HomeMy WebLinkAboutRIGDEN FARM, 9TH FILING, PARKSIDE COMMONS - PDP - 56-98T - CORRESPONDENCE - (3)Topic: Utility plans
Number: 14 Created: 5/12/2003
Meter pits may not be placed closer than 4 feet to the building envelope. Place all curb stops within 2 feet
of meter pits. Meter pits and curb stops may not be located in hardscaped surfaces (i.e. driveways,
sidewalks, etc.). Place meter pits adjacent to drives and roadways.
Number: i 6 Created: 5/12/2003
All existing stubs must be used or abandoned at the mains. Clearly define all abandonments on these plans.
Number: 19 Created: 5/12/2003
As previously indicated, raise or lower storm sewer where possible to eliminate the need for water main
lowerings.
Number: 24
Created: 5/12/2003
As previously indicated, maintain 10 feet of separation between water/sewer lines and all mail kiosk, electric
services/transformers, trash enclosures, light poles, etc.
Number: 121 Created: 7/22/2003
Will a lowering of the proposed water main in Kansas be required at the 54-inch storm sewer? Provide a detail
if required.
Water line lowering detail shown on the detail sheet is very confusing. Are the water mains being deflected
in multiply directions?
See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours T uly, I`
Troy Jone
City Plann r l
Page 6
I
I
Topic: Utility plans
Number: 25 Created: 5/12/2003
The ouffall of the northen portion this site is dependent on the construction of the ouffall storm sewer to be
built by the overall Rigden Farms developer in accordance with the Drake/Ziegler plans. Please specify
which lines will be built by this project and which one will be done "by others" on the utility plans. What
happens if the ones to be built "by others" are not built at the time this project goes to construction ?
Construction of storm line ST-2 should be coordinated between this developer and the Rigden Farms overall
developer in order to make sure that the lines are compatible. It might be a good ides to have one
contractor build the line oil the way from the proposed inlet on Kansas to the Rigden Farms storm line on
Drake.
An inlet should be added between building I and J to capture localized runoff and to ddelineate the break
from public system to private system.
Please provde a detail for how the existing sewer in Limon Drive will be modified to add the manhole and the
incoming 18" RCP. Call out collared joints at the proposed stom manhole. Show approximate limits of street
cut on the utility plan.
Please specify water -tight joints on the pipe profile sheets since the 100 year HGL exceeds the pipe crown
Department: Transportation Planning Issue Contact Tom Reiff
Topic: General
Number: 123 Created: 7/22/2003
The handicap ramps within the development need to be depicted on the utility plan sheets in addition to the
site and landscape plans. Currently, the utility plans show these areas as raised curbs with no indication of a
handicap ramp.
Number: 124 Created: 7/22/2003
Please note that "No Parking Bike Lane" signs may be necessary along Limon Drive where the curb extends
out into Limon Drive. Contact Traffic Operations regarding the appropriate signage.
Topic: Transportation
Number: 38 Created: 5/14/2003
Please replace the high volume driveways off of Kansas and Rockford Drive with Type 1 driveways as
described in the LCUASS (dwg. 706 & 1601). (FOLLOW UP COMMENT 7-22-03) Why are there sidewalk ramps
shown at the driveways to Kansas and Rockford Dr.? If the ramps are necessary please be aware that the
concrete sidewalks need to continue across these driveways. Refer to drawing # 706 in the utility details sheet
for the acceptable sidewalk grade across Type 1 driveways.
Number: 40 Created: 5/14/2003
Additional access ramps need to be added to the plan at the intersections of Drake Road and Minnesota
Drive. (see red lines) The directional ramps should align as much as possible with the sidewalk to
accommodate the visually impaired, and the ramps should be as wide as the sidewalks. (FOLLOW UP
COMMENT 7-22-03) An additional handicap ramp still needs to be added on the west side of the Limon and
Minnesota intersection (see red lines). It will also need to align with the future ramp across Limon Drive that
leads to the future Pioneer School. Please refer to the Pioneer School construction plans for the ramp
location.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape
Number: 23 Created: 5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation between shrubs and all
water/sewer lines. Correct the note on the landscape plans pertaining to tree/utility separation to read 10
feet of separation. Maintain the required landscape/utility separation distances on the landscape plans.
Page 5
7/22/03 still applies.
Number: 127 Created: 7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of the street
at the high point (- station 12+86). If it is not the design needs to be adjusted so that the x-slopes are within
the required ranges for new streets.
Number: 128 Created: 7/30/2003
You have not been showing a cross pan at the south side of the Kansas Limon intersection. Was it not built
with the x-pan? It was suppose to be built with a cross pan. If it doesn't have a cross pan the cross pan will
need to be built in accordance with the original plans.
Number: 129 Created: 7/30/2003,
Show the curb return information at the north end of the street. This can be shown as existing since Drake will
need to be built first or concurrently. Currently have larger than allowed grade breaks where the flowline you
have designed ties into the Drake Road curb returns.
Number: 130 Created: 7/30/2003
You are showing a vertical curve that is not a vertical curve, but a straight grade line. Please remove the vc
information.
Topic: Plat
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an
easement. If the entire area is retained as an easement then this plat will need to vacate the
area with in the building envelope.
7/22/03 Still may be true - need to see what the utilities want.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 119 Created: 7/16/2003
The proposed electric line between buildings I and J needs to maintain a minimum separation from the
proposed storm sewer of 10-feet. This needs to be shown on the utility plans.
