Loading...
HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, LOT 5, GREASE MONKEY/CARWASH - PDP - 56-98AI - CORRESPONDENCE -SCHEME T" ILI PATIO , Q� 461 lei am • 5r � J TR.ANa is 4 N10NUNIC/T 9 F41C I CUSTER DRIVE z l AR000MV a: lerm INFO: UASITE FF1�!"�I �1 BULSrM INO F 20.911 S.F. f P. y i.cResl " .; �x NOTC BU1LpNb FOOTPRINT 6F+ .T,9T0 8P s.eer + j A THIS PLAN 19 FOR II.WSTRATWM PURPOSES ONLY GAR COUNT: B OARS t NO SCALE AND SMALL NOT BM CONSIPAW A9 OWPHS A9 TO 51 ! ?}" LOCATION. SLIM, OR CONFWAATILTI OF ANY f MPROVMMMNTB OF ImLDWBS SNOFN Hme ON. MC�..CNLi M. /t• Drive and Illinois Drive, is absolutely critical. This can be done with landscaping, berming, walls, or a combination of these. Also, there are Land Use and Development Standard's specific to the NC District that development on this property will be subject to. Copies of Article 3 and Division 4.19 are available in the Current Planning Department or on the City of Fort Collins website @ www.fc o� v.com Go to Departments, then the Current Planning Department. 10. The City's Current Planning Department will coordinate the development review process. The required submittal package will be submitted to this department and distributed accordingly to other City departments and outside reviewing agencies involved in development review. The submittal requirements for Project Development Plans and Final Compliance Plans are available on the City's website. 11. The proposed Grease Monkey and car wash (minor vehicle repair, servicing and maintenance) are permitted in the NC District as a Type 1, administrative review and public hearing. The applicant for this development request is not required to hold a neighborhood information meeting prior to formal submittal of the project; however, City staff will schedule a meeting if the developer/applicant thinks that there is a benefit to conducting one. Steve, and possibly other City staff, would be present to facilitate the meeting. 8 7. Doug Moore of the Natural Resources Department offered the following comments: a. The trash enclosure needs to be designed to accommodate recycling services. The City of Fort Collins Design Considerations Guidance Document may be found at: httR://www.fcqov.com/recycling/pdf/enclosure -quidel ines08O4.pdf b. Please consider installing a recycling collection container with trash collection along side the proposed car wash. C. The landscape should be designed to reduce the amount of bluegrass lawns and try to utilize Fort Collins. native plants and grasses to help meet the City's landscape and water conservation standards. d. A Hazardous Materials Management Plan will need to be filed with the Poudre Fire Authority. Please contact Doug, at (970)22476143, if you have questions about these comments. 8. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. 9. This development proposal is subject to all the requirements set forth in the City's LUC, specifically Article 2. Administration (Development Review Procedures), Article 3. General Development Standards, and Article 4. Districts (specifically Division 4.19 - Neighborhood Commercial Zoning District). - The most pertinent sections of Article 3 (relative to this new mixed - use development) are Sections 3.2.1 - Landscaping, 3.2.2 - Parking, 3.5.1- Architectural Compatibility, and 3.5.3 - Mixed -Use, Institutional and Commercial Buildings. Sufficient screening of the outdoor parking and large vehicle use area, being located right at the prominent intersection of Custer I b. The transformer locations must be coordinated with Light & Power. Transformers can be located no more than 10' from a paved area that can be accessed by City trucks and equipment. The proposed location on the conceptual plan looks OK. C. The standard electric development charges will apply to this development request. This property has 2 street frontages; therefore, the charges could be relatively high. Some of the charges may have already been paid. If you have questions in the future, please contact Monica Moore of Light & Power, at (970)224-6150. 6. David Averill of the Transportation Planning Department offered the following comments: a. A Transportation Impact Study (TI5), addressing all modes of transportation, will be required with your Project Development Plan (PDP) submittal. Please contact Eric Bracke of the Traffic Operations Department, at (970)224-6062, and David Averill of the Transportation Planning Department, at (970)416-2643, to determine what information will be needed in the TIS pertaining to LOS for vehicle, pedestrian, bicycle, and transit modes of transportation. b. This development proposal will be subject to the Transportation Level of Service Requirements set forth in Section 3.6.4 of the LUC. C. Handicapped access ramps should be provided in and around this