Loading...
HomeMy WebLinkAboutJFK SENIOR APTS. - PDP - 61-98 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYAs shown above, acceptable operations are expected under all traffic volume sce- narios with the existing roadway geometry. Of particular importance is the fact that all overall intersection levels of service remain constant whether or not this development is built. Capacity sheets are in Appendix E. VII. PEDESTRIAN FACILITIES A. Existing Conditions The existing sidewalk system was field reviewed within 1,320 feet of the JFK Senior Apartments site. Particular attention was given to trips to the various commercial entities on College Avenue. Detached sidewalks currently exist along both Troutman and JFK Parkways adjacent to the site. Pedestrian facilities have been installed under several editions of City design stan- dards. This has resulted in varying designs; however, all facilities were determined in generally good condition. Pedestrian ramps are available at critical intersections and traffic signals facilitate crossing at the JFK Parkway — Harmony Road intersection. At the JFK Parkway — Troutman Parkway intersection, east -west roadway crossings can be negotiated under north -south stop sign control. Some vegetation overgrowth has reduced the effective width of the sidewalk along the north side of Troutman Parkway, however, this is not considered critical to site users. B. Planned Improvements The pedestrian system planned with JFK Senior Apartments will conform to current City criteria. It will connect to the external pedestrian system thereby accommodating and complimenting the integration of pedestrians into the site. The City is currently assessing an upgrade in controls at the JFK Parkway — Troutman Parkway intersec- tion. If implemented, a safer pedestrian crossing will result at this intersection. 1 22 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 ' Transportation -------------Center Streets: (E-W) -For -Microcomputers HARMONY -In_ (N-S) JFK -----__----___- Analyst: GC File Name: ' Area Type: Comment: EX Othe 10-16-98 BG OT AM PM Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- 1 ---- ---- 2 1 ---- ---- ---- ---- ---- ---- 1 2 1 0 > 0 < 0 ---- ---- 2 0 ---- 1 Volumes 325 970 15 30 1095 230 10 35 250 305 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 50 0 100 ' Lost Time3_ 003_ 00 3.003_ 003.00 3.003_003_ 003_003_00 - --- - - -- ------ Signal Operations - ------ ' Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right ' Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 25.OA 45.OP Green 26.OA 8.0A Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 ' Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane- Groups Adjlow Approach: ' Cap Flow Ratio Ratio Delay Delay LOS Delay LOS EB L 387 1770 -v/c- -g/C- Delay 0.884 0.608 37.8 --- D 15.4 C T 2266 3725 0.473 0.608 8.5 B R 963 1583 0.017 0.608 6.0 B WB L 91 227 0.352 0.400 17.2 C 22.1 C ' T R 1490 633 3725 1583 0.813 0.400 23.2 0.298 0.400 15.9 C C NB LR 122 1466 0.393 0.083 34.8 D 34.8 D SB L 826 3539 0.328 0.233 24.8 C 26.3 D R 369 1583 0.585 0.233 28.1 D ' Intersection Delay = 20.1 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.753 ----------------------------------------------------------------------- HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Center For Microcomputers In Transportation ----------------------------------------------------------------------- Streets: (E-W) HARMONY (N-S) JFK Analyst: GC File Name: Area Type: Comment: EX Oth ST) ( 10-16-98 BG TO PM ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- 1 ---- ---- 2 1 ---- ---- 1 2 ---- 1 ---- ---- 0 > 0 < ---- 0 ---- ---- ---- 2 0 1 Volumes 175 1010 20 30 640 100 25 30 100 85 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 25 0 25 Lost Time 13.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 55.OP Green 23.OA 16.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- EB L ---- 250 ------- 1770 ----- 0.736 ----- ----- 0.567 16.6 --- C ----- --- 11.4 B T 2111 3725 0.529 0.567 10.6 B R 897 1583 0.023 0.567 7.4 B WB L 90 187 0.355 0.483 13.5 B 12.7 B T 1801 3725 0.393 0.483 12.9 B R 765 1583 0.103 0.483 10.9 B NB LR 226 1504 0.257 0.150 29.3 D 29.3 D SB L 737 3539 0.146 0.208 25.1 D 25.2 D R 330 1583 0.191 0.208 25.3 D Intersection Delay = 13.3 sec/veh Intersection LOS = B Lost Time/Cycle, ----------------------------------------------------------------------- L = 9.0 sec Critical v/c(x) = 0.451 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 308 Potential Capacity: (pcph) 967 Movement Capacity: (pcph) 967 Prob. of Queue -Free State: 0.99 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 316 ' Potential Capacity: (pcph) 1212 Movement Capacity: (pcph) 1212 Prob. of Queue -Free State: 1_00 ------------- --------------------------------------- 1Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 497 ' Potential Capacity: (pcph) 546 Major LT, Minor TH Impedance Factor: 1.00 ' Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 ' Movement Capacity: ------------------------- (pcph)---------------543 ------------- Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 12 ------ 543 ------------- > ------- ----- --------- 636 5.8 0.0 B 5.8 NB R 6 967 > WB L 6 1212 3.0 0.0 A 0.1 Intersection Delay = 0.2 sec/veh HCS: Unsignalized Intersections Release 2.ig Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) ACCESS (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 10/1 98 Other Information ..... ....EX ST OT AM PM Two-way Stop -controlled Interse ion ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T -R-- L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's ($) CV's M PCE's 0 1 < 0 N 285 15 .95 .95 0 ---------------I 1 1 0 N 5 175 .95 .95 0 1.10 --------------- 0 > 0 < 0 10 5 .95 .95 0 1_1010 --------- 1_ ' Adjustment Factors Vehicle Critical Follow-up Maneuver (tg) --------- -----------------------------Gap Left Turn Major Road ----- ------------Time 5.00 - -- --- 2.10 Right Turn Minor Road 5.50 2.60 ' Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 70 Potential Capacity: (pcph) 1276 Movement Capacity: (pcph) 1276 Prob. of Queue -Free State: 1.00 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 73 ' Potential Capacity: (pcph) 1582 Movement Capacity: (pcph) 1582 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street -------------------------- NB SB ------------------------------ Conflicting Flows: (vph) 150 Potential Capacity: (pcph) 867 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: I 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: ------------------------- (pcph)---------------864 ------------- Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- ------ NB L 12 ------ 864 ------ > ------- ------- ----- --------- 968 3.8 0.0 A 3.8 NB R 6 1276 > WB L 6 1582 2.3 0.0 A 0.2 Intersection Delay = 0.4 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) ACCESS (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 10/16 8 Other Information ..... ....E. T TOT PM Two-way Stop -controlled Inters io ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's (�) CV's M PCE's ------------ 0 1 < 0 N 65 5 .95 .95 0 --------------- 1 1 0 N 5 70 .95 .95 0 1.10 ---------------- 0 > 0 < 0 10 5 .95 .95 0 1.10 1.10 •--------------- Adjustment Factors Vehicle Critical Follow-up ' Maneuver Gap(-- -------- Left Turn Major Road ----- ------ 5.00 ------Time-(tf) --- 2.10 Right Turn Minor Road 5.50 2.60 ' Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 [1 HCS: Unsignalized Intersections Release 2.lg Page 2 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 211 153 Potential Capacity: (pcph) 1082 1158 Movement Capacity: (pcph) 1082 1158 Prob. of Queue -Free State: 0.96 0.76 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 211 169 Potential Capacity: (pcph) 1360 1424 Movement Capacity: (pcph) 1360 1424 Prob. of Queue -Free State: 0.98 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 527 511 Potential Capacity: (pcph) 577 588 Capacity Adjustment Factor due to Impeding Movements 0.89 0.89 Movement Capacity: (pcph) 512 522 Prob. of Queue -Free State: 0.63 0.58 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 738 616 Potential Capacity: (pcph) 396 466 Major LT, Minor TH Impedance Factor: 0.51 0.56 Adjusted Impedance Factor: 0.62 0.65 Capacity Adjustment Factor due to Impeding Movements 0.47 0.63 Movement Capacity: -------------------------------------------------------- (pcph) 186 293 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 98 ------ 186 ------------- 39.1 ------- ----- 2.5 E --------- NB T 191 512 > 19.2 NB R 41 1082 > 565 10.7 2.1 C ' SB L SB T SB R ' EB L WB L 75 293 220 522 > 278 1158 > 753 133 1424 29 1360 16.5 1.0 C 14.0 13.6 5.0 C 2.8 0.3 A 0.9 2.7 0.0 A 0.4 ' Intersection Delay = 9.5 sec/veh HCS: Unsignalized Intersections Release 2.1g Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) JFR (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst...... .......... GC Date of Analysis.......... 