Loading...
HomeMy WebLinkAboutRIGDEN FARM, 9TH FILING, PARKSIDE COMMONS - PDP - 56-98T - CORRESPONDENCE - REVISIONS (3)39. Addressed -proposed striping was also added to the street plan and profile sheet (Sheet 10) 40. Addressed 44. Addressed WATER WASTEWATER Topic: Utility Plans 31. Addressed 32. Addressed 14. Addressed 15. Addressed -one instance where minimum separation was not shown is the water and fire services to Bldg. "K"; the fire service is shown 10' from the proposed ss manhole and only 5' from the water service 16. Addressed 17. Addressed 18. Addressed/Acknowledged-per our phone conversation, you stated that the water main would be placed 5' from the flowline of the private drives, with the sanitary sewer mains being 10' from the water, with the understanding that this put the sansew main at a slight offset from the road centerline 19. Acknowledged -Storm sewer is already at minimal bury depth 20. Addressed 21. Addressed 22. Addressed ZONING Topic: Zoning 11. Information is located on Sheet 2 of 2 of the Final Plat Sincerely; TST, C. CONSULTING ENGINE IRSSpenc M. Smith SMS M 73. Addressed (see Topic: General, 57) 74. Addressed 75. Addressed 76. Addressed LIGHT & POWER Topic: General 1. Addressed 2. Addressed 4. Addressed 6. Addressed 7. Addressed STORMWATER UTILITY Topic: General 27. Acknowledged -all given information from master plan is included in the drainage report for this project 26. Addressed -storm sewer stub on the north side of the project is a proposed 24" RCP included in the Drake/Ziegler plans by JR Engineering; we will be tying our proposed ST-2 to this stub Topic: Erosion Control 12. Addressed -"Grading and Erosion Control Notes" are located on Sheet 16, gravel inlet filters will be placed on all existing inlets downstream of construction, seeding and mulching note placed on Sheet 16 Topic: Grading 96. Addressed Topic: Plat 33. Acknowledged-ST-1 is located in a dedicated blanket easement that includes drainage, and is at least 20' wide Topic: Utility Plans 25. Addressed/Acknowledged-the proposed ST-1 connection is directly into the existing 30" RCP and is approximately 4' behind the existing back of curb and is not believed to necessitate a street cut TRANSPORTATION PLANNING Topic: Transportation 38. Addressed 3 50. Acknowledged 51. Acknowledged 52. Storm lines have a minimum of 2' of cover from top of pipe, and a minimum of 1.5' from top of encasement 53. Addressed 54. Addressed 55. Addressed 56. Addressed 57. Addressed. However, it appears that there is not an existing location for a handicapped ramp on the south side of Limon, across from the space between Bldgs. "J" and "K", as indicated in your redlines (Sheet 6). 58, Addressed 59. Addressed 77. Addressed 94. Addressed 95. Addressed Topic: Kansas Design 78. Both centerline and flowline stationing is shown on the plans. Additional elevation information was provided in the plan view as indicated in the redlines (Sheet 10). 79.Addressed 80. Addressed 81. Addressed 82. Grades approaching lowpoint from each side are a minimum of 0.50% 83. Addressed 84. Addressed 85. Addressed 86. Addressed 87. Curb and gutter on Limon that extended past the PCR has been removed from our design. The street/pan grades at the intersection of Limon and Kansas are being shown based upon field survey information by TST Inc. 88. Addressed 89. Addressed Topic: Plat 60. Addressed 61. Addressed 62. Addressed 63. Addressed 64. Addressed 65. Addressed 66. Addressed 67. Acknowledged -will be addressed at a later date Topic: Site Plan 70. Addressed 71. Addressed 72. Addressed N July 2, 2003 Mr. Troy Jones City of Fort Collins Current Planning 281 North College Ave. Fort Collins, CO 80521 Re: Rigden Farm 9th Filing — Parkside Commons Project No. 0891-040 Dear Mr. Jones, We are pleased to submit the Rigden Farm 9th Filing — Parkside Commons construction plans and drainage report. The May 28, 2003 comments have been acknowledged and/or addressed. CURRENT PLANNING Topic: General 28. We received two different comments concerning the name of this project. The one that was used on our plans was "Rigden Farm 9 h Filing — Parkside Commons" 29. Utility meter locations have been coordinated between ourselves, Cityscape, Parkside Homes, Monica Moore (City of Fort Collins) and Connie Woodard (Xcel Energy) 97. Addressed 105.Addressed 111. Addressed ENGINEERING Topic: Details 90. Addressed 91.Addressed 92.Addressed 93. Addressed Topic: General 34.Addressed 45. Addressed 46. Addressed 47.Addressed 48. Addressed 49.Our plans were updated to reflect the Drake/Ziegler design. Sidewalk culverts along Drake Road were removed from our plans. 1