Loading...
HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, LOT 5, GREASE MONKEY/CARWASH - PDP - 56-98AI - CORRESPONDENCE - REVISIONS (5)J Preferred Developer We sincerely appreciate your time and efforts spent helping us prepare this application and we look forward to proceeding with the final approval/hearing process Sincerely, ,t,cL4w— Jody Newton AUTOMOTIVE DEVELOPMENT GROUP, INC AUTOMOTIVE DEVELOPMENT GROUP, LLC. 5 3 4 0 S o u t h Q u e b e c S t r e e t, S u i t e 3 3 0 S Greenwood Village, CO 8 0 1 1 1 P ( 3 0 3 ) 2 2 1 - 0 0 7 1 F ( 3 0 3 ) 2 2 1 - 0 0 7 2 i r\ E) rJ Preferred Developer 76. The storm pipe note has been added, referring to the Master Drainage Plans sheet C 19 prepared by Kimley Horn. 77. The new Fire Hydrant easement has been located/added to the Utility Plan. 78. All requested details have been added. 79. The requested street trench detail has been added to the Plans. 80. All detail text has been adjusted to meet minimum scanning requirements. TRANSPORTATION PLANNING 1. The bike rack has been added to the Utility Plans. STORMWATER-WATER-WASTE WATER 1. All Plans have been revised to indicate existing and proposed utilities as requested. 2. A spill containment apparatus has been added to the plan. 3. The proposed storm drain facility has been added to the Landscape Plan. 4. The Utility Plans include a legend and a drainage summary table has been added. 5. A Drainage Study Compliance Letter has been included with this submittal. 6. The previously approved master utility plans for the Shops at Rigden Farm 8`s Filing, shall be revised by Kimley Horn upon approval of the PDP Site Plan and shall be submitted as part of the FDP. ZONING 56. The Site Plan has been revised, eliminating all utility information. The scale has been increased to match the Utility Plans and notes have been adjusted to improve clarity. 57. The unnecessary handicap parking stall and sign have been removed. .AuToMonw DEvELopmMT GROUP, LLC. 5 3 4 0 South Quebec Street, Suite 3 3 0 S Greenwood Village, CO 8 0 1 1 1 P ( 3 0 3 ) 2 2 1 - 0 0 7 1 F ( 3 0 3 1) 2 2 1 - 0 0 7 2 M Preferred Developer 41. In order preserve the professional right's of the Master Developer's engineer, we are not able to revise Kin -ley Horn's sheet C 19. We request a deferral of this request until the PDP Site Plan is approved and the FDP is submitted. 44. Redline comments have been noted and addressed as requested. 45. Easements are currently being prepared for the Fire Hydrant and the utility easements as requested. These documents will be submitted upon completion as requested. 60. All provided redlines have been returned with this submittal. 61. The relocated light pole has been located on the Site Plan. 62. A Drainage Letter of Compliance has been provided. 63. General notes 47 and 48 have been added, indicating no private streets are to be maintained and no variances have been requested. 64. The Vicinity Map on the Utility Plans has been revised. 65. The Title on the Cover Sheet has been corrected. 66. Current dates have been added to the title and the legal. 67. Revision blocks will be cleared for final signatures upon approval. 68. General Construction notes have been added. 69. The indemnification statement has been added to the Utility Plan Cover sheet. 70. All Developer and Consultant info has been added to the Utility Plans. 71. Tree wells, specifications and dimensions have been added to the Landscape and Utility Plans. 73. The requested manhole note has been added. 74. The street cut note has been added to the Utility Plans. 75. The Grease Monkey meter pit has been added and is located in a landscape area. AUTOMOTIVE DEVELOPMENT GROUP, LLC. 5 3 4 0 S o u t h Q u e b e c S t r e e t, S u i t e 3 3 0 S Greenwood Village , CO 8 0 1 1 1 P ( 3 0 3 ) 2 2 1 - 0 0 7 1 F (303) 2 2 1 - 0 0 7 2 -AD J Preferred Developer February 9, 2006 Mr. Steve Olt City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80522 RE: SITE PLAN SUBMITTAL FOR RIGDEN FARM, 8`h FILING, LOT 5, GREASE MONKEY & CAR WASH Dear Steve, Automotive Development Group, LLC submits the attached revised documents, which includes 6 Project Response Letters, 6 Site Plans and Elevations, 4 Landscape Plans, 1 Drainage Letter of Compliance, 4 Utility Plans, 1 Lighting Plan and all provided redlined plans. A Staff Review Meeting was held for this project on January 25, 2006, and review comments have been address as follows: ENGINEERING 22. All plan titles have been revised as requested. 25. Existing/as built curb lines to the west of the site have been added to the Site, Landscape and Utility Plans. 32. Two benchmarks have been provided. 33. The Title Block text has been corrected to meet City Standards. 38. The existing and proposed contours have been corrected as best as possible, using survey information currently available. 40. Text has been adjusted on all plan documents to meet scanning standards. .AUTOMOTIVE DEVELOPMENT GROUP, LLC. 5 3 4 0 S o u t h Q u e b e c S t r e e t, S u i t e 3 3 0 S Greenwood Village, CO 8 0 1 1 1 P ( 3 0 3 ) 2 2 1 - 0 0 7 1 F ( 3 0 3 ) 2 2 1 - 0 0 7 2