Loading...
HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, LOT 5, GREASE MONKEY/CARWASH - FDP - 56-98AK - CORRESPONDENCE - (4)key&CarWash.FCRevisionsCommentLet" ioc Page 4 Be sure and return all red -lined plans if/when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, Steve Olt City Planner cc: Dan DeLaughter Current Planning file #56-98AK Page 4 Steve Olt- RigdenFarm, 8thFiling-Grease' key&CarWash.FCRevisionsCommentLe+ Joc Page 3 2. If there is a DA, the erosion control surety should be set at $1,000. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Landscape plan Number: 83 Created: 1 / 25 / 2006 [6/ 13/06] [4/21/06] [2/28/06] [1/25/06] Revise landscape plan to reflect correct utility line/service line locations. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Stormwater Number: 94 Created: 3 / 1 / 2006 [6/ 12/06] Revision bubbled out to KHA plans. Ready for mylars once new drainage easement for Inlet A-1B is dedicated. [4/ 17/06] The revision done to Sheet C 19 of the Kimley-Horn plans should be labeled separately and revision number 3 and bubbled out clearly so it can be identified. The dedication by separate document for the area where the inlet is being stubbed out should be finalized prior to plans signature. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterlWW Number: 102 Created: 4/21 /2006 [6/ 13/06] The Kimley-Horn overall utility plan must be revised to reflect the changes to the water and sanitary sewer improvements. [4/21/06] When will the Kimley-Horn plans be revised to reflect these utility plan revisions? Number: 103 Created: 4 / 21 / 2006 [6/ 13/06] Include the updated detail so that meter pit is modified to meet current requirements. [4/21/06] Substitute updated detail for the 1-1/2" water meter pit detail. Number: 114 Created: 6/ 13/2006 [6/ 13/06] On Sheet 4, revise Note 2 under Additional Water Notes to refer to D.I.P. with polywrap. Page 3 Steve Olt- RigdenFarm,8thFiling-Grease key&CarWash.FCRevisionsCommentLe' ioc Page 2 Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 110 Created: 6/6/2006 [6/6/06] Please label the fire access easement as "Emergency Access Easement" to include other emergency vehicles as well. Number: 111 Created: 6/6/2006 [6/6/06] For new easements, please note on the plans that they are to be dedicated by separate document. Number: 113 Created: 6/ 12/2006 [6/ 12/06] The three requested easements have been received. Thank you. Department: PFA Issue Contact: Carte Dann Topic: fire Number: 95 Created: 3/3/2006 [6/ 15/06] [4/ 19/06] Address numerals will be required on only the Grease Monkey building; however, we still request numerals on both the east and west side of the building, minimum of six inches in height and on a contrasting background. [3/3/06] PFA requests that address numerals be posted on both the west and east sides of the Grease Monkey building, and the west side of the car -wash structure. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Erosion Control Number: 97 Created: 4/ 18/2006 [6/2/06] Please use the correct set of City of Fort Collins erosion control notes on sheet 6. I can e-mail you these upon request. Sediment/Erosion Control Plan Comments Grease Monkey; Rigden Farm 8th June 2, 2006 The grading/erosion control notes on plan sheet 6 are incorrect, please replace with the correct City notes for sediment/erosion control. [4/ 18/06] April 18, 2006 Please replace the erosion control notes on plan sheet #6 with the most recent City of Fort Collins notes. Page 2 Steve Olt- RigoprnFarm 8thFiling Greasekey&CarWash.FC Revision sCommentLet ioc 6 a STAFF PROJECT REVIEW City of Fort Collins Automotive Development Group Date: 06/ 16/2006 c/o Jody Newton 360 Happy Canyon Road Castle Rock, CO. 80108 Staff has reviewed your submittal for RIGDEN FARM, STH FILING, LOT 5, GREASE MONKEY/CARWASH - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 112 Created: 6/ 12/2006 [6/ 12/06] Current Planning comments have been addressed. Ready for the Site Plan, Landscape Plan, and Building Elevations mylars. Department: Engineering Issue Contact: Sheri Wamhoff Topic: General Number: 41 Created: 11 / 14 / 2005 [6/6/06] Revision bubbles must be more clear. Limits of Rev. 3 are not shown. [4/ 18/06] Please refer to redlines for additional minor comments. [3/ l/06] Sheet C19 needs to be revised by Kimley-Horn or completely redrawn (everything needs to be provided and the engineering company will need to sign off on the design) so that the existing sheet can be replaced with the revised or new sheet. This needs to be submitted with the final compliance submittal. [1/24/061 This sheet has not yet been submitted for review. This revision will need to be approved before or at the same time this project is approved. [ 11 / 14/05] For the removal of the storm drain inlet- the original plans (sheet C 19) needs to be revised to show this change. These plans also need to be revised to show the new inlet and manhole that you are proposing. Number: 68 Created: 1 /24/2006 [6/6/06] If Stormwater has requested different erosion control notes to be used that is fine, but there are also Street Improvement Notes, Traffic Signing and Pavement Marking Construction Notes, Storm Drainage Notes, and a Waterline Note, all of which can be found in Appendix E-2. [4/ 18/06] Repeat [3/ 1 /06] These can be found in appendix E - You have added the General Notes, but are still missing the Construction Notes. [1/24/061 Provide the applicable General Construction notes. Page 1