Number: 120 Created: 7/16/2003
Sidewalk and landscaping are not to be installed along Drake Road until such time as Drake Road is built and
all electric facilities are installed.
Department: Police
Topic: General
Number: 125
Lighting and landscape issues appear to be resolved.
Department: Stormwater Utility
Topic: Erosion Control
Number: 12
July 24, 2003
Plan is OK. Thank you.
Issue Contact: Joseph Gerdom
Created: 7/23/2003
Issue Contact: Basil Hamdan
Created: 5/9/2003
Page 4
occur within the horizontal curve. Also need to identify the location of beginnings and
endings of horizontal curves with elevations noted on the profile and plan view. Since this
roadway is a local roadway flowline station can be used if the above information is provided.
7/22/03 Need to provide the x-section if the flowline profiles are to be used.
Number: 79 Created: 5/20/2003
Need to show the removal limits for the existing intersection.
7/22/03 As well as for the other cuts that are needed.
Number: 80 Created: 5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows
different elevations at the PCR on Kansas than the other plans do. Alse the plans differ- in
together.
7/22/03 Still showing different elevations at the PCR than the Drake road plans do. Are you
planning on rebuilding this intersection to your elevations? If so the whole pan section will
need to be rebuilt and street cut fees paid. If not the elevations at the PCRs need to match
those shown on the Drake Road plans.
Number: 82 Created: 5/20/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7.4.13.4 even
within a sag vertical curve located at the flowline the minimum slope needs to be maintained.
7/22/03 Not yet showing this. The vertical curve as you show it may not work if minimum
grades can't be maintained in the flowline.
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need
to provide the transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location. from the flowline
of the pan. The elevation that is provided at the southend of Kansas that may have intended
to be the transition elevation doesn't work as the transition elevation. The transition
elevation is the location where the street starts its transitions from its standard crowned
configuration. At this point the slope on the west side of the street is 0%. This is okay as
long as this is within the area transitioning from the crown to the pan (at some point you will
have 0 x-slope but vertical slope to keep the water from ponding).
Number: 89 Created: 5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon.
Provide tie in points and elevations as needed to show what is to be done here. It should be a
straight grade across the intersection so no flowline design is needed as long as that is. what
remains.
Page 3
7/22/03 this applies to the waterline as well. The extension of the waterline from
Drake into Kansas needs to be done with the Drake road construction.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this
site. If for some reason the Drake Road work is not proceeding and this project is ready to
build then it will need to incorporate the needed improvements (storm sewer ad water line)
into this plan set and build them.
7/22/03 Drake road plans are not yet approved.
Number: 52 Created: 5/20/2003
May not meet the minimum cover requirements over the stormsewer line. You meet it now,
but have not shown the concrete encasement - with that it may not meet it. How thick is the
concrete encasement?
7/22/03 you no longer meet the minimum cover requirement. The stormdrain needs to be
lowered or the street raised to meet minimum cover requirements. You only have about 1.6
feet of cover where 3 feet is needed here.
Number: 94 Created: 5/20/2003
See additional comments on the plans.
Number: 95
See returned check list.
Created: 5/20/2003
Number: 126 Created: 7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with Engineering Inspection.
What I have shown is the minimum amount of patching that will be required for the street cuts and curb and
gutter work. Please show these on your site plan so the contractor has an idea of what the limits of the
repairs will be.
Topic: Kansas Design
Number: 78 Created: 5/20/2003
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for
submittal will be the following is what is being required. For Arterials and Collectors - the
existing criteria remains in place. Centerline stationing is to be provided along with the
required x-sections every 50 feet. For Residential and Local Streets - in lieu of providing
centerline stationing flowline stationing can be used if actual x-sections of the roadway at the
beginning of a horizontal curve, end of a horizontal curve, and additional x-sections be
provided if there are other elevation changes, grade changes and street width changes that
Page 2
STAFF PROJECT REVIEW
Citv of Fort Collins
CITYSCAPE URBAN DESIGN, INC. Date: 07/31/2003
JOE CARTER
3555 STANFORD RD. #105
FT. COLLINS, CO 80525
Staff has reviewed your submittal for RIGDEN FARMS, PARKSIDE COMMONS —TRACT U-
9th FLG-TYPE I (LUC) 56-98T, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number: 131 Created: 7/31 /2003
A hearing for the project has been scheduled for Wednesday August 20 at 4:00 p.m. in the conference room
at 281 North College.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Details
Number: 92 Created: 5/20/2003
Need to provide the following details in addition to the ones that need to be updated as
indicated on the plans:
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
7/22/03 Still need to provide the three details indicated above
Topic: General
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the
driveway cuts within the row do not have a curb. Concentrated flow is not allowed out of the
driveways, thus from the highpoint in the driveway there is to be no curb and gutter, just a
concrete or asphalt edge so sheet flow occurs. (See next comment regarding the amount of
flow allowed out a driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter ends. The driveway
cuts do not have curb and gutter need to indicate that the on -site curb and gutter ends at the high point. From
that point it can just be a asphalt edge or a concrete edge if desired. Also need to identify the driveway widths.
Number: 49 Created: 5/20/2003
Need to coordinate a bunch of work with the Drake/ Ziegler plans. Any work within Drake
Road or that affects the curb, gutter or pavement must be shown as a part of the Drake Road
plans and constructed with that construction. Need to work with JR eng to get the items
incorporated into the plans and work with Matt Baker to pay for the cost of the installation of
those items.
Page 1