HomeMy WebLinkAboutRIGDEN FARM, 9TH FILING, PARKSIDE COMMONS - PDP - 56-98T - CORRESPONDENCE - REVISIONS (3)39. Addressed -proposed striping was also added to the street plan and profile sheet
(Sheet 10)
40. Addressed
44. Addressed
WATER WASTEWATER
Topic: Utility Plans
31. Addressed
32. Addressed
14. Addressed
15. Addressed -one instance where minimum separation was not shown is the water
and fire services to Bldg. "K"; the fire service is shown 10' from the proposed ss
manhole and only 5' from the water service
16. Addressed
17. Addressed
18. Addressed/Acknowledged-per our phone conversation, you stated that the water
main would be placed 5' from the flowline of the private drives, with the sanitary sewer
mains being 10' from the water, with the understanding that this put the sansew main
at a slight offset from the road centerline
19. Acknowledged -Storm sewer is already at minimal bury depth
20. Addressed
21. Addressed
22. Addressed
ZONING
Topic: Zoning
11. Information is located on Sheet 2 of 2 of the Final Plat
Sincerely;
TST, C. CONSULTING ENGINE IRSSpenc M. Smith
SMS
M
73. Addressed (see Topic: General, 57)
74. Addressed
75. Addressed
76. Addressed
LIGHT & POWER
Topic: General
1. Addressed
2. Addressed
4. Addressed
6. Addressed
7. Addressed
STORMWATER UTILITY
Topic: General
27. Acknowledged -all given information from master plan is included in the drainage
report for this project
26. Addressed -storm sewer stub on the north side of the project is a proposed 24"
RCP included in the Drake/Ziegler plans by JR Engineering; we will be tying our
proposed ST-2 to this stub
Topic: Erosion Control
12. Addressed -"Grading and Erosion Control Notes" are located on Sheet 16, gravel
inlet filters will be placed on all existing inlets downstream of construction,
seeding and mulching note placed on Sheet 16
Topic: Grading
96. Addressed
Topic: Plat
33. Acknowledged-ST-1 is located in a dedicated blanket easement that includes
drainage, and is at least 20' wide
Topic: Utility Plans
25. Addressed/Acknowledged-the proposed ST-1 connection is directly into the
existing 30" RCP and is approximately 4' behind the existing back of curb and is
not believed to necessitate a street cut
TRANSPORTATION PLANNING
Topic: Transportation
38. Addressed
3
50. Acknowledged
51. Acknowledged
52. Storm lines have a minimum of 2' of cover from top of pipe, and a minimum of
1.5' from top of encasement
53. Addressed
54. Addressed
55. Addressed
56. Addressed
57. Addressed. However, it appears that there is not an existing location for a
handicapped ramp on the south side of Limon, across from the space between
Bldgs. "J" and "K", as indicated in your redlines (Sheet 6).
58, Addressed
59. Addressed
77. Addressed
94. Addressed
95. Addressed
Topic: Kansas Design
78. Both centerline and flowline stationing is shown on the plans. Additional elevation
information was provided in the plan view as indicated in the redlines (Sheet 10).
79.Addressed
80. Addressed
81. Addressed
82. Grades approaching lowpoint from each side are a minimum of 0.50%
83. Addressed
84. Addressed
85. Addressed
86. Addressed
87. Curb and gutter on Limon that extended past the PCR has been removed from our
design. The street/pan grades at the intersection of Limon and Kansas are being
shown based upon field survey information by TST Inc.
88. Addressed
89. Addressed
Topic: Plat
60. Addressed
61. Addressed
62. Addressed
63. Addressed
64. Addressed
65. Addressed
66. Addressed
67. Acknowledged -will be addressed at a later date
Topic: Site Plan
70. Addressed
71. Addressed
72. Addressed
N
July 2, 2003
Mr. Troy Jones
City of Fort Collins Current Planning
281 North College Ave.
Fort Collins, CO 80521
Re: Rigden Farm 9th Filing — Parkside Commons
Project No. 0891-040
Dear Mr. Jones,
We are pleased to submit the Rigden Farm 9th Filing — Parkside Commons construction
plans and drainage report. The May 28, 2003 comments have been acknowledged
and/or addressed.
CURRENT PLANNING
Topic: General
28. We received two different comments concerning the name of this project. The
one that was used on our plans was "Rigden Farm 9 h Filing — Parkside
Commons"
29. Utility meter locations have been coordinated between ourselves, Cityscape,
Parkside Homes, Monica Moore (City of Fort Collins) and Connie Woodard (Xcel
Energy)
97. Addressed
105.Addressed
111. Addressed
ENGINEERING
Topic: Details
90. Addressed
91.Addressed
92.Addressed
93. Addressed
Topic: General
34.Addressed
45. Addressed
46. Addressed
47.Addressed
48. Addressed
49.Our plans were updated to reflect the Drake/Ziegler design. Sidewalk culverts
along Drake Road were removed from our plans.