HomeMy WebLinkAboutRIGDEN FARM, 11TH FILING, BROOKLYN PARK ROW HOUSES - PDP - 56-98AD - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW• t
b. Please visit our website at htW://www.fcgov.com/currentplanninpJsubmittals.12h for a
complete list of submittal requirements.
c. A utility coordination meeting is necessary. I would suggest that we conduct
it prior to a project submittal. We need a proposed utility layout drawing
distributed to the various departments and agencies representing gas, TV,
phone, water, sewer, electricity, stormwater. Contact Sheri Wamhoff to
coordinate.
d. Although utilities are going to be a challenge to coordinate on this site, the
zoning requires a minimum density of 12 units per net acre of land, so there
will need to be some give and take with utility configurations, enough to
accomplish the required density.
P
.J�
4
6.. Natural Resources:
Dust Control
• Contact Larimer County Environmental Health regarding a fugitive dust control permit (970-498-
6789)
Trash/Recycling Collection Services
• We request that you provide adequate space in your Dumpster area to allow recycling service.
Landscaping and Design
• Please use native plantstgrasses and reduce bluegrass lawns as much as possible in landscaping or
re -landscaping as per Land Use Code Section 3.2. 1 (E)(2)(3).
7. Fire Department:
a. Address must be visible from the street using a minimum 6" numerals on a
contrasting background.
b. Contact Ron Gonzales for comments from Poudre Fire Authority.
8. Light and Power:
a. The design of the site seems to be very tight. It's unclear how it could be
served.
b. Where will the electric, gas, and. TV meters go? Show this information.
c. Locations need to be provided to accommodate 2 to 3 transformers.
d. Without additional easement width along Custer, the existing sidewalk may
`j need to be ripped up in order to locate the electric service under the
sidewalk locaiton.
9. Transportation:
a. Since Traffic Operations will not be requiring a complete TI5 on the
project, I would still like the submittal.to include LOS for bikes,
pedestrians, and existing and long range transit service. The memo should
also include existing conditions and long range / ultimate build out of Rigden
Farms and the structure plan.
b. All units need to face and open onto a "connecting walkway."
10. Park Planning:
a. The neighborhood and community parkland fees are based on square footage
of each unit, and are due at the time of building permit.
11. Current Planning:
a. Refer to Section 3 (General Development Standards), and Section 4.5 (MMN
Zoning District) in the Land Use Code for the standards that apply to your
proposed development. The Land Use Code is available to view on the
internet at www.fcaov.com/cityclerk/codes.php.
91
Fr7
2. Stormwater Utility Department: _
Location: Rigden Farms
1. This site is in the Foothills drainage basin where the new development fees are
$6,525/acre which is subject to the runoff coefficient reduction.
2. The site is on Stormwater inventory map #12M. A copy can be obtained from the
Utilities office at 700 Wood Street.
3. The drainage study needs to verify compliance with the Overall Drainage Plan (ODP)
for Rigden Farm.. The site imperviousness and subbasin delineation needs to be the.same
as in the ODP or mitigation for changes may be required.
4. Water quality treatment was included in the ODP.
3. Engineering Department:
a. Street Oversizing Fees are-$996/dwelling unit for multifamily. Check with
Matt Baker for the specific amount of this fee for your project.
b. See Traffic Operations and Transportation Planning comments regarding
traffic study requirements.
c. You will be required to have a Development Agreement, a Development
Construction Permit, and Utility Plans.
d. Utility easements, at least 9 feet in. width, will be required to be dedicated
adjacent to Custer and Iowa. Custer Drive will likely need more than 9 feet
in easement width to accommodate electric and gas services. A utility
% coordination meeting will be necessary. This can happen prior to project
submittal.
e. Need to meet driveway separation requirements for the driveways onto
Iowa.
f. Street cut fees will apply for any cuts into streets for utilities and/or
driveway cuts.
4. Traffic Operations
a. The project will require a memo from a traffic engineer showing vehicular
trip generation and consistency with what's already been approved.
5. Water & Wastewater Utility:
Location: SE of Custer Drive and Iowa Drive (Rigden Farm) (M-12)
Proposal: Residential development with 42 townhouses
Ex. Mains: 8-inch water and 8-inch sewer in both Custer and Iowa
c. Comments: The water and sewer mains serving the site must be located in
driveway(s) to avoid landscape conflicts; therefore, the drives must be moved or new
mains brought into the site (and existing stubs abandoned). The proposed project is very
dense (25+/- units/acre). A utility coordination meeting must be held prior to finalizing
the site layout to insure that adequate space is available for the installation of all
underground_ utilities. The water conservation standards for landscape and irrigation will
apply. Development fees and water rights will be due at time of building permit.