10/1; 8 Other Information ......... EX ST BG TOT AM PM Two-way Stop -controlled Interse ion ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R -L-- T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's 1 1 1 Y 115 200 60 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 N 25 130 30 .95 .95 .95 0 1.10 ---------------- 1 2 < 0 85 165 35 .95 .95 .95 0 1.10 1.10 1.10 ---------------- 1 2 < 0 65 190 240 .95 .95 .95 0 1.10 1.10 1.10 --------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 42 58 Potential Capacity: (pcph) 1318 1294 Movement Capacity: (pcph) 1318 1294 Prob. of Queue -Free State: 0.99 0.96 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 42 64 Potential Capacity: (pcph) 1637 1598 Movement Capacity: (pcph) 1637 1598 Prob. of Queue -Free State: 0.99 0.98 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 153 148 Potential Capacity: (pcph) 907 912 Capacity Adjustment Factor due to Impeding Movements 0.97 0.97 Movement Capacity: (pcph) 878 883 Prob. of Queue -Free State: 0.92 0.91 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 212 184 Potential Capacity: (pcph) 798 828 Major LT, Minor TH Impedance Factor: 0.88 0.89 Adjusted Impedance Factor: 0.91 0.92 Capacity Adjustment Factor due to Impeding Movements 0.87 0.91 Movement Capacity: -------------------------------------------------------- (pcph) 692 753 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Dela 1 Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/vy-- (sec/veh) ---e-e-t NB L -Rate- 35 -Cap-- 692 -Cap-- -Delay- 5.5 -Length 0.0 -LOS- B NB T 69 878 > 4.6 1 NB R 12 1318 > 924 4.3 0.2 A SB L 23 753 4.9 0.0 A ' SB T 81 883 > 4.2 SB R 58 1294 > 1018 4.1 0.5 A EB L 29 1598 2.3 0.0 A 0.7 WB L 23 1637 2.2 0.0 A 0.6 ' Intersection Delay = 2.9 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 --------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) JFK (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 10/1� �98 Other Information ..... ....EX 1�S.T�/) BG TOT 1\AM1 PM Two-way Stop -controlled Interse ion �J ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's 1 1 1 Y 25 40 20 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 N 20 50 10 .95 .95 .95 0 1.10 •--------------- 1 2 < 0 30 60 10 .95 .95 .95 0 1.10 1.10 1.10 --------------- Adjustment Factors 1 2 < 0 20 70 50 .95 .95 .95 0 1.10 1.10 1.10 •-------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 APPENDIX E HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Center For Microcomputers In Transportation ------------------------------------------------- Streets: (E-W) HARMONY (N-S) JFK Analyst: GC File Name: Area Type: Othe ST TOT 10-16-98 AM Comment: EX ------------------------------------------ ------------------------------------------- Eastbound Westbound ---------------------------- Northbound Southbound L T R L T R L T R L T R ---- ---- ---- No. Lanes ---- ---- ---- 1 2 1 ---- ---- ---- 1 2 1 ---- ---- ---- 0 > 0 < 0 2 0 1 Volumes 320 970 15 30 1095 230 10 35 250 300 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 50 0 100 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right g * Right eds Peds NB Right EB Right SB Right WB Right Green 25.OA 45.OP Green 26.OA 8.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay ----- LOS Delay LOS --- ----- --- ----- EB L ----------- 387 1770 ----- ----- 0.871 0.608 36.2 D 15.0 B T 2266 3725 0.473 0.608 8.5 B R 963 1583 0.017 0.608 6.0 B WB L 91 227 0.352 0.400 17.2 C 22.1 C T 1490 3725 0.813 0.400 23.2 C R 633 1583 0.298 0.400 15.9 C NB LR 122 1466 0.393 0.083 34.8 D 34.8 D SB L 826 3539 0.328 0.233 24.8 C 26.1 D R 369 1583 0.571 0.233 27.9 D Intersection Delay = 19.9 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 ----------------------------------------------------------------------- sec Critical v/c(x) = 0.749 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Center For Microcomputers In Transportation --------------------------------------------------------------- Streets: (E-W) HARMONY (N-S) JFK Analyst: GC File Name: Area Type: Comment: EX Ot BG TOT AM PM 10-16-98 ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- 1 ---- ---- 2 1 ---- ---- 1 2 ---- 1 ---- ---- 0 > 0 < ---- 0 ---- ---- 2 0 ---- 1 Volumes 175 1010 20 30 640 100 25 30 100 80 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 25 0 25 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 55.OP Green 23.OA 16.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- ----- EB L ---- 250 ------- 1770 ----- 0.736 ----- ----- 0.567 16.6 --- ----- C 11.4 B T 2111 3725 0.529 0.567 10.6 B R 897 1583 0.023 0.567 7.4 B WB L 90 187 0.355 0.483 13.5 B 12.7 B T 1801 3725 0.393 0.483 12.9 B R 765 1583 0.103 0.483 10.9 B NB LR 226 1504 0.257 0.150 29.3 D 29.3 D SB L 737 3539 0.146 0.208 25.1 D 25.1 D R 330 1583 0.176 0.208 25.2 D Intersection Delay = 13.2 sec/veh Intersection LOS = B Lost Time/Cycle, ----------------------------------------------------------------------- L = 9.0 sec Critical v/c(x) = 0.447 HCS: Unsignalized Intersections Release 2.ig Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 205 145 Potential Capacity: (pcph) 1090 1169 Movement Capacity: (pcph) 1090 1169 Prob. of Queue -Free State: 0.97 0.76 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 205 158 Potential Capacity: (pcph) 1369 1441 Movement Capacity: (pcph) 1369 1441 Prob. of Queue -Free State: 0.98 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 505 492 Potential Capacity: (pcph) 593 602 Capacity Adjustment Factor due to Impeding Movements 0.89 0.89 Movement Capacity: (pcph) 529 537 Prob. of Queue -Free State: 0.64 0.59 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 718 594 Potential Capacity: (pcph) 406 480 Major LT, Minor TH Impedance Factor: 0.53 0.57 Adjusted Impedance Factor: 0.63 0.66 Capacity Adjustment Factor due to Impeding Movements 0.48 0.64 Movement Capacity: -------------------------------------------------------- (pcph) 195 308 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach LOS Delay ' Movmn (pcph) (pcph) (pcph)(sec/veh) (veh) (secveh) - ec/ve-- ---e-e-t NB L -Rate- 98 -Cap-- 195 -Cap-- -Delay- 35.8 -Length 2.3 E NB T 191 529 > 18.0 NB R 35 1090 > 575 10.3 2.0 C SB L 69 308 15.0 0.9 C SB T 220 537 > 13.1 SB R 278 1169 > 769 12.9 4.8 C EB L 133 1441 2.8 0.2 A 0.9 WB L 23 1369 2.7 0.0 A 0.3 I Intersection Delay = 9.0 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) JFR (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 10/ 98 Other Information ..... ....EX ZST 'BG TOT AM PM Two-way Stop -controlled Interse io ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MCI M SU/RV's M CV's M PCE's ------------ 1 1 1 Y 115 195 60 .95 .95 .95 0 1.10 --------------- 1 1 < 0 N 20 125 25 .95 .95 .95 0 1.10 •--------------- 1 2 < 0 85 165 30 .95 .95 .95 0 1.10 1.10 1.10 •--------------- 1 2 < 0 60 190 240 .95 .95 .95 0 1.10 1.10 1.10 -------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap(tg) Time (-- -------- Left Turn Major Road ------------------------- 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS_-Unsignalized_ Intersections Release -2.1gPage -2 Worksheet for TWSC Intersection Step 1: RT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 37 50 Potential Capacity: (pcph) 1326 1306 Movement Capacity: (pcph) 1326 1306 Prob. of Queue -Free State: 0.99 0.96 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 37 52 Potential Capacity: (pcph) 1646 1619 Movement Capacity: (pcph) 1646 1619 Prob. of Queue -Free State: 0.99 0.98 Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 131 128 Potential Capacity: (pcph) 931 935 Capacity Adjustment Factor due to Impeding Movements 0.97 0.97 Movement Capacity: (pcph) 904 908 Prob. of Queue -Free State: 0.92 0.91 -------------------------------------------------------- Step 4: LT from Minor Street ---- --- --- ----- ------ ---------------NB-----------SB Conflicting Flows: (vph) 192 166 Potential Capacity: (pcph) 820 849 Major LT, Minor TH Impedance Factor: 0.88 0.90 Adjusted Impedance Factor: 0.91 0.92 Capacity Adjustment Factor due to Impeding Movements 0.87 0.91 Movement Capacity: (pcph)714----------775 ------------------------- ---------------Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach LOS Movemn(pcph) (pcph) (pcph)(sec/veh) (veh) seceh) (sec/vy-- -----e-t -Rate- -Cap-- -Cap-- NB L 35 714 -Delay- 5.3 -Length 0.0 B NB T 69 904 > 4.5 NB R 12 1326 > 949 4.1 0.2 A SB L 18 775 4.8 0.0 A SB T 81 908 > 4.1 SB R 58 1306 > 1040 4.0 0.5 A EB L 29 1619 2.3 0.0 A 0.7 WB L 18 1646 2.2 0.0 A 0.5 ' Intersection Delay = 2.9 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) JFR (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 10/1 98 Other Information ..... ....EX S BG TOT O PM Two-way Stop -controlled Interse io ----------------------------------------- ----------------------------------------- Eastbound Westbound L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's ------------ 1 1 1 Y 25 35 20 .95 .95 .95 0 1.10 --------------- 1 1 < 0 N 15 45 5 .95 .95 .95 0 1.10 --------------- Northbound L T R 1 2 < 0 30 60 10 .95 .95 .95 0 1.10 1.10 1.10 --------------- Southbound L T R 1 2 < 0 15 70 50 .95 .95 .95 0 1.10 1.10 1.10 --------------- ' Adjustment Factors Vehicle Critical Follow-up ' Maneuver Gap ----------------------------- Left Turn Major Road -(tg)------------Time 5.00 - -- 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 I I 1 APPENDIX D 1 1 1 [1' I t C I HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Transportation -------------Center -For -Microcomputers Streets: (E-W) HARMONY -In- (N-S) JFK --------------- Analyst: GC File Name: Area Type: OtheK Comment: EX ST 10-16-98 BG TOT AM PM ---------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- 1 ---- ---- 2 1 ---- ---- ---- 1 2 1 ---- ---- ---- 0 > 0 < 0 ---- ---- ---- 2 0 1 Volumes 195 945 15 30 1075 185 10 25 160 180 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 50 0 100 Lost Time 13.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 15.OA 55.OP Green 26.OA 8.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- ---- EB L 239 ------- 1770 ----- ----- ----- 0.858 0.608 38.4 --- D ----- --- 13.2 B T 2266 3725 0.461 0.608 8.4 B R 963 1583 0.017 0.608 6.0 B WB L 107 222 0.298 0.483 12.6 B 15.3 C T 1801 3725 0.660 0.483 15.8 C R 765 1583 0.186 0.483 11.4 B NB LR 123 1478 0.300 0.083 33.8 D 33.8 D SB L 826 3539 0.209 0.233 24.0 C 24.0 C R 369 1583 0.227 0.233 24.1 C Intersection Delay = 15.4 sec/veh Intersection LOS = C Lost Time/Cycle, L = 12.0 ----------------------------------------------------------------------- sec Critical v/c(x) = 0.552 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Microcomputers Transportation -------------Center -For Streets: (E-W) HARMONY -In- (N-S) JFK --T------------ Analyst: GC File Name: Area Type ther Comment: EX ST 10-16-98 BG TOT AM PM ' Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- No. Lanes 1 ---- ---- 2 1 ---- ---- 1 2 ---- ---- ---- 1 0 > 0 < ---- 0 ---- ---- ---- 2 0 1 Volumes 65 985 20 30 625 65 20 25 40 45 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 25 0 25 ' Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right ' Peds Peds WB Left * SB Left Thru Right * * Thru Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 55.OP Green 23.OA 16.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 ' Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane- Group AdFlSat Approchc-- ' Mvmts Cap Flow Ratio Ratio Delay LOS Delay Delay LOS EB L 258 1770 -v/c- 0.264 -g/C- Delay 0.567 8.4 --- B 10.3 B T 2111 3725 0.516 0.567 10.5 B R 897 1583 0.023 0.567 7.4 B WB L 92 190 0.349 0.483 13.4 B 12.7 B T 1801 3725 0.384 0.483 12.8 B ' R 765 1583 0.055 0.483 10.6 B NB LR 226 1504 0.208 0.150 29.0 D 29.0 D SB L 737 3539 0.058 0.208 24.6 C 24.6 C R 330 1583 0.064 0.208 24.6 C Intersection Delay = 12.1 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.364 ----------------------------------------------------------------------- 1 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 297 ' Potential Capacity: (pcph) 979 Movement Capacity: (pcph) 979 Prob. of Queue -Free State: 0.99 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 305 ' Potential Capacity: (pcph) 1227 Movement Capacity: (pcph) 1227 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 470 ' Potential Capacity: (pcph) 566 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 ' Movement Capacity: ------------------------- (pcph)---------------563 ------------- Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 12 ------ 563 ------------- > ------- ----- --------- 656 5.6 0.0 B 5.6 NB R 6 979 > WB L 6 1227 2.9 0.0 A 0.1 Intersection Delay = 0.2 sec/veh HCS: Unsignalized Intersections Release 2.1g Page 1 --------------------------------------------------------------------- --------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 --------------------------------------------------------------------- --------------------------------------------------------------------- Streets: (N-S) ACCESS (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 0/16/98 Other Information........ EX ST TO AM PM Two-way Stop -controlled In rsectio --------------------------------------------------------------------- --------------------------------------------------------------------- Eastbound I Northbound I Southboundd LR LR Ld L No. Lanes 1 0 1 < 0 1 1 1 0 1 0 > 0 < 0 1 0 0 0 Stop/Yield ' Volumes PHF Grade ' MC's M SU/RV's M CV's M N 275 15 .95 .95 0 5 160 .95 .95 0 N 10 5 95 .95 0 PCE's 1 11.10 11.10 1.101 ----------------------------------------------------------------------- Adjustment Factors ' Vehicle Critical Follow-up Maneuver------------------------------Gap-(tg)------------Time - -- Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 56 ' Potential Capacity: (pcph) 1297 Movement Capacity: (pcph) 1297 Prob. of Queue -Free State: 1.00 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 58 ' Potential Capacity: (pcph) 1609 Movement Capacity: (pcph) 1609 Prob. of Queue -Free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 118 ' Potential Capacity: (pcph) 905 Major LT, Minor TH Impedance Factor: 1.00 ' Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: ------------------------- (pcph)---------------902 ------------- Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Approach Rate Cap Cap Delay Length LOS Delay Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh) -------- NB L ------ 12 ------ 902 ------------- > ------- ----- --------- 1004 3.7 0.0 A 3.7 NB R 6 1297 > WB L 6 1609 2.2 0.0 A 0.2 Intersection Delay = 0.5 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) ACCESS (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... 0/16/98 Other Information........ EX ST TOT PM Two-way Stop -controlled In rsection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T -R-- L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's 0 1 < 0 N 50 5 .95 .95 0 ---------------- 1 1 0 N 5 55 .95 .95 0 1.10 --------------- 0 > 0 < 0 10 5 .95 .95 0 1.10 1.10 Adjustment Factors 0 0 0 Vehicle Critical Follow-up ' Maneuver Gap(tg) Time ------------------------------------------- Left Turn Major Road 5.00 -- 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 1 II [1 HCS: Unsignalized Intersections Release 2.lg Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 205 145 Potential Capacity: (pcph) 1090 1169 Movement Capacity: (pcph) 1090 1169 Prob. of Queue -Free State: 0.97 0.77 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 205 158 Potential Capacity: (pcph) 1369 1441 Movement Capacity: (pcph) 1369 1441 Prob. of Queue -Free State: 0.98 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 500 487 Potential Capacity: (pcph) 596 606 Capacity Adjustment Factor due to Impeding Movements 0.90 0.90 Movement Capacity: (pcph) 534 543 Prob. of Queue -Free State: 0.69 0.65 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 697 579 Potential Capacity: (pcph) 418 489 Major LT, Minor TH Impedance Factor: 0.58 0.61 Adjusted Impedance Factor: 0.67 0.70 Capacity Adjustment Factor due to Impeding Movements 0.52 0.68 Movement Capacity: -------------------------------------------------------- (pcph) 216 331 Flow Rate Movement (pcph) NB L 64 NB T 168 NB R 35 ' SB L SB T SB R EB L WB L Intersection Performance Summary Move Cap (pcph) 216 534 1090 Avg. 95% Shared Total Queue Cap Delay Length (pcph)(sec/veh) (veh) 23.5 1.2 > 585 9.4 1.7 75 331 191 543 > 272 1169 > 792 128 1441 23 1369 14.0 0.9 10.7 3.9 Approach LOS Delay (sec/veh) --------- ----- D 12.8 B C 11.2 C 2.7 0.2 A 0.8 2.7 0.0 A 0.3 IIntersection Delay = 6.9 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- Streets: (N-S) JFK (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis .........��0/16/98 Other Information........4E7ft ST BG AM PM Two-way Stop -controlled In eisection ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MCIs M SU/RVIs M CVIs M PCEIs ------------ 1 1 1 Y 110 195 55 .95 .95 .95 0 1.10 --------------- 1 1 < 0 N 20 125 25 .95 .95 .95 0 1.10 ---------------- 1 2 < 0 55 145 30 .95 .95 .95 0 1.10 1.10 1.10 •--------------- 1 2 < 0 65 165 235 .95 .95 .95 0 1.10 1.10 1.10 -------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------ Left Turn Major Road 5.00 2.10 ' Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg Page 2 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 37 52 Potential Capacity: (pcph) 1326 1303 Movement Capacity: (pcph) 1326 1303 Prob. of Queue -Free State: 1.00 0.96 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 37 58 Potential Capacity: (pcph) 1646 1609 Movement Capacity: (pcph) 1646 1609 Prob. of Queue -Free State: 0.99 0.98 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 132 126 Potential Capacity: (pcph) 930 937 Capacity Adjustment Factor due to Impeding Movements 0.97 0.97 Movement Capacity: (pcph) 907 913 Prob. of Queue -Free State: 0.96 0.93 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 180 146 Potential Capacity: (pcph) 833 872 Major LT, Minor TH Impedance Factor: 0.91 0.94 Adjusted Impedance Factor: 0.93 0.95 Capacity Adjustment Factor due to Impeding Movements 0.89 0.95 Movement Capacity: -------------------------------------------------------- (pcph) 743 826 Flow Rate Movement (pcph) -------- NB L ------ 12 NB T 35 NB R 6 ' SB L SB T SB R ' EB L WB L Intersection Performance Summary Move Cap (pcph) 743 907 > 1326 > Avg. 95% Shared Total Queue Cap Delay Length (pcph)(sec/veh) (veh) -------------------- 4.9 0.0 951 4.0 0.0 18 826 64 913 > 52 1303 > 1054 29 1609 12 1646 4.5 0.0 3.8 0.3 Approach LOS Delay ----- (sec/veh) --------- A 4.2 A A 3.9 A 2.3 0.0 A 0.7 2.2 0.0 A 0.3 Intersection Delay = 2.4 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) JFR (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis ...... ....����0/16/98 Other Information........{E7� ST BG OT AM PM Two-way Stop -controlled In rsection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's 1 1 1 Y 25 35 20 .95 .95 .95. 0 1.10 ---------------- 1 1 < 0 N 10 45 10 .95 .95 .95 0 1.10 --------------- 1 2 < 0 10 30 5 .95 .95 .95 0 1.10 1.10 1.10 ---------------- 1 2 < 0 15 55 45 .95 .95 .95 0 1.10 1.10 1.10 --------------- ' Adjustment Factors Vehicle Critical Follow-up ' Maneuver (tg) ------------------------------Gap Left Turn Major Road ------------Time 5.00 - -- 2.10 Right Turn Minor Road 5.50 2.60 1 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road i 6.50 3.40 1 APPENDIX C TRAFFIC VOLUME GUIDELINES FOR DESIGN OF RIGHT TURN LANES 2 — LANE HIGHWAYS 100 x c' 60 FULL• WIOTH TURN LANE 0 x Y Q W z 60 o: Warranted? Yes_ No K 20 NOTE: For ported speeds at or under 45 mph, peak hour right turns greater than 40, vph, and total peak hour approach Ins than 300 vph, adjust right turn volumes. DAdjust peak hour right turns Peak hour right turns — 20 100 200 300 400 500 600 700 TOTAL PEAK HOUR APPROACH VOLUME (VPH) �n Location: �ojx4K - Atce! 5 Etj 2"r Time: ST &M 2 — LANE HIGHWAYS 100 > Warranted? FULL- WIDTH TURN LANE 80 Yes_ 0 s Y Q W = 60 z No o:• ►• 40 x c� 20 NOTE: For ported speeds at or un er 45 mph, peak hour right turns pre then 40 vph, and total peak hour ap lets than 300 vph, adjust right turn volume Adjust peak hour right turns • Peak hour right turns — 20 100 200 3 400 Soo 600 700 TOTAL PEA0 HOUR APPROACH VOLUME (VPH) Location: rvu IMa•, - ,Q-rGes5 C 13 R_:-7 Time: ST [26q ' Source: NCHRPR 279 Intersection Channelization Design Guide TRB Nov. 1985 APPENDIX B HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Center For Microcomputers In Transportation -------------------------------------------------------------- Streets: (E-W) HARMONY (N-S) JFK Analyst: GC File Name: Area Type�ther Comment: X ST BG TOT 10-16-98 AM PM 1. Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- 1 ---- ---- 2 1 ---- ---- ---- 1 2 1 ---- ---- 0 > 0 < ---- 0 ---- ---- 2 0 ---- 1 Volumes 192 943 15 31 1075 187 8 23 162 179 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 50 0 100 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 15.OA 55.OP Green 26.OA 8.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS ----- EB L ---- 239 ------- 1770 ----- ----- ----- 0.845 0.608 36.8 --- ----- D 12.9 --- B T 2266 3725 0.460 0.608 8.4 B R 963 1583 0.017 0.608 6.0 B WB L 108 223 0.307 0.483 12.7 B 15.3 C T 1801 3725 0.660 0.483 15.8 C R 765 1583 0.188 0.483 11.4 B NB LR 122 1469 0.261 0.083 33.6 D 33.6 D SB L 826 3539 0.213 0.233 24.0 C 24.0 C R 369 1583 0.225 0.233 24.1 C Intersection Delay = 15.2 sec/veh Intersection LOS = C Lost Time/Cycle, ----------------------------------------------------------------------- L = 12.0 sec Critical v/c(x) = 0.548 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4g 10-16-1998 Transportation -------------Center -For -Microcomputers Streets: (E-W) HARMONY -In- (N-S) JFR --------------- Analyst: GC File Name: ' Area Typether Comment:(EX) 10-16-98 ST BG TOT PM ----------z -------- Eastbound ______________________________________ Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes ---- ---- ---- 1 2 1 ---- ---- 1 2 ---- ---- ---- 1 0 > 0 < ---- 0 ---- ---- ---- 2 0 1 Volumes 63 984 18 28 624 67 20 23 38 42 Lane W (ft) 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 RTOR Vols 0 25 0 25 Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 ----------------------------------------------------------------------- Signal Operations ' Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * * Thru Right * * Right ' Peds Peds WB Left * SB Left Thru * Thru Right * Right Peds Peds NB Right EB Right SB Right WB Right Green 10.OA 55.OP Green 23.OA 16.OA Yellow/AR 0.0 6.0 Yellow/AR 5.0 5.0 Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane- Group Adj Approach: ' Mvmts Cap Flow low Ratio Ratio Delay LOS Delay LOS EB L 258 1770 -v/c- 0.256 -g/C- Delay 0.567 8.4 --- B -- 10.3 B T 2111 3725 0.515 0.567 10.5 B R 897 1583 0.021 0.567 7.4 B WB L 92 190 0.316 0.483 12.9 B 12.6 B T 1801 3725 0.383 0.483 12.8 B R 765 1583 0.059 0.483 10.6 B NB LR 226 1507 0.199 0.150 28.9 D 28.9 D SB L 737 3539 0.056 0.208 24.6 C 24.6 C ' R 330 1583 0.055 0.208 24.6 C Intersection Delay = 12.0 sec/veh Intersection LOS = B Lost Time/Cycle, L = 9.0 ----------------------------------------------------------------------- sec