HomeMy WebLinkAboutRIGDEN FARM, NORTHWEST ROADS - PDP - 56-98Z - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESNovember 23, 2004
V
Steve Olt
City of Fort Collins, Current Planning J R ENGINEERING
281 North College Avenue A Westrian Company
Fort Collins, Colorado 80525
Re: Rigden Farm Filing 10 — Northwest Roads Statement of Purpose
Dear Steve:
JR Engineering as the development consultant and Rigden Farm, LLC and Rigden Development, LLC as
owners are pleased to submit the following Project Development Plan with Subdivision Plat application
for Rigden Farm Filing 10 — Northwest Roads.
Statement of Purpose: The intent of this PDP and subdivision is to construct roadway and utility main
line infrastructure to serve the adjacent unplatted properties. The construction of the roadways shown in
the utility plan set will complete the roadway network within this area of Rigden Farm to serve the
remaining developable land. The platting of the adjacent lands will occur during the design and review
process of the specific parcels. The subdivision plat creates necessary road right of way, which will be
dedicated to the City of Fort Collins for the repair and maintenance of the completed roads.
The following is a list of the proposed street names:
Iowa Drive
Limon Drive
Phasing:
This project will be completed in one phase. The construction is intended to start in spring of 2005 and
be completed by fall of 2005.
Owners:
Rigden Farm, LLC and Rigden Development, LLC
By: Wolverine management Group, Inc., Its. Manager
By: Fred L. Croci, its President
By: Sierra Resources Corporation, Its. Manager
By: David J. Pietenpol, its President
If you should have any questions please contact me at 970-491-9888.
Mk:5'&k
�
Michael Brake, PE, PLS
Director of Operations
2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525
970-491-9888 • Fax: 970-491-9984 • w ..jrengineeringxom