HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, LOT 5, GREASE MONKEY/CARWASH - FDP - 56-98AK - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETASS : 3�2�iav(o
FINAL PLAN ROUTING SHEET
Item: (�XP i%1 L�r.%zt �� _ �C'C��,i ` ilut
4a
tv of Fortallins
This project t Chas been scheduled for�ublic l ng on 6J�ar�- 4. Zl � n RAC P cuz� t«c
The following table lists final plan submittal requirements for this project.
,/A final fee of $1,000.00 is required at the time of submittal
Fee Waiver/Reduction Approval: Amount: Da
Planner: G,t�—�1.��,� Engineer:/wait
. • . . '
niiiii�i
• 1 . - • .
iiiiiiiiiii
BuildingInspection
• i
iiiiiiiiiii
Engineering
Engineering Pavement
• ii
i
iiiiiiiii
• ' • - i
i
iiiiiiiii
Natural Resources
' • ' • i
i
iiiiiiiii
Poudre Fire Authority
• • iiiiiiiiiiiii
StreetOversizing
• --
Technical
Traffic Operations
.1 •
..rtation PlanningWater
& Wastewater
iii
iiiE.11111111
Xcel EnerW
• _
iii
""
iiiiiii
Countyi 11111111�111
• i
i
.!i��f����
, 1 • i
Railroad: 11111�11®�111
kSchools:
Poudre
Thom son
1111111�1������
TOTA�LTo be Submitted
V
l/