Critical v/c(x) = 0.361 HCS: Unsignalized Intersections Release 2.lg Page 2 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 198 138 Potential Capacity: (pcph) 1099 1179 Movement Capacity: (pcph) 1099 1179 Prob. of Queue -Free State: 0.97 0.77 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 198 150 Potential Capacity: (pcph) 1380 1454 Movement Capacity: (pcph) 1380 1454 Prob. of Queue -Free State: 0.98 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 482 470 Potential Capacity: (pcph) 609 618 Capacity Adjustment Factor due to Impeding Movements 0.90 0.90 Movement Capacity: (pcph) 547 555 Prob. of Queue -Free State: 0.69 0.66 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 680 562 Potential Capacity: (pcph) 428 500 Major LT, Minor TH Impedance Factor: 0.59 0.62 Adjusted Impedance Factor: 0.68 0.70 Capacity Adjustment Factor due to Impeding Movements 0.53 0.68 Movement Capacity: (pcph) -------------------------------------------------------- 225 342 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Rate Cap Cap Delay Length LOS Movement (pcph) (pcph) (pcph)(sec/veh) (veh) -------- NB L ------ 64 ------ 225 ------------- 22.2 ------- ----- 1.1 D NB T 171 547 > NB R 30 1099 > 591 9.2 1.6 B ' SB L SB T SB R ' EB L WB L 62 342 189 555 > 271 1179 > 806 127 1454 21 1380 Approach Delay (sec/veh) 12.3 12.8 0.7 C 10.5 10.2 3.8 C 2.7 0.2 A 0.8 2.6 0.0 A 0.3 Intersection Delay = 6.6 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ---------------------------------------------------------------- Streets: (N-S) JFK (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis.......... /16/98 Other Information........ EX ST BG TOT AM PM Two-way Stop -controlled I section --------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's M CV's M PCE's 1 1 1 Y 109 188 54 .95 .95 .95 0 1.10 ---------------- 1 1 < 0 N 18 120 23 .95 .95 .95 0 1.10 •--------------- 1 2 < 0 55 147 26 .95 .95 .95 0 1.10 1.10 1.10 --------------- 1 2 < 0 53 163 234 .95 .95 .95 0 1.10 1.10 1.10 •-------------- ' Adjustment Factors ' Vehicle Critical Follow-up Maneuver ----------------------------- Gap (tg)------------Time-(tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 HCS: Unsignalized Intersections Release 2.lg Page 2 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from•Minor Street NB SB Conflicting Flows: (vph) 35 44 Potential Capacity: (pcph) 1329 1315 Movement Capacity: (pcph) 1329 1315 Prob. of Queue -Free State: 0.99 0.96 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 35 46 Potential Capacity: (pcph) 1650 1630 Movement Capacity: (pcph) 1650 1630 Prob. of Queue -Free State: 1.00 0.98 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 112 110 Potential Capacity: (pcph) 953 955 Capacity Adjustment Factor due to Impeding Movements 0.98 0.98 Movement Capacity: (pcph) 933 935 Prob. of Queue -Free State: 0.96 0.93 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 160 130 Potential Capacity: (pcph) 855 890 Major LT, Minor TH Impedance Factor: 0.91 0.94 Adjusted Impedance Factor: 0.93 0.95 Capacity Adjustment Factor due to Impeding Movements 0.90 0.95 Movement Capacity: -------------------------------------------------------- (pcph) 768 845 Flow Rate Movement (pcph) NB L 14 NB T 37 NB R 7 SB L SB T SB R ' EB L WB L Intersection Performance Summary Move Cap (pcph) 768 933 1329 Avg. 95% Shared Total Queue Cap Delay Length (pcph)(sec/veh) (veh) -------------------- 4.8 0.0 > 979 3.9 0.0 19 845 63 935 > 50 1315 > 1072 29 1630 6 1650 4.4 0.0 3.8 0.3 2.2 0.0 2.2 0.0 Approach LOS Delay (sec/veh) --------- ----- A 4.1 A A 3.8 A A 0.7 A 0.2 Intersection Delay = 2.4 sec/veh HCS: Unsignalized Intersections Release 2.lg Page 1 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Center For Microcomputers In Transportation University of Florida 512 Weil Hall Gainesville, FL 32611-2083 Ph: (904) 392-0378 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Streets: (N-S) JFR (E-W) TROUTMAN Major Street Direction.... EW Length of Time Analyzed... 15 (min) Analyst ................... GC Date of Analysis ......... 8(0/16/98 �\ Other Information........ ST BG TOT CAM PM Two-way Stop -controlled Irsection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R ---- ---- ---- ---- ---- ---- ---- ---- - ---I---- ---- ---- No. Lanes Stop/Yield Volumes PHF Grade MC's M SU/RV's ($) CV's M PCE's ------------ 1 1 1 Y 25 33 18 .95 .95 .95 0 1.10 1 1 < 0 N 5 39 5 .95 .95 .95 0 1.10 --------------- 1 2 < 0 12 32 6 .95 .95 .95 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 2 < 0 16 54 43 .95 .95 .95 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 APPENDIX A X. CONCLUSIONS Based upon the analyses, investigations, and findings documented in earlier sections of this report, the following can be concluded: • Current roadway operations in the area of JFK Senior Apartments are ac- ceptable during all peak hour periods. • Site traffic associated with the JFK Senior Apartments development is ex- pected to be 17 morning peak hour trips, 25 afternoon peak hour trips, and 263 trips per day. These trips are considered minor. • The impacts of site generated traffic are negligible. This is evidenced by the finding that overall intersection levels of service remain constant whether or not JFK Senior Apartments is developed. This finding applies to all investigated time frames. • Per City criteria, traffic operations will be acceptable with the proposed de- velopment. • The JFK Senior Apartments development will enhance the pedestrian envi- ronment. It will result in improved visual interest and security. Pedestrian levels of service will meet or exceed City criteria. • Current and future bicycle levels of service will exceed those required by City standards. This site has direct access to both north -south and east - west on street bicycle lanes. • Future transit operations are expected to achieve level of service `B' condi- tions. This level of service exceeds City standards. In summary, the transportation demands associated with JFK Senior Apartments are considered negligible. They can be easily absorbed and accommodated by the current transportation system. Furthermore, acceptable operating conditions can be expected in the vicinity of the development for the foreseeable future. 29 rs r r r r rr r r r ar rr r rl� r r rrr ar r r N OD TABLE 3 Future Transit Level of Service Travel Time Factor Worksheet Destination Approximate Distance Auto Travel Time Bus Travel Time Travel Time Factor Fort Collins HighSchool 2.5 miles 12.5 min. 48 min. Foothills Fashion Mall 1.0 miles 8.1 min. 11 min. CSU Transit Center 4.0 miles 17.2 min. 45 min. Downtown 4.2 miles 17.8 min. 23 min. Total Travel Time 55.7 min. 127 min. 1 2.28 Service Level Standards Worksheet Standard Mixed Use Centers and Commercial Corridors Remainder of the Service Area Meets Standard Fails Standard Score Hours of Weekday Service 18 Hours 16 Hours 1 0 Weekday Frequency of Servic 15 Minutes 20 Minutes 1 0 Travel Time Factor 2.0 X 2.0 X 0 1 Peak Load Factor < = 1.2 < = 1.2 1 1 0 3 3of4=LOS'B' town area as defined in the Manual. Bus travel times and transfer times were ex- tracted from the current Transfort bus schedule brochure. A 5 minute walk time from the site to the bus stop locations at the College Avenue — Troutman Parkway inter- section was assumed. Auto travel time assumed a 20-mile per hour travel speed. Auto park and walk times were assumed to total 5 minutes. Current travel.times for bus and auto traffic were estimated and resulted in a travel time factor of 2.28. By 2015, it is expected that weekday service hours will be extended to at least ac- commodate any growth in demand. With the high frequency transit corridor designa- tion along College Avenue, improved headways, travel times and extended service hours can be anticipated. This is expected to result in a future LOS "B" as shown on Table 3. Since the site is located outside the designated mixed use centers and commercial corridors, the established goal of LOS 'D' is clearly exceeded. 