HomeMy WebLinkAboutRIGDEN FARM, PIONEER CHARTER SCHOOL - SITE PLAN ADVISORY REVIEW - 56-98U - CORRESPONDENCE - (5)Number: 21 . Created: 7/30/2003 Shift proposed water main away from landscape islands to avoid tree/utility conflict. Number: 22 Created: 7/30/2003 Label sanitary sewer clean outs which occur in traffic areas as "Traffic Rated" and provide the traffic rated clean out detail on the detail sheet. Number: 23 Created: 7/30/2003 Label proposed manhole at the entrance to this development as new and list rim as well as invert elevations into the proposed manhole. Include the standard sanitary sewer manhole detail on the detail sheet. See site, landscape and utility plans for other comments. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility Plans Number: 50 Created: 8/6/2003 PFA has agreed to the elimination of the fire hydrant within the school property since there are fire hydrants on all four Intersections adjacent to the site. Therefore, abandon the 8-inch water line stub (on Minnesota Drive) at the main and connect the domestic tap to the main In the street. Place the curb stop near the back of the easement in a landscaped area with the meter pit within two feet of the curb stop. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. " Yours Truly, -, roy Jones (city Planner Page 6 a 4. City of Fort Collins erosion control notes must be on the plan (Sheet C-6), please delete the Larimer County Street Standards grading and erosion control notes. 5. If the project is to be phased, a "stand alone" erosion control plan must be submitted for each phase. 6. The outlet to the existing detention area should be protected until construction is complete and the site stabilized. Department: Traffic Operations Issue Contact: Eric Bracke Topic: traffic engineering Number: 1 Created: 7/17/2003 Charter schools typically create morning and afternoon traffic problems. The circulation plan will appear to work to mitigate potential problems but I am uncertain if enough storage for dropoff/pickup is being provided. Parking will be allowed on Minnesota to help with any overflow problems. However, with the 40' cross section, there is no room for bike lanes. Department: Transfort Topic: General Number: 2 No comments Issue Contact: Garold Smith Created: 7/21 /2003 Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 6 Created: 7/25/2003 Please be aware that Kansas Dr., Limon Dr. and Minnesota have been previously identified for on -street bike lanes in the first filing of Pigden Farms and that a combined 1 1-foot parking and bike lane needs to be striped on all streets. Include a cross section for these roadways depicting 2 10-foot travel lanes and 2 1 1-foot parking & bike lanes within the detail sheet of the utility plans. Number: 7 Created: 7/25/2003 Also note that no on -street parking will be permitted at the locations where the curb extends into the street on Kansas and Limon Drive. 'No Parking Bike Lane' signs may be required. Contact Traffic Operations regarding the appropriate signage. Number: 8 Created: 7/25/2003 Add an additional handicap ramp where the curb extends out into the street on Kansas to align with the future street and ramps to the west (see red lines). Number: 9 Created: 7/25/2003 According to the Larimer County Urban Area Street Standards, enhanced treatment is required for the crosswalk where the trail is planned to cross Minnesota and Kansas. On -street parking will also have to be pulled back a safe distance from the crosswalk so it doesn't create a sight distance issue. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 19 Created: 7/30/2003 Clearly define all aspects of water and sewer construction (i.e. Install new manhole, remove existing plug and thrust block, Lengths of pipe between fittings/valves, etc.) Number: 20 Created: 7/30/2003 Provide utility easement documentation for our review. Page 5 Department: Park Planning Topic: General Number: 34 No Comment. Issue Contact: Craig Foreman Created: 7/31/2003 Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 5 Created: 7/24/2003 Lighting and Landscaping: A minimum of 0.7 fc around the building would improve safety. Parking lot also needs additional lighting. Landscape materials along east side of building prohibit surveillance of parking lot. Recommend a taller canopy or lower shrubs. North side of building should have 1.0 fc or greater to minimize potential vandalism. Also lighting on bridge should be increased to a minimum of 0.5 for safety. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 40 Created: 8/1/2003 The drainage swale/pond will need to be maintained by the property owner. This will need to be documented as a note on the Drainage Plan, as well as the Site Plan. Number: 41 Created: 8/1/2003 All of the backup information and calculations were not submitted. Please submit all information with next submittal. Number: 42 Created: 8/1/2003 The grading plan in not detailed enough for construction. Please provide spot elevations for the parking lot and have the grading be detailed enough for construction. The parking lot drains to the southeast, yet there are berms in this location with no outfall. Number: 43 Created: 8/1/2003 Please provide a basin summary table on the drainage plan, along with pond/swale WSEL. Number: 44 Created: 8/1/2003 Please provide all drainage details that are used for this site on the plans. Number: 45 Created: 8/1/2003 Please provide any information from previous reports in the appendix of the new report to document the site is in compliance with previous drainage design. Number: 47 Created: 8/1/2003 Please provide details for the pedestrian bridge including abutments. Topic: Erosion/Sediment Control Number: 46 Created: 8/1/2003 1. Please submit an erosion control report with PS, EFF, and surety calculations. 