development. d. Bicycle parking should be provided in compliance with Section 3.2.2(C)(4) of the LUC. e. This developer must explore how to satisfy the connecting pedestrian walkway standards. It is important to tie this development into the rest of the Shops at Rigden Farm center and the surrounding area. Enhanced crosswalks could and should be provided. Please contact David, at (970)416-2643, if you have questions about these comments. ri 4. Glen Schlueter of the Stormwater Utility offered the following comments: a. The site is located in the Foothills Drainage Basin, where the new development fee is $6,525 per acre, which is subject to the runoff coefficient reduction. This fee is to be paid at the time of issuance of building permits. b. The site in on Stormwater Inventory Map #12M. A copy of the map can be obtained from the Utility Service Center at 700 Wood Street. C. The standard drainage and erosion control report and construction plans are required and they must be prepared by a professional engineer registered in the State of Colorado. In this case a letter verifying compliance with the overall drainage plan for Rigden Form, Wh Filing should be sufficient. d. On -site detention is required, with a 2-year historic release rate for water Quanti and extended detention is required for water ggglity treatment. In this case the water quantity and water quality has been accounted for in the overall drainage plan for Rigden Farm. Therefore, the developer's design engineer will need to verify compliance with the overall drainage plan and provide a grading plan that maintains the drainage basins as shown in that plan. e. There is a storm sewer proposed to cross this site north to south. It is being installed with the King Soopers development. It appears that it will run under the proposed Grease Monkey building, which is not allowed. Please contact Glen, at (970)224-6065, if you have questions about these comments. 5. Bruce Vogel of the Light & Power Department offered the following comments: a. The City has existing power in Custer Drive to the south of this site. Power is at the southeast corner of this site, at the Illinois Drive intersection. Power may also be available from within the Shops at Rigden Farm center. F'. I h. A Development Agreement may be required and a Development Construction Permit will be required for development on this property. i. Development on this property may be responsible for repays for . previous Custer Drive and Illinois Drive street improvements. j. Development on this property will be responsible for the repair and/or replacement.of any damaged existing curb, gutter, and sidewalk around the site. Please contact Marc, at (970)221-6750 or (970)221-6605, if you have questions about these comments. 3. Roger Buffington of the Water/Wastewater Department offered the following comments: a. There is an existing 12" water main in Custer Drive, an existing 8" water main in Illinois Drive, and an existing 8" water main at the northwest corner of this site within the Rigden Farm, 8 h Filing. b. There is an existing 8" sanitary sewer main in Custer Drive and an existing 8" sanitary sewer main in Illinois Drive. C. Any existing service lines stubbed into this site must be used or abandoned at the main. d. Plant investment (development) fees and water rights will apply to this development request. They will be collected at the time of issuance of building permits. e. A sand and oil interceptor is required for the drains from the service bays and the car wash. Please contact Roger, at (970)221-6854, if you have questions about these comments. 4 C. The Lorimer County Road Impact Fees will apply to development on this property. d. A Transportation Impact Study (TIS), addressing all modes of transportation, will be required with your Project Development Plan (POP) submittal. Please contact Eric Bracke of the Traffic Operations Department, at (970)224-6062, and David Averill of the Transportation Planning Department, at (970)416-2643, to determine what information will -be needed in the TIS pertaining to Level of Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of "transportation. An update of the previous TI5 for the Shops at Rigden Farm may be sufficient. e. This property will have to dedicate necessary easements behind the ROW for Custer Drive and Illinois Drive. It may be necessary to vacate some existing easements. All of this can be done with a replat of the property or through separate documents (processed through the Engineering Department). f. This development will be subject to the requirements set forth in the Lorimer County Urban Area Street Standards. • The applicants should reuse the Rigden Farm, 8rh Filing (Shops at Rigden Farm) utility plans. • The building as shown on the conceptual plan is over the proposed storm sewer, with the inlet for lot drainage located on top of the building. This development proposal will need to reconfigure the grading and storm water utility. • Sidewalks on Custer Drive and Illinois Drive are required adjacent to this site. • Any street cuts to Custer Drive will be subject to triple street cut fees; and, an overlay of the street may be required. g. A subdivision plat (replat) will not be required as part of this submittal to the City for development review. One can be submitted with the POP if the applicant wants to use a replat to dedicate or vacate easements. 