27 ; r r� Mfts" MIMI M r r M" IM r M M r TV 00 IM 0 FMM specific connections to priority sites: N destination area within 1,320' including address Further than 1,320 feet from the site. TABLE 2 Bicycle LOS Worksheet level of service - connectivity C. Levels of Service The City of Fort Collins defines level of service based upon connectivity of the site to existing and planned bicycle facilities. In this instance, the site abuts existing bicycle lanes on Troutman Parkway and JFK Parkway resulting in excellent connectivity in all 1 directions. This results in level of service 'A' being realized both currently and in the future. The bicycle level of service work sheet is presented on Table 2. IX. TRANSIT ' A. Existing Conditions Transit stops are currently located in the vicinity of the Troutman Parkway — College Avenue intersection. Bus route 1 provides 30-minute service to this location. Service is available from 6:24 A.M. to 6:56 P.M., which is about 12'/z hours per day. The ' current peak load factor is less than 1.20 for a representative weekday peak hour. 1 B. Planned Improvements The College Avenue transit corridor is designated as a high frequency transit corridor. With this designation, improved transit headways and extended service hours can be anticipated in the future. C. Levels of Service Using the criteria presented in the Manual, current and future transit levels of service were determined. ' Current travel time factors were calculated for both transit and automobile trips to Fort Collins High School, Foothills Fashion Mall, the CSU Transit Center, and the down- 25 a N A TABLE 1 Pedestrian LOS Worksheet project location classification: Other F1 description of applicable destination area within 1,320' including address destination area classification Commercial level minimum actual proposed minimum actual proposed actual proposed minimum actual of service (minimum based on project location classification directness continuity street crossings visual interest& amenities security Commercial area along College Avenue C C C C C B B B C C B B B B B F-31minimum ® proposed [1 C. Levels -of -Service The City of Fort Collins multi -modal transportation Level -of -Service Manual (the Manual) was used to assess both current and future pedestrian conditions. It was determined that the site fits the "other' classification. These classifications provide the basis for determining minimum level of service criteria. Five factors were as- sessed under current and future conditions. Based upon the investigations into current and future pedestrian levels of service, acceptable levels of service are cur- rently being and will continue to be experienced. The pedestrian level of service worksheet is presented on Table 1. As shown, all pedestrian factors are expected to approximate LOS 'B' conditions. This represents an improvement in current condi- tions since the visual interest and security elements will be enhanced. VIII. BICYCLE FACILITIES A. Existing Conditions Troutman and JFK Parkways currently have on -street bicycle lanes. They border the site on the north and west. These lanes connect to established bicycle routes on other area roadways. Excellent connectivity is therefore provided in both the north - south and east -west directions. B. Planned Improvements No improvements are planned on the area bicycle system in conjunction with this development. 23 Capacity worksheets are presented in Appendix D. Operating conditions with JFK Senior Apartments fully operational were assessed using the existing roadway geometry (Figure 3) and the traffic volumes shown on Figure 9. In addition to the intersections investigated earlier, the primary site access was also investigated. Resultant total traffic levels of service are shown below. SHORT-TERM TOTAL OPERATING CONDITONS (WITH JFK SENIOR APARTMENTS) LEVEL OF SERVICE INTERSECTION CONTROL APPROACH/ MOVEMENT AM PK HR PM PK HR JFK Parkway — Troutman Pkwy Stop NB LT B E NB TH/RT A C SB LT A C SB TH/RT A C EB LT A A WB LT A A Access —Troutman Parkway Stop NB LT/RT A B WB LT A A Overall... JFK Parkway — Harmony Road Signal EB B C WB B C NB D D SB D D =:Overall r .B .I C 21 C. Short -Term Operating Conditions Short-term operating conditions were assessed with both background traffic and total traffic. Total traffic includes full development of JFK Senior Apartments. Background levels of service (without JFK Senior Apartments) were calculated at the Troutman Parkway and Harmony Road intersections with JFK Parkway. This investigation used the traffic volumes shown on Figure 7 and the existing roadway geoemtry shown on Figure 3. It resulted in the operating conditions presented below which indicate acceptable conditions. SHORT-TERM BACKGROUND OPERATING CONDITONS (WITHOUT JFK SENIOR APARTMENTS) LEVEL OF SERVICE INTERSECTION CONTROL APPROACH/ MOVEMENT AM PK HR PM PK HR JFK Parkway — Troutman Parkway Stop NB LT B E NB TH/RT A C SB LT A C SB TH/RT A C EB LT A A WB LT A A JFK Parkway — Harmony Road Signal EB B B WB B C NB D D SB D D ..'Overall", , '; B C'. EXISTING TOTAL TRAFFIC CONDITONS (WITH JFK SENIOR APARTMENTS) LEVEL OF SERVICE INTERSECTION CONTROL APPROACH/ AM PK HR PM PK HR MOVEMENT JFK Parkway — Troutman Pkwy Stop NB LT A D NB TH/RT A B SB LT A C SIB TH/RT A C EB LT A A WB LT A A •Overall � ,� `A °r jB' Access —Troutman Parkway Stop NB LT/RT A B WB LT A A JFK Parkway — Harmony Road Signal EB B B WB B C NB D D SIB C C W This represents the worst case from a site traffic impact standpoint. It was deter- mined that operating conditions will be acceptable with JFK Senior Apartments fully developed. It should be noted that overall levels of service do not change with the addition of site generated traffic. Capacity worksheets are presented in Appendix C. 19 Auxiliary Lane Requirements Traffic movements at the site access to Troutman Parkway were reviewed. This effort focused on the need for an eastbound right turn lane to accommodate eastbound vehicles entering the site. Since a westbound left turn lane is currently available, this movement was not given further consideration. The eastbound right turn lane was determined to be unnecessary using criteria presented in Report 279, "Intersection Channelization Design Guide" as published by TRB. A warrant sheet is presented in Appendix B. B. Existing Total Traffic Conditions Capacity analyses were conducted to assess existing total traffic conditions at the Troutman Parkway intersections with JFK Parkway and the site access, and the JFK Parkway — Harmony Road intersections. By definition, total traffic represents the combination of background and site traffic. Site traffic at the access point was rounded upward when less than 5 vehicles per hour were expected for any traffic movement. Operating levels of service were calculated using the existing roadway geometry (as shown on Figure 3), existing traffic controls, and the traffic volumes presented on Figure 8. These procedures indicate the following levels of service could be expected in 1998 if the JFK Senior Apartments development was built and fully occupied. 18 Troutman Parkway Harmony Road 00 vu 0 0 0 10/30 I 4—501130 20/25 4— 70/175 5/5 ,(- �- 25/115 -�4 1 65/285 40/200 � 20/60 c m Q oLO o�0 0 O Y u_ Lo LO o o 100/230 1 !