2. Your erosion control plan must show the BMP's you are planning to use. Please include a legend. 3. All disturbed areas must be seeded and mulched within 30 days of project start, not within a year and a half as your document suggests. There must be a note on the plan (Sheet C-6) so indicating. Page 4 issues? I would suggest some written documentation be provided which becomes part of the packet for P&Z, as the TIS will likely be included in the packet prepared by Current Planning. Topic: Utility Plans Number: 15 Created: 7/29/2003 Please provide information on the plans to indicate the amount and type of flows that will cross over the sidewalks outside the driveways. Please note 9.4.11 of LCUASS; concentrated storm water cannot discharge across a sidewalk, although sheet flow drainage over a walk is allowed as long as the area draining across is less than 750 sq. ft. Number: 16 Created: 7/29/2003 In general, the utility plans were difficult to follow. Please use varying linetypes and lineweights in order to make contour (existing and proposed) lines distinguishable from easement lines, sidewalk, etc. Additional comments may arise from clarification of the plans. Number: 29 Created: 7/30/2003 It appears that no additional utility servicing is required to necessitate street cuts onto the existing surrounding public streets. With the creation of the driveways though, street cuts are likely. Please show street patching and indicate as a typical note, "Limits of street repair are approximate. Final limits to be determined in the field by the City Engineering Inspector at the time the street cuts are made." Department: Excel Energy Topic: General Issue Contact: Len Hilderbrand Number: 35 Created: 7/31/2003 EXISTING 6" FB GAS MAIN ALONG NORTH EDGE OF CUSTER DR. Number: 36 Created: 7/31/2003 IF MTR LOCATION IS ON NORTH WALL / PSCO WILL NEED TO EXTEND MAIN NORTH ALONG EAST SIDE OF KANSAS DR. Number: 37 Created: 7/31/2003 NO TREES PLANTED WITHIN 4 FT OF GAS MAINS OR GAS SERVICES. Department: Forestry Issue Contact: Tim Buchanan Topic: General Number: 38 Created: 7/31/2003 Change the Autum Purple Ash that are uses as a street tree to Bur Oak. The Autum Purple Ash is not on teh approved City street tree list (see attached plan). Number: 39 Add the attached notes to the landscape plan. Department: Light & Power Topic: General Created: 7/31/2003 Issue Contact: Monica Moore Number: 3 Created: 7/21 /2003 The developer will need to coordinate power requirements and a location for a pad type transformer with Light 8E Power Engineering. Normal electric development charges will apply. Number: 4 Created: 7/21 /2003 Landscape plan needs to show both existing and proposed streetlighting. Street trees will need to maintain minimum clearances to streetlights. 15-feet for ornamental trees and 40-feet for shade trees. Department: Natural Resources Topic:. Utility Plans Number: 49 Issue Contact: Doug Moore Created: 8/4/2003 A note to: Bury with 6" of topsoil and seed with appropriate mix. Needs to be added to the Riprap Detail and point out on applicable drawings. Page 3 period until September 5, 2003 at 5:00 p.m. in order to have enough time for the following to occur: (a) Pioneer Charter School's consultant team to respond to these comments and submit revisions, (b) the City to review the revisions, and (c) the City to conduct a Planning and Zoning Board Hearing on the item. In the event that the School Staff isn't willing to grant the City of Fort Collins permission in writing to extend the review and comment period until September 5, we request that such extension be granted to at least August 22, 2003 at 5:00 p.m. Again, I will be out of the office between July 31 and August 10, so please direct any correspondence on this matter to Cameron Gloss, the Current Planning Director while rm gone. Number: 30 Created: 7/31 /2003 The site plan shows both existing and proposed contours. Please remove the existing contours, and only show the proposed. contours. Number: 31 Created: 7/31 /2003 Please add landscaping to screen the transformer, utility meters, and the trash enclosure. Number: 32 Created: 7/31/2003 Coordinate with the Rigden Farm LLC on the ownership and maintenance of the swale area. This has been a point of disageement between the developer of the site directly to the east and Rigden Farm LLC, so it would be a good idea to coordinate this early. Department: Engineering Issue Contact: Marc Virata Topic: General Number: 13 Created: 7/29/2003 Both the site plan and utility plan indicates the use of gravel paving "or approved equal". Please note that gravel is not an approved surface as referenced in 3.2.2(D)(3) per the interpretation of the Current Planning Director. Number: 14 Created: 7/29/2003 With the requirement of a material other than gravel, the utility plans should provide spot elevations and flow arrows to indicate the direction of onsite flows. Number: 17 Created: 7/29/2003 A public access easement should be dedicated to the City for the regional bike/trail connection bisecting the site. It would appear to be beneficial (as a suggestion) if the proposed trail bisecting the property is realigned along the west to intersect with the street curb cut opening on the west side of Kansas Drive as it prevents crossing Kansas Drive at an awkward location which may be directly in front of a future building. Number: 18 Created: 7/29/2003 The site plan and utility plan documents show potential future expansion. A note should be placed on