HomeMy WebLinkAboutRIGDEN FARM, PIONEER CHARTER SCHOOL - SITE PLAN ADVISORY REVIEW - 56-98U - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVES(vi) The applicant shall submit as evidence of successful completion of
the applicable criteria, the completed documents pursuant to these
regulations for each proposed use. The Planning Director may require, or
the applicant may choose to submit, evidence that is beyond what is
required in that section. Any variance from the criteria shall be described.
The applicant has submitted the requested Project Development Plan documents
requested by the Planning Director. No variances from the applicable criteria is
being requested, at this time. The applicant recognizesthat the Planning
Director may request additional information for review as deemed appropriate.
(vii) Narrative description of how conflicts between land uses or
disturbances to wetlands or natural area are being avoided or mitigated.
The original ODP has mitigated pedestrian and vehicular conflicts where
appropriate. An internal bike/ped trail system will enhance the connection of the
residential blocks, connect to common area amenities, Fort Collins public trail
and street systems as well as provide access to the proposed Neighborhood
Retail Center. No natural areas exist within this tract, nor mitigation required.
(viii) Written narrative addressing each concern/issue raised at the
neighborhood meeting(s), if a meeting has been held.
No neighborhood meeting has been held. No public concerns have been raised
at this time.
(ix) Name of the project as well as any previous name the project may
have come through conceptual review with.
Rigden Farm, 1st Filing, Tract'E'. Previous reference names of the project were
Spring Creek Farms, CSU, for zoning requests, Poudre Ridge and Pioneer
Charter School for Concept Technical Reviews.
Name and addresses of each owner of property within the boundaries of
the development plan area.
Rigden Farm, LLC
1027 W. Horsetooth Road
Fort Collins, Colorado
80526
List of names of all general and limited partners and/or officers involved as
either applicants or owners.
Wolverine Management Group, Inc., Fred Croci, President
Sierra Resources Corp., Dave Pietenpol, President
June 30, 2003
Pioneer Charter School
@ Rigden Farm
.Statement of Plannln4 Obiectives
(i) Statement of appropriate City Plan Principles and Policies achieved
by the proposed plan.
Appropriate 'City Plan Principals and Policies' were approved through the original
Rigden Farm PDP, 1 't Filing, "Statement of Planning Objectives " dated,
February 24,1999 from Jim Sell Design, Inc. None of those design principles
are proposed to change. This project will meet or exceed all required design
criteria.
(ii) Description of proposed open space, buffering, landscaping,
circulation, transition areas, wetlands and natural areas on site and in the
general vicinity of the project
All open space, buffering, circulation and other areas were designed and
approved originally as a part of the Rigden O.D.P. An off-street trail system was
approved throughout the development connecting this tract to the residential
areas and proposed Neighborhood Commercial Center. All open space, parks
and bicycle/ped trails shall be constructed according to the O.D.P.
(fii) Statement of proposed ownership and maintenance of public and
private open space areas; applicant's intentions with regard to future
ownership of all or portions of the project development plan.
The landscaping along the collector street Custer Drive has been constructed by
the Development Team, Rigden Farm, LLC and dedicated to a Home Owners
Association for maintenance. The remaining street frontage and interior tract
landscaping shall be constructed and maintained by the Pioneer Charter School
development. The public bike path and detention pond areas shall be
constructed by the P.C.S. and maintained by the H.O.A.
(iv) Estimate of number of employees for business, commercial, and
Industrial uses.
The proposed staff requirement for the P.C.S. is 28. This would project total
staff count at any one time. Maintenance, training and similar uses will typically
occur offline to normal "full occupancy' conditions and will not necessarily
overlap with normal classroom operations/conditions.
(v) Description of rationale behind the assumptions and choices made
by the applicant.
As part of an overall development plan including LMN and MMN zonings, an
educational facility is an allowable use. Educational uses are a compatible
complement to a primarily residential neighborhood structure and MMN zoning.