— 640/1095 30/30 175/325 1 1010/970 20/15 Ln o_ o Q i?o0 N M N C LEGEND: AM/PM rn O Figure 9 NOTE: Rounded to Nearest 5 Vehicles = SHORT-TERM TOTAL TRAFFIC 17 Troutman Parkway Harmony Road LOLO M CO LO CQ v LO Lo 10/25 1 f— 45/125 10/20 4 - 55/160 5/5 A% j- 25/110 -� 50/275 5/15 I 35/195 —► I �r 20/55 v o Q o LO 0 LO �o M Y u_ Co m v CD v � 65/185 625/1075 A% 1 30/30 65/195 ) I 985/945 20/15 o o LO o LO N N Ci LEGEND: AM/PM 0 NOTE: Rounded to Nearest 5 Vehicles = Figure 8 EXISTING TOTAL TRAFFIC 16 00 v o) o m Lo 0 Troutman Parkway 25/115 35/195 - ► 20/60 0 o Ln O N M o 0 a00025 Harmony Road 175/320 1010/970 20/15 LEGEND: AM/PM NOTE: Rounded to Nearest 5 Vehicles Y LL 1�— 5/25 4-- 45/125 W 15/20 LoLo0 Co co M 00 M O O L 100/230 4 640/1095 t�— 30/30 I 0 LO in 0 0 N CV) Figure 7 SHORT-TERM BACKGROUND TRAFFIC 15 be reasonably predicted. For analysis purposes, any future improvements are as- sumed to occur well beyond the time frames considered in this study. B. Short -Term Background Traffic Volumes Background traffic was developed using an annual growth rate in the range of 2 — 3 percent per year. This factor was applied to existing traffic volumes to approximate short-term conditions. Short-term conditions reflect the year 2000. By this time, JFK Senior Apartments will be fully built and occupied. Short-term background traffic volumes are shown on Figure 7. These estimates also include increased development activity related to the Harmony Towne Center. VI. TRAFFIC IMPACTS In order to assess operating conditions with JFK Senior Apartments fully operational, capacity analyses were conducted at the JFK Parkway intersections with Harmony Road and Troutman Parkway. Total traffic (background traffic combined with site traffic) was developed. Existing total traffic is shown on Figure 8. This represents a hypothetical time frame where site traffic is at its largest percentage of total traffic. Short-term total traffic is shown on Figure 9. Prior to commencing the analysis, traffic volumes were reviewed at the site access to Troutman Parkway from an auxiliary lane standpoint. Where deemed necessary, warrants were applied to assess the need for additional lanes. The results of this review are discussed in the following section. 14 Troutman Parkway Harmony Road LEGEND: AM/PM m rn O Figure 6 SITE TRAFFIC 13 ' Troutman Parkway Figure 5 SITE TRAFFIC DISTRIBUTION 1 12 Land Use Size Daily AM Peak Hour PM Peak Hour Rate Trips Rate In Out Rate In Out Retirement Community 54 D.U. 2.93 158 0.17 4 5 0.27 8 7 Townhome/Condominium 18 D.U. 5.86 105 0.44 1 7 0.54 7 3 TOTAL 5 12 15 10' As shown above, JFK Senior Apartments is expected to generate 17 morning peak hour trips, 25 afternoon peak hour trips, and 263 trips per day. These trips are con- sidered minor. C. Trip Distribution Trip distribution is a function of the origin and destination of site users and the avail- able roadway system. In this case, all site traffic must use Troutman Parkway to access the site. Approximate site traffic distributions are shown on Figure 5. These distributions reflect directional demands and are not indicative of actual traffic using the indicated roadways. Morning and afternoon peak hour traffic resulting from the distribution is presented on Figure 6. V. FUTURE CONDITIONS A. Roadway Improvements Major roadway improvements have recently been implemented. Accordingly, no significant major roadway improvements are planned in the area of the site in the short-term. When and if improvements are made is largely speculative and cannot 11 I \ I I � I I I I �/ I I I ry,N IIPY IIr (INS MG) J.F.K. SR. APPARTMENT5 I .c.. Ir.�o "4x90` w m n. .mr�ra Engineering, Ltd. JR eer C. w.Pn we. , s.,,e M 1-000-922.1997 CONCEPTUAL SITE PUN ra er rsw r.n Comiu. Color... eeeze .. u w n rsw Tel'(sn)) m-roe �.... . oA _ _ ra lzi%I-PYN 10 Figure 4 IV. DEVELOPMENT ISSUES ' A. Project Description ' JFK Senior Apartments is a residential development with some 72 apartments. It is expected that construction will start in 1999 with completion and full occupancy some Itime in 2000. ' A single access point to Troutman Parkway is planned to serve this development. A second access for emergency use only is planned to JFK Parkway. The concept plan for this development is presented on Figure 4. B. Site Traffic Site traffic was estimated using Institute of Transportation Engineers (ITE) publication, ' "Trip Generation, 6th Edition", a nationally recognized reference. The JFK Senior Apartments will serve a resident population which based upon historical data will have an average age of 68 and an occupancy rate of about 1.2 people per unit. Typically, 80% of the units will have one occupant that is either single, retired or widowed. The ' balance of the units will accommodate two occupants. Given the anticipated blend of residents, a composite trip generation rate was developed. This rate assumed a ' blend of 25 percent townhome/condominium land use and 75 percent retirement ' community land use. This should sufficiently allow for some residents who might work. Trips associated with the JFK Senior Apartments project are as indicated ' below. J I1 9 CURRENT OPERATING CONDITONS LEVEL OF SERVICE INTERSECTION CONTROL APPROACH/ AM PK HR PM PK HR MOVEMENT JFK Parkway — Troutman Parkway Stop NB LT A D NB TH/RT A B SB LT A C SB TH/RT A C EB LT A A WB LT A A JFK Parkway — Harmony Road Signal EB B B WB B C NB D D SB C C Overall , C Per City standards, overall level of service 'D' is defined as acceptable for arterial street intersections. As shown above, all intersections currently operate at level of service 'C' or better during peak hour periods. Capacity work sheets are presented in Appendix A. 9 Troutman Parkway Harmony Road c m o Figure 3 CURRENT ROADWAY FEATURES 7 v M M LO M M v� v Ln Troutman Parkway 25/109 --! 33/188 ---► 18/54 � a) N n W a�C v Co. M �1(.. Harmony Road 63/192 984/943 —� 18/15 LEGEND: AM/PM Y u_ N C m 0 0 k— 5/23 4 39/120 W 5/18 I Lo n co L\vN N ILcoo N M k— 67/187 4 624/1075 �— 28/31 I co o c+m G1Q N M N OWN Figure 2 CURRENT PEAK HOUR TRAFFIC L office land uses and several vacant parcels also exist in the area of the site. New large scale retail uses exist at the JFK Parkway — Harmony Road intersection. C. Existing Traffic Weekday morning and afternoon peak hour traffic counts were conducted at key intersections as part of this study. Data collected at the JFK Parkway intersections with Troutman Parkway and Harmony Road are presented on Figure 2. D. Existing Traffic Operations Highway Capacity Manual procedures were used to quantify current intersection oper- ations. Resultant levels of service (LOS) are indicated below for both morning and afternoon peak hour conditions at both the Harmony Road and Troutman Parkway intersections with JFK Parkway. Traffic volumes from Figure 2 were loaded onto the current roadway geometry shown on Figure 3. 5 III. EXISTING CONDITIONS A. Existing Road Network ' The JFK Senior Apartments site is located in the southeast corner of the Troutman Parkway — JFK Parkway intersection. The site is bordered on the north by Troutman Parkway and on the west by JFK Parkway. Troutman Parkway is an arterial roadway having one lane in each direction and a shared center left turn lane adjacent to the site. It is an east — west arterial roadway extending from Mason Street to Boardwalk Drive. Recent daily traffic on Troutman Parkway adjacent to the site is estimated at 4,000 vehicles per day. It typically has auxiliary lanes at all key intersections and on -street bicycle lanes. There are no 1 driveways along the north side of Troutman Parkway in the area of the site. JFK Parkway is a north — south roadway that currently has two lanes, a shared center left turn lane, and a bicycle lane in each direction. It is an arterial roadway according to the City of Fort Collins Master Street Plan. JFK Parkway was recently opened to traffic to the south of the site and carries an estimated 4,750 vehicles per day. It extends from Harmony Road to Horsetooth Road. To the south of Harmony Road, it is named Hogan Drive and has one lane in each direction. The Troutman Parkway — JFK Parkway intersection is currently under stop sign ' control while the JFK Parkway — Harmony Road intersection is under traffic signal control. Pedestrian phasing is available across all legs of the latter intersection. B. Surrounding Land Uses The JFK Senior Apartments site is currently vacant. Residential developments lie directly east and west of the site with a post office to the north. Other business and 4 II. AGENCY DISCUSSIONS Prior to undertaking this study, a scoping session was held with Eric Bracke. During that discussion, it was determined that an abbreviated transportation impact study was appropriate. Key items of agreement and direction are identified below. • A full assessment of pedestrian, bicycle, and transit levels of service needs to be conducted. • The Troutman Parkway — JFK Parkway, JFK Parkway — Harmony Road, and site access intersections should be investigated. Weekday morning and afternoon peak hour conditions should be investigated. Other intersec- tions are considered negligible. • An assessment of existing and future short-term conditions is appropriate. The short-term was identified as two years into the future. This is consis- tent with the buildout of JFK Senior Apartments. • Traffic growth on nearby arterial streets of 2 percent per year is reasonable to estimate future background traffic. • Mr. Bracke specifically asked that the Harmony Towne Center development be included in background traffic estimates. ' • Mr. Bracke stated that the City would be investigating the need for up- graded traffic controls at the Troutman Parkway — JFK Parkway intersec- tion. The investigation was to be initiated in the immediate future. The above items are included or addressed in the following sections of this report. 