3 C. At least 1 van accessible parking space is required in this development. The definition of van accessible is set forth in Section 3.2.2(K)(5)(d) of the LUC. d. Bicycle parking must be provided in the development and it must satisfy the requirements set forth in Section 3.2.2(C)(4) of the LUC. e. The building in this development will be subject to the requirements set forth in Section 3.5.3 - Mixed -Use, Institutional and Commercial Buildings of the LUC. This section deals with setbacks, build -to lines, design. f. The required amount of parking lot interior landscaping is set forth in Sections 3.2.1(E)(5) and 3.2.2(M) of the LUC. The required (minimum) amount is 6% for this proposed development. g. This development will be in the City's Residential Neighborhood Sign District; therefore, locations onlv'for exterior building wall signage must be shown on the building elevations that are submitted for development review. The actual size and content of signs should not be shown. Please see Section 3.8.7(E) of the LUC. h. The trash enclosure in this development must be designed and constructed to accommodate recycling. This is set forth in Section 3.2.5 of the LUC. Please contact Jenny, at (970)416-2313, if you have questions about these comments. 2. Marc Virata of the Engineering Department offered the following comments: a. The standard utility plan submittal requirements will apply to this development request. b. Street oversizing fees will apply to this development request. The fees are based on vehicle trip generation for the proposed land use in the development plan. Please contact Matt Baker of Engineering, at (970)224-6108, for detailed information on the fees. The fees will be collected at the time of issuance of building permits. 2 L CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: April 25, 2005 ITEM: Grease Monkey on Pad 8, Lot 5 of Rigden Farm, 8 "' Filing APPLICANT: Masterworks c/o Jody Newton 360 Happy Canyon Road Castle Rock, CO. 80108 LAND USE DATA: Request for a Grease Monkey automobile oil & lube (and possibly car wash) facility on Pad 8, Lot 5 of the Shops at Rigden Farm. The site is 0.49 acre in size and is located at the northwest corner of Custer Drive and Illinois Drive. The property is in the NC - Neighborhood Commercial Zoning District. COMMENTS: 1. Jenny Nuckols of the Zoning Department offered the following comments: a. This property is in the NC - Neighborhood Commercial Zoning District, which is Division 4.19 of the City's Land Use Code (LUC). The Grease Monkey is.defined as a "vehicle minor repair, servicing and maintenance establishment (indoor)" in the LUC. The NC District permits this land use, subject to an administrative (Type 1) review and a public hearing in front of an administrative hearing officer. b. The maximum parking allowance for vehicle servicing & maintenance is set forth in Section 3.2.2(K)(2) of the LUC, specifically the table in Section 3.2.2(K)(2xa). There are Alternative Compliance measures dealing with alternative parking ratios for non-residential uses available in the LUC. The proposed 8 spaces is less than the allowed for the 2,970 square foot building. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 181 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT C J Community Planning and Environmental Services Current Planning City of Fort Collins May 12, 2005 Masterworks c/o Jody Newton 360 Happy Canyon Road Castle Rock, CO. 80108 Dear Jody, For your information, attached is a copy of the Staff's comments concerning the request for a Grease Monkey on Pad 8, Lot 5 of Rigden Farm, 8th Filing, which was presented before the Conceptual Review Team on April 25, 2005. This is a request fora Grease Monkey automobile oil & lube (and possibly car wash) facility on Pad 8, Lot 5 of the Shops at Rig den Farm. The site is 6.49 acre in size and is located at the northwest corner of Custer Drive and Illinois Drive. The property is in the NC - Neighborhood Commercial Zoning District. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at (970)221-6341. Si2cerely, Steve Olt, Project Planner cc: Stormwater Utility Traffic Operations File 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 - FAX (970) 416-2020