2
:Wj
P
MEETING DATE: September 9, 2002
ITEM: Southeast corner of Custer and Iowa, Tract C, Rigden Farm
APPLICANT: Kevin Hearne
LAND USE DATA:
The request is to develop 42 condo units, each with a 2 car garage, on
approximately 2 acres of land.
i DEPARTMENTAL CONTACTS:
- Current Planning-
Troy Jones
221-6750
4
1 Zoning Department-
Peter Barnes
221-6760
Engineering Department-
Sheri Wamhoff
221-6605
Street Oversizing Coordinator-
Matt Baker
221-6605
Poudre Fire Authority-
Ron Gonzales
221-6570
Stormwater Utility-
Glen Schlueter
224-6065
Water & Sewer Utilities-
Roger Buffington
221-6854
Natural Resources Development Planner
Doug Moore
221-6750
Light and Power
Bruce Vogel
221-6700
Transportation Services (ped. & transit)
Tom Reiff
416-2040
Transportation Services (traffic)
Eric Bracke
224-6062
Transfort (local bus service)
Gerold Smith
224-6195
Park Planning
Jeff Lakey
416-2260
COMMENTS:
1. Zoning Department:
a. The property is in the MMN zone district.
b. The minimum density is 12 units per acre.
c. The compact spaces shown need" ",feet of landscaping between the property of
line and the parking stall.
d. Garage doors that face one another are required to be at least 28 feet
apart.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. .PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
CURRENT PLANNING DEPARTMENT
2. Each individual dwelling unit has a garage, and will each subscribe to the
HOA endorsed trash hauling service, including recycling.
3. We intend to use fescue in turf areas rather than bluegrass.
Poudre Fire Authority
a. Address will be visible from the street using 6" numerals. We won't be
using bronze numerals on brown brick.
b. We have coordinated with Ron Gonzales on fire code issues.
Light and Power
a. We've revised the design since the Conceptual Review. We've
reduced the total number of buildings, thereby eliminating the need to
run water or sewer in the drive aisles. This has allowed utility
coordination to be greatly simplified.
b. We have shown on the utility plans the locations of the gas, electric
and TV meters. The meter locations have been screened by
i configuration and landscaping.
C. Transformer locations have been coordinated with Light & Power.
d. We propose a 9 foot wide easement along Custer Drive. If necessary,
we acknowledge that the sidewalk may need to be torn up to
accommodate utilities.
Transportation Planning
a. The TIS update memo includes the LOS for bikes, pedestrians, and
existing and long range transit service, including existing conditions
and long range / ulitimate build -out of Rigden Farms.
b. All units face and open directly onto either a street sidewalk or a
connecting walkway.
Park Planning
a. We acknowledge that the community and parkland fees will be due
at the time of building permit.
Current Planning
a. We acknowledge that our PDP must comply with Articles 3 and 4 of
the LUC, and has been designed accordingly.
b. We have visited the website and obtained a complete list of submittal
requirements.
C. We have met with the utility providers and coordinated utilities with
one another.
d. We have satisfied the required minimum density.
0a
zoning
Conceptual Review Response Letter
Brooklyn Park Row Houses P.D.P.
a. We acknowledge that the property is in the MMN zone district, and
propose uses and intensities consistent with such zoning.
b. The density proposed satisfies the minimum density of 12 units per acre.
c. We have provided at least 5 feet between the property line and the
parking stall.
d. The garage doors that face one another are over 28 feet apart.
Stormwater
1. We acknowledge that the site is in the Foothills drainage basin, and that
the new stormwater development fees will need to be paid at the time of
building permit.
2. We acknowledge that the site is in the Foothills drainage basin, and that
the new stormwater development fees will need to be paid at the time of
building permit.
3. The drainage study verifies compliance with the Rigden Farm Overall
Drainage Plan.
4. We acknowledge that water quality treatment was included in the ODP.
Engineering
a. We acknowledge that the Larimer County Road Impact Fees and Street
Oversizing Fees will apply to the project.
b. We have included and update TIS memo by Matt Delich, Traffic Engineer.
c. We acknowledge that utility plans, a development agreement, and a
development construction permit will be required for this project.
d. We are providing utility easements as required along Custer and Iowa.
We have met with the utility providers to coordinate.
e. We have requested an engineering variance to the driveway separation
along Iowa.
We acknowledge that street cut fees will apply for any cuts into streets.
Traffic Operations
a. We have included and update memo to the original TIS by Matt Delich,
Traffic Engineer.
Water/Wastewater
1. We have met with WateNWastewater staff and other utility providers
several time leading up to this submittal to coordinate locations of water
and sewer lines with other utilities that will serve this development. We
acknowledge that the water conservation standards for landscape and
irrigation will apply, and that development fees and rights are due prior to
building permit.
Natural Resources
1. We will contact Larimer County regarding a fugitive dust permit.