HomeMy WebLinkAboutRIGDEN FARM, 9TH FILING, PARKSIDE COMMONS - FDP - 56-98V - CORRESPONDENCE -Topic: Utility plans
Number: 16 Created: 5/12/2003
9/23/03 All existing stubs must be used or abandoned at the mains. Clearly define all abandonments on
these plans.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
p ase feel ree to call me at (970) 221-6750.
ours Trul
0 roy p es
Cdy PI nner
Page 4
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Details
Number: 135 Created: 9/24/2003
Please provide a City of Fort Collins standard metal sidewalk chase detail.
Topic: Drainage Plan
Number: 27 Created: 5/12/2003
9/23/2003
The hydrology summary table should only have some of the information provided, it should have basin
numbers, basin areas, basin runoff coefficients, design points, 2-year flows, 10-year flows and 100-year flows.
All additional information is extraneous and makes the table harder to decipher.
Topic: ST-2 Alignment
Number: 134 Created: 9/23/2003
ST-2 is currently designed to go in the Kansas Drive right of way, between the curb line and the sidewalk. That
would put it in conflict with any future trees in the parkway strip and potentially with electric lines. Please
move the line such that it is in the Kansas Drive right of way, since there seems to be ample room in that area.
Topic: Utility plans
Number: 25 Created: 5/12/2003
9/23/2003
The ouffall of the northern portion this site is dependent on the construction of the outfoll storm sewer to be
built by the overall Rigden Farms developer in accordance with the Drake/Ziegler plans. Please specify
which lines will be built by this project and which one will be done 'by others" on the utility plans. What
happens if the ones to be built "by others" are not built at the time this project goes to construction ? This
development is dependent on the Rigden Farms 6th Filing obtaining all necessary easements and having the
Drake Road storm sewer built ahead of the construction of drainage facilities associated with this
development.
Construction of storm line ST-2 should be coordinated between this developer and the Rigden Farms overall
developer in order to make sure that the lines are compatible. It might be a good ides to have one
contractor build the line all the way from the proposed inlet on Kansas to the Rigden Farms storm line on
Drake.
Please provide a detail for how the existing sewer in Limon Drive will be modified to add the manhole and
the incoming 18" RCP. Call out collared joints at the proposed stom manhole. Show approximate limits of
street cut on the utility plan.
Department: Transportation Planning
Topic: General
Number: 132
No further comments.
Department: Water Wastewater
Topic: General
Issue Contact: Tom Reiff
Created: 9/22/2003
Issue Contact: Jeff Hill
Number: 133 Created: 9/23/2003
Correct the sanitary sewer profiles to correctly station proposed services. Include sanitary sewer service
inverts which enter manholes on the profile.
See site, landscape and utility plans for other comments.
Topic: Landscape
Number: 23 Created: 5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation between shrubs and all
water/sewer lines. Maintain the required landscape/utility separation distances on the landscape plans.
Page 3
Topic: Kansas Design
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to provide the
transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline of the pan. The
elevation that is provided at the southend of Kansas that may have intended to be the transition elevation doesn't
work as the transition elevation. The transition elevation is the location where the street starts its transitions from
its standard crowned configuration. At this point the slope on the west side of the street is 0%. This is okay as
long as this is within the area transitioning from the crown to the pan (at some point you will have 0 x-slope but
vertical slope to keep the water from ponding).
9/22/03 Need to look at the transition points that are provided. At the south end of the street the cross section of
the street reaches and even exceeds the maximum x-slope before the transition elevation is reached. At the
north end of the street the elevations in the street didn't quite match that shown on the profile.
Number: 127 Created: 7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of the street at
the high point (- station 12+86). If it is not the design needs to be adjusted so that the x-slopes are within the
required ranges for new streets.
9/22/03 the section above is within range - but one of the x-sections probvided is not though. One of the
sections provided exceeds the 3% maximum although you had indicated that the cross slope was 3 %. The
profiles need to be adjusted so that the cross slopes are within parameters. The other cross slope provided is
within parameters, but is not the 2% indicated.
Number: 138 Created: 9/25/2003
Have several places where items on the plan and profiles do not match or are not shown correctly.
Topic: Plat
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement. If the entire area
is retained as an easement then this plat will need to vacate the area with in the building envelope.
7/22/03 Still may be true - need to see what the utilities want.
9/22/03 The Ordinance to vacate the row and retain it as a utility easement is Ordinance No. 131, 2003.
Department: PFA Issue Contact: Michael Chavez
Topic: Addressing
Number: 136 Created: 9/24/2003
ADDRESS NUMERALS:
Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch
numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable).
1997 UFC 901.4.4
A. In Multi -family buildings more then one floor shall abide by the following requirements.
1. The first floor units shall be designated with 100's.
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back side as well as the front of the
buildings.
D. A counter clock addressing pattern shall be maintained when ever possible.
E. An addressing scheme shall be submitted to the fire department for approval prior to being posted on
the building.
Page 2
6a
STAFF PROJECT REVIEW
Ciq•of Fnrt Collins
CITYSCAPE URBAN DESIGN, INC. Date: 09/26/2003
JOE CARTER
3555 STANFORD RD. #105
FT. COLLINS, CO 80525
Staff has reviewed your submittal for RIGDEN FARM, PARKSIDE COMMONS —TRACT U—
9th FLG-TYPE I & FINAL COMPLIANCE (LUC) 56-98T, and we offer the following
comments:
ISSUES:
Department: Current Planning
Topic: General
Issue Contact: Troy Jones
Number: 139 Created: 9/26/2003
Take the City Clerk signature line off the plat. The City Clerk does not sign a plat. Be sure that when we are
ready for mylars, you bring in the those. mylars with owner, lien holder, and attorney's signatures on them
where necessary. The cover sheet of the site plan also needs an owner's certification signature block. Let
me know if you need me to fax you an example of this.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the driveway cuts within the
row do not have a curb. Concentrated flow is not allowed out of the driveways, thus from the highpoint in the
driveway there is to be no curb and gutter, just a concrete or asphalt edge so sheet flow occurs. (See next
comment regarding the amount of flow allowed out a driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter ends. The driveway
cuts do not have curb and gutter need to indicate that the on -site curb and gutter ends at the high point. From
that point it can just be a asphalt edge or a concrete edge if desired. Also need to identify the driveway widths.
9/22/03 Have identified that the curb and gutter ends - but it needs to end at the high point in the driveway not
the right-of-way line.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this site. If for some
reason the Drake Road work is not proceeding and this project is ready to build then it will need to
incorporate the needed improvements (storm sewer ad water line) into this plan set and build them.
7/22/03 Drake road plans are not yet approved.
9/22/03 Drake Road plans have still not been approved.
Number: 94
See additional comments on the plans.
Created: 5/20/2003
Number: 126 Created: 7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with Engineering Inspection.
What I have shown is the minimum amount of patching that will be required for the street cuts and curb and
gutter work. Please show these on your site plan so the contractor has an idea of what the limits of the
repairs will be.
9/22/03 One needs to be extended from what is shown due to where the waterline is in the street.
Number: 137 Created: 9/25/2003
Need to information for development agreement sheet filed out.
Page I