1 3 4 ` 't� I Bockmon Dr. � moo,°L . �� � "'row Al 'fC (board =_ �o` Nest a. Boorowolk br. n O t-n Sf 5h SI Z Pwl i eton I r. ` " We 'Ions • 7; / o°� 3 West cl k u - s c Sro�mon T DO O 1 J Mort" Trout On P 3 ° V 1 SITE r a Thr Sher o I r c C St. o o 6 O 0 I Y O N 1 � p O �� • f . o P � �Oi orkbunri E I I I/j Povilion \ fQ CIS O C ► Owl hulk I n o C Krrnun - pr. o °' ° u 1M rmOn Towhee St. 1 PI _ ��� L MCI *� Po 1 o I I i Q 1 mcr Oalro e c II Qa 0 r o S4� 1pre,ne S( ' Foiwo Ln F a I r w o l n. LL A r r• � r � .. S. a rkwd CO OnodO CO„--� g �� c 1 o1 q C v S c, e .^. ` 1 _ c o apple Blo"I>M Ln C S op i V ? N j Dr d'C Figure 1 VICINITY MAP OA I. INTRODUCTION JFK Senior Apartments is a planned residential development in the southeast corner of the Troutman Parkway — JFK Parkway intersection in Fort Collins, Colorado. A vicinity map is presented on Figure 1. This transportation impact study follows the established guidelines for such studies as are applicable and appropriate to the proposed project. The following key steps were undertaken as part of this study. • Obtain current traffic and roadway data in the immediate area of the site. • Evaluate current operations to establish base conditions. • Determine site generated traffic volumes and distribute this traffic to the nearby street system. • Estimate roadway traffic volumes for future conditions. • Evaluate operations with the JFK Senior Apartments fully operational under existing and future conditions. • Inventory, evaluate, and assess the pedestrian, bicycle, and transit net- works serving the site. • Identify deficiencies and recommend measures to mitigate the impact of site generated traffic and enhance the alternate travel mode systems as appropriate. Key areas of investigation are documented in the following sections of this transporta- tion impact study. List of Tables Table 1 Pedestrian LOS Worksheet........................................................................24 Table 2 Bicycle LOS Worksheet..............................................................................26 Table 3 Future Transit Level of Service...................................................................28 List of Figures Figure1 Vicinity Map...............................................................................................2 Figure 2 Current Peak Hour Traffic......................................................................... 6 Figure 3 Current Roadway Features....................................................................... 7 Figure4 Concept Plan...........................................................................................10 Figure 5 Site Traffic Distribution............................................................................12 Figure6 Site Traffic...............................................................................................13 Figure 7 Short -Term Background Traffic...............................................................15 Figure 8 Existing Total Traffic................................................................................16 Figure 9 Short -Term Total Traffic..........................................................................17 IX. TRANSIT.........................................................................................................25 A. Existing Conditions..........................................................................................25 B. Planned Improvements....................................................................................25 C. Levels of Service............................................................................................. 25 X. CONCLUSIONS..............................................................................................29 ' Table of Contents I. INTRODUCTION...............................................................................................1 II. AGENCY DISCUSSIONS..................................................................................3 III. EXISTING CONDITIONS..................................................................................4 A. Existing Road Network......................................................................................4 B. Surrounding Land Uses.....................................................................................4 C. Existing Traffic...................................................................................................5 D. Existing Traffic Operations................................................................................ 5 IV. DEVELOPMENT ISSUES................................................................................. 9 A. Project Description............................................................................................9 B. Site Traffic......................................................................................................... 9 C. Trip Distribution...............................................................................................11 V. FUTURE CONDITIONS..................................................................................11 A. Roadway Improvements..................................................................................11 B. Short -Term Background Traffic Volumes........................................................14 VI. TRAFFIC IMPACTS........................................................................................14 Auxiliary Lane Requirements..................................................................................18 ' B. Existing Total Traffic Conditions......................................................................18 C. Short -Term Operating Conditions....................................................................20 VII. PEDESTRIAN FACILITIES.............................................................................22 A. Existing Conditions..........................................................................................22 B. Planned Improvements....................................................................................22 C. Levels-of-Service.............................................................................................23 VIII. BICYCLE FACILITIES.....................................................................................23 A. Existing Conditions..........................................................................................23 B. Planned Improvements....................................................................................23 C. Levels of Service............................................................................................. 25 Transportation Impact Study JFK SENIOR APARTMENTS Fort Collins, Colorado Prepared For: JR Engineering Ltd. 2620 E. Prospect Road, Suite 190 Fort Collins, CO 80525 Prepared By: Eugene G. Coppola P. O. Box 260027 Littleton, CO 80127 303-792-2450 October 19, 1998