the utility drawings indicating that prior to any development of the future expansion, revised utility drawings showing the design for this area needs to be submitted and approved. I have a general concern on how the potential future driveways intersects with the public streets; the driveway off Limon Drive does not appear to line-up well with the driveway shown on the north side, and the driveway off Minnesota Drive appears that it could be angled better to intersect Minnesota Drive at 90 degree while aligning with the access on the east side. Number: 48 Created: 8/1 /2003 Previous issues #1 & #11 by Traffic Engineering and Transportation Planning respectively discusses the issue of bikelane and bikelane striping on Minnesota Drive. In order to resolve the bikelane issue on Minnesota between both departments, please add the following note to the site and utility plan set: 'The Developer is responsible for all costs for the initial installation of traffic signing and striping for this Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing access for all modes of transportation to and from the Development. Said signing and striping shall meet City criteria. Prior to construction, contact the Signing and Striping Department of Traffic Operations for guidance on proper signing and striping." Topic: traffic engineering Number: 51 Created: 8/6/2003 A traffic study was recently received (dated 8/5103). In reponse to the information contained in the study, the City Traffic Engineer would like to know how the applicant plans to address stacking and circulation problems on the public street(s). I would also like to add that has all possible site design ideas been explored with regards to mitigating these Page 2 ft W,,,i STAFF PROJECT REVIEW Citvof Fort Collins ARCHITECTURE WEST LLC Date: 8/6/03 STEVE STEINBECKER 4710 S. COLLEGE AVE FT. COLLINS, CO 80525 Staff has reviewed your submittal for RIGDEN FARM, 10TH FILING, PIONEER CHARTER SCHOOL - TYPE I (LUC) #56-98U, and we offer the following comments: ISSUES: Department: AT&T Broadband Topic: General Issue Contact: Dennis Greenwalt Number: 33 Created: 7/31/2003 Comcast Cable will not be making plans to service this School until a Broadband Utility Easement is completed with our Commercial Accounts Executive, Reneta Santro. Department: Current Planning Topic: General Issue Contact: Troy Jones Number: 24 Created: 7/30/2003 Please clarify colors of building materials on the elevations. Also, please label the main entry, and any other doors as either entries or exits. Number: 25 Created: 7/30/2003 General note #2 on the site lighting plan specifies that thewalkway lighting is 12 feet tall. The fixtures B3 and B5 are specified in the luminare schedule on the lighting plan to have 50 watt bulbs, however the fixture spec sheets don't show these fixtures with a 50 watt optuion. Also, the post top lighting diagram entitled '1N Metal Halide Decorative Post Top Lighting" shows the footcandle readings for a 175 watt bulb. Please show this information with the 50 watt bulb. The reason this is such an issue is that the Land Use Code specifies that all fixture shall be concealed and fully shielded and shall feature sharp cut-off capability so as to minimuze up -light, spill light, glare and unnecessary diffusion on adjacent property. It is likely that a 50 watt bulb will accomplish the purpose of this standard even though the fixture isn't fully shielded, but I need to see the specs on the 50 watt fixture option to be sure. Number: 26 Created: 7/30/2003 City Staff would prefer to take the item to the September 4th Planning and Zoning Board Hearing. It is my understanding that the Pioneer School staff would prefer taking the item to the August 21st Planning and Zoning Board Hearing. I will be out of the office between July 31 and August 10. Please coordinate the timing of the hearing with Cameron Gloss the Current Planning Director in my absence. Number: 27 Created: 7/30/2003 The surface of the parking lot is shown to be "gravel pave or approved equal." Gravel is not an approved material. We recommend asphalt. There may be other types of paving that could work other than asphalt, but that would require further discussion with Cameron Gloss, the director of Current Planning, and would need to be coordinated with Engineering and Stormwater. Please show further clarification and specifications on the interlocking blocks concept that is part of the proposed design of the parking lot. We are concerned about mid to long term maintenance of the proposed parking lot design. Please clarify how snow plowing works with the proposed parking lot design. I will be out of the office until August 11, 2003, so while I'm gone, I recommend that you discuss this issue with Cameron Gloss, Marc Virata from Engineering, and Basil Harridan from Stormwater. Number: 28 Created: 7/30/2003 We appreciate Pioneer Charter School's commitment to submit a full submittal in accordance with the City of Fort Collins PDP submittal requirements, and their commitment to satisfy the City of Fort Collins standards where possible. Although Section 22-32-124-1.5 of the Colorado Revised Statutes governs the review of this project, we truly do appreciate the school's willingness to go above and beyond what's required as the minimum amount of City review, to work out a win -win solution to design concerns that come up during the review. To that end, Section 22-32-124-1.5 of the Colorado Revised Statutes gives the City thirty days within which to review and comment on the project. We request that you grant the City of Fort Collins permission in writing to extend the the review and comment Page 1