto Rigden Parkway and picked up by the proposed 10' Type R Inlet (DP 18) designed with the "Final Drainage and Erosion Control Report for Rigden Farm Filing Six", which is still awaiting city approval Runoff from Sub -basin 107 will flow southward to Design Point 5. Flow is release onto the proposed Parkside Drive and conveyed to the on -grade combination inlet at Design Point 21. The flows will then be conveyed to the south via pipe flow to the existing Water Quality Pond 1. Runoff from Sub -basin 108 will flow westward and then southward to design point 6. An on -grade trench drain will pick up this flow and direct it to a concrete chase which will outlet on the north flowline of Parkside Drive. The flows will follow the north gutter of Parkside Drive to the west, to the proposed sump inlet at Design Point 7. The flows will be conveyed via storm pipe southward to the existing Water Quality Pond 1. Runoff from Sub -basin 109 will be conveyed via overland and gutter flow to a sump inlet, at Design Point 7. The flow will then be carried via pipe flow to the existing Water Quality Pond 1. Runoff from Sub -basin 110 is conveyed via overland and gutter flow to design point 9, a proposed sump inlet in Parkside Drive. These flows are joined by those flows from Design Point 7 and conveyed via pipe flow to the existing Water Quality Pond 1. Runoff from Sub -basin 110a is conveyed via overland and gutter flow to Design Point 23, an on -grade trench drain. The trench drain releases into a concrete chase which in Drainage and Erosion Control Report Page 5 The Willows at Rigden Farm June 18, 2001 Runoff from Sub -basin 100 will be conveyed via overland and gutter flow eastward to design point 4 on Custer Drive, where an existing sump inlet will ultimately convey these flows south to the existing Water Quality Pond 1. Runoff from Sub -basin 101 will be conveyed via overland flow to design point 1, where a sump inlet will ultimately convey these flows to the existing Water Quality Pond 1. Runoff from Sub -basin 102 will flow along the western gutter of Willow Drive to design point 2, where gutter flow will carry the flows east to an existing sump inlet on Custer Drive (Design Point 4). These flows are to be ultimately conveyed to the existing Water Quality Pond 1 designed with Rigden Farm Filing One P.D.P. The revised flows to the existing sump inlet were checked and do not show any negative impacts to the inlet or the pipe system installed with Rigden Farm First Filing. (See calculations in Appendix E.) Runoff from Sub -basin 102a will flow east to the western gutter of Parkfront Drive to design point 2, where gutter flow will carry the flows east to an existing sump inlet on Custer Drive (Design Point 4). These flows are to be ultimately conveyed to the existing Water Quality Pond 1 designed with Rigden Farm Filing One P.D.P Runoff from Sub -basin 103 will flow along the eastern gutter of Parkfront Drive to Design Point 3. From here, the southern gutter of Chase Drive will carry flows to the existing sump inlet (DP 4) and ultimately to the existing Water Quality Pond 1. Runoff from Sub -basin 104 and 105 will be conveyed along the southern side of Chase Drive to Design Point 4 and into the existing sump inlet. The flows will be carved via pipe flow to the existing water quality ponds. Runoff from Sub -basin 106 will be conveyed via overland and gutter flow the north gutter of proposed Parkside Drive to a proposed on -grade combination inlet (DP 21), which outlets to the south into the existing Water Quality Pond 1. A carryover of 0.24 cfs will be released onto Rigden Parkway and picked up by the proposed 10' Type R Drainage and Erosion Control Report The Willows at Rigden Farm Page 4 June 18, 2001 U Control Report for Rigden Farm Filing One, P.D.P." addressed the historic quantities and routing of storm water within The Willows development and therefore, historic runoff calculations are not included as part of this report. 3. LOCAL DEVELOPED DRAINAGE DESIGN 3.1 Method The Rational Method was used to determine the 2-year and 100-year flows for the sub -basins indicated in this drainage report. Drainage facilities were designed to convey the 100-year peak flows. A detailed description of the hydrologic analysis is provided in Section 3.4 and the calculations are found in Appendix B of this report. 3.2 General Flow Routing The proposed drainage patterns from the Overall Drainage Plan for the Rigden Farm O.D.P. have been maintained as closely as possible with this development. Flows within this site will take the form of overlot, gutter, swale and pipe flow. The proposed drainage facilities for this site consist of proposed sump inlets, swales, sidewalk chases, drainage pipes, and erosion control. The following summarizes proposed flow routing within the site. The Overall Drainage Plan,, attached in the map pocket, depicts the locations of basins, design points, and proposed storm sewer. Runoff from the parcel will be conveyed to the south where it will then be collected by a number of inlets and storm pipe, along proposed Parkside Drive. From here, the storm pipes outlet into Water Quality Ponds 1 & 2, designed with Rigden Farm Filing One P.D.P. 1 3.3 Proposed Drainage Plan A qualitative summary of the drainage patterns within each sub -basin and at each design point is provided in the following paragraphs. Certain sub -basins are combined for discussion purposes where practicable, and discussed relative to the design point to which the sub -basins drain. Discussions of the detailed design methodologies for the drainage facilities identified in this section are included in the following sections. Drainage and Erosion Control Report Page 3 The Willows at Rigden Farm June 18, 2001 1 1.4 Design Criteria ® This report was prepared to meet or exceed the submittal requirements established in the City of Fort Collins' "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), dated May 1984. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD) dated 1969 and 1991, developed by the Denver Regional Council of Governments have been utilized. 1.5 Master Drainage Basin The Willows at Rigden Farms lies in Reach 2 of the Foothills Drainage Basin. The master drainage basin study for this area is the "Foothills Basin (Basin G) Master Drainage Plan" by Resource Consultants, Inc., 1981. Another applicable report is the "Final Report for Hydrologic Model Update for the Foothills Basin Master Drainage Plan" by Anderson Consulting Engineers, Inc. (ACE) dated July 15, 1999. The proposed site is also included in the "Overall Drainage Plan for Rigden Farm O.D.P." by JR Engineering, dated November 24, 1999. The ACE model incorporates the proposed build out of the Rigden Farm subdivision as defined in the O.D.P. report. 2. HISTORIC (EXISTING) DRAINAGE The historic (existing) flows draining to or through the site consist primarily of on -site flows with some off -site flows. The overall drainage pattern for the entire site is via overland flow in a southerly direction at slopes that range from 0.5 to 10 percent. The site currently drains directly into Water Quality Ponds 1 & 2 designed with the "Final Drainage and Erosion Control Report for Rigden Farm Filing One, P.D.P." These Water Quality Ponds outlet directly into the Foothills Regional Channel. The most recent HEC-2 hydraulic model for the Foothills Regional Channel was developed by ACE in 1995 and was revised in 1999 to reflect the new 3.67" 100-year rainfall discharges. The latest ACE model (file name FHBRC99.dat dated 7/18/99) was converted to HEC-RAS for the Overall Drainage Plan for the Rigden Farm O.D.P. (file name Foot6.prj). The HEC-RAS for the O.D.P. was modified to reflect proposed improvements for Rigden II, which is awaiting city approval. The "Overall Drainage Plan for the Rigden Farm O.D.P." and the "Final Drainage and Erosion Drainage and Erosion Control Report Page 2 The Willows at Rigden Farm June 18, 2001 1. INTRODUCTION 1.1 Project Description The Willows at Rigden Farm is located in the north half of Section 29, Township 7 North, Range 68 West, City of Fort Collins, Larimer County, Colorado. The Willows is shown as Tract D on Rigden Farm Filing One Final Plat. A location map is provided in Appendix A. The site is bound by Custer Drive to the north, Water Quality Ponds 1 & 2 (from Rigden Farm Filing One P.D.P.) to the south, Rigden Parkway to the east and, the soon to be, Timberline Church site to the west. 1.2 Existing Site Characteristics The site is primarily covered with native grasses. The parcel currently drains in a southerly direction at slopes ranging from 0.5% to 3%. The site discharges into Water Quality Ponds 1 & 2 designed in Rigden Farm Filing One P.D.P. documents. The soil is predominately Nunn clay loam (soil numbers 73 and 74) having slopes from 0 to 5% as shown on the soil map included in Appendix A (USDA SCS, 1980). Nunn clay loam consists of nearly level soils on high terraces and fans. Pertinent characteristics of this soil include slow to medium runoff, a slight hazard of wind erosion, and a moderate hazard of water erosion. Nunn clay loam is categorized as Hydrologic Group C. The other soil group found in the site area in limited amounts is Fort Collins Loam (soil number 36). Runoff from the Fort Collins Loam is moderate, and the hazards of wind and water erosion are moderate. 1.3 Purpose and Scope of Report This report defines the proposed drainage and erosion control plan for Rigden II. The plan includes consideration of all on -site and tributary off -site runoff and the design of all drainage facilities required for these streets, lots, and open spaces. This drainage plan is consistent with the design concepts of the drainage report prepared for Rigden Farm Overall Development Plan (O.D.P.) and with the design concepts of the Drainage and Erosion Control Report for Rigden Farm Filing One, P.D.P. (PDP). Drainage and Erosion Control Report Page 1 The Willows at Rigden Farm June 18, 2001 I- TABLE OF CONTENTS PAGE TRANSMITTALLETTER.................................................................................. i TABLEOF CONTENTS................................................................................................................ ii 1. INTRODUCTION..................................................................................................................1 1.1 Project Description..........................................................................................................1 1.2 Existing Site Characteristics...........................................................................................1 1.3 Purpose and Scope of Report ..........................................................................................1 1.4 Design Criteria................................................................................................................2 1.5 Master Drainage Basin....................................................................................................2 2. HISTORIC (EXISTING) DRAINAGE................................................................................2 3. LOCAL DEVELOPED DRAINAGE DESIGN...................................................................3 3.1 Method............................................................................................................................3 3.2 General Flow Routing.....................................................................................................3 3.3 Proposed Drainage Plan ..................................................................................................3 3.4 Hydrologic Analysis of the Proposed Drainage Conditions...........................................9 4. HYDRAULIC ANALYSIS..................................................................................................10 4.1 Allowable Street Capacity .............................................................................................10 4.2 Inlet Sizing....................................................................................................................11 4.3 Storm Sewer System.....................................................................................................I I 5. EROSION CONTROL.........................................................................................................12 5.1 Erosion and Sediment Control Measures......................................................................12 5.2 Dust Abatement.............................................................................................................12 5.3 Tracking Mud on City Streets.......................................................................................12 5.4 Maintenance..................................................................................................................13 5.5 Permanent Stabilization................................................................................................13 8. REFERENCES ................................... Appendix A: Maps and Figures Appendix B: Hydrologic Calculations Appendix C: Street Capacity Calculations Appendix D:"Inlet Calculations Appendix E: Storm Pipe and Swale Calculations Appendix F: Erosion Control Appendix G: Excerpts from Other Reports Drainage and Erosion Control Report The Willows at Rigden Farm .....................................................14 June 18, 2001 4 FINAL DRAINAGE AND EROSION CONTROL REPORT The Willows at Rigden Farm Prepared for: Slayt Construction 215 Union Boulevard, Suite 350 Lakewood, Colorado 80228 (303) 989-2026 Prepared by: JR Engineering 2620 E. Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 June 18, 2001 Job Number 9304.00 Drainage and Erosion Control Report The Willows at Rigden